Amendment 0001 - RFP 47PB0024R0033 extended.pdf
PDF 762 KB Posted
- Attached to
- Construction Manager as Constructor (CMc) Services for the Land Port Of Entry (LPOE), Highgate Springs, VT
- Solicitation number
- 47PB0024R0033
About this file
This document is Amendment 0001 to Solicitation 47PB0024R0033 for Construction Manager as Constructor (CMc) Services for the Land Port of Entry (LPOE) in Highgate Springs, Vermont.
The amendment extends the due date for Phase I proposals from May 9, 2024 to May 30, 2024. It updates the Phase I Master Attachment List and revises requirements for the Qualifications and Experience of Key Personnel and the Sustainability evaluation factor. The Sustainability factor requires offerors to commit to furnishing construction materials (asphalt, concrete, glass, steel) with greenhouse gas emissions below specified limits, and to submit compliant environmental product declarations. Offerors will receive higher technical scores based on the emissions levels they commit to. The amendment also extends the deadline for requests for clarification and provides guidance on how GSA will review any missing environmental product declarations. The solicitation is for design and construction services for a new LPOE facility to accommodate increased traffic volumes from a planned Canadian highway project. The LPOE will serve Customs and Border Protection, FDA, USDA, and GSA. The estimated construction cost is between $110-$130 million.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Solicitation 47PB0024R0033, Amendment 0001, CMc Services, Highgate Springs LPOE, VT
2.) Request for Proposal (RFP), Solicitation Section I.B., List of Solicitation Documents; (1) F, Highgate Springs Master Attachment List is deleted in its entirety and is replaced with the following:
Phase I Master Attachment List A.0 CMc SOW Highgate Springs LPOE 20240322
A.1 AE SOW
A.2 CMa-CxA SOW A.3 P-100 2021v w2022 Addendum A.4 P-120, Public Buildings Service Cost and Schedule Management Policy Requirements, October
A.6 Program of Requirements - PROTECTED A.8 CBP Land Port of Entry Design Standards and Room Data Sheets – PROTECTED D.4 P100 Submittal Matrix v10 20220314 (263 pages) – CMc E.1 Guiding Principles for Sustainable Federal Buildings and Associated Instructions Feb 2016 P.5 IRA Project Submittal/Reporting Form – Sample. Note: GSA’s IRA Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements are linked files within RFP, Solicitation Section II.C., Technical Proposal – Phases I and II; Phase II Technical Proposal; (5) Sustainability (15%) – Phase II. They are also linked here.
3.) RFP, Solicitation Section II.C., Technical Proposal – Phases I and II; Phase I Technical Proposal; (3) Qualifications and Experience of Key Personnel (15%); the first sentence of the third paragraph is deleted in its entirety and is replaced with the following:
Team members shall include those with the expertise listed in Section II.C.4 of the CMc Statement of Work. At a minimum, the CMc Contractor’s team members should include each of the following experts to provide expertise (a single individual may be assigned more than ONE of the responsibilities / expertise listed below) as and when needed for efficient and effective operations:
4.) RFP, Solicitation Section II.C., Technical Proposal – Phases I and II; Phase II Technical Proposal; (5) Sustainability (15%) – Phase II; is deleted in its entirety and is replaced with the following:
Background and Overview
This project is funded in part by Section 60503 of the Inflation Reduction Act of 2022 (IRA), which provides funding for purchase of construction materials with substantially lower levels of embodied greenhouse gas emissions.
GSA’s IRA Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements establish numeric global warming potential (GWP) limits for certain EPA-approved construction materials:
concrete (and cement), asphalt, steel, and glass (IRA-Eligible Materials). For each material, GWP limits have been established for the best performing 20% of materials in terms of embodied carbon (Top 20% Limits), the best performing 40% of materials in terms of embodied carbon (Top 40% Limits), and better than industry average (Better Than Average Limit).
https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf
This Evaluation Factor calls for Offeror commitments to furnishing IRA-Eligible Materials with the lowest possible GWP values. IRA Limit commitments proposed under this evaluation factor will be incorporated into the successful offeror’s resultant contract.
Individual materials’ GWP values may be found on individual manufacturers’ environmental product declarations (EPDs). EPDs must meet the standards reflected in GSA’s IRA Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements (see Compliance Documentation criteria listed for each IRA-Eligible Material).
Technical Acceptability and Scoring
Offerors will only meet the standard for technical acceptability under this Factor if they commit to furnish all required IRA-Eligible Materials with a GWP better (lower) than each IRA-Eligible Material’s Better Than Average Limit.
Offerors meeting the standard for technical acceptability will receive a number of Raw Scores, one for each IRA-Eligible Material required by the Contract:
• Offerors will receive a Raw Score of 100 for each IRA-Eligible Material commitment that is better (lower) than GSA’s Top 20% Limits.
• Offerors will receive a Raw Score of 40 for each IRA-Eligible Material commitment that is only better (lower) than GSA’s Top 40% Limits.
• Offerors will receive a Raw Score of 20 for each IRA-Eligible Material commitment that is only better (lower) than GSA’s Better Than Average Limit.
Offerors shall complete the “IRA Sustainability Factor Table” attached to this solicitation by filling out the applicable IRA Limit they commit to meet for each IRA-Eligible Material. Based upon the offeror’s selection in the “IRA Limit Commitment” column, the associated Raw Score, the Weighted Score, and the Total Weighted Score will be automatically calculated.
In addition, for each IRA-Eligible Material identified in the IRA Sustainability Factor Table, offerors shall submit EPDs listing that material’s GWP. Such EPDs must meet the standards reflected in GSA’s IRA Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements (see Compliance Documentation criteria listed for each IRA-Eligible Material).
Note 1: By submitting an offer, Offeror consents to unrestricted GSA use of supplier names and the GWP values associated with supplier materials. Such information may be disclosed publicly or used to inform other low embodied carbon procurement activities. Technical solutions, supplier pricing and supplier-offeror terms and conditions will not be shared. Any objection shall be transmitted to the Contracting Officer by the due date for offers and shall adhere to 41 C.F.R. § 105-60.601.
Note 2: For each offeror that is unable to submit any of the compliant EPDs by the proposal due date, the offeror shall submit a statement for each such missing compliant EPD certifying that it is unable to submit the compliant EPD by the proposal due date. Failure by an offeror to submit any compliant EPD or its certification (as described in the immediately preceding sentence) by the proposal due date shall result in the offeror’s proposal being unacceptable and the offeror being ineligible for award.
https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf
The contract resulting from this solicitation shall have the following provision: “Within 180 days after contract award, the Contractor shall submit a compliant EPD for any IRA-eligible Material for which the Contractor was unable to submit a compliant EPD by the proposal due date. Such EPD must reflect GWP values that comply with the IRA Limit Commitments incorporated into the contract. GSA shall not issue a Notice to Proceed with construction services to the Contractor until the Contractor has submitted a compliant EPD for each IRA-eligible Material for which the Contractor was unable to submit a compliant EPD by the proposal due date. In addition to other remedies available to the Government, if the Contractor fails to comply with the 180-day requirement in this paragraph for submission of compliant EPDs, GSA shall have the option to cancel the contract for the construction services at no cost to either the Contractor or GSA.
Cancellation of the contract for the construction services by GSA under this paragraph shall not relieve the contractor of its obligation to provide GSA with a completed design in compliance with the contract.
The design completed by the contractor in compliance with the contract shall be property of GSA and may be used by GSA to, among other things, obtain construction services under a separate contract with another contractor.”
5.) Request for Proposal (RFP), Solicitation Section III.B., Requests for Clarification or Interpretation.
The revised due date for Requests for Clarification or Interpretation is 05/10/24. The Government will not warrant that requests received past this date will be answered.
6.) RFP, Solicitation Section VI.F., Non-Price Factors; Standard for Evaluation; (5) Sustainability. The following is added as Note 2:
Note 2: If an EPD is not available, GSA will review the offeror’s statement certifying inability to submit a compliant EPD by the proposal due date.
| Amendment 0001 SF30-16c 1 |
| Amendment 0001 |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0001 |
| Code[0]: 1PQ |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Jim Adamo, Contracting Officer |
| Description[0]: Solicitation referenced in Block Number 9 for Construction Manager as Constructor (CMc) Services at the Highgate Springs Land Port of Entry (LPOE), in Highgate Springs, VT, is hereby amended as follows: |
1.) The due date for Phase I proposals is extended with this amendment from Thursday, May 9, 2024 at 2:00 pm local Boston time to Thursday, May 30, 2024 at 2:00 pm local Boston time.
(cont.)
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: U.S. General Services Administration, Public Buildings Service |
Region 1 (New England), Acquisition Management Division Thomas P. O'Neill Federal Building, 11th Floor 10 Causeway Street Boston, MA 02222
| NameandAddress[0]: ALL PROSPECTIVE OFFERORS |
| AdministeredBy[0]: Same as Block 6 |
Attn: Jim Adamo, Contracting Officer
(617) 565-8619 james.adamo@gsa.gov
| ContractIDCode[0]: | |
| ReqNumber[0]: | |
| AmendmentNo[1]: 47PB0024R0033 | |
| ModificationNo[0]: | |
| ProjectNo[0]: | |
| Page[0]: 1 | |
| Pages[0]: 4 | |
| EffectiveDate[0]: 04/26/2024 | |
| Dated9B[0]: 03/25/2024 | |
| Dated10B[0]: | |
| CheckBox9[0]: 1 | |
| CheckBox10[0]: Off | |
| CheckBox11[0]: 1 | |
| CheckBox13A[0]: Off | |
| CheckBox13B[0]: Off | |
| CheckBox13C[0]: Off | |
| CheckBox13D[0]: Off | |
| IsNot[0]: Off | |
| Is[0]: 1 | |
| Extended[0]: 1 | |
| NotExtended[0]: Off | |
| 2024-04-26T08:58:22-0400 | |
| JAMES ADAMO |
| DateSigned[0]: |
| DateSigned[1]: 4/26/2024 |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .