472_23198.JGH - Ionia VMS - Addendum 01.pdf
PDF 11 MB Posted
- Attached to
- 472/23198. JGH; Ionia CF - VMS Upgrade
- Solicitation number
- RFQ 171 260000000314 3
- Issued by
- Huron County, Michigan
About this file
This is Addendum 01 to the Request for Proposal (RFP) for the Ionia Correctional Facility Video Management System (VMS) Upgrade issued by the State of Michigan. The addendum modifies the original solicitation 472/23198.JGH by clarifying project requirements and specifications for the VMS upgrade at the Ionia facility. The document addresses technical specifications, system requirements, and vendor qualifications necessary to support the facility's video surveillance infrastructure modernization. Key modifications include updates to system compatibility requirements, equipment specifications, and installation timelines. Vendors responding to this solicitation must account for all addendum provisions in their bids, as the addendum becomes an integral part of the contract documents and supersedes any conflicting language in the original RFP.
The addendum establishes binding requirements that all bidders must incorporate into their proposals and pricing submissions. Failure to acknowledge receipt and acceptance of Addendum 01 may result in bid rejection. The modifications outlined in the addendum directly impact both technical approach and cost proposals, requiring bidders to carefully review all changes and their implications for system design, implementation, and ongoing maintenance. All bid submissions must reference compliance with the addendum specifications and include any necessary cost adjustments resulting from the revised requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 01
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
6/4/2026
PROJECT NAME
Ionia Correctional Facility – Video Management System Upgrade
FILE NUMBER
472/23198.JGH
PROFESSIONAL
Commtech Design, Inc.
PROJECT DIRECTOR
Jared Gavin-Helfrich
BID OPENING DATE:
6/10/2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required) Attachments;
1. Meeting Attendance record, Pre-Bid sign-in sheets.
2. NEW Bid Schedule
3. Reissued Drawings (See Below)
Specifications
1. New Bid schedule
Drawings reissued
1. TC101, TC106, TC110 thru TC118, TC119, TC120, TC122 - Re-issued
2. TC301, TC302A, TC302B, TC318 - Re-Issued
3. E-200, E-501, E-506 -Re-Issued
Questions:
1. Support Services comm room S2 shown on TC108 states “No camera cables to this comm room.” TC302B states “cables on this side of line shall route to Comm S2.” The one line does not show a new switch for S2.
Please advise.
Answer. All cables shall route to Comm S1 as noted on TC108. The note shown on TC302A & B was not updated as part of an old project. See TC302A & B.
2. One line general security notes 4 & 5 on TC110 states that all drop ceiling cameras shall be recessed mount.
There is no part # provided for drop ceiling mounts for CC or CE type cameras. Please advise
Answer. All drop ceiling mounts shall be ‘surface mount’. TC110 thru TC118
3. Perimeter #10 ground wire. Drawing E800 shows "New #10 Ground" in details 1 & 3. For clarity, are we to install a new #10 ground wire from every pole to each cabinet?
Answer. Yes, a #10 Ground wire shall be installed from each pole to the nearest cabinet.
4. Lighting control. On E501 Keynote 7, we are directed to demo the horner lighting control. We are to provide a new lighting control override switch and connect to existing Ultralink system. Please provide a more specific detail with part #'s and a one line - assume some sort of contactor, photocell setup would be required. No info as to the lighting circuit's origin, circuit size, etc is provided. Is there to be a control center manual override button? More info required to quote this work.
Answer. See re-issued sheets E-200, E-501, and E-506.
5. Sheet TC301 shows a new Intercom Base Station is needed on the 2nd floor of the Admin Building 100. This base station is not shown on detail 2 of sheet TC120. Is it required?
Answer. The base station on the 2nd floor of the Admin Building shall not be provided as part of this project. See TC301
6. Door Hardware Spec 08 7100 shows new panic bars with request to exit sensors will be installed at Doors 101; 104 & 204. Sheet TC301 and TC120 do not show the RX symbol, will these request to exit sensors need to be connected to the access control system?
Answer. See TC301. We have updated doors with RX where required. We do not see door 204 and are assuming this is referring to door 201.
Clarifications:
7. TC-111: ICF-1264 is shown as a surface mount but labeled as pendant mount. Which is correct?
Answer. Camera ICF-1264 shall be pendant. See TC111
8. TC-111: ICF-1266 is shown as a pendant mount but labeled as hard ceiling surface mount. Which is correct?
Answer. Camera ICF-1266 shall be surface mount. See TC111
9. Drawing TC301 references a base station (BS) on the second floor, but the one-line drawing TC120 does not show it. Will this exist?
Answer. The base station on the 2nd floor of the Admin Building shall not be needed. See TC301
10. 283500 1.03 C 2 says multisheath cable shall be White in color or multicolor cables. Is pink sufficient so it matches the cat6 color scheme?
Answer. Yes. If you can find a Pink Multi-sheath cable for access control, Plenum rated we would approve and allow.
11. TC120 & TC301 show a motion request to exit only on door 202. Please confirm this is the only door that should be receiving one.
Answer. The following doors shall receive a request to exit in lock: 101, 103.1, 103.2, 104 and 201.
See TC301 and TC120.
12. TC110 shows "XM" for the Deputy Conference Room 1-139 PC but offers a description of "pull out corner mount". The Warden's Conference room 1-179 shares this description and is labelled XN. Please confirm if this should be XM or XN.
Answer. Each mount is shown correctly ‘XM’ is a 55” LCD mount. ‘XN’ is a 65” LCD mount with both mounts articulating. The ‘XN’ mount will be installed close to the ‘corner’ in Conf Rm 1-179.
13. TC110 shows the new cameras goes to a new patch panel that is being patched to switch type NB. This is a fiber switch. This patch panel appears to be located in Comm Room A3. Should these new connections be routed to A2, or should a copper POE NC style switch also be installed in Comm Room A3?
Answer. Good note. See TC110 updated to show the CAT-6 connections being routed to the NC style copper POE Switch
14. TC110 shows 9 PCs with both the SD and SL label. Which one is correct?
Answer. Each PC shall have SD & SK. See TC110 thru 112.
15. TC110 shows Symphony PC in a rack. TC122 shows it on a shelf under the desk or on the wall. Which is the desired mounting solution?
Answer. The Server shall be rack mounted in the Admin comm room. The PC shall be mounted on the wall in Admin Central Control.
16. TC318 shows a new conduit going from Housing Unit 6/7 to the Weight Pit. It also shows a line from a similar spot on the building going to the Education building. What is this extra line signifying? There is no mention of it on E-200.
Answer. The extra line is an existing conduit from HU 6/7 to the education building. There is no associated work with this conduit for this project. See updated TC318
17. Support services building shows two IDFs, but only one is mentioned in the one-line drawings. Does this second IDF exist and if so, can we get updated drawings reflecting the cameras and switch count that needs to be there?
Answer. Yes, there are (2) existing Comm Rooms S1 & S2 with camera cables terminating in S1 only.
18. Education shows two IDFs, but only one is mentioned in the one-line. Can we get confirmation that all cameras and workstations are going to E1 and E2 is not used for this project?
Answer. Yes, there are (2) existing Comm Rooms E1 & E2 with all camera cables terminating in E1 only.
19. TC301 shows a cooling cabinet in the EM Room. TC110 says this is an existing cabinet. Please confirm that this is existing and not something that needs to be provided.
Answer. The cooling cabinet in the EM Room exists and will not need to be provided as part of this contract. This is just a technology cabinet that houses the PC’s
20. Most of the Genetec workstations show SH for the keyboard and mouse, but SH is a KVM. Should this be SG or SJ?
Answer. Use SG for wireless keyboard & mouse. See TC110 thru 112.
21. TC112 shows YO for the privacy screen, but this is not defined anywhere. XQ looks like it may be what this is supposed to be, please confirm.
Answer. Use YH which is a 55” monitor privacy screen. See TC101 & TC112.
22. TC110 shows SF for the ICF-BUBBLE, but this is shown to be a laptop. Which is this supposed to be?
Answer. Use SE which is a Genetec mini monitoring PC. See TC110.
23. TC101 shows a single gang card reader as Signo 40-PIV. 283500 2.13 A 12 shows it as 40NKS-00-000000, which is not a Signo PIV part. Please confirm the reader.
Answer. The specifications are correct. We changed the note on TC101 to read “SEE SPECS”
24. E-501: Three of the four data racks shown get power fed from both the UPS-A panel and the RP-A panel. The topmost one has both feeds from the UPS-A panel. Is this correct?
Answer. One of the feeds shall be from RP-A.
25. TC-112 shows camera ICF-1342 having a wall arm mount on an interior wall. There are not accessories mentioned for this scenario. Should this be using the same as the "building exterior"?
Answer. Yes, camera ICF-1342 shall use a building exterior mount. See TC112.
26. The existing Starnet is a completely independent Cisco network. They only show 10 ultralinks, but there are
15 out there. 4 of these will have no connection back to a place with security network switches.
Answer. Yes, there are a total of (15) Ultralink locations. See updated site plan and connectivity diagram. TC122 & TC318. Assume each has a network connection that is able to be connected to the new Ethernet Network being provided as part of this project.
Answer. Transition these Ultralinks to the new Camera network as part of this project.
27. There are existing camera switches in the gun towers that are not referenced. The fiber feeding these switches is likely the same fiber feeding the Starnet cisco switches...or maybe they're the same thing?
Answer. Bid as per design documents.
28. Conference room TC106 CP references a 3 rack unit custom plate in the A/V Cabinet. There is also a note to mount the PC enclosure on the wall next to LCD. Please advise which PC enclosure to provide.
Answer. See updated TC106. Change reference to PC enclosure to mount plates at LCD location on wall. Fish wall. See updated detail “CP” to remove reference to “3-Rack unit tall”
29. Who is responsible for providing locking hardware for the access control doors?
Answer. All work in the contract Specifications and Drawings is the responsibility of the contractor.
This project will have a single contractor who is responsible for the entire project. That contractor may have subcontractors. The State of Michigan will recognize one contractor to hold the contract and be responsible for all aspects of the work. See Door hardware Specification 087100
30. Will an updated Detail 4/TC119 be provided with correct call out icons?
Answer. See TC119 re-issued. Reference list of equipment on TC101
31. Will an updated inspector PC location detail be provided with correct icons?
Answer. Yes an updated Inspector PC location is provided. See TC110.
32. Please confirm the security var is providing new 24 port patch panels and new core ethernet switches.
Answer. The contractor hired as part of this project shall provide and install all Patch panels for new data cables being installed.
33. Confirm symbol "SH" is for KVM switch and "SG" is for wireless mouse and keyboard. TC110 has mouse and keyboard labeled as "SH".
Answer. Use SG for wireless keyboard & mouse. See TC110 thru 112.
34. Will and updated detail be provided for the ICF-Bubble PC2 Mini New with correct icons?
Answer. Yes an updated ICF-Bubble PC2 Mini New detail is provided. See TC110.
35. Confirm the symbol for the "Equipment technician laptop-replace" on TC111 should be SF not SG?
Answer. Use SF for Equipment Technician laptop-replace. See TC111.
36. Please confirm whether security contractor is to furnish all Ethernet switches (core and edge), or if switches will be owner-furnished and/or reused.
Answer. Contractor shall furnish, install and configure all Ethernet switches (core & edge).
37. Please confirm security contractor is responsible for all Genetec VMS, Synergis, and associated licensing
(camera, server, workstation).
Answer. Refer to Specification 283600, Specifically note 2.08
38. Please Confirm whether security contractor is responsible for full network configuration (VLANs, IP addressing, switch programming) or owner IT support will provide.
Answer. Contractor shall furnish, install and configure all Ethernet switches (core & edge).
39. Do any physical doors and or door frames need to be replaced? If so, please identify door locations.
Answer. No, there shall be no doors or door frames to be replaced.
40. Please confirm the correct part number and alternative solution regarding LG: 22MD4KA-B. The part is discontinued.
Answer. Where this monitor is specified, provide the item XB NEC 22” monitor
41. Can you provide Input/Output Configuration for Symphony?
Answer. The UCM file is not available prior to issuance of this bulletin. Assume 8 points are being monitored on each Ultralink for bid scope purposes and field investigation purposes. The UCM file will be available to the chosen contractor for this project. See TC122
42. Can you provide the current config files for the existing SenStar system. Symphony?
Answer. The UCM file is not available prior to issuance of this bulletin. Assume 8 points are being monitored on each Ultralink for bid scope purposes and field investigation purposes. The UCM file will be available to the chosen contractor for this project.
43. There isn’t an Access Control portion to the bid schedule. Could you please add?
Answer. This has been added to the Bid Schedule document. See new Bid Schedule issued with this addendum
44. Does the new (additional) Aruba core switch need to provide copper access ports, or is an SFP+ interface-only switch acceptable? The network diagrams show cameras connecting directly to the switch, which would suggest that copper ports are required. However, the specifications appear to call for an SFP+ switch for the additional Aruba core switch based on the diagram. Can you have them clarify the expected interface requirements for the new core switch?
Answer. When using the “additional” Aruba core it shall be SFP+ ports. The difference is that the Cisco SFP+ switches are 48 port and Aruba are 24. The owner wants to have a minimum of 72 SFP+ ports available. The “additional” switch if Aruba is provided shall be configured and ready to be used in case of loss of a different Core Switch.
45. Are we to assume any saw cutting of concrete will come out of the hydrovac allowance or cover it in the contractor scope?
Answer. The Hydrovac Allowance is for Hydrovac work only. Include any other work in the Contractor Scope
46. On sheet E-200 note 7 shows a 1” conduit running across a concrete slab, it doesn’t mention anything about how to get it across the slab. Is the contractor responsible for saw cut, removal, and infill of the concrete to get this conduit across the area shown?
Answer. All site conduit installation shall be directionally bored. See keynote 6.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Bret Emerson, Commtech Design DATE: 6/4/2026
APPROVED BY:
PROJECT DIRECTOR: DATE: Click to enter date
MICHSPEC DTMB 00300 − 4
ARTICLE 6 BID SCHEDULE – ADD 01
6.1 Base Bid Schedule - The Bidder will complete the Work and accept in full payment, for the Work items listed, the following unit prices and/or Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description
Unit Price
Item Bid Price
1 1 Cameras & Cabling Equipment
2 1 Camera and Cabling labor
3 1 Camera Licenses
4 1 Servers and Storage Equipment
5 1 Servers and Storage Labor
6 1 Network Switches Equipment
7 1 Network Switches Labor
8 1 Genetec Integrator Scope (GIS) Equipment
9 1 Genetec Integrator Scope (GIS) Labor
10 1 General Conditions
11 1 Electrical equipment including UPS and lighting protection
12 1 Electrical labor including UPS and lighting protection
13 1 Audio/Video equipment
14 1 Audio/Video labor
15 1 Symphony monitoring system Equipment
16 1 Symphony monitoring system Labor
17 1 Access Control Equipment
18 1 Access Control Labor
19 1 Mobilization
20 1 Bonds and Warranty
21 1 2% Code Approval
22 1 2% Warranty
23 1 2% As-Builts
CONTINGENCY ALLOWANCE AMOUNT $75,000.00 $75,000.00
HYDROVAC ALLOWANCE $30,000.00 $30,000.00
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Bid Prices for all Base Bid Items):
________________________________________________________________ Dollars and No/Cents $__________________________ (use words) (in figures)
Name of the Bidder _________________________________________ File No. _______________
Date _________________________
SIGMA VENDOR NUMBER _________________________________
Telephone No. _______________________
C
C
C C
C
C
C
C
C
C
C
C C
C
C
C
C
C C
C C
C
C
C
C
PL-017
PL-018
PL-019
PL-020
PL-021
PL-022
PL-023
PL-024
PL-025
PL-026
PL-027
PL-028
PL-029
PL-030
PL-031
PL-032
PL-033
PL-034
PL-035
PL-036PL-037
PL-038PL-039
PL-039B
PL-001
PL-002
PL-003
PL-004
PL-005
PL-006
PL-007
PL-008
PL-009
PL-010
PL-011
PL-012
PL-013
PL-014 PL-015
PL-016
PL-001B
PL-039A
PL-016A
PL-008A
PL-027A
PL-033A
PL-001A
C
C
C
C
C
C C
C
C
C C
C
C
C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
CC
C
C
C
C
C
C
C
C
C
C
C
C C
C P
2 2
1 1
(1) 1" CND
(1) 1" CND
(1) 1" CND
C2
C2
C
C 2
C 2
C
C
C
C
C
C 2
C 2C
C C
(1) 1" CND 6
2" CND
2" CND
2" CND
2" CND
2" CND
2" CND
2" CND
2" CND
ELECTRICAL KEY NOTES
PROVIDE AND INSTALL NEW SURGE PROTECTION DEVICES
AND JUNCTION BOX FOR CAMERAS ON POLE. ALL POLES ARE
EXISTING TO REMAIN UNLESS OTHERWISE SPECIFIED. REFER
TO SHEET E-800 DETAIL 3.
PROVIDE AND INSTALL NEW SURGE PROTECTION DEVICES IN
COMMUNICATIONS ROOM FOR CAMERAS ON BUILDING.
REFER TO SHEET E-800 DETAIL 2.
REMOVE EXISTING SURGE PROTECTION DEVICES AND
HORNER LIGHTING CONTROLS. PROVIDE AND INSTALL NEW
SURGE PROTECTION DEVICES IN PERIMETER CABINET
(RAYCAP G29-00-394-OTL-PROTEC-T1-40 AND RAYCAP
NJ2010B). REFER TO SHEET E-800 DETAIL 1. REMOVE ALL
HARDWARE AND EXPOSED WIRING FROM THE CABINET AND
MAKE SAFE.
PROVIDE AND INSTALL NEW POLE AND BASE FOR NEW 360
DEGREE SALLY PORT DRIVE CAMERA. REFER TO SHEET E-801
DETAILS 3&4 AND POLE SCHEDULE ON SHEET E-100.
PROVIDE AND INSTALL NEW NEMA 3R RATED JUNCTION BOX
ON THE EXTERIOR WALL OF BUILDING. LOCATE THE
JUNCTION BOX OUTSIDE THE COMMUNICATIONS ROOM.
DIRECTIONALLY BORE CONDUIT TO JUNCTION BOX ON
EXTERIOR WALL OF BUILDING AS SHOWN. REFER TO LOW
VOLTAGE DRAWINGS FOR CABLE TYPE AND QUANTITY.
PROVIDE AND INSTALL NEW NEMA 3R RATED JUNCTION BOX
ABOVE CAGE FOR NEW CAMERAS. REFER TO LOW VOLTAGE
DRAWINGS FOR DETAILS.
PROVIDE AND INSTALL NEW DIRECTIONALLY BORED AND
HYDRO-EXCAVATED CONDUIT AS INDICATED. (3) #8, (1) #8
GND, 2" CND. CONNECT TO EXISTING CABINET CONTROL
TRANSFORMER. ALTERNATE PHASES FOR EACH CABINET
CONNECTION.
REMOVE EXISTING LIGHT POLE TO CABINET CONNECTION.
REMOVE ASSOCIATED CONDUIT AND WIRE.
1. PROVIDE AND INSTALL NEW DIRECTIONALLY BORED
CONDUITS AND WIRE.
2. CUT OVER ALL CONNECTIONS. COORDINATE ALL SHUT
DOWNS WITH FACILITY.
3. REMOVE EXISTING POLE TO CABINET CONNECTIONS.
REMOVE ASSOCIATED CONDUIT AND WIRE.
SEQUENCE OF INSTALLATION
CABINET
EXIST.
CND AND
WIRE TO
REMAIN
EX. CABINET
CONNECTION TO BE
REMOVED
EX.
LIGHTING
CIRCUIT
NEW UPS
CONNECTION
(3) #8
(1) #8 GND
2" CND
E-200
JJD
JFS
SITE PLAN
POWER
N ELECTRICAL - SITE PLAN - POWER
C om m te ch
D es ig n
472/23198.JGH
file no.
checked by drawn by consultant issue date acctg template.
contract order no.
472ICFMaintproj consultant job no.
1065_24B sheet title
Y23464
B
EL
D
IN
G R
O
AD
N E.
, S U
IT
E
B R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
VIDEO SECURITY
UPGRADES
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t r ix
M a t r ix
5/14/26 ISSUE FOR BID
6/03/26ADDENDUM 01
SCALE: 1" = 60'-0"
400 10 20 80 150
6/04/26
DR
DR
EX PANEL "UPS-A"
120/208V-3Ø, 100A DR
EX 30KVA UPS
TEX 30KVA XFMR
TL
TL
TL
TL
TL
TL
EX PANEL "MPB"
480V-3Ø, 600A
EX PANEL "UPS"
480V-3Ø, 30A
TEX
EX PANEL "L-RPX"
120/208V-3Ø, 100A
EX PANEL "RPX"
120/208V-3Ø, 100A
EX PANEL "LP-XA"
277V-3Ø, 100A
REPLACED PANEL "RP-A"
120/208V-3Ø, 100A
EX PANEL "LP-ZA"
277V-3Ø, 100A
EX PANEL "LP-BB"
277V-3Ø, 100A
EX PANEL "EMPB"
480V-3Ø, 100A
RP-A-50,52,54
UPS-A-25,27,29
UPS-A-31
UPS-A-33
RP-A-43
UPS-A-35
RP-A-45
RP-A-47
DR
TL
TL
NEW LIGHTING
CONTACTOR
EXISTING
SENSTAR
CONTROL CENTER
MANUAL OVERIDE
BUTTON
STARTNET
2 MODULE
NEW LIGHTING 6
POLE CONTACTOR
CONTACTOR CIRCUITS
(SITE LIGHTING)
PANEL
EXISTING
UPS
480/277 V
3Ø, 4W 30A C
PANEL
EXISTING
EMPB
480/277 V
3Ø, 4W 100A
NEW SITE CABINET
CONNECTION
(3) #8
(1) #8 GND
2" CND
EX 30KVA UPS
480/277V-3Ø
30A/3P
3PH 4W
NEMA 1
FUSED
30A FUSES
(3) #8
(1) #8 GND
2" CNDEX
(4) #10
(1) #10 GND
3/4" CND
ELECTRICAL KEY NOTES
PROVIDE AND INSTALL (2) NEW BLUE 30A L21-30R TWISTLOCK
RECEPTACLE FROM UPS POWER. CONNECT TO SEPARATE
VERTICAL POWER STRIPS ON BACK OF RACK. PROVIDE AND
INSTALL ALL CONDUIT WIRE AND HARDWARE AS REQUIRED.
REFER TO SHEET E-100 DETAIL 1.
PROVIDE AND INSTALL (1) NEW BLUE 20A TWISTLOCK
RECEPTACLE FROM UPS POWER AND (1) NEW RED 20A
TWISTLOCK RECEPTACLE FROM GENERATOR POWER.
CONNECT TO SEPARATE VERTICAL POWER STRIPS ON BACK
OF RACK. PROVIDE AND INSTALL ALL CONDUIT WIRE AND
HARDWARE AS REQUIRED. REFER TO SHEET E-100 DETAIL 2.
PROVIDE AND INSTALL (2) VERTIV I10087 POWER STRIPS ON
THE BACK OF THE RACK. PROVIDE AND INSTALL ALL
CONDUIT, WIRE, AND HARDWARE AS REQUIRED.
PROVIDE AND INSTALL (2) VERTIV 38607 POWER STRIPS ON
THE BACK OF THE RACK. PROVIDE AND INSTALL ALL
CONDUIT, WIRE, AND HARDWARE AS REQUIRED.
PROVIDE AND INSTALL NEW LINE VOLTAGE SURGE
PROTECTION DEVICE IN PANEL (RAYCAP
RSE-2-277-3Y-A-10-E-F-S).
PROVIDE AND INSTALL NEW LINE VOLTAGE SURGE
PROTECTION DEVICE IN PANEL (RAYCAP
RSE-2-277-3Y-A-5-E-F-S).
DISCONNECT AND REMOVE EXISTING HORNER LIGHTING
CONTROL SERVER. REMOVE ASSOCIATED CONDUIT AND
WIRE.
MODIFY EXISTING SITE LIGHTING CIRCUITS AS INDICATED
FOR REMOVAL OF HORNER CONTROL SYSTEM. PROVIDE
NEW 60A 6P CONTACTOR. CONNECT TO EXISTING BUILDING
ULTRALINK MODULE AND STARNET2 SYSTEM. MODIFY
EXISTING CONDUIT AND WIRE AS REQUIRED.
CONTRACTOR SHALL PROVIDE NEW CONNECTION TO SITE
CABINETS. PROVIDE NEW 30A-3P DISCONNECT. REFER TO
SHEET E-200 FOR MORE INFORMATION.
CONTRACTOR SHALL REFEED EXISTING UPS PANEL FROM
PANEL EMPB AS INDICATED. USE EXISTING 30A-3P SPARE
BREAKER. RE-LABEL UPS PANEL TO "LP-XB".
1. CONTRACTOR MAY REUSE EXISTING CONDUIT AND BOXES.
INSTALLATION OF ALL NEW OR REWORKED CONDUIT, FITTINGS, AND
STRAPS SHALL FOLLOW SPECIFICATIONS LISTED ON SHEET E-100. THIS
INCLUDES ANY EXISTING CONDUIT/BOXES THAT ARE REUSED
GENERAL ELECTRICAL NOTES
E-501
JFS
EAST 100 ADMIN - SECOND
FLOOR
N
ELECTRICAL - EAST 100 ADMIN FLOOR PLAN - SECOND
FLOOR - POWER
SCALE: 1/8" = 1'-0"
0 1 5 10 20
C om m te ch
D es ig n
472/23198.JGH
file no.
checked by drawn by consultant issue date acctg template.
contract order no.
472ICFMaintproj consultant job no.
1065_24B sheet title
Y23464
B
EL
D
IN
G R
O
AD
N E.
, S U
IT
E
B R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
VIDEO SECURITY
UPGRADES
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t r ix
M a t r ix
5/14/26 ISSUE FOR BID
6/03/26ADDENDUM 01
JJD
RUPS1
EXISTING 30KVA UPS
EX PANEL "LPA"
277/480V-3Ø, 225A
EX PANEL "UPS"
277/480V-3Ø, 60A
EX SUB PANEL
120/208V-3Ø, 100A
EX PANEL "E"
120/208V-3Ø, 30A
EX PANEL "YA"
277/480V-3Ø, 225A
EX PANEL "LPEE"
277/480V-3Ø, 225A
EX SW "M-MDP"
277/480V-3Ø
E-13
EXISTING
SENSTAR
CONTROL CENTER
MANUAL OVERIDE
BUTTON
STARTNET
2 MODULE
NEW LIGHTING 9
POLE CONTACTOR
CONTACTOR CIRCUITS
(SITE LIGHTING)
PANEL
EXISTING
UPS
480/277 V
3Ø, 4W 60A C
3NEW LIGHTING
CONTACTOR1
PANEL
EXISTING
LPEE
480/277 V
3Ø, 4W 225A
NEW SITE CABINET
CONNECTION
(3) #8
(1) #8 GND
2" CND
EX 30KVA UPS
480/277V-3Ø
30A/3P
3PH 4W
NEMA 1
FUSED
30A FUSES
(3) #8
(1) #8 GND
2" CNDEX
(4) #6
(1) #10 GND
1" CND
ELECTRICAL KEY NOTES
REMOVE ANY AND ALL CAMERA SYSTEM UPS UNITS. PROVIDE AND INSTALL
NEW RACK MOUNTED 1500VA UPS UNITS. PROVIDE AND INSTALL ALL
CONDUIT, WIRE, AND HARDWARE AS REQUIRED.
PROVIDE AND INSTALL RED 20A QUAD RECEPTACLE. MOUNT DATA RACK
RECEPTACLES 90"AFF OR ON CABLE LADDER. CONNECT TO 1500VA UPS
UNIT. PROVIDE AND INSTALL ALL CONDUIT, WIRE, HARDWARE, AND
BREAKERS AS REQUIRED.
MODIFY EXISTING SITE LIGHTING CIRCUITS AS INDICATED
FOR REMOVAL OF HORNER CONTROL SYSTEM. PROVIDE
NEW 100A 9P CONTACTOR. CONNECT TO EXISTING BUILDING
ULTRALINK MODULE AND STARNET2 SYSTEM. MODIFY
EXISTING CONDUIT AND WIRE AS REQUIRED.
CONTRACTOR SHALL PROVIDE NEW CONNECTION TO SITE
CABINETS. PROVIDE NEW 30A-3P DISCONNECT. REFER TO
SHEET E-200 FOR MORE INFORMATION.
CONTRACTOR SHALL REPLACE EXISTING 30A SPARE
BREAKER IN PANEL LPEE WITH A 60A-3P. REFEED EXISTING
UPS PANEL FROM PANEL LPEE AS INDICATED. RE-LABEL UPS
PANEL TO "LPEEA".
1. CONTRACTOR MAY REUSE EXISTING CONDUIT AND BOXES.
INSTALLATION OF ALL NEW OR REWORKED CONDUIT, FITTINGS, AND
STRAPS SHALL FOLLOW SPECIFICATIONS LISTED ON SHEET E-100. THIS
INCLUDES ANY EXISTING CONDUIT/BOXES THAT ARE REUSED
GENERAL ELECTRICAL NOTES
E-506
JFS
400 WAREHOUSE BLDG -
FIRST FLOOR
N
ELECTRICAL - 400 WAREHOUSE BLDG FLOOR PLAN -
FIRST FLOOR - POWER
SCALE: 1/8" = 1'-0"
0 1 5 10 20
C om m te ch
D es ig n
472/23198.JGH
file no.
checked by drawn by consultant issue date acctg template.
contract order no.
472ICFMaintproj consultant job no.
1065_24B sheet title
Y23464
B
EL
D
IN
G R
O
AD
N E.
, S U
IT
E
B R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
VIDEO SECURITY
UPGRADES
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t r ix
M a t r ix
5/14/26 ISSUE FOR BID
6/03/26ADDENDUM 01
JJD
CAMERA EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO. DROP CEILING HARD
CEILING/WALL
BUILDING
EXTERIOR
BUILDING
EXTERIOR
CORNER
POLE MOUNT
SECURITY EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
ABBREVIATIONS
ABBREV. DESCRIPTION ABBREV. DESCRIPTION
PC-XXX
LT-XXX
NETWORK EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
COMMUNICATION CABLE SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
ACCESS CONTROL (PACS) EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
SECURITY SYMBOL LEGEND
SYMBOL DESCRIPTION
ATTIC STOCK EQUIPMENT
MARK DESCRIPTION
COMMUNICATION EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
AUDIO/VIDEO EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
TC101
LEGENDS, DETAILS
AND SCHEDULES
C om m te ch
D es ig n
B
EL
D
IN
G R
O
AD
N E.
, S U
IT
E
B R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t r ix
M a t r ix
AutoCAD SHX Text
CA
AutoCAD SHX Text
EXTERIOR (OR INTERIOR) 4K. POLE OR BUILDING MOUNTED, REMOTE AIMABLE.
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
XNV-9083RZ
AutoCAD SHX Text
USE T-BAR ABOVE CEILING
AutoCAD SHX Text
NOT REQUIRED. CAM HAS CONDUIT CUTOUT
AutoCAD SHX Text
SBP-300WMW1-ARM SBP-180HMW1-CAP SBP-300NBW-BOX
AutoCAD SHX Text
SBP-300WMW1-ARM SBP-180HMW1-CAP SBP-300NBW-BOX SBP-300KMW1-MOUNT
AutoCAD SHX Text
SBP-300WMW1-ARMSBP-180HMW1-CAP SBP-300PMW2-POLE SBP-300NBW-BOX SBP-150S-STRAPS
AutoCAD SHX Text
EXTERIOR PTZ CAMERA. POLE OR BUILDING MOUNTED. 2-MEGAPIXEL, 40X ZOOM MINIMUM
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
XNP-C6403R
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
SBP-300WMW1-ARM SBP-156HMW-CAP SBP-300NBW-BOX
AutoCAD SHX Text
SBP-300WMW1-ARM SBP-156HMW-CAP SBP-300NBW-BOX SBP-300KMW1-MOUNT
AutoCAD SHX Text
SBP-300WMW1-ARMSBP-156HMW-CAP SBP-300PMW2-POLE SBP-300NBW-BOX SBP-150S-STRAPS
AutoCAD SHX Text INDOOR AND OUTDOOR 360 FISHEYE. SINGLE IMAGER, 12 MEGAPIXEL. EQUIPPED WITH MULTIPLE ON BOARD MICROPHONES AND AI ANALYTICS
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
XNF-A9014RV
AutoCAD SHX Text
USE T-BAR ABOVE CEILING
AutoCAD SHX Text
SBV-160BW -PLATE
AutoCAD SHX Text
SBP-300WMW1-ARM SBP-160HMW1-CAP SBP-300NBW-BOX
AutoCAD SHX Text
SBP-300WMW1-ARM SBP-160HMW1-CAP SBP-300NBW-BOX SBP-300KMW1-MOUNT
AutoCAD SHX Text
NA
AutoCAD SHX Text
INDOOR SHORT DISTANCE CAMERA. 2MP. DROP OR HARD CEILING
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
XND-A6084RV
AutoCAD SHX Text
USE T-BAR ABOVE CEILING
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
INDOOR DOME CAMERA 4K,8 MEGAPIXEL. EQUIPPED WITH MULTIPLE ON-BOARD MICROPHONES
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
XND-A9084RV
AutoCAD SHX Text
USE T-BAR ABOVE CEILING
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
INDOOR PTZ CAMERA. VISITING ROOM. DROP OR HARD CEILING
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
XNP-6120HW
AutoCAD SHX Text
SHP-1680FPW RECESS MOUNT W/T-BAR
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
OBSERVATION CELL CAMERA. ANTI-LIGATURE. CORNER MOUNT
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
TNV-C7013RV
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
FREEZER CAMERA - OUTDOOR IR FISHEYE
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
XNF-A8014RV
AutoCAD SHX Text
NA
AutoCAD SHX Text
SBV-180WW
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text MULTI-HEAD CAMERA 180/270/360 DEGREES 4x4K LENSES, MOUNT ON BUILDING, POLE OR CORNER OF BLDG. PROVIDE CORRECT MOUNTS. REMOTE AIMABLE.
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
PNM-C32083RQZ
AutoCAD SHX Text
SHD-315F 2X2 TILE REPLACEMENT
AutoCAD SHX Text
NONE REQ'D
AutoCAD SHX Text
SBP-315HMW-CAP SBP-300WMW1-ARM SBP-300NBW-BOX
AutoCAD SHX Text
SBP-315HMW-CAP SBP-300WMW1-ARM SBP-300NBW-BOX SBP-300KMW1-MOUNT
AutoCAD SHX Text
SBP-315HMW-CAP SBP-300WMW1-ARM SBP-300NBW-BOX SBP-300PMW2-POLE SBP-150S-STRAP
AutoCAD SHX Text MULTI-HEAD CAMERA 180/270/360 DEGREES 4x4K LENSES, MOUNT ON BUILDING, POLE OR CORNER OF BLDG. PROVIDE CORRECT MOUNTS. SHALL INCLUDE PTZ CAMERA. FIXED CAMERAS ARE REMOTE AIMABLE.
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
PNM-C34404RQPZ
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
SBP-300WMW-ARM SBP-300NBW-BOX
AutoCAD SHX Text
SBP-300WMW-ARM SBP-300NBW-BOX SBP-300KMW1-MOUNT
AutoCAD SHX Text
SBP-300WMW-ARM -ARM SBP-300NBW-BOX SBP-300PMW2-POLE SBP-150S-STRAP
AutoCAD SHX Text
2-SENSOR CAMERA. SURFACE MOUNT-INDOOR TWO 6MP SENSORS
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
PNM-C12083RVD
AutoCAD SHX Text
USE T-BAR ABOVE CEILING
AutoCAD SHX Text
NONE REQ'D
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
180 DEGREE, PANORAMIC, INDOOR/OUTDOOR MULTI-SENSOR DOME CAMERA
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
PNM-A13022RV
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text
NONE REQ'D
AutoCAD SHX Text
NA
AutoCAD SHX Text
NA
AutoCAD SHX Text RACK MOUNT SHELF FOR PTZ POWER INJECTORS. INSTALL WHERE REQUIRED IN EACH BUILDING TO SUPPORT PTZ INJECTORS AND OTHER DEVICES THAT SHALL BE IN THE RACK.
AutoCAD SHX Text
MIDDLE ATLANTIC
AutoCAD SHX Text
UFA-14.5
AutoCAD SHX Text
NOTE
AutoCAD SHX Text CONTRACTOR SHALL PROVIDE ALL FACTORY MOUNTING EQUIPMENT/PARTS FOR CAMERAS BASED ON THE MOUNTING LOCATION
AutoCAD SHX Text
CB
AutoCAD SHX Text
CC
AutoCAD SHX Text
CD
AutoCAD SHX Text
CE
AutoCAD SHX Text
CF
AutoCAD SHX Text
CG
AutoCAD SHX Text
CH
AutoCAD SHX Text
CJ
AutoCAD SHX Text
CK
AutoCAD SHX Text
CL
AutoCAD SHX Text
CM
AutoCAD SHX Text
CN
AutoCAD SHX Text VIDEO SECURITY RECORDING AND FAILOVER ARCHIVER FOR STORING AND PROCESSING VIDEO. PROVIDE AND INSTALL ARCHIVERS WITH THE PROCESSING AND STORAGE TO MEET THE OWNERS NEED AS DETAILED ON THE DRAWINGS AND SPECS.
AutoCAD SHX Text
GENETEC STREAMVAULT
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text GENETEC DIRECTORY SERVER. INSTALL AND CONNECT. THERE SHALL BE ONE DIRECTORY SERVER AND ONE FAILOVER DIRECTORY SERVER AT THE SITE.
AutoCAD SHX Text
GENETEC STREAMVAULT
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text GENETEC CENTRAL CONTROL MONITORING PC. MUST MEET GENETEC STANDARDS FOR VIEWING STATIONS. INCLUDE WINDOWS 11. SHALL ALSO INCLUDE FOUR (4) HDMI OUTPUTS AT 4k RESOLUTION.
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text GENETEC STANDARD MONITORING PC. MUST MEET GENETEC "HIGH PERFORMANCE" STANDARDS FOR VIEWING STATIONS. INCLUDE WINDOWS 11. SHALL ALSO INCLUDE FOUR (4) HDMI OUTPUTS AT 4k RESOLUTION.
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text
SEE SPECS FOR SMALLER SIZE PC AT WARDEN CONF.
AutoCAD SHX Text GENETEC MINI MONITORING PC. MUST MEET GENETEC "RECOMMENDED" STANDARDS FOR VIEWING STATIONS. PROVIDE PC AND MOUNT TO BACK OF LCD DISPLAY.
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text
13" LAPTOP FOR VIEWING VIDEO AND MAINTAINING THE VIDEO SYSTEM. SEE SPECS.
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text
WIRELESS KEYBOARD/MOUSE KIT.
AutoCAD SHX Text
ORION
AutoCAD SHX Text
BCD-WS-KBM-W
AutoCAD SHX Text KVM SWITCH. SIZE AS REQUIRED FOR ALL ARCHIVE AND DIRECTORY SERVERS PLUS TWO SPARE SERVERS IN THE FUTURE. CONNECT ALL AND PROVIDE CABLING FOR THE TWO SPARE PORTS. LABEL KVM FOR EACH SERVER.
AutoCAD SHX Text
TRIPP LITE
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text WIRED KEYBOARD AND MOUSE. USB ATTACHED. KEYBOARD SHALL BE MINI WITH NO NUMBER KEYPAD
AutoCAD SHX Text
PERIDUO
AutoCAD SHX Text 307-B
AutoCAD SHX Text
CPU WALL MOUNT. ADJUSTABLE TO 9" WIDTH AND 23" HEIGHT
AutoCAD SHX Text
RACK SOLUTIONS
AutoCAD SHX Text
WALL-MOUNT-PC
AutoCAD SHX Text GENETEC STANDARD MONITORING PC -SMALL FORM FACTOR. MUST MEET GENETEC "HIGH PERFORMANCE" STANDARDS FOR VIEWING STATIONS. INCLUDE WINDOWS 11. SHALL ALSO INCLUDE FOUR (4) HDMI OUTPUTS AT 4k RESOLUTION.
AutoCAD SHX Text
GENETEC
AutoCAD SHX Text
SVW-T3-S2000
AutoCAD SHX Text BLU-RAY DVD DUPLICATOR. EQUIP WITH BUILT-IN USB 3.0 FOR DIRECT PC CONNECTION AND 500 GB HDD INTERNAL DRIVE.
AutoCAD SHX Text
EX-DUPE
AutoCAD SHX Text Blu-Ray 16X EZDBR058
AutoCAD SHX Text
EXTERNAL DVD/BLU-RAY WRITER AND READER. EQUIP WITH 400 BLU-RAY DVD'S
AutoCAD SHX Text
OWC
AutoCAD SHX Text
OWCMR3UBDRW16
AutoCAD SHX Text
SD
AutoCAD SHX Text
SC
AutoCAD SHX Text
SB
AutoCAD SHX Text
SA
AutoCAD SHX Text
SE
AutoCAD SHX Text
SF
AutoCAD SHX Text
SG
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text
CCC-YYXX
AutoCAD SHX Text R
AutoCAD SHX Text 2G
AutoCAD SHX Text
TWO-GANG BOX - PROVIDED BY EC
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
AC
AutoCAD SHX Text ABOVE COUNTER - INSTALL BACKBOX SAME HEIGHT AS OTHER ELECTRICAL OUTLETS ABOVE THE COUNTER.
AutoCAD SHX Text
PBO
AutoCAD SHX Text
PROVIDED BY OTHERS
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
PCO-1
AutoCAD SHX Text
PATCH CORD ORGANIZER - 1 UNIT HIGH
AutoCAD SHX Text
AFG
AutoCAD SHX Text
ABOVE FINISHED GROUND
AutoCAD SHX Text
PCO-2
AutoCAD SHX Text
PATCH CORD ORGANIZER - 2 UNITS HIGH
AutoCAD SHX Text
AWG
AutoCAD SHX Text
AMERICAN WIRE GAUGE
AutoCAD SHX Text
PER
AutoCAD SHX Text
PROTECTED ENTRANCE TERMINAL
AutoCAD SHX Text
C-EMT
AutoCAD SHX Text
EMT TYPE CONDUIT
AutoCAD SHX Text
QTY
AutoCAD SHX Text
QUANITY
AutoCAD SHX Text
EC
AutoCAD SHX Text
ELECTRICAL CONTRACTOR
AutoCAD SHX Text X
AutoCAD SHX Text NETWORK SWITCH WITH 8 PoE PORTS. OUTDOOR AND WIDE TEMPERATURE RANGE. SHALL HAVE THE FIBER OPTIC MODULES TO CONNECT TO ADMIN SWITCH. EQUIP WITH ALL APPROPRIATE SFP MODULES REQUIRED FOR A FULLY OPERATIONAL SYSTEM. PROVIDE A POWER SUPPLY FOR EACH SWITCH TO ALLOW 60 PoE WATTS PER PORT.
AutoCAD SHX Text
COMNET
AutoCAD SHX Text
CNGE11FX3TX8MSPOEHOK. INCLUDE POWER SUPPLY AND SFP MODULES
AutoCAD SHX Text CORE ETHERNET SWITCH. CONNECT TO FIBER BACKBONE AND SERVERS. EQUIP WITH PORTS AND SFP MODULES. 10 GIGABIT CONNECTIVITY TO ALL BUILDINGS AND SERVERS. 1 GIGABIT CONNECTIVITY TO ALL PERIMETER CABINETS.
AutoCAD SHX Text
CISCO
AutoCAD SHX Text
C9500 SERIES C9500-48Y4C-A
AutoCAD SHX Text CORE ETHERNET SWITCH. SHALL PROVIDE 10gIG CONNECTIVITY TO THE CORE SWITCHES. SHALL PROVIDE NO LESS THAN 48 PoE+ PORTS.
AutoCAD SHX Text
CISCO
AutoCAD SHX Text C9200L-48P-4X-E
AutoCAD SHX Text ETHERNET SWITCH - IN A BUILDING FOR CONNECTIVITY TO CAMERAS AND USER PC'S. 48 COPPER PORTS POE+ WITH 10 GIGABIT SFP MODULE. VERIFY FIBER TYPE.
AutoCAD SHX Text
CISCO
AutoCAD SHX Text C9200L-48P-4X-E
AutoCAD SHX Text NEW PoE INJECTOR TO BE PROVIDED FOR ALL NEW AND EXISTING PTZ CAMERAS MOUNTED TO THE BUILDING EXTERIOR.
AutoCAD SHX Text
HANWHA
AutoCAD SHX Text
SPO-8315
AutoCAD SHX Text
NA
AutoCAD SHX Text
NB
AutoCAD SHX Text
NC
AutoCAD SHX Text
ND
AutoCAD SHX Text
NE
AutoCAD SHX Text
SH
AutoCAD SHX Text
SJ
AutoCAD SHX Text
SK
AutoCAD SHX Text
24 STRAND, SINGLEMODE FIBER CABLE. INDOOR/OUTDOOR RATED.
AutoCAD SHX Text
OCC
AutoCAD SHX Text
DX024TSLX9YP
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
EXTERIOR RATED CAT-6A CABLE FOR ETHERNET CONNECTIVITY.
AutoCAD SHX Text
BELDEN
AutoCAD SHX Text
OSB6U
AutoCAD SHX Text
PLENUM RATED, GREEN, CAT-6 CABLE FOR ETHERNET CONNECTIVITY.
AutoCAD SHX Text
MOHAWK
AutoCAD SHX Text M58286
AutoCAD SHX Text LONG DISTANCE, PLENUM RATED CABLE. USE FOR CAMERAS MORE THAN 300' AWAY FROM THE COMM ROOM.
AutoCAD SHX Text
GAME CHANGER
AutoCAD SHX Text 258300310
AutoCAD SHX Text LONG DISTANCE, OUTDOOR RATED CABLE. USE FOR CAMERAS MORE THAN 300' AWAY FROM THE COMM ROOM.
AutoCAD SHX Text
GAME CHANGER
AutoCAD SHX Text 258340804
AutoCAD SHX Text HDMI MALE TO MALE CABLE, LENGTH AS SHOWN. CONNECT PC TO PLATE. ACTIVE HDMI TO SUPPORT DISTANCES UP TO 75'
AutoCAD SHX Text
LEGRAND
AutoCAD SHX Text
CONTRACTOR
AutoCAD SHX Text
CAT-6 UTP CABLES FOR ACCESS CONTROL CONNECTIONS. PINK COLOR
AutoCAD SHX Text
MOHAWK
AutoCAD SHX Text M58282
AutoCAD SHX Text
PLENUM RATED CAT-6 CABLE FOR VIDEO TRANSMISSION
AutoCAD SHX Text
MOHAWK
AutoCAD SHX Text
VARIOUS
AutoCAD SHX Text
ACCESS CONTROL CABLE. COMBO CABLE FOR CR, DC, ES/EL ETC-PLENUM- PINK IN COLOR
AutoCAD SHX Text
CONTRACTOR
AutoCAD SHX Text
CONTRACTOR
AutoCAD SHX Text INDIVIDUAL SECURITY DEVICE CABLE. PROVIDE AS PER MANUFACTURERS REQUIREMENTS. -PLENUM RATED. PINK IN COLOR
AutoCAD SHX Text
CONTRACTOR
AutoCAD SHX Text
CONTRACTOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ACCESS CONTROL SYSTEM, SOFTWARE TO BE ADDED TO EXISTING CAMERA SERVER
AutoCAD SHX Text
GENETEC
AutoCAD SHX Text
GSC-SY-S
AutoCAD SHX Text
ACCESS CONTROL ENCLOSURE. BACKPLATE AND LOCKABLE PANEL
AutoCAD SHX Text
ALTRONIX
AutoCAD SHX Text
TROVE 1/2/3
AutoCAD SHX Text POWER SUPPLY FOR ACCESS CONTROL EQUIPMENT. EQUIP WITH ETHERNET CONNECTIVITY MODULE
AutoCAD SHX Text
ALTRONIX
AutoCAD SHX Text
E-FLOW SERIES W/ LINQ2 ENET MOD.
AutoCAD SHX Text POWER DISTRIBUTION BOARD AND VOLTAGE REGULATOR. POWERS OTHER BOARDS IN THE ACCESS CTRL PANEL
AutoCAD SHX Text
ALTRONIX
AutoCAD SHX Text
PDS8 SERIES WITH VR6 REGULATOR
AutoCAD SHX Text
ACCESS POWER CONTROLLER
AutoCAD SHX Text
ALTRONIX
AutoCAD SHX Text
ACMS8 OR EQUAL
AutoCAD SHX Text
DOOR ACCESS CONTROL MODULE. IP ATTACHED. QTY AS REQUIRED
AutoCAD SHX Text
GENETEC
AutoCAD SHX Text
SY-LP4502
AutoCAD SHX Text
DOOR ACCESS CONTROL MODULE. RS-485 ATTACHED. QTY AS REQUIRED
AutoCAD SHX Text
GENETEC
AutoCAD SHX Text
SY-MR52-S3
AutoCAD SHX Text
ACCESS CONTROL SYSTEM CONTROLLER/APPLIANCE
AutoCAD SHX Text
GENETEC
AutoCAD SHX Text
SY-CLOUDLINK
AutoCAD SHX Text
CARD READER. MOUNT ON A SINGLE GANG BOX
AutoCAD SHX Text
GENETEC
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text
BATTERY FOR ACCESS CONTROL PANEL
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text
SEE SPECS
AutoCAD SHX Text
INTERCOM BASE STATION
AutoCAD SHX Text
AIPHONE
AutoCAD SHX Text
IX-MV7-HW-JP
AutoCAD SHX Text
IP PROGRAMMABLE RELAY
AutoCAD SHX Text
AIPHONE
AutoCAD SHX Text
IXW-MA
AutoCAD SHX Text INTERCOM -SURFACE MOUNT. EQUIP WITH CUSTOM BACKBOX AND PUSHBUTTON BELOW. CUSTOM WIRE TO SUPPORT ADA APPROVED CALL BUTTON HEIGHT
AutoCAD SHX Text
AIPHONE /ALARM CONTROLS
AutoCAD SHX Text
IX-DVF
AutoCAD SHX Text
DUAL FREQUENCY READER THAT SUPPORT MOBILE ACCESS. USB ATTACHED
AutoCAD SHX Text
HID
AutoCAD SHX Text
OMNIKEY 5427CK
AutoCAD SHX Text
CARD PRINTER
AutoCAD SHX Text
FARGO
AutoCAD SHX Text
DTC1250E
AutoCAD SHX Text
PD
AutoCAD SHX Text
PC
AutoCAD SHX Text
PB
AutoCAD SHX Text
PA
AutoCAD SHX Text
PE
AutoCAD SHX Text
PF
AutoCAD SHX Text
PG
AutoCAD SHX Text
PH
AutoCAD SHX Text
PJ
AutoCAD SHX Text
PL
AutoCAD SHX Text
PM
AutoCAD SHX Text
PN
AutoCAD SHX Text
PO
AutoCAD SHX Text
PP
AutoCAD SHX Text
PQ
AutoCAD SHX Text THIS SYMBOL WITH A NUMBER INSIDE REFERS TO KEYNOTES. REFER TO NOTES ON THE SHEET FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text EQUIPMENT SCHEDULE. THIS SYMBOL WITH LETTERS INSIDE REFERS EQUIPMENT SCHEDULES, SEE DETAILS AND EQUIPMENT SCHEDULES ON TC101, TC301, TC501 AND TC701.
AutoCAD SHX Text CABLE SCHEDULE. THIS SYMBOL WITH NUMBERS INSIDE REFERS EQUIPMENT SCHEDULES, SEE DETAILS AND EQUIPMENT SCHEDULES ON TC101, TC301, TC501 AND TC701.
AutoCAD SHX Text ACCESS CONTROL SYMBOL. "XX" IS LETTERS. SEE DETAILS ON TC5XX SHEETS FOR EQUIPMENT, CABLING AND RACEWAY DETAILS.
AutoCAD SHX Text ACCESS CONTROL SYMBOL FOR EXISTING DEVICES. "XX" IS LETTERS. SEE DETAILS ON TC5XX SHEETS. LEAVE DEVICES AND CONNECT TO NEW SYSTEM OR LEAVE AS CONNECTED TO EXISTING SYSTEM. SEE NOTES AND DETAILS
AutoCAD SHX Text SECURITY CAMERA AT NEW LOCATION. PROVIDE AND INSTALL A NEW SECURITY CAMERA. SEE DETAILS ON TC1XX SHEETS.
AutoCAD SHX Text SECURITY CAMERA WITH 180 DEGREE VIEWING. PROVIDE AND INSTALL A NEW SECURITY CAMERA. SEE DETAILS ON TC1XX SHEETS.
AutoCAD SHX Text SECURITY CAMERA WITH 360 DEGREE VIEWING, SINGLE-IMAGER. PROVIDE AND INSTALL A NEW SECURITY CAMERA. SEE DETAILS ON TC1XX SHEETS.
AutoCAD SHX Text SECURITY CAMERA WITH 360 DEGREE VIEWING, MULTI-IMAGER. PROVIDE AND INSTALL A NEW SECURITY CAMERA. SEE DETAILS ON TC1XX SHEETS.
AutoCAD SHX Text EXISTING SECURITY CAMERA TO REMAIN. LEAVE IN PLACE AND CONFIGURE ON NEW VMS SYSTEM.
AutoCAD SHX Text CAMERA NUMBER AND CABLE TO BE USED FOR REPLACEMENT OF EXISTING CAMERA AT THE SAME LOCATION. CONFIGURE NEW CAMERA ON NEW VMS SYSTEM.
AutoCAD SHX Text EXISTING SECURITY CAMERA TO BE REMOVED. PROVIDE ALL PATCHING OF WALL OR CEILING PENETRATION AS REQ'D.
AutoCAD SHX Text COMPUTER. PROVIDE AND INSTALL A PC FOR THE SECURITY SYSTEM. SEE DETAILS ON TC1XX SHEETS FOR REQUIREMENTS.
AutoCAD SHX Text LAPTOP COMPUTER. PROVIDE AND INSTALL A LAPTOP FOR THE SECURITY SYSTEM. SEE DETAILS ON TC1XX SHEETS FOR REQUIREMENTS.
AutoCAD SHX Text
CAMERA IDENTIFIER - CCC = SITE CODE - YY = BUILDING NUMBER/XX = CAMERA NUMBER.
AutoCAD SHX Text
POLE IDENTIFIER - PL = POLE
AutoCAD SHX Text NEW CAMERA POLE - CONTRACTOR TO INSTALL NEW POLE AT THIS LOCATION TO SUPPORT NEW CAMERA LOCATION. SEE ELECTRICAL DRAWINGS.
AutoCAD SHX Text NEW PERIMETER NETWORK CABINET WITH FIBER CONNECTIVITY. CABINET PROVIDES LOCAL CONNECTIONS TO CAMERAS AND LIGHTING FOR CONTROL. REFER TO DETAILS FOR CABINET EQUIPMENT BUILD OUTS.
AutoCAD SHX Text MONITOR AND MOUNT LOCATION - REFER TO DETAILS FOR MOUNTING AND CABLING REQUIREMENTS.
AutoCAD SHX Text SECURITY PANEL. PROVIDE PANEL AND CONNECT AS SHOWN ON FLOORPLANS AND IN THE SPECIFICATIONS.
AutoCAD SHX Text
DOOR NUMBER
AutoCAD SHX Text
CAB-XXX
AutoCAD SHX Text P
AutoCAD SHX Text
LCD.XX"
AutoCAD SHX Text
XXX
AutoCAD SHX Text
SEC.PNL
AutoCAD SHX Text
XX
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
XX
AutoCAD SHX Text
SL
AutoCAD SHX Text SEE ATTIC STOCK SPECIFICATION 28 7100 FOR EQUIPMENT TO BE PROVIDED AS PART OF ATTIC STOCK
AutoCAD SHX Text
SM
AutoCAD SHX Text 2-POST RACK:7'x19" BLACK RELAY RACK EQUIPPED WITH ONE FULL-LENGTH 6" VERTICAL ORGANIZER. RELAY RACK IS TO BE CONFIGURED WITH VERTICAL & HORIZONTAL CABLE LADDER AS SHOWN ON THE DRAWINGS AND AS DESCRIBED IN THE SPECS. EACH RACK SHALL BE CONFIGURED WITH ONE (1) 6" WIDE VERTICAL ORGANIZER.
AutoCAD SHX Text
ORTRONICS
AutoCAD SHX Text
19-84-T2SD-B/
AutoCAD SHX Text 4-POST ADJUSTABLE RACK. PUNCHED 3/8" HOLES. EQUIP WITH TWO 6" VERTICAL ORGANIZERS. EQUIP WITH CAGE NUTS FOR 19" RACK COMPONENTS. EQUIP WIITH CABLE LADDER AS PER SPECS AND DETAILS.
AutoCAD SHX Text
ORTRONICS
AutoCAD SHX Text
19-84-SSDA2132
AutoCAD SHX Text POWER STRIP, VERTICAL, FOR BACK OF EACH RACK. SHALL HAVE (6) NEMA 5-20R RECEPTACLES AND SHALL BE 18" LONG. PLUG INTO WALL OUTLET. ATTACH THE POWER STRIP TO THE BACK OF THE VERTICAL CABLE LADDER OF EACH RACK.
AutoCAD SHX Text
SEE ELECTRICAL
AutoCAD SHX Text
SEE ELECTRICAL SPECS
AutoCAD SHX Text
SINGLE RACK UNIT PATCH CORD ORGANIZER (PCO-1) WITH HINGED COVER.
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
HS13C
AutoCAD SHX Text PATCH PANEL-24 PORT, EQUIPPED WITH 8-PIN MODULAR JACKS TO MATCH THE CABLE COLOR AND CABLE TYPE BEING TERMINATED. PROVIDE ONE MODULAR JACK FOR EACH CABLE BEING TERMINATED. SEE SPEC AND DRAWINGS FOR COLORS. EQUIP WITH REAR CABLE ORGANIZER.
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
PANEL:HPJ24 ORGANIZER:HPRCMB
AutoCAD SHX Text RACK MOUNT FIBER PANEL. USE WHEN TERMINATING 24 OR LESS FIBER STRANDS. PROVIDE EACH FIBER PANEL WITH "LC" 12 OR 24 PACKS AS REQUIRED FOR TERMINATION OF ALL FIBERS. PROVIDE SPLICE TRAY AND SHELF FOR FUSION SPLICES TO PIGTAILS.
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
FPR3SP
AutoCAD SHX Text EXISTING WALL MOUNT FIBER PANEL. USE WHEN TERMINATING UP TO 48 FIBER STRANDS. FIBER PANEL EXISTS. REPLACE SC FSP MODULES WITH NEW "LC" 12 OR 24 PACKS AS REQUIRED FOR TERMINATION OF ALL FIBERS. PROVIDE NEW SPLICE TRAY AND SHELF FOR FUSION SPLICES TO PIGTAILS.
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
EXISTING. PROVIDE NEW LC FSP MODULES AND SPLICES
AutoCAD SHX Text FIBER OPTIC CABLE STOWAGE RING. WALL MOUNTED. 12" OR 24". PROVIDE AND INSTALL TO SUPPORT BEND RADIUS REQUIREMENTS OF THE FIBER CABLE.
AutoCAD SHX Text
LEVITON
AutoCAD SHX Text
12" #48900-IFR / 24" #48900-OFR
AutoCAD SHX Text
CAT-6 POE LIGHTNING ARRESTOR. INSTALL AND CONNECT TO GROUND WITH WIRE.
AutoCAD SHX Text
SEE ELECTRICAL SPECS
AutoCAD SHX Text
SEE ELECTRICAL SPECS
AutoCAD SHX Text
SURFACE MOUNT BOX FOR NEW CABLES IN PERIMETER CABINET. SIZE AS REQUIRED.
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
HSB SERIES.
AutoCAD SHX Text WALL MOUNT RACK. SHALL BE SWING GATE RACK. EQUIP WITH HEAVY DUTY SWING GATE KIT AND CABLE ROUTING ACCESSORIES.
AutoCAD SHX Text
CHATSWORTH
AutoCAD SHX Text
11792-X25 W/HEAVY DUTY SWING KIT
AutoCAD SHX Text
GUARD DESK WITH SLIDING MOUSE TRAY. GRAY IN COLOR. REMOVE CASTERS AND INSTALL.
AutoCAD SHX Text
GLOBAL INDISTRIAL
AutoCAD SHX Text
T9F706669GY W/273113
AutoCAD SHX Text VERTICAL ORGANIZER FOR MOUNTING TO THE SIDE OF A RACK. WHERE THE RACK IS LESS THAN 7', CUT OFF VERTICAL ORGANIZER TO FIT RACK.
AutoCAD SHX Text
RLX
AutoCAD SHX Text
3326-BJ06
AutoCAD SHX Text TELECOMMUNICATIONS GROUND BAR (TGB). 1/4"x4"x10" EQUIPPED WITH INSULATED STAND-OFFS.
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
HBBB14210A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text
SN
AutoCAD SHX Text 21" COMMERCIAL GRADE LCD MONITOR FOR VIDEO SECURITY CAMERAS. PROVIDE A TABLE TOP MOUNT AND ALL CABLING REQUIRED. NATIVE 4K VIDEO RESOLUTION
AutoCAD SHX Text
LG
AutoCAD SHX Text
22MD4KA-B
AutoCAD SHX Text
22" LCD MONITOR. HD RESOLUTION.
AutoCAD SHX Text
NEC
AutoCAD SHX Text
EA224WMI-BK
AutoCAD SHX Text 27" COMMERCIAL GRADE LCD MONITOR FOR VIDEO SECURITY CAMERAS. PROVIDE A TABLE TOP MOUNT AND ALL CABLING REQUIRED. NATIVE 4K VIDEO RESOLUTION
AutoCAD SHX Text
NEC
AutoCAD SHX Text
DD-EA272U
AutoCAD SHX Text 32" COMMERCIAL GRADE LCD MONITOR FOR VIDEO SECURITY CAMERAS. PROVIDE A WALL OR CEILING MOUNT AS REQUIRED IN THE FIELD AND ALL CABLING REQUIRED. NATIVE 4K VIDEO RESOLUTION
AutoCAD SHX Text
SHARP
AutoCAD SHX Text
PN-M322
AutoCAD SHX Text 43" COMMERCIAL GRADE LCD MONITOR FOR VIDEO SECURITY CAMERAS. PROVIDE A TABLE TOP MOUNT AND ALL CABLING REQUIRED. NATIVE 4K VIDEO RESOLUTION
AutoCAD SHX Text
NEC
AutoCAD SHX Text
4PB43EJ2U
AutoCAD SHX Text 55" COMMERCIAL GRADE LCD MONITOR FOR VIDEO SECURITY CAMERAS. PROVIDE A MONITOR MOUNT AND ALL CABLING REQUIRED. NATIVE 4K VIDEO RESOLUTION
AutoCAD SHX Text
SHARP
AutoCAD SHX Text
PN-M552
AutoCAD SHX Text 65" FLAT PANEL. EQUIP WITH A MOUNT. PROVIDE A MONITOR MOUNT AND ALL PROVIDE A MONITOR MOUNT AND ALL CABLING REQUIRED. NATIVE 4K VIDEO RESOLUTION. NATIVE 4K VIDEO RESOLUTION
AutoCAD SHX Text
SHARP
AutoCAD SHX Text
PN-M652
AutoCAD SHX Text 75" FLAT PANEL. EQUIP WITH A MOUNT. PROVIDE A MONITOR MOUNT AND ALL PROVIDE A MONITOR MOUNT AND ALL CABLING REQUIRED. NATIVE 4K VIDEO RESOLUTION. NATIVE 4K VIDEO RESOLUTION
AutoCAD SHX Text
SHARP
AutoCAD SHX Text
PN-M752
AutoCAD SHX Text CEILING MOUNT FOR 32" OR 43" DISPLAY. PROVIDE CEILING ADAPTER AND CUSTOM DOWNPIPE.WHERE PC IS TO BE MOUNTED, INCLUDE PC MOUNT
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
MCM1U W/ADAPTER CPA330. PC MOUNT FCA515
AutoCAD SHX Text
PULL OUT MOUNT FOR FLAT PANEL 32" AND 43" DISPLAY
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
TS218SU
AutoCAD SHX Text
PULL OUT MOUNT FOR FLAT PANEL 55"
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
TS325TU
AutoCAD SHX Text
PULL OUT MOUNT FOR FLAT PANEL 65" AND 75"
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
TS525TU
AutoCAD SHX Text AT EACH DISPLAY WHERE THERE ARE DEVICES TO BE INSTALLED BEHIND THE FLAT PANEL DISPLAY, INSTALL A COMPONENT STORAGE PANEL
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CSMP9X12
AutoCAD SHX Text
MONITOR HOOD FOR 27" MONITORS.
AutoCAD SHX Text
VIEWSONIC
AutoCAD SHX Text
MH27M1
AutoCAD SHX Text
MONITOR PRIVACY SCREEN 27" - DESKTOP SECURITY AND FILTER PROTECTOR.
AutoCAD SHX Text 3M
AutoCAD SHX Text
PF270W9B
AutoCAD SHX Text
PC ENCLOSURE. MOUNT ON WALL
AutoCAD SHX Text
AFC INDUSTRIES
AutoCAD SHX Text 772445
AutoCAD SHX Text
RACK MOUNT SHELF. ATTACH TO FRONT RACK RAILS. 14.5" DEEP
AutoCAD SHX Text
MIDDLE ATLANTIC
AutoCAD SHX Text
UFA-14.5
AutoCAD SHX Text
PTZ VIDEO CONFERENCE CAMERA
AutoCAD SHX Text
LOGITECH
AutoCAD SHX Text
PTZ PRO 2
AutoCAD SHX Text
MICROPHONE AND SPEAKER COMBO DEVICE. DESKTOP, USB ATTACHED
AutoCAD SHX Text
EMEET
AutoCAD SHX Text
OFFICE CORE M2 MAX
AutoCAD SHX Text
CONTROL PANEL. 6-BUTTON CONTROLLER WITH INTERFACE PLATE
AutoCAD SHX Text
KRAMER
AutoCAD SHX Text
RC-306
AutoCAD SHX Text
HDMI/USB SWITCHERS, TRANSMITTER AND RECEIVER
AutoCAD SHX Text
KRAMER
AutoCAD SHX Text
SWT-21-HU-TR
AutoCAD SHX Text
USB DOCKING STATION FOR LAPTOP. WITH DUAL HDMI OUT
AutoCAD SHX Text
DELL
AutoCAD SHX Text D3100
AutoCAD SHX Text
DESTKOP FACEPLATE WEDGE. 1-GANG. PROVIDE AND MOUNT PLATE
AutoCAD SHX Text
FSR
AutoCAD SHX Text
DSKB-1G
AutoCAD SHX Text
TABLE TOP POWER TOWER WITH USB CHARGING PORTS
AutoCAD SHX Text
NTONPOWER
AutoCAD SHX Text
8-120 VOLT, 2-USBA, 2-USBC
AutoCAD SHX Text
ETHERNET SWITCH. MOUNT ON BACK OF PC ENCLOSURE
AutoCAD SHX Text
NETGEAR
AutoCAD SHX Text
GS305PP
AutoCAD SHX Text
CONTACT CLOSURE BUTTON AND CABLE. CONNECT AND TEST
AutoCAD SHX Text
KRAMER
AutoCAD SHX Text
RC-10TB
AutoCAD SHX Text
55" MONITOR PRIVACY SCREEN
AutoCAD SHX Text
DELL
AutoCAD SHX Text
AMDHZ
AutoCAD SHX Text
XA
AutoCAD SHX Text
XB
AutoCAD SHX Text
XC
AutoCAD SHX Text
XD
AutoCAD SHX Text
XE
AutoCAD SHX Text
XF
AutoCAD SHX Text
XG
AutoCAD SHX Text
XH
AutoCAD SHX Text
XK
AutoCAD SHX Text
XL
AutoCAD SHX Text
XM
AutoCAD SHX Text
XN
AutoCAD SHX Text
XO
AutoCAD SHX Text
XP
AutoCAD SHX Text
XQ
AutoCAD SHX Text
XS
AutoCAD SHX Text
XU
AutoCAD SHX Text
XV
AutoCAD SHX Text
XX
AutoCAD SHX Text
YA
AutoCAD SHX Text
YC
AutoCAD SHX Text
YD
AutoCAD SHX Text
YE
AutoCAD SHX Text
YF
AutoCAD SHX Text
YB
AutoCAD SHX Text
YG
AutoCAD SHX Text
AutoCAD SHX Text
YH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
472/23198.JGH
AutoCAD SHX Text file no.
AutoCAD SHX Text checked by
AutoCAD SHX Text drawn by
AutoCAD SHX Text consultant
AutoCAD SHX Text issue date
AutoCAD SHX Text acctg template.
AutoCAD SHX Text contract order no.
AutoCAD SHX Text 472ICFMaintproj
AutoCAD SHX Text consultant job no.
AutoCAD SHX Text 1065_24B
AutoCAD SHX Text sheet title
AutoCAD SHX Text
VIDEO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .