472-26238RWG Kinross Correctional and NRT Facility- Addendum #2..pdf

PDF 5 MB Posted

Attached to
472/26238. RWG; Kinross C. F. - Electrical Upgrades Phase 2
Solicitation number
RFQ 171 260000000411 3
Issued by
Chippewa County, Michigan

About this file

This is Addendum No. 2 to the contract documents for the Kinross Correctional and NRT Facility Electrical Upgrades - Phase 2 project issued by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division. The addendum modifies and clarifies the original contract documents for electrical upgrades at the Kinross Correctional Facility. Key modifications include adding two new line items to the base bid schedule for pad mount medium voltage transformers: a 225 KVA transformer for the Powerhouse/Steam plant (Item 12) and a 75 KVA transformer for the Admin building (Item 13), both requiring removal and installation of new units. Additional revisions include updating panelboard main circuit breakers to include LSI trip units per specification section 262416, and modifying multiple electrical drawings (E-200, E-201, and E-600) to reflect the removal and replacement of transformers T5 and T6, the addition of a new Incoming Utility Switch Cabinet #1 (IUSW #1), clarifications on medium voltage feeder installations, and updates to feeder tags for loop feeders from MVSW #5 through MVSW #7. The addendum was issued for bidding on August 25, 2026.

The base bid schedule includes 13 line items designated as lump sum (LS) work covering transformers and switchgear, miscellaneous electrical equipment, site restoration, electrical demolition, paint, concrete, arc flash work, mobilization, bonds, warranty, and as-built documentation. Two allowance amounts of $250,000 each are noted in the bid schedule for contingency purposes. All work must be completed in accordance with the original drawings and specifications except where specifically modified by this addendum, and all incidental items required to complete the modifications shall be included in the bid even if not explicitly described. Receipt of this addendum must be acknowledged on the Proposal Form by all bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

544 Cherbourg Drive, LANSING, MI 48917

PHONE: (517) 487-2511

FAX: (517) 487-2544

ADDENDUM NO. 2

Kinross Correctional and NRT Facility Electrical Upgrades – Phase 2

File No.: 472/26238.RWG Accounting Template: 472MTUMaintproj

Date:8/25/2026 Matrix Job Number: 260053.00

ENGINEER:

Matrix Consulting Engineers 544 Cherbourg Drive.

Lansing, MI 48917

This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.

All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.

General

1. Refer to Bid Form Base Bid Schedule (Re-Issued):

a. Provide a unit price to remove and install a new 225 KVA pad mount MV transformer for existing transformer T5 at Powerhouse/Steam plant (12.47KV delta primary, 480/277V wye secondary) This shall be included in base bid.

b. Provide a unit price to remove and install a new 75 KVA pad mount MV transformer for existing transformer T6 at the Admin building (12.47KV delta primary, 208/120V wye secondary). This shall be included in base bid.

2. Refer to Specifictions section 262416 – Panelboards (section not re-issued):

a. Revise panelboard main circuit breakers to have LSI trip units.

3. Refer to Drawing E-200 (Sheet Re-issued):

a. Revise transformers T5 and T6 to be removed.

4. Refer to Drawing E-201 (Sheet Re-issued):

b. Revise Add new Incoming utility switch cabinet #1 (IUSW #1) and feed to

MVSW #1:

c. Revise transformers T5 and T6 to new.

5. Refer to Drawing E-600 (Sheet Re-issued):

d. Revise Add new Incoming utility switch cabinet #1 (IUSW #1) and feed to

MVSW #1:

e. Revise transformers T5 and T6 to be removed and replaced as part of base bid on Pad Mount Transformer Schedule and Medium Voltage Riser Diagram

- New.

f. Revise Pad Mount Transformer Schedule to show transformer T8 as 150 KVA with a 400A secondary circuit breaker.

g. Clarify medium voltage feeder for transformer T4 is to be installed as part of part of northern region training and professional development center project and connection to MVSW #5 as part of this project.

h. Revise feeder tag for loop feeders from MVSW #5 to MVSW #6, and from MVSW #6 to MVSW #7 to NEW (3) #1/0 15KV 133% SHIELDED MV-105

COPPER WIRE, (1) #6 GND, (1) 4" CND.

MICHSPEC DTMB 00300 − 4

ARTICLE 6 BID SCHEDULE

6.1 Base Bid Schedule - The Bidder will complete the Work and accept in full payment, for the Work items listed, the following unit prices and/or Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description

Unit Price

Item Bid Price

1 LS Transformers and Switchgear

2 LS Miscellaneous Electrical Equipment

3 LS Site Restoration

4 LS Electrical Demolition

5 LS Paint

6 LS Concrete

7 LS Arc Flash

8 LS Mobilization

9 LS Bonds

10 LS Warranty

11 LS As-Builts

12 LS ADDENDUM #2 – 225 KVA Pad Mount MV Transformer

13 LS ADDENDUM #2 – 75 KVA Pad Mount MV Transformer

ALLOWANCE AMOUNT $250,000.00 $250,000.00

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Bid Prices for all Base Bid Items):

________________________________________________________________ Dollars and No/Cents $__________________________ (use words) (in figures)

Name of the Bidder _________________________________________ File No. _______________

Date _________________________

SIGMA VENDOR NUMBER _________________________________

Telephone No. _______________________

T

T

T

T

T

T

T

#1

#5

25 KVA

#7

#2#3

#4

#6 #8

#9 #10 #11 #12 #13 #14

#15

#16

#17

#18

#19

#20

#21

#23

#24

#25

#22

#26

#27 #28

#29 #30

2 22 2 2 2 2 2

2 2

#31

#32

WAREHOUSE

EX

METER

EXIST

GENERATOR

#33

EXIST

GENERATOR

K-UNIT

TECH

BUILDING

STEAM

BUILDING

ADMIN

BUILDING

MAINTENANCE

BUILDING

MSI

BUILDING

BUILDING

BUILDING

K-UNIT

GENERATOR

BLDG

EXIST

PNL 'A' EXIST

PNL 'MDP'

EXIST

PNL 'MDP'

EXIST

PNL 'MDP' 12

EXIST

PNL 'MDP'

13 13

13 13 13

75 KVA

75 KVA

75 KVA

150 KVA

150 KVA

45 KVA

225 KVA

75 KVA

150 KVA

225 KVA

A2

A2

EXISTING MEDIUM VOLTAGE OVERHEAD UTILITY LINES TO REMAIN.

REMOVE EXISTING OVERHEAD MEDIUM VOLTAGE UTILITY LINES.

REMOVE EXISTING MEDIUM VOLTAGE UNDERGROUND FEEDER.

REMOVE EXISTING PAD MOUNT TRANSFORMER.

NOT USED.

REMOVE EXISTING OVERHEAD SECONDARY SERVICE CONDUCTORS.

REMOVE EXISTING BUILDING.

EXISTING MEDIUM VOLTAGE UNDERGROUND FEEDER TO REMAIN.

REMOVE EXISTING UNDERGROUND SECONDARY FEEDERS.

REMOVE EXISTING GENERATOR AND BUILDING. TURN GENERATOR OVER TO

MDOC. GENERATOR AND BUILDING TO REMAIN UNTIL NEW TRAINING

CENTER IS FULLY OPERATIONAL.

REMOVE EXISTING OVERHEAD GENERATOR FEEDER TO EXISTING TEMP

TRAINING BUILDING.

REMOVE EXISTING PANEL 'MDP'. EXISTING BRANCH CIRCUITS TO REMAIN

AND TRANSFERED TO NEW PANEL 'MDP'.

EXISTING MEDIUM VOLTAGE OVERHEAD UTILITY LINES TO REMAIN UNTIL

THE NEW TRAINING CENTER IS FULLY OPERATIONAL.

EXISTING OVERHEAD GENERATOR FEEDER TO EXISTING TEMP TRAINING

BUILDING TO REMAIN UNTIL NEW TRAINING CENTER IS FULLY OPERATIONAL.

DEMOLITION NOTES

A2 file no.

checked by drawn by consultant issue date contract order no.

472MTUMAINTPROJ

consultant job no.

260053.00

472/26238.RWG

acct. template sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

07/27/2026

08/13/2026

08/25/2026

M A

T R

I X

ISSUED FOR BIDDING

ADDENDUM #1

ADDENDUM #2

N PHASE 2 SITE PLAN - ELECTRICAL DEMOLITION

SCALE: 1" = 100'

25080400 20 160

E-200

JFS

SITE PLAN

ELECTRICAL

DEMOLITION

MVSW #1

MVSW #2

T2

T8

T9

T7

MVSW #9

NEW

T6

NEW

T5

NEW

T1

MVSW #8

MVSW

#5

T3

T4

#2#3

#4

EXIST

GENERATOR

K-UNIT

TECH

BUILDING

STEAM

BUILDING

ADMIN

BUILDING

MAINTENANCE

BUILDING

MSI

BUILDING

BUILDING

BUILDING

NEW

TRAINING

CENTER

K-UNIT

GENERATOR

BLDG

EXIST

PNL

EXIST

PNL

EXIST

WAREHOUSE

BUILDING

PNL 'A'

NEW

WAREHOUSE

BUILDING

PNL 'MDP'

NEW

MAINTENANCE

BUILDING

PNL 'MDP'

NEW MSI

BUILDING

PNL 'MDP'

NEW TECH

BUILDING

PNL 'MDP'

EXIST

PNL 'MDP'

MVSW #7

MVSW

#3

MVSW #4

MVSW

#6

MVSW

#10

WAREHOUSE

BUILDING

NEW

POLE #34

A2

IUSW #1

A2

A2

ELECTRICAL KEY NOTES

REFER TO PANEL SCHEDULES FOR QUANTITY OF BRANCH CIRCUITS TO

RETERMINATE FOR NEW PANEL 'MDP'.

A1 file no.

checked by drawn by consultant issue date contract order no.

472MTUMAINTPROJ

consultant job no.

260053.00

472/26238.RWG

acct. template sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

07/27/2026

08/13/2026

08/25/2026

M A

T R

I X

ISSUED FOR BIDDING

ADDENDUM #1

ADDENDUM #2

N PHASE 2 SITE PLAN - POWER

SCALE: 1" = 100'

25080400 20 160

E-201

JFS

SITE PLAN

MEDIUM VOLTAGE

POWER - NEW

150A

LOOP

SWITCH

#1

150A

LOOP

SWITCH

#2

INCOMING

LINE

12.47kV 208/120V

150 KVA

TECH BUILDING

NEW PAD MOUNT

TRANSFORMER

400A

12.47kV 208/120V

75 kVA

BUILDING 240 AND 243

NEW PAD MOUNT

TRANSFORMER

200A

SCALE: NONE

MEDIUM VOLTAGE

RISER DIAGRAM - NEW

12.47kV 208/120V

75 KVA

ADMIN BUILDING

EXISTING PAD MOUNT TRANSFORMER

12.47kV 208/120V

150 kVA

K-UNIT

EXISTING PAD MOUNT TRANSFORMER

12.47kV 208/120V

75 kVA

MSI BUILDING

EXISTING PAD MOUNT TRANSFORMER

M

UTILITY CO.

#2#3 #4 #7

#6

#5

#8

#9 #10 #11 #12 #13 #14

#15

#16 #17 #18

#19

#20

#21

#22

#24

#23

#25 #26 #27 #28 #29 #30

12.47kV 208/120V

225 KVA

POWERHOUSE

EXISTING PAD MOUNT TRANSFORMER

SCALE: NONE

MEDIUM VOLTAGE

RISER DIAGRAM - DEMOLITION

1 1

2 2 2 2 2 2 2 2

2 2

2 2 2 2

#31

#32

12.47kV 480/277V

500 KVA

NEW TRAINING BUILDING

NEW PAD MOUNT

TRANSFORMER

EXIST

(4) #3/0

2" CND

M

UTILITY CO.

EXISTING MEDIUM VOLTAGE OVERHEAD UTILITY LINES TO REMAIN.

REMOVE EXISTING OVERHEAD MEDIUM VOLTAGE UTILITY LINES.

REMOVE EXISTING MEDIUM VOLTAGE UNDERGROUND FEEDER.

REMOVE EXISTING PAD MOUNT TRANSFORMER.

EXISTING PAD MOUNT TRANSFORMER TO REMAIN.

REMOVE EXISTING OVERHEAD SECONDARY SERVICE CONDUCTORS.

REMOVE EXISTING BUILDING.

EXISTING MEDIUM VOLTAGE UNDERGROUND FEEDER TO REMAIN.

REMOVE EXISTING UNDERGROUND SECONDARY FEEDER.

REMOVE EXISTING TRANSFORMER MOUNTED UTILITY KWH METER.

EXISTING UNDERGROUND MEDIUM VOLTAGE FEEDER TO REMAIN.

EXISTING UNDERGROUND LOW VOLTAGE FEEDER TO REMAIN.

REMOVE EXISTING PANEL 'MDP'. EXISTING BRANCH CIRCUITS TO REMAIN

AND TRANSFERED TO NEW PANEL 'MDP'.

EXISTING PANEL TO REMAIN.

DEMOLITION NOTES

EXIST

(4) #500 KCMIL

4" CND

(2) SETS OF

(4) 350KCMIL

3" CND

TO BE INSTALLED AS PART OF NORTHERN

REGION TRAINING AND PROFESSIONAL

DEVELOPMENT CENTER PROJECT.

DTMB FILE NO. 472/23280.SDW

TO BLDG #240

EXIST MAIN PANEL

TO BLDG #243

EXIST MAIN PANELNEW

(4) #4/0

(1) #6 GND,

(1) 2" CND

TO UNIT K

EXISTING TAPS

EXISTING

PANEL

NEW

WH 'MDP'

208/120 3 Ø, 4W

400A MCB

PANEL

EXIST

WH SERVICE #2

208/120 3 Ø, 4W

200A MCB

NEW

(4) #3/0

(1) #6 GND,

(1) 2" CND

600A

NEW

(4) #500 KCMIL

(1) #3 GND,

(1) 4" CND

NEW

(4) #500 KCMIL

(1) #3 GND,

(1) 4" CND

#33

PANEL

NEW

PANEL 'MDP'

208/120 3 Ø, 4W

400A MCB

PANEL

NEW

MAINT 'MDP'

208/120 3 Ø, 4W

400A MCB

PANEL

NEW

TECH 'MDP'

208/120 3 Ø, 4W

400A MCB

NEW

(4) #500 KCMIL

(1) #3 GND,

(1) 4" CND

PANEL

EXIST

MSI 'MDP'

208/120 3 Ø, 4W

MLO

PANEL

EXIST

MAINT 'MDP'

208/120 3 Ø, 4W

MLO

PANEL

EXIST

WH 'MDP'

208/120 3 Ø, 4W

200A MLO

PANEL

EXIST

WH SERVICE #2

208/120 3 Ø, 4W

200A MLO

PANEL

EXIST

TECH 'MDP'

208/120 3 Ø, 4W

MLO

12.47KV 3PH 3W

M

UTILITY CO.

EXIST

EXIST

POLE

#3

EXIST

EXIST

POLE

#2

EXIST

EXIST

POLE

#4

EXIST

SPARE

FUSED

SWITCH

NEW

(4) #500 KCMIL

(1) #3 GND,

(1) 4" CND

MVSW #4

T3

MVSW #5

T4

200A

MVSW #3MVSW #2

MVSW #10 MVSW #9 MVSW #8 MVSW #7 MVSW #6

T2 T1

T9 T8 T7 T6 T5

12.47kV 208/120V

150 KVA

K-UNIT

NEW PAD MOUNT

TRANSFORMER

600A

12.47kV 208/120V

150 KVA

WAREHOUSE BUILDING

NEW PAD MOUNT

TRANSFORMER

400A

12.47kV 208/120V

150 KVA

MSI BUILDING

NEW PAD MOUNT

TRANSFORMER

400A

12.47kV 208/120V

150 KVA

MAINT BUILDING

NEW PAD MOUNT

TRANSFORMER

400A

12.47kV 208/120V

75 KVA

ADMIN BUILDING

NEW PAD MOUNT

TRANSFORMER

12.47kV 480/277V

225 KVA

POWERHOUSE

NEW PAD MOUNT

TRANSFORMER

MVSW #1

EXIST

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

15kV PAD MOUNT

SWITCH

600A

400A200A

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

TO BE INSTALLED AS PART OF NORTHERN

REGION TRAINING AND PROFESSIONAL

DEVELOPMENT CENTER PROJECT.

DTMB FILE NO. 472/23280.SDW

tHIS CONTRACTOR TO CONNECT TO NEW 60A

USED SWITCH IN MVSW #5

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND NEW

(3) #2 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

25 KVA

225 KVA

150 KVA

75 KVA

150 KVA

45 KVA

75 KVA

20A SPARE

15kV PAD MOUNT

SWITCH

600A

20A SPARE

15kV PAD MOUNT

SWITCH

600A

20A SPARE

15kV PAD MOUNT

SWITCH

600A

10A SPARE

15kV PAD MOUNT

SWITCH

600A

15A SPARE

15kV PAD MOUNT

SWITCH

600A

60A SPARE

15kV PAD MOUNT

SWITCH

600A

20A SPARE

15kV PAD MOUNT

SWITCH

600A

10A SPARE

15kV PAD MOUNT

SWITCH

600A

20A SPARE

15kV PAD MOUNT

SWITCH

600A

T5

T6

NEW

NEW

POLE

#34

NEW

POLE

#34 A2

IUSW #1

200A

15kV PAD MOUNT

SWITCH

600A

A2A2

A2

A2

A2 A2

A2

NEW

(3) #1/0 15KV 133% SHIELDED

MV-105 COPPER WIRE.

(1) #6 GND,

(1) 4" CND

A2 file no.

checked by drawn by consultant issue date contract order no.

472MTUMAINTPROJ

consultant job no.

260053.00

472/26238.RWG

acct. template sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

07/27/2026

08/13/2026

08/25/2026

M A

T R

I X

ISSUED FOR BIDDING

ADDENDUM #1

ADDENDUM #2

ELECTRICAL

DETAILS

MEDIUM VOLTAGE

RISER DIAGRAM

DEMOLITION AND NEW

File details come from the government source that posted it. Updated .