About this file

Video Management System Upgrade at Ionia Correctional Facility

This is a specification and bidding document for the State of Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, for a Video Management System Upgrade at Ionia Correctional Facility located at 1576 W. Bluewater Highway, Ionia, Michigan 48846. The project encompasses infrastructure and technology system upgrades including video security system components, access control system installation, Wardens AV system upgrades, replacement of Starnet 2 perimeter detection software with Symphony software, and electrical power upgrades with UPS devices. Work includes installation of cabling, security cameras, network switches, monitoring PCs, servers, and storage systems; replacement of existing camera monitoring PCs; provision and installation of a Genetec access control system with removal of existing systems; provision of AV systems for the Wardens Conference room with LCD display replacements; replacement of perimeter detection software; and electrical system upgrades including new UPS devices, grounding and bonding improvements, surge suppression devices, underground boring and trenching to new poles and camera locations, and ground penetrating radar implementation. Software licensing for new cameras and monitoring PCs must extend through July 31, 2029. Bids must be submitted electronically through the SIGMA VSS website no later than 2:00 p.m. ET on June 10, 2026. A mandatory pre-bid conference will be held on May 26, 2026 at 1:00 PM ET at the facility, with an optional tour at 2:00 PM ET. Vendor/contractor representatives attending must submit a Vendor/Contractor LEIN Request five business days prior to the meeting. Bids shall remain valid for acceptance by the Owner for ninety (90) calendar days after bid opening. The Genetec integrator scope contractor must be a Genetec certified channel partner, and specifications detail extensive documentation and as-built requirements including network connectivity one-line diagrams, archiver and server configuration diagrams, access control system configuration, and cabling location documentation.

Bid Security must be submitted in the amount of five percent (5%) of the Bidder's Base Bid, provided as a certified or cashier's check, money order, or duly executed Bid Bond payable to the State of Michigan, with physical checks or money orders delivered to the State Facilities Administration Design and Construction Division at 3111 W. St. Joseph Street, Lansing, Michigan 48917 before the bid due time. The Apparent Low Bidder must submit a List of Subcontractors within two (2) business days of the Professional's request and must provide a PreAward Schedule and Qualification Submittals within five (5) calendar days. All contractors and subcontractors must comply with Michigan prevailing wage requirements, nondiscrimination in employment provisions, and the Natural Resources and Environmental Protection Act regarding soil erosion and sedimentation control. The document is based on MICHSPEC 2008 Version Owner and Contractor Standard Contract Forms and Conditions, developed from FORMSPEC Michigan Model, and includes detailed general conditions, technical specifications across multiple divisions covering electrical work, security and communications systems, exterior improvements, and technology-related work. Contact for questions is Bret Emerson at Commtech Design (bids@commtechdesign.com), with questions accepted until June 1, 2026 at 2:00 PM. The Owner expressly reserves the right to reject any or all bids, waive irregularities, issue post-bid addenda and rebid without re-advertising, re-advertise for bids, withhold award, or take other appropriate action.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHSPECTM DTMB

This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0

Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR

STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

MICHSPEC No. 97.0820 − 00020 THROUGH 97.0820 − 00440

RELEASED ON NOVEMBER 1, 1997.

Developed from

Contract Forms and Conditions of the Contract

FORMSPEC Michigan Model and suggested for use with

Bidding Requirements

File No. 472/23198.JGH Department of Corrections

Video Management Upgrade Ionia Correctional Facility

May 14, 2026

1997 Edition/R 4/26

STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS

MICHSPEC DTMB 00010 − 1

SECTION 00010 TABLE OF CONTENTS

SECTION/PAGE NO.

SUBJECT INDEX

SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1

SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1

SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1

ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 2

ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 2

ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2

ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 4

ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 4

ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 5

ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 5

ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 6

ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 7

ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 7

ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 8

ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 9

ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 9

ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 9

ARTICLE 15 EXECUTION OF THE AGREEMENT .............................................................................................................. 00100 - 12

ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -12 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -13 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1

SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1

SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1

SECTION 00300 BID SUMMARY ....................................................................................................................................... 00300 - 1

SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 2

ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 2

ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................... 00300 - 2

ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 3

ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 3

ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 3

ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 4

ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 6

ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 7

SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1

SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................... 00320 – 1

SECTION 00330 ASBESTOS ABATEMENT ATTESTATION........................................................................................... 00330 – 1

SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1

SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1

ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1

ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1

ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1

ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2

ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3

SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1

SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1

ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1

ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS .................................................................... 00440 - 2

SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1

ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1

ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1

ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2

MICHSPEC DTMB 00010 − 2

ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2

ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3

ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 4

ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 4

ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 4

ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 5

SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1

SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1

SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1

SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1

ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1

1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1

1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1

1.3 Priority of the Contract Documents: ....... 00700 - 2

1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 3

1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 3

1.6 Ownership and Use of the Contract Documents: .......................................................................................................... 00700 - 3

1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 4

ARTICLE 2 THE OWNER−GENERAL PROVISIONS .......................................................................................................... 00700 - 4

2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 4

2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 4

2.3 Stop Work Order: .......................................................................................................................................................... 00700 - 4

2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4

2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 5

2.6 Partnering Charter: ....................................................................................................................................................... 00700 - 5

ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS .......................................................................................... 00700 - 5

3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 5

3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 5

3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 6

3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 6

3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 6

ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS ........................................................................................... 00700 - 6

4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 6

4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 6

4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 7

4.4 Concerning Control of Work: ........................................................................................................................................ 00700 - 7

4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 8

4.6 Use of Premises: .......................................................................................................................................................... 00700 - 8

4.7 Record Documents: ...................................................................................................................................................... 00700 - 9

4.8 Emergencies: ................................................................................................................................................................ 00700 - 9

4.9 Indemnification: ............................................................................................................................................................ 00700 - 9

ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS ........................................................................................................ 00700 - 10

5.1 Employment of Subcontractors: .................................................................................................................................. 00700 - 10

5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................. 00700 - 10

5.3 The Contractor’s Continuing Responsibilities: .......................................................................................................... 00700 - 11

ARTICLE 6 SUBMITTALS .................................................................................................................................................. 00700 - 11

6.1 Shop Drawing, Sample and Other Technical Submittals: ........................................................................................... 00700 - 11

6.2 Review and Return of Technical Submittals: .............................................................................................................. 00700 - 12

6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 12

6.4 Review and Return of Progress Schedule Submittals: ............................................................................................... 00700 - 13

6.5 Additional Provisions Concerning Submittals: ............................................................................................................ 00700 - 13

ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 13

7.1 Laws; Permits (Which Include Approvals and Licenses): ........................................................................................... 00700 - 13

7.2 Sales and Use Tax and Other Similar Taxes, including Tariffs: .................................................................................. 00700 - 14

7.3 Safety and Protection: ................................................................................................................................................ 00700 - 14

7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 15

7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 15

7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 16

7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 16

MICHSPEC DTMB 00010 − 3

7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 16

7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 16

7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 17

7.11 Michigan Right-To-Know Law: .................................................................................................................................... 00700 - 17

7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 17

7.13 Michigan Residency for Employees: ........................................................................................................................... 00700 - 18

7.14 Prevailing Wages: ....................................................................................................................................................... 00700 - 18

7.15 Asbestos Abatement:.................................................................................................................................................. 00700 - 19

ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 20

8.1 Starting the Work: ....................................................................................................................................................... 00700 - 20

8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 20

8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 20

8.4 Substantial Completion: .............................................................................................................................................. 00700 - 20

8.5 Partial Use: ................................................................................................................................................................. 00700 - 21

8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 21

8.7 Suspension of Work: .................................................................................................................................................. 00700 - 21

8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 22

ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND

APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 22

9.1 Warranty: ................................................................................................................................................................... 00700 - 22

9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 22

9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 23

9.4 Correction of Work: .................................................................................................................................................... 00700 - 23

9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 24

9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 24

ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 24

10.1 Changes in the Work: ................................................................................................................................................ 00700 - 24

10.2 Differing Subsurface or Physical Site Conditions: ...................................................................................................... 00700 - 25

10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 26

10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 26

10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 26

10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 27

10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 27

10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 27

ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN

CONTRACT TIME ......................................................................................................................................... 00700 - 28

11.1 General Provisions: ................................................................................................................................................... 00700 - 28

11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 28

11.3 Methods for Making Adjustments in Contract Price: .................................................................................................. 00700 - 29

11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 29

11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 30

11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 30

11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 30

11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 30

11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 31

11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ........................ 00700 - 31

11.11 Limits on the Fee for the Work Involved: .................................................................................................................... 00700 - 32

11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 32

11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 33

11.14 Access to Records: ..................................................................................................................................................... 00700 - 33

11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 33

ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 34

12.1. Schedule of Values: ................................................................................................................................................... 00700 - 34

12.2 Requests for Payment: .............................................................................................................................................. 00700 - 34

12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 35

12.4 Refusal to Make or to Recommend Payment: ........................................................................................................... 00700 - 35

12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 35

12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 36

12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 36

12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 36

ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 36

MICHSPEC DTMB 00010 − 4

13.1 Related Work at Site: ................................................................................................................................................. 00700 - 36

13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 37

13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 37

ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 38

14.1 Notice Requiring Assurance of Due Performance: .................................................................................................... 00700 - 38

14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 38

14.3 Surety Default: ........................................................................................................................................................... 00700 - 39

14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 39

14.5 The Contractor May Suspend Work: ........................................................................................................................ 00700 - 40

ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 40

15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 40

15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 41

15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 41

15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 41

15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 42

15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 42

15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 42

SECTION 00800 SUPPLEMENTARY CONDITIONS ......................................................................................................... 00800 - 1

SECTION 01310 PROGRESS SCHEDULE ........................................................................................................................ 01310 - 1

TECHNICAL SPECIFICATIONS – BOUND WITHIN

DIVISION 02 - EXISTING CONDITIONS

023123 ELECTROMAGNETIC INVESTIGATIONS

023200 HYDRO EXCAVATION

DIVISION 08 - CONSTRUCTION

087100 DOOR HARDWARE

DIVISION 26 - ELECTRICAL

260010 BASIC ELECTRICAL REQUIREMENTS

260500 COMMON WORK RESULTS FOR ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260572 OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY

260573 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

260574 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY

262416 PANELBOARDS

262726 WIRING DEVICES

262813 FUSES

262816 ENCLOSED SWITCHES & CIRCUIT BREAKERS

262913.03 MANUAL AND MAGNETIC MOTOR CONTROLLERS

264313 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

265600.01 POLES AND BASES

DIVISION 28 - SECURITY AND COMMUNICATIONS

281000 TECHNOLOGY OVERVIEW

281050 UTILITY SHUTDOWN STANDARDS

281100 COMMUNICATIONS ROOM

281150 COMMUNICATIONS GROUNDING

281500 FIBER CABLING

281600 CAT-6 CABLING

282150 TECHNOLOGY AND INSTALLATION STANDARDS

MICHSPEC DTMB 00010 − 5

283400 SECUTIY MANAGEMENT SYSTEM

283500 ACCESS CONTROL

283600 SECURITY RECORDING – GENETEC INTEGRATOR SCOPE

283700 SECURITY CAMERAS

285401 AUDIO VIDEO EQUIPMENT

286200 DATA NETWORK

287100 ATTIC STOCK

287200 TECHNOLOGY SUBMITTALS

287300 TECHNOLOGY PASS-THRU AND FIRESTOP

287600 TECHNOLOGY LABELING

287700 TECHNOLOGY TESTING

287750 TECHNOLOGY TRAINING

287800 TECHNOLOGY WARRANTY

DIVISION 32 - EXTERIOR IMPROVEMENTS

329200 TURF AND GRASSES

DRAWINGS - BOUND SEPARATELY

ELECTRICAL & MECHANICAL

E-100 IONIA ELECTRICAL SYMBOLS, ABBREV. & NOTES

E-200 IONIA - SITE PLAN - POWER

E-500 IONIA - EAST - 100 ADMIN. BLDG. FIRST FLOOR - POWER

E-501 IONIA - EAST - 100 ADMIN. BLDG. SECOND FLOOR - POWER

E-502 IONIA - 200 SUPPORT SERVICES. - FIRST FLOOR - AREA B - POWER

E-503 IONIA - 200 SUPPORT SERVICES. - SECOND FLOOR - POWER

E-504 IONIA - 300 EDUCATION BLDG. - FIRST FLOOR - POWER

E-505 IONIA - 300 EDUCATION BLDG. - SECOND FLOOR - POWER

E-506 IONIA - 400 WAREHOUSE BLDG. - FIRST FLOOR - POWER

E-507 IONIA - HOUSING UNIT 1 - BASEMENT - POWER

E-508 IONIA - HOUSING UNIT 2 - BASEMENT - POWER

E-509 IONIA - HOUSING UNIT 3 - BASEMENT - POWER

E-510 IONIA - HOUSING UNIT 4 - BASEMENT - POWER

E-511 IONIA - HOUSING UNIT 5 - BASEMENT - POWER

E-512 IONIA - HOUSING UNIT 6/7 - FIRST FLOOR - POWER

E-800 ELECTRICAL DETAILS

E-801 ELECTRICAL DETAILS

SECURITY AND COMMUNICATIONS

TC101 IONIA SECURITY LEGENDS, DETAILS, AND SCHEDULES

TC102 IONIA CONNECTIVITY CODES DETAILS

TC103 IONIA CABLING & SECURITY MOUNTING DETAILS

TC104 IONIA CABLING & SECURITY MOUNTING DETAILS

TC105 IONIA POLE MOUNTING & NEW PC DETAILS

TC106 IONIA DUAL WARDENS CONFERENCE DETAILS

TC107 IONIA FIBER BACKBONE

TC108 IONIA RACK LAYOUTS

TC109 IONIA RACK LAYOUTS

TC110 IONIA SECURITY CAMERA ONE LINE DIAGRAMS

TC111 IONIA SECURITY CAMERA ONE LINE DIAGRAMS

TC112 IONIA SECURITY CAMERA ONE LINE DIAGRAMS

TC113 IONIA SECURITY CAMERA ONE LINE DIAGRAMS

TC114 IONIA SECURITY CAMERA ONE LINE DIAGRAMS

TC115 IONIA SECURITY CAMERA ONE LINE DIAGRAMS

TC116 IONIA SECURITY CAMERA ONE LINE DIAGRAMS

MICHSPEC DTMB 00010 − 6

TC117 IONIA SECURITY CAMERA ONE LINE DIAGRAMS - PERIMETER

TC118 IONIA SECURITY CAMERA ONE LINE DIAGRAMS - PERIMETER

TC119 IONIA ACCESS CONTROL CABLE LABELING

TC120 IONIA ACCESS CONTROL SYSTEM (PACS)

TC121 IONIA DOOR HARDWARE & SECURITY REQUIREMENTS

TC122 IONIA SYMPHONY SCHEDULE, DETAILS & REQUIREMENTS

TC301 IONIA ADMINISTRATION BLDG. 100 - ALL FLOORS - NEW AND ADDITIONAL

TC302A IONIA SUPPORT SERVICES - FIRST FLOOR - A - NEW AND ADDITIONAL

TC302B IONIA SUPPORT SERVICES - FIRST FLOOR & MEZZANINE - B - NEW AND ADDITIONAL

TC303 IONIA SUPPORT SERVICES - SECOND FLOOR - NEW AND ADDITIONAL

TC304 IONIA EDUCATION - FIRST FLOOR - NEW AND ADDITIONAL

TC305 IONIA EDUCATION - SECOND FLOOR - NEW AND ADDITIONAL

TC306 IONIA MSI - FIRST FLOOR - & MEZZANINE NEW AND ADDITIONAL

TC307 IONIA HOUSING UNIT 1 - LOWER LEVEL - NEW AND ADDITIONAL

TC308 IONIA HOUSING UNIT 1 - UPPER LEVEL - NEW AND ADDITIONAL

TC309 IONIA HOUSING UNIT 2 - LOWER LEVEL - NEW AND ADDITIONAL

TC310 IONIA HOUSING UNIT 2 - UPPER LEVEL - NEW AND ADDITIONAL

TC311 IONIA HOUSING UNIT 3 - LOWER LEVEL - NEW AND ADDITIONAL

TC312 IONIA HOUSING UNIT 3 - UPPER LEVEL - NEW AND ADDITIONAL

TC313 IONIA HOUSING UNIT 4 - LOWER LEVEL - NEW AND ADDITIONAL

TC314 IONIA HOUSING UNIT 4 - UPPER LEVEL - NEW AND ADDITIONAL

TC315 IONIA HOUSING UNIT 5 - LOWER LEVEL - NEW AND ADDITIONAL

TC316 IONIA HOUSING UNIT 5 - UPPER LEVEL - NEW AND ADDITIONAL

TC317 IONIA HOUSING UNIT 6 & 7- NEW AND ADDITIONAL

TC318 IONIA SITE PLAN - NEW AND ADDITIONAL

STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY

MICHSPEC DTMB 00020 - 1

SECTION 00020 GLOSSARY

1.1 Defined Terms:

1.1.1. The following terms or relative pronouns used in Division 0 of the Specifications have these intent and meanings:

Activity− An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

Addenda− Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.

Agreement− The written agreement between the Owner and Contractor covering the Work to be furnished and performed.

Alternate− Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.

Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s pre ference is the lowest Bidder is considered the Apparent Low Bidder.

Archaeological Feature− Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.

As-Planned Schedule− The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.

Authorized Technical Data− Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph

3.0 of Section 00210 Information for Bidders.

Bar Chart Schedule− Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

STATE OF MICHIGAN MODEL

Developed from FORMSPEC Michigan Model.

Bid− Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.

The term Bid includes a Rebid.

Bidder− The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding Documents− The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.

Bid Price− The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid Security− A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.

MICHSPEC DTMB 00020 - 2

Bidding Requirements− The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

*AD Board− The Administrative Board of the State of Michigan.

Bonds− Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.

Business Day− Any Day except Saturdays, Sundays and holidays observed by the Owner.

Bulletin− A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar Day− Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Cash Allowance− An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents.

Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change Authorization− A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.

Change Order− A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Construction Mechanic− A skilled or unskilled mechanic, laborer, worker, helper, assistant, or apprentice working on a state project but shall not include executive, administrative, professional, office, or custodial employees

Contact Person− Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.

Contract− Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.

Contract Award− The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.

Contract Documents− Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.

Contract Float− Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.

Contract Price− The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).

Contract Times− The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.

Contractor− Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.

Correction Period− The period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove, and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.

MICHSPEC DTMB 00020 - 3

Cost of the Work Involved− The sum of all costs that would be, or were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.

CPM Schedule− Computerized, Activity-based Progress Schedule, using Critical Path Method (CPM) techniques, and accounting for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

Critical Path Method (CPM)− The Critical Path Method of planning and scheduling. The term “Critical Path” denotes a sequence of Activities controlling achievement of a specified Contract Time.

Date of Commencement of the Contract Time− The date when the Contract Time starts to run.

Defective− An adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of any inspection, test, or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.

Defective Work/Non-Compliance Notice – A DTMB-0499 form or equivalent issued to identify defective or non-compliant conditions requiring response and remedy by the Contractor.

Delay− Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.

Tariffs, trade restrictions, or governmental pricing measures do not constitute a Delay and shall not excuse performance or entitle the Contractor to additional compensation or time.

*Department (DTMB)− Department of Technology, Management and Budget of the State of Michigan. Director is the Director of the Department.

Director-SFA- The Director of DTMB State Facilities Administration.

Director-DCD- The Director of DTMB State Facilities Administration, Design and Construction Division

Division− Each of the numbered, distinct parts (starting with Division 0) into which the Specifications are divided.

Drawings− Part of the Contract Documents showing the Work. Drawings shall neither serve nor be used as Shop Drawings.

Early (Late) Dates− Early (late) times of performance for the Activities.

Emergency− A condition affecting the safety or protection of persons, or the Work, or property at or adjacent to the site.

Fee for the Work Involved (Fee)− A negotiated, percentage mark-up on the Cost of the Work Involved which is allowed to the Contractor for (a) reasonable administrative costs, and (b) negotiated, reasonable profit on the Cost of the Work Involved.

General Requirements− Division 1 of the Specifications.

Hazardous Material− Asbestos, ACBMs, PCBs, petroleum products, such construction materials as paint thinners, solvents, gasoline, oil, etc., and any other like material the manufacture, use, treatment, storage, transportation, or disposal of which is regulated by federal, State, or local Laws governing the protection of public health, natural resources, or the environment.

State Facilities…