This is a Bidding and Contract Document for a roof restoration project at the Marquette Branch Prison in Marquette, Michigan. The project, with DTMB File No. 472/19456.JBB, involves removing the existing EPDM and ballasted roof system and installing a new fully adhered 60 mil EPDM roofing system with a 20-year warranty. A mandatory pre-bid conference and site tour will be held on February 18, 2020. Bids are due on March 4, 2020 at 2:00 pm local time through the SIGMA VSS website. The contract time for completion is 120 calendar days.
The project is funded under Funding Code 171CODOC7237. A 5% bid bond is required, and the successful bidder must provide performance and payment bonds. Bidders must provide qualifications including experience modification rating, proposed superintendent, and list of similar projects completed. Nominated subcontractors must also be identified. The contract will be awarded to the responsive and responsible best value bidder, with a 10% pricing preference for qualified disabled veteran-owned businesses if they meet the requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Admin 472-19456.JBB (Advertisment).pdf | ||
| LEIN Request REV 09-2019.pdf | ||
| Admin 472-19456 JBB Bid Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
State of Michigan Department of Technology, Management and Budget
State Facilities Administration Design and Construction Division
DCSPEC
Bidding and Contract Document
Minor Projects
File No. 472/19456.JBB
Funding Code -171CODOC7237
DOC/Marquette Branch Prison Restoring Various Roof Admin/Brooks Center
Marquette, MI
December 10, 2019
Bi
DT
ht
F
C
B
M
S B I
F
B
By
BA
Al
Bu
A
AC
BI
Pr
Pr Pr m
Th su dding and Con
TMB-0401D (R 0
ids must be su tps://sigma.mic
FILE NUMBER
472/19456.JBB
CONTRACT TIM
120 Calendar Da
BID OPENING D
March 4, 2020
SEE SECTION 00
BID: WE PROPO
IN CONSIDERAT
FIRM NAME AN
□ Qualified Disa
BIDDER'S SIGN
y signing this bid
ASE BID FRO
ternate1: (Add ternate 2: (Add ternate 3: (Add uilders Risk In
PERFORMANC
CCOMPANIED B
DDERS ARE AL
roject Scope of rovide remova rovide a fully a anufacture’s 30 he Bidder must ubstitution prop ntract Documen
05/19)
DEPART
ubmitted elec chigan.gov/web
B
ME(S)
ays
DATE
at
0100 INSTRUCTIO
OSE TO FURNISH
TION OF THE BID
D COMPLETE A
abled Veteran
ATURE AND TIT
above, bidder ce
OM BID SCH
(use words)
/Subtract) ____ d/Subtract) ___ d/Subtract) ___ nsurance is NO
CE BOND AND
BY A FIVE (5) PE
LSO CAUTIONED
f Work:
l of the existin dhered 60 mil 0 year warranty t figure its Bas posals will be p nt (R 5/19)
TMENT OF
tronically thro bapp/PRDVSS
FUNDING
171CODO
PROJECT
Admin/Broo t 2:00 pm Loca
ONS TO BIDDER
H, PERFORM AN
D PRICE (S) STAT
ADDRESS
TLE
ertifies their encl
HEDULE (Inc
OT provided b
A PAYMENT
ERCENT BID GU
D TO FAMILIAR
ng EPDM & ba EPDM roofing y system instal e Bid on the sp ermitted after B
Project Na
BID S
F TECHNOL
STATE FACI
DESIGN AND
3111 W Lansi ough the SIGM S2X1/AltSelfSer
CODE
OC19007
NAME
ok Center Roof R al Time
RS AND SECTION
ND COMPLETE T
TED BELOW.
osed Qualified D clude specified
(use words)
(use words)
(use words) by the State of
BOND ARE R
UARANTEE.
RIZE THEMSELV
allasted system system, flashi llation requirem pecified, or Add Bid opening, ex ame: Restoring
SUMMARY
LOGY, MA
ILITIES ADMIN
CONSTRUCT
W. St. Joseph ng, Michigan 4
MA VSS websi rvice
D
Restoration
FO
S
N 00700 GENERA
THE ENTIRE WO
TE
FE
(pr
DATE W
Disabled Veteran d Allowances f Michigan.
REQUIRED FOR
VES WITH ALL O
m for the two ngs and protec ments. Project w dendum-appro xcept as provid g Various Roof
Y
NAGEMEN
NISTRATION
TION DIVISION
Street 48917 ite at
EPARTMENT/A
DOC/Marquette
OR AN EXAMIN
Sean Sundholm
AL CONDITIONS
ORK IN ACCORD
ELEPHONE NU
EDERAL I.D. NU
rotected information requir
WITNESS' SIGNA
n and Michigan-B s):
R ALL BIDS OV
OF THE OTHER
building areas ction pads. EP will require a 2 oved, materials ded in the Gene f Admin/Brook
NT AND BU
N
AGENCY
e Branch Prison
LO
M
NATION OF THE
m (906) 226-27
PROVIDED WITH
DANCE WITH THE
MBER and E-MA
UMBER (LAST
red for processing paymen
ATURE
Based Business C
______Dollars
______ Dollars
VER $50,000.00
CONDITIONS O
s along with fla PDM system sh
0 year warrant s and equipmen eral Conditions
Center File N
UDGET
n
OCATION
Marquette, MI
SITE CONTACT
H THE BIDDING D
E CONTRACT DO
AIL ADDRESS
4 ONLY)
nts)
Certifications.
s $__________ (in figures
(in figure
(in figure
(in figure
0. EACH BID M
OF THE CONTRA
ashing and pro hall be construc ty certificate.
nt only. No “o s.
No. 472/19456.
T:
DOCUMENTS.
OCUMENTS
DATE
s) es) es) es)
MUST BE
ACT.
otection pads.
ction using the or equal” or
.JBB
E
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:
FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description (Bidder to write price in Words)
Unit Price
Item Bid Price
1 1 General Conditions
2 1 Demo existing roof system
3 1 Proposed EPDM
4 1 Proposed Insulation
5 1 Flashing
6 1 Protective Mats
7 1 Security Fencing
8 1 Electrical raceway
9 1 Roof Turbines
10 1 20 year Warranty
11 1 Repair Allowance Amount $15,000 $15,000
12 1 OD ALLOWANCE AMOUNT $15,000 $15,000
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________ (use words) (in figures)
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Alternate Item No.
Bid Quantity
Description (Bidder to write price in Words)
Unit Price
Item Bid Price
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.
Item No.
Units or Quantity
Description (Bidder to write price in Words)
Bidder’s Bid Price
Price Proposed By The Owner
1 60 4’x8’ of 2” iso insulation
‘Q co
‘Q
Th do
Ea dis Q
Fr
T
V o If
I c ga siz
I a bu dding and Con
Qualified Disabl onnected disab
Qualified Disabl
The ven he contractor r ocumentation p ach bid reque
8.1241.3 shall sability (if the d DV ownership.
raudulent Certif
To qualify as a
Vendor must ha or f the business check all that a
F a
F
W certify that I ha aining the statu ze of the busin authorize the M usiness indicate dder shall also
Bid
Bid
Pri wit
Fraudule
WILLFU
WHICH
$25,000 ntract Documen led Veteran,’ m bility.
ed,’ means a b ndor represent represents and per the followin sting the Qua include a DD2 disability is not ication as a Qua
(Info
Michigan Base ave, during the is newly estab apply):
Filed a Michig apportioned to
208.1 – 208.14 Filed a Michiga
Withheld Michi Department of ave personal k us of a Michiga ess and the na
Michigan Depa ed above and t o indicate one o dder qualifies a dder does not q ncipal place of hin the State o ent Certification
LLY SUBMITS A
IT HAS ITS PRI
and subject to d nt (R 5/19)
Qu means a busin business entity s that it IS ___ d warrants tha g:
lified Disabled 214 Proof of S indicated on th alified Disabled
Certific rmation Required P ed Business:
12 months im lished, for the p an single bus the State of M
45; or an income tax r igan income ta Treasury; or knowledge of s an business, a ature of its activ artment of Trea to disclose the of the following as a Michigan b qualify as a Mic f business is o of Michigan (pro as a Michigan
A FALSE CERTI
NCIPAL PLACE
debarment under
Project Na
DE
ualified Dis Business ess entity that that is 51% or
___, a qualified at the compan d Veterans (QD Service and D he DD214), an d Veteran may re ation of a Prior to Contract Aw mediately prec period the busi iness tax retu Michigan pursu return showing ax from compe such filing or w and that it indic vities.
asury to verify verifying inform business (provi chigan busines outside the Sta ovide zip code:
business is pro
FICATION THAT
OF BUSINESS
r MCL 18.264.
ame: Restoring
EPARTMENT O
sabled Vete s Represen t is 51% or mo more owned b disabled veter y meets the a
DV) preferenc ischarge, a Ve d appropriate l esult in debarm
Michigan B ward for Application ceding this bid d ness has been rn showing a uant to the Mic income genera ensation paid withholding, tha cates a signific y that the busin mation to the p de zip code: _ ss (provide nam ate of Michigan ohibited by MCL
T IT IS A MICHIG
IS GUILTY OF A
g Various Roof
OF TECHNOL
eran (QDV ntation ore owned by by one or more ran.
above (when c ce, in accordan eterans Admin legal documen ment under MCL
Based Bus n of State Reciproc deadline:
n in existence, portion or all chigan Single B ated in or attrib to the bidder’s at it was more t cant business p ness has or ha procuring agenc me of State: ___ n, however ser
L 18.1268 § 268
GAN BUSINESS
A FELONY, PUN
f Admin/Brook
LOGY, MANAG
State Fa
Design &
V) one or more v e with a service checked) and nce with Publi nistration rating nts setting forth
18.264.
siness city Provisions) it has:
of the income Business Tax A buted to the Sta s owners and than a nominal presence in th as not met the cy.
rvice/commodi
8. A BUSINES
S OR FALSELY
NISHABLE BY A
Center File N
GEMENT AND
acilities Admin
& Construction veterans with a e-connected dis has attached ic Act 22 of 2 g decision lette the 51% natur e tax base all Act, 1975 PA 2 ate of Michigan remitted the t l filing for the p he state, consid e criteria for a ty provided by
SS THAT PURP
INDICATES TH
A FINE OF NOT L
No. 472/19456.
BUDGET
nistration n Division a service-sability.
supporting
2010, MCL
er, proof of ral persons ocated or
228, MCL
n; or tax to the purpose of dering the
Michigan y a location
POSELY OR
E STATE IN
LESS THAN
.JBB
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
BID BOND
BID SUBMITTED ON the _______ day of ________________, 20____.
Bid Security is in the form of: a Bid Bond _______ Bid Bond form has been duly executed _______; or
A Bank Certified or Cashier's check ___ or Money Order ___ is attached to this page ____ (If Bid Security is by Check or Money Order, the original check or money order must be delivered to the issuing office before Bid Due Time. ALL other SIGMA bid submittals are also still to be made).
If the Bidder is an Individual:
Name of Individual: _________________________________________________________
Name & Title of Person Authorized to sign: ___________________________________________
Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date
Doing Business as: _________________________________________________________
Business Address: _________________________________________________________
County of registration _________________________
Telephone: _________________________ FAX: ______________________
If the Bidder is a Partnership:
By: _________________________________________________________ (True Name of the Partnership)
Partner Authorized to Sign Date
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Business Address: _________________________________________________________
County of registration _________________________
Telephone: _________________________ FAX _______________________
If the Bidder is a Corporation:
By: _________________________________________________________ (Legal Corporation Name)
Name & Title of Authorized Officer: __________________________________________________
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Name & Title of Officer Attesting: __________________________________________________
Signature: _________________________________________________________ Date
Business Address: _________________________________________________________
Telephone: _________________________ FAX _______________________
(State of Incorporation): _________________________________________________________
If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES MUST BE AS PROVIDED IN INSTRUCTIONS TO BIDDERS. EACH JOINT VENTURER SIGNING THE BID MUST SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF
REGISTRATION _____________________
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
POST-BID SUBMITTALS
The PSC will request this submittal after bid opening. Complete and submit these items within two business days after the request.
BIDDER’S EXPERIENCE MODIFICATION RATING (EMR) ____________
Attach letter of explanation if the Bidder does not have an EMR.
PROPOSED PROJECT SUPERINTENDENT _______________________________
Attach brief resume or list of similar successful projects.
LIST OF SIMILAR PROJECTS COMPLETED BY THE BIDDER
Please list at least three completed projects of similar size and complexity to the project being bid, with reference contact information
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
POST BID SUBMITTALS: LIST OF SUBCONTRACTORS
The Apparent Low Bidder shall nominate for each Division of Specification and/or trade category, the Subcontractor to be awarded Sub-agreements, including the apparent Low Bidder if work is to be self-performed. Nominated subcontractors shall not be removed, replaced or added to except by written request for good reason, subject to Owner acceptance.
Division, Specification Section Nominated Amount of Subcontract Minority, Woman, and/or Trade Subcontractor(s) Handicapped?
1.___Security Fence_________ _________________________ __________________ ______________
2.___Electrical _____________ _________________________ __________________ ______________
3.________________________ _________________________ __________________ ______________
4.________________________ _________________________ __________________ ______________
5.________________________ _________________________ __________________ ______________
6.________________________ _________________________ __________________ ______________
7.________________________ _________________________ __________________ ______________
8.________________________ _________________________ __________________ ______________
9.________________________ _________________________ __________________ ______________
10._______________________ _________________________ __________________ ______________
11._______________________ _________________________ __________________ ______________
12._______________________ _________________________ __________________ ______________
13._______________________ _________________________ __________________ ______________
14._______________________ _________________________ __________________ ______________
The undersigned Apparent Low Bidder _____________________________________________________________ certifies that all the information and data furnished in this List of Subcontractors are current, accurate and complete as of the date stated below.
Signed by:____________________________Name_______________________________ Title ________________________ on this __________ day of ____________________, 20_______.
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
PERFORMANCE BOND
SURETY COMPANY REFERENCE No. __________________________________
That "the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.
The Contractor has entered into "the Contract" with the Owner for _______________________________________________ _______________, "the Work," covered by the Contract Documents, which are incorporated into this Performance Bond by this reference;
If the Contractor faithfully performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of the Contract Documents within the Contract Time (including any authorized changes, with or without notice to the Surety) and during the Correction Period, and if the Contractor also performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of any and all duly authorized modifications of the Contract Documents, then THIS
OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL
FORCE AND EFFECT.
A. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision) releases the Surety of its obligations under this Section 00610 Performance Bond. The Surety expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision).
B. This Performance Bond must be solely for the protection of the Owner and its successors, legal representatives or assigns.
C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to General Conditions and this Performance Bond). However, this Performance Bond is executed pursuant to 1963 PA 213, as amended, MCL
129.201 et seq., and if any provision(s) of this Performance Bond is/are illegal, invalid or unenforceable, all other provisions of this Performance Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.
IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs Insurance Bureau, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.
Name, Address and Telephone of the Surety:
Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan
Signed and sealed this __________ day of _______________________, 20_____.
THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________
WITNESS ______________________________ Name & Title: __________________________________________________
Telephone No. _________________________________________________
THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________
WITNESS ______________________________ Attorney-in-Fact: ________________________________________________
Telephone No. _______________________________________________
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
PAYMENT BOND
SURETY COMPANY REFERENCE No.___________________________________
"the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.
The Contractor has entered into "the Contract" with the Owner for _____________________________________________ __________________, "the Work," covered by the Contract Documents, which are incorporated into this Payment Bond by this reference;
If the Contractor promptly pays all claimants supplying labor or materials to the Contractor or to the Contractor's Subcontractors in the prosecution of the Work, then THIS
OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL
FORCE AND EFFECT.
A. All rights and remedies on this Payment Bond are solely for the protection of all claimants supplying labor and materials to the Contractor or the Contractor's Subcontractors in the prosecution of the Work, and must be determined in accordance with Michigan Law.
B. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision) must release the Surety of its obligations under this Payment Bond. The Surety hereby expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision).
C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to this Payment Bond).
However, this Payment Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Payment Bond is/are illegal, invalid or unenforceable, all other provisions of this Payment Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.
IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs Insurance Bureau, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.
Name, Address and Telephone of the Surety:
Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan
Signed and sealed this __________ day of _______________________, 20_____.
THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________
WITNESS ______________________________ Name & Title: __________________________________________________
Telephone No. _________________________________________________
THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________
WITNESS ______________________________ Attorney-in-Fact: ________________________________________________
Telephone No. ____________________________________________________
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
TABLE OF CONTENTS
CONTRACT FORMS
BID SUMMARY FORM
BID SCHEDULE
QUALIFIED DISABLED VETERAN (QDV) BUSINESS REPRESENTATION
CERTIFICATION OF A MICHIGAN BASED BUSINESS
BID BOND
POST-BID SUBMITTALS
PERFORMANCE BOND
PAYMENT BOND
TABLE OF CONTENTS
DIVISION 00 BIDDING REQUIREMENTS AND CONTRACT CONDITIONS
SECTION TITLE PAGES THRU
00010 PRE-BID INFORMATION 00-1
00100 INSTRUCTIONS TO BIDDERS 00-2 TO 00-6
00120 SUPPLEMENTARY INSTRUCTIONS 00-6
00200 INFORMATION TO BIDDERS 00-7
00700 GENERAL CONDITIONS 00-7 TO 00-19
00750 SPECIAL WORKING CONDITIONS 00-19
00800 SUPPLEMENTARY CONDITIONS 00-19
00900 ADDENDA 00-19
DIVISION 01 - GENERAL REQUIREMENTS
01010 SUMMARY OF WORK 01-1
01020 ALLOWANCES 01-1
01025 MEASUREMENT AND PAYMENT 01-1
01030 ALTERNATES 01-1
01040 COORDINATION 01-2
01050 FIELD ENGINEERING 01-2
01060 REGULATORY REQUIREMENTS 01-2 TO 01-4
01090 REFERENCES 01-4
01100 PROJECT PROCEDURES 01-4 TO 01-5
01200 PROJECT MEETINGS 01-5
01300 SUBMITTALS 01-6 TO 01-9
01400 QUALITY CONTROL 01-9
01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01-9 TO 01-10
01600 MATERIAL AND EQUIPMENT 01-10
01650 FACILITY START-UP 01-10 TO 01-11
01700 CONTRACT CLOSE-OUT 01-11
01800 MAINTENANCE 01-11
APPENDIX I – GLOSSARY
APPENDIX II – SPECIAL WORKING CONDITIONS
APPENDIX III – SPECIAL PROJECT PROCEDURES
TECHNICAL SPECIFICATIONS
DIVISION 6 – WOOD
061053 Miscellaneous rough carpentry
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
072113 Board Insulation 075303 Elastomeric Membrane Roofing 076200 Sheet Metal Flashing and Trim 079000 Joint Sealants
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
DRAWINGS - BOUND SEPARATELY
TITLE SHEETS THRU
COVER G001
ARCHITECTURAL A101-A103
Bidding and Contract Document (R 5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
DIVISION 00
BIDDING REQUIREMENTS AND CONTRACT CONDITIONS
Bidding and Contract Document (5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
00-1
SECTION 00010 PRE-BID INFORMATION
1. Invitation to Bid (ITB) Your firm is invited to submit a Bid. The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, for
Marquette Branch Prison Various Roof Restoration Admin/Brook Center Roof until 2:00 p.m., local time, on March 4, 2020.
The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period. Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.
2. Work Description The Work is to provide removal of the existing EPDM & ballasted system for the two building areas along with flashing and protection pads. Provide a fully adhered 60 mil EPDM roofing system, flashings and protection pads. EPDM system shall be construction using the manufacture‟s 30 year warranty system installation requirements. Project will require a 20 year warranty certificate, Agency No. 472, Funding Code. 171CODOC7237, DTMB File No. 472/19456.JBB includes, but is not necessarily limited to:
The site is located at 1960 S. US Hwy 41 Marquette, MI, as shown on the Drawings.
3. Bidding Documents Sets of Bidding Documents may be obtained at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService .
4. Bid Security Each Bid must enclose Bid Security, in the amount of five percent (5%) of the Bidder's Base Bid, paid to the
“State of Michigan” in the form of a certified or cashier‟s check or money order drawn upon a bank insured by an agency of the Federal Government or a bid bond with an authorized surety company. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:
State Facilities Administration Design & Construction Division
3111 W. St. Joseph Street Lansing, Michigan 48917
All other Bid information must be submitted via SIGMA as per standard bidding procedure
5. Pre-Bid Conference A mandatory _X_ pre-bid conference will be held at 1960 S. US Hwy 41 Marquette, MI on February 18, 2020 at 9:00 am Local Time. A tour of the roof area will _X__ be held on the same day, starting at 9:30 local time. All prospective Bidders are required _X_ to attend the tour, if held. Other parties interested in the Work are encouraged to attend the tour. Addenda may be issued, in response to issues raised at the pre-bid conference and tour, or as the Owner and/or Professional may otherwise consider necessary.
The purpose of the pre-bid conference and inspection is to answer questions and provide an inspection tour of the Project site at the scheduled time on the day of the meeting. A representative will be available to assist the Contractors. Other inspection visits may be allowed if needed. Individuals needing special services to fully participate in the meeting due to a disability may contact Ken Dillinger at kdillinger@upea.com.
FOR CORRECTIONAL FACILITIES ONLY: All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vender/Contractor LEIN Request five business days prior to the meeting date, (Lein Request For CAJ-1037 attached to Bid posting). Send the LEIN Request form, filled out and signed, by email to Dan Smith email address: smithd@michigan.gov. The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
6. Equal Employment Opportunity Covenants to not discriminate in employment by Contractors, Subcontractors and
Suppliers required by Law are contained in Instructions to Bidders and General Conditions and are applicable to the Work and any Sub-agreement under the Contract.
7. Contract Times The Contract Times and the associated liquidated damages are specified in the Contract.
8. Contact Person All requests or inquiries concerning the Bidding Documents or the Work must be addressed to: _Ken
Dillinger U.P. Engineers & Architects, kdillinger@upea.com (906)-482-4810_. Questions will be accepted until February, 26, 2020 at 12:00 PM Local Time.
9. Award Subject to any agreed extension of the period for holding Bids, Bids must remain valid for acceptance by the Owner for 60 Calendar Days after the date of Bid opening. In addition, the Owner expressly reserves the right, within the Owner's sole discretion, to reject any or all Bids, to waive any irregularities, to issue post-Bid Addenda and re-bid the Work without re-advertising, to re-advertise for Bids, to withhold the award for any reason the Owner determines and/or to take any other appropriate action.
10. Performance and Payment Bonds – A performance bond and a payment bond are required for all contracts over $50,000.00.
END OF SECTION 00010
http://www.buy4michigan.com/ http://www.buy4michigan.com/ mailto:smithd@michigan.gov mailto:kdillinger@upea.com
Bidding and Contract Document (5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
00-2
SECTION 00100 INSTRUCTIONS TO BIDDERS
1. PREPARATION OF BID: Execute Bid fully and properly. Bid Summary Form (DTMB -0401D) and Bid Form Attachments must be used and completely filled out for the Bid to be considered responsive and meeting the requirements of the contract solicitation. All Bid prices must be printed or typed in both words and figures.
2. BID CHECKLIST: Submit Bid Summary Form with original signatures plus Bid Form Attachments in accordance with the electronic bidding procedures on the SIGMA VSS website.
A complete Bid will consist of the following forms, which are included immediately following the Bid Summary Form:
Bids SUBMIT THESE Bid Forms and Bid Form Attachments
All Bids □ Signed and completed Bid Summary Form (DTMB-0401D);
□ Bid Schedule;
□ Qualified Disabled Veteran (QDV) Business Representation;
□ Bid Security in the amount of 5% of Base Bid Price;
If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:
State Facilities Administration Design & Construction Division
3111 W. St. Joseph Street Lansing, Michigan 48917
All other Bid information must be submitted via SIGMA as per standard bidding procedure
□ Signature Authorization or copy of the partnership agreement if signed by all partners;
□ Other Forms;
Over $50K □ Forms listed under All Bids;
□ Payment and Performance Bond (upon issuing the Notice of Award).
Over $100K □ Forms listed under All Bids;
□ Certification of a Michigan Based Business;
Over $250K □ Forms listed under All Bids;
□ Certification of a Michigan Based Business;
Apparent Low Bidders ONLY (upon request from the Professional)
□ Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.
□ Identification of the proposed project superintendent, with a resume or list of similar projects handled by that individual.
□ A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.
□ A list of nominated sub-contractors, including proposed self-performed categories, for each
Division/Trade/etc.
3. BID SUBMISSION: Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.
4. BID GUARANTEE: Each proposal must be accompanied by either a bank certified or cashier's check on an open, solvent bank or a bid bond with an authorized surety company (the surety must be listed on the current U.S. Department of the Treasury Circular 570) in the amount of five percent of the base bid payable to the State of Michigan, as a guarantee of good faith. If the successful Bidder fails to furnish satisfactory bonds and insurance within fifteen Calendar Days after Notice of Award, such guarantee must be forfeited to the State as liquidated damages. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to the Issuing Office. The bid http://www.buy4michigan.com/
Bidding and Contract Document (5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
00-3 security, exclusive of bid bonds, of all unsuccessful Bidders will be returned when an award is made or upon substitution of a bid bond. The bid security of the successful Bidder will be returned when the performance bond and labor and material bond are approved.
5. CERTIFICATE OF AWARDABILITY: Not required.
6. MICHIGAN BASED BUSINESS CERTIFICATION: All Bidders submitting Bids in excess of $100,000.00 must complete the
Certification of Michigan Based Business. This information will determine if a Bidder qualifies as a "Michigan" business for purposes of application of reciprocity where applicable.
7. POST-BID SUBMITTAL: For all projects, the Professional may request a Post-Bid Submittal from the Apparent Low
Bidders. The Apparent Low Bidders must submit to the Professional, within two Business Days after receipt of the
Professional‟s request, Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.
Identification of the proposed project superintendent with a resume or list of similar projects managed by that individual.
A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.
Failure to provide the submittals may disqualify the Bid.
8. SIGNATURES: All Bids, notifications, claims, and statements must be signed as follows:
(a) Corporations: Signature of official must be accompanied by a certified copy of the Resolution of the Board of Directors authorizing the individual signing to bind the corporation.
(b) Partnerships: Signature of one partner must be accompanied by a signed copy of the legal document (e.g. Power of
Attorney or partnering agreement) authorizing the individual signing to bind all partners. If Bid is signed by all partners, no authorization is required.
(c) Individual: No authorization is needed. Each signature must be witnessed.
9. BID PRICES: The Bidder‟s Base Bid and Alternate Bid prices must include, and payment for completed Work will compensate in full for: all services, obligations, responsibilities, management, supervision, labor, materials, devices, equipment, construction equipment, general conditions, permits, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, supplies, Bonds, insurance, taxes, mobilization, close-out, overhead and profit and all connections, appurtenances and any other incidental items of any kind or nature, as are necessary to complete the Work, in a neat, first quality, workmanlike and satisfactory manner in accordance with the Drawings and Specifications and as otherwise required to fulfill the requirements of the Bidding Documents. For each Cash Allowance item, the Bidder must include, within the Bid, all labor costs, construction equipment costs, insurance and Bond premiums and other general conditions costs and Fees (Bidder‟s and Subcontractors‟) to complete Work associated with the material, equipment or other designated item to be furnished under the Cash Allowance. For each Provisionary Allowance, the Bidder must include, within the Bid, insurance, premiums (not recoverable as labor burden) and Bond premiums required to complete Work that may be ordered under a Provisionary Allowance.
10. INSPECTION OF BIDDING DOCUMENTS AND SITE CONDITIONS: The Bidder must carefully review and inspect all documents referenced and made part of this ITB, site conditions, all applicable statutes, regulations, ordinances and resolutions addressing or relating to the goods and services under this contract. Failure to do so or failure to acquire clarifications and answers to any discovered conflicts, ambiguities, errors or omissions in the Bidding Documents will be at the Bidder‟s sole risk.
11. SAFETY REQUIREMENTS AND LAWS: The Bidder awarded the Contract must comply with all applicable federal, state and local Laws including health and safety regulations, environmental protection, permits and licensing.
12. INTERPRETATIONS AND ALTERATIONS TO THE BID AND BIDDING DOCUMENTS: All requests for clarification or interpretation of the Bidding Documents, all proposals for any modifications to the Bidding Documents, all requests for information and all other questions or inquiries about the Bidding Documents and/or the Work shall be submitted in writing to the Contact Person identified in the Bid Documents. Requests or inquiries received less than seven Calendar Days before the date of Bid opening will be answered only if (a) the response can be given through an Addendum made available at least seventy-two hours before Bid opening (counting Business Days only), (b) the Bid opening is postponed by Addendum, or (c) the Work is rebid without readvertising following the issuance of post-Bid Addenda.
Bidders must not rely upon any oral statements or conversations regarding interpretations, clarifications, corrections, additions, deletions or other revisions or information to the Bidding Documents. Any addition, limitation or provision made with or attached to the Bid may render it non-responsive and/or irregular and be a cause for rejection. The Owner reserves the right to issue a post-Bid Addendum after opening the Bids and set a new date for the receipt and opening of sealed Bids. The Bidder acknowledges that any quantities of Unit Price Work given in this ITB are approximate only and payments will be made only for actual quantities of Unit Price Work completed in accordance with the Contract Documents.
Bidding and Contract Document (5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
00-4
13. MODIFICATION OF BID: The entire bid must be resubmitted on the SIGMA VSS website.
14. BID WITHDRAWAL: Except for timely filed claims of mathematical or clerical errors granted by the State, no Bid may be withdrawn within sixty Calendar Days after the Bid Opening time and date or before the Bid expiration date without forfeiting Bid security. The request to withdraw a Bid due to error must be submitted in writing along with the supporting documents within two Business Days after the date of Bid Opening. The claim must describe in detail the error(s), include a signed affidavit stating the facts of the alleged error(s) and request that the Bidder be released from its Bid. The review of the claim and its supporting documents by the State is only for the purpose of evaluating the Bidder‟s request and must not create duty or liability on the State to discover any other Bid error or mistake. The sole liability of any Bid error or mistake rests with Bidder.
15. OBJECTION TO THE AWARD: A Bidder may file a written protest with the Director-SFA to object to the Apparent Low Bidder. This objection must be filed within seven Calendar Days after the date of Bid opening and must describe in detail the basis for the protest and request a determination. The Director-SFA will either dismiss or uphold the protest and notify the protestor within ten Calendar Days after receipt of the written protest.
16. BID IRREGULARITIES: The following irregularities on any Bid Form or Bid Form Attachment must be resolved as follows:
(a) between SIGMA entry and signed Bid Summary attachment, the signed Bid Summary attachment will be used;
(b) between words and figures, the words must be used;
(c) between any sum, computed by the Bidder, and the correct sum, the sum computed by the Bidder must be used;
(d) between the product, computed by the Bidder, of any quantity and Bid Unit Price and the correct product of the Unit Price and the quantity of Unit Price Work, the product extended by the Bidder must be used;
(e) between a stipulated Allowance and the amount entered, the Allowance must be used;
(f) any mobilization pay item exceeding the maximum specified must be ignored and the Bid must remain unchanged;
(g) if any Bidder fails or neglects to bid a Unit Price for an item of Unit Price Work but shows an "Bid Price" for that item, the missing unit price must be computed from the respective quantity and the Item Bid Price shown;
(h) if any Bidder fails or neglects to show a "Bid Price" for an item of Unit Price Work but bids a unit price, the missing Bid
Price must remain as “zero”; and
(i) if any Bidder fails or neglects to enter a Bid Price in both words and figures, the Bid Price printed or typed, whether in words or figures, must be used.
17. CERTIFICATION: The bidder certifies to the best of its knowledge and belief that, within the past three (3) years, the bidder, an officer of the bidder, or an owner of a 25% or greater interest in the bidder:
(a) Has not been convicted of a criminal offense incident to the application for or performance of a contract or subcontract with the State of Michigan or any of its agencies, authorities, boards, commissions, or departments.
(b) Has not had a felony conviction in any state (including the State of Michigan).
(c) Has not been convicted of a criminal offense which negatively reflects on the bidder‟s business integrity, including but not limited to, embezzlement, theft, forgery, bribery, falsification or destruction of records, receiving stolen property, negligent misrepresentation, price-fixing, bid-rigging, or a violation of state or federal anti-trust statutes.
(d) Has not had a loss or suspension of a license or the right to do business or practice a profession, the loss or suspension of which indicates dishonesty, a lack of integrity, or a failure or refusal to perform in accordance with the ethical standards of the business or profession in question.
(e) Has not been terminated for cause by the Owner.
(f) Has not failed to pay any federal, state, or local taxes.
(g) Has not failed to comply with all requirements for foreign corporations.
(h) Has not been debarred from participation in the bid process pursuant to Section 264 of 1984 PA 431, as amended, MCL
18.1264, or debarred or suspended from consideration for award of contracts by any other State or any federal Agency.
(i) Has not been convicted of a criminal offense or other violation of other state or federal law, as determined by a court of competent jurisdiction or an administrative proceeding, that in the opinion of DTMB indicates that the bidder is unable to perform responsibly or which reflects a lack of integrity that could negatively impact or reflect upon the State of Michigan, including but not limited to, any of the following offenses under or violations of:
1. The Natural Resources and Environmental Protection Act, 1994 PA 451, MCL 324.101 to 324.90106.
2. A persistent and knowing violation of the Michigan Consumer Protection Act, 1976 PA 331, MCL 445.901 to
445.922.
3. A finding that the bidder failed to pay the wages and/or fringe benefits due within the time period, as may be required by applicable law.
4. Repeated or flagrant violations of 1978 PA 390 MCL 408.471 to 408.490 (law relating to payment of wages and fringe benefits).
5. A willful or persistent violation of the Michigan Occupational Health and Safety Act, 1974, PA 154, MCL
408.10001 to 408.1094, including: a criminal conviction, repeated willful violations that are final orders, repeated violations that are final orders, and failure to abate notices that are final orders.
6. A violation of federal or state civil rights, equal rights, or non-discrimination laws, rules, or regulations.
7. Been found in contempt of court by a Federal Court of Appeals for failure to correct an unfair labor practice as prohibited by Section 8 of Chapter 372 of the National Labor Relations Act, 29 U. s. C. 158 (1980 PA 278, as amended, MCL 423.321 et seq).
(j) Is not an Iran-Linked Business as defined in MCL 129.312.
Bidding and Contract Document (5/19) Project Name: Restoring Various Roof Admin/Brook Center File No. 472/19456.JBB
00-5
A false statement, misrepresentation or concealment of material facts on this certification may be grounds for rejection of this proposal or termination of the award and may be grounds for debarment.
18. REJECTION OF BID: The Bidder acknowledges the right of the Owner to reject any Bids and to waive any informality, defects or irregularity in any Bid received. In addition, the Bidder recognizes the right of the Owner to reject a Bid if:
(a) the Bid is in any way incomplete or irregular;
(b) the Bidder, Subcontractor or Supplier is not responsible as determined by the Owner;
(c) the Bidder‟s performance as a Contractor was unsatisfactory under a prior Contract with the Owner for the construction, repair, modification or demolition of a facility with the Owner, or under any other Contract, which was funded, directly or indirectly, by the Owner;
(d) there are reasonable grounds for believing that collusion or unlawful agreements exists between any Bidders, that a Bidder is interested in more than one Bid, or that the Bid is not genuine;
(e) the Bid exceeds the funds available.
19. MATERIALS AND EQUIPMENT SUBSTITUTION: Any Bidder wishing to use manufacturers or materials other than those specified must submit a written request to the Professional not later than seven days before due date for Bids. Request must be accompanied by product data to permit evaluation and comparison with specified products or materials. The Person submitting the request will be responsible for its prompt delivery. The Professional and the Owner will examine and evaluate the product data and if found acceptable, an Addendum will be issued and mailed or delivered to each Person who has received a set of Drawings and Specifications. All Addenda issued must be made a part of the Contract requirements. Contractor will be responsible for any extra work and expense incurred to satisfactorily and completely incorporating each substitute product into the Project.
20. MICHIGAN PRODUCTS AND RECYCLED PRODUCTS: All Contractors and Suppliers are encouraged to provide
Michigan-made products and/or recycled products and/or green products and/or environmentally-friendly products whenever possible where price, quality, and performance are equal to, or superior to, non-Michigan products and the requirements of the Contract Documents. The Contractor will be required to use alternatives to landfills for waste disposal such as reuse or recycle of asphalt, bricks, concrete, masonry, plastics, paint, glass, carpet, metals, wood, drywall, insulation and any other waste materials to the extent practical.
21. PRE-AWARD PRODUCT SUBMITTALS: If requested, the Apparent Low Bidders must submit a summary…