467059 2025-08-21 CR803 100 percent CD Mech Plans.pdf
PDF 17 MB Posted
- Solicitation number
- 25IFB17245
- Issued by
- Pennington County, South Dakota
About this file
This document is a comprehensive mechanical and electrical design set for the Replace HVAC Units in B803 - RC Camp Rapid (CR803) project, located at 615 12th Street in Rapid City, South Dakota, prepared by Skyline Engineering, LLC for the South Dakota National Guard. The project involves a complete replacement and upgrade of HVAC systems in a multi-story military facility, with detailed architectural and engineering plans spanning multiple floors (Area A and Area B). The design includes base bid specifications and two alternate implementation options, with drawings covering mechanical demolition, piping plans, roof mechanical plans, and detailed mechanical and electrical schedules.
The project scope includes replacing existing HVAC units, fluid coolers, boilers, pumps, and associated mechanical infrastructure, with careful consideration for maintaining existing building operations during renovation. The design provides multiple implementation alternatives (Base Bid, Alternate #1, and Alternate #2) that offer different equipment configurations and replacement strategies. Mechanical components include water-to-air heat pumps, condensing boilers, closed circuit fluid coolers, and comprehensive piping and electrical system modifications. The project number is 24043, with design drawings dated 08/21/2025, suggesting a future infrastructure upgrade planned for the military facility to improve heating, ventilation, and air conditioning systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace HVAC Units In B803 - RC Camp Rapid
(CR803) CFMO#467059
Camp Rapid Vicinity Map
615 12th Street Rapid City, SD 57701 Fax: 605.737.3859
Tel: 605.737.3800
PROJECT # 24043
DESIGN PROFESSIONALS
INDEX TO DRAWINGS
GENERAL
COVER TITLE SHEET (INDEX, CONSULTANTS LIST)
MECHANICAL
MECHANICAL & ELECTRICAL ENGINEER:
Skyline Engineering, LLC 615 12th Street Rapid City, SD 57701 (605)737-3800 Phone (605)737-3859 Fax
ELECTRICAL
Project Location
MECHANICAL LEGEND AND SHEET INDEXM0.0
AREA "A" FIRST FLOOR HVAC DEMOLITION PLANMD3.0
AREA "B" FIRST FLOOR HVAC DEMOLITION PLANMD3.1
AREA "A" SECOND FLOOR HVAC DEMOLITION PLANMD3.2
MD3.4
MD4.0
MD4.1
MD4.2
ENLARGED MECHANICAL PLANS (BASE BID)M5.0
MECHANICAL DETAILSM6.0
MECHANICAL/ELECTRICAL SCHEDULESME1.0
AREA "A" FIRST FLOOR HVAC PIPING DEMOLITION PLAN
AREA "B" FIRST FLOOR HVAC PIPING DEMOLITION PLAN
AREA "A" SECOND FLOOR HVAC PIPING DEMOLITION PLAN
AREA "A" FIRST FLOOR HVAC PLANM3.0
AREA "B" FIRST FLOOR HVAC PLANM3.1
AREA "A" SECOND FLOOR HVAC PLANM3.2
M4.0 M4.1 M4.2
AREA "A" FIRST FLOOR HVAC PIPING PLAN
AREA "B" FIRST FLOOR HVAC PIPING PLAN
AREA "A" SECOND FLOOR HVAC PIPING PLAN
AREA "B" ROOF MECHANICAL DEMOLITION PLAN
AREA "B" ROOF MECHANICAL PLANM3.4
MECHANICAL/ELECTRICAL SCHEDULESME1.1
ENLARGED MECHANICAL PLANS (ALTERNATE #1)M5.1
E0.0 ELECTRICAL LEGEND AND SHEET INDEX
ED1.0 AREA "A" FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ED1.1 AREA "B" FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ED1.2 AREA "A" SECOND FLOOR ELECTRICAL DEMOLITION PLAN
E1.0 AREA "A" FIRST FLOOR ELECTRICAL PLAN
E1.1 AREA "B" FIRST FLOOR ELECTRICAL PLAN
E1.2 AREA "A" SECOND FLOOR ELECTRICAL PLAN
E1.3 AREA "B" ROOF ELECTRICAL PLAN
E2.0 PANEL SCHEDULES
E2.1 PANEL SCHEDULES
E2.2 PANEL SCHEDULES
E2.3 AFC CALCULATIONS
ME1.0 MECHANICAL/ELECTRICAL SCHEDULES
ME1.1 MECHANICAL/ELECTRICAL SCHEDULES
ENLARGED MECHANICAL PLANS (ALTERNATE #2)M5.2
ENLARGED MECHANICAL PLAN (ALTERNATE #2)M5.4
MECHANICAL PIPING DIAGRAMSM5.5
MECHANICAL SCHEDULESM7.0
MECHANICAL DETAILSM6.1
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
SH
EE
T
IN
DE
X
M
EC
HA
NI
CA
L
LE
G
EN
D
AN
D
M0.0
GJKGSL
ELEVATOR
STAIR 4
STAIR 1
STAIR 4
STAIR 3
STAIR 2
STAIR 1
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
STORAGE
ELEV.
EQUIP.
STORAGE
SEMI-
PRIVATE
LAUNDRY
CUST.
LAUNDRY
CUST.
LAUNDRY
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
MECHANICAL
TELECOMMUNICATIONS
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
PRIVATE
SEMI-
PRIVATE
VESTIBULE
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
LATRINE
LATRINE
LATRINE
LATRINE
BILLET
BILLET
BILLET
BILLET
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
DE
M
O
LI
TI
O
N
PL
AN
AR
EA
"A
" F
IR
ST
F
LO
O
R
HV
AC
MD3.0
SCALE: 1/8" = 1'-0"
AREA "A" - FIRST FLOOR HVAC DEMOLITION PLAN1
STAIR 5
VESTIBULE
108A
TRASH ENCLOSURE
114A
POT & PAN120
QUEING
COATS/HATS
STORAGE
LOBBY
SCULLERY
MALE
FEMALE
COMPANY
SUPPLY
QUEING
STORAGE
VEG PREP
KITCHEN
SELF-SERVE
A-LINE
DINING
RESTROOM
STORAGE
STORAGE
FOOD
SERVICE
SGT
TOE
CAN WASH
MECHANICAL
DRY STORAGE
STAGING
AREA119
INSULATED
CONTAINER
STORAGE
VESTIBULE
ADMIN.
OFFICE
OFFICE
OFFICE
VAULT
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
DE
M
O
LI
TI
O
N
PL
AN
AR
EA
"B
" F
IR
ST
F
LO
O
R
HV
AC
MD3.1
GJKGSL
AREA "B" - FIRST FLOOR HVAC DEMOLITION PLAN1
STAIR 3
STAIR 1
STAIR 2
BILLET
BILLET
BILLET
BILLET
LATRINE
LATRINE
LATRINE
LATRINE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
PHYSICAL
FITNESS
LAUNDRY
CUST.
221 LAUNDRY
CUST.
LAUNDRY
SEMI-
PRIVATE
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
SEMI-
PRIVATE
TELECOMM
203A
MECHANICAL
BILLET
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
DE
M
O
LI
TI
O
N
PL
AN
AR
EA
"A
" S
EC
O
ND
F
LO
O R
HV
AC
MD3.2
GJKGSL
AREA "A" - SECOND FLOOR HVAC DEMOLITION PLAN1
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
DE
M
O
LI
TI
O
N
PL
AN
AR
EA
"B
" R O
O F
M
EC
HA
NI
CA
L
MD3.4
GJKGSL
AREA "B" ROOF MECHANICAL DEMOLITION PLAN1
STAIR 1
STAIR 4
STAIR 3
STAIR 2
STAIR 1
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
STORAGE
ELEV.
EQUIP.
STORAGE
SEMI-
PRIVATE
LAUNDRY
CUST.
LAUNDRY
CUST.
LAUNDRY
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
144MECHANICAL
TELECOMMUNICATIONS
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
158 BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
PRIVATE
SEMI-
PRIVATE
VESTIBULE
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
LATRINE
LATRINE
LATRINE
LATRINE
BILLET
BILLET
BILLET
BILLET
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
MD4.0
GJKGSL
PI
PI
NG
D
EM
O
LI
TI
O N
PL
AN
AR
EA
"A " F
IR
ST
F
LO
O R
HV
AC
AREA "A" - FIRST FLOOR HVAC PIPING DEMOLITION PLAN1
108A
TRASH ENCLOSURE
114A
POT & PAN
QUEING
COATS/HATS
STORAGE
LOBBY
SCULLERY
MALE
FEMALE
COMPANY
SUPPLY
QUEING
STORAGE
VEG PREP
KITCHEN
SELF-SERVE
A-LINE
DINING
RESTROOM
STORAGE
STORAGE
FOOD
SERVICE
SGT
TOE
CAN WASH
DRY STORAGE
STAGING
AREA
INSULATED
CONTAINER
STORAGE
VESTIBULE
ADMIN.
OFFICE
OFFICE
OFFICE
VAULT
MECHANICAL
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PI
PI
NG
D
EM
O
LI
TI
O N
PL
AN
AR
EA
"B " F
IR
ST
F
LO
O R
HV
AC
MD4.1
GJKGSL
AREA "B" - FIRST FLOOR HVAC PIPING DEMOLITION PLAN1
STAIR 3
STAIR 1
STAIR 2
BILLET
BILLET
BILLET
BILLET
LATRINE
LATRINE
LATRINE
LATRINE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
PHYSICAL
FITNESS
LAUNDRY
CUST.
221 LAUNDRY
CUST.
LAUNDRY
SEMI-
PRIVATE
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
SEMI-
PRIVATE
TELECOMM
203A
MECHANICAL
BILLET
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PI
PI
NG
D
EM
O
LI
TI
O N
PL
AN
AR
EA
"A " S
EC
O
ND
F
LO
O
R
HV
AC
MD4.2
GJKGSL
AREA "A" - SECOND FLOOR HVAC PIPING DEMOLITION PLAN1
STAIR 1
STAIR 4
STAIR 3
STAIR 2
STAIR 1
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
177BATH
BATH
CORRIDOR
CORRIDOR
STORAGE
ELEV.
EQUIP.
STORAGE
SEMI-
PRIVATE
LAUNDRY
CUST.
LAUNDRY
CUST.
LAUNDRY
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
MECHANICAL
TELECOMMUNICATIONS
SEMI-
PRIVATE
SEMI-
PRIVATE
OFFICE
BILLET
BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
PRIVATE
SEMI-
PRIVATE
180VESTIBULE
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
LATRINE
LATRINE
LATRINE
LATRINE
BILLET
BILLET
BILLET
BILLET
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PL
AN
AR
EA
"A " F
IR
ST
F
LO
O R
HV
AC
M3.0
GJKGSL
SCALE: 1/8" = 1'-0"
AREA "A" - FIRST FLOOR HVAC PLAN1
108A
TRASH ENCLOSURE
114A
POT & PAN
QUEING
COATS/HATS
LOBBY
SCULLERY
MALE
FEMALE
COMPANY
SUPPLY
QUEING
STORAGE
VEG PREP
KITCHEN
SELF-SERVE
A-LINE
DINING
RESTROOM
STORAGE
STORAGE
FOOD
SERVICE
SGT
TOE
CAN WASH
MECHANICAL
DRY STORAGE
STAGING
AREA
INSULATED
CONTAINER
STORAGE
VESTIBULE
ADMIN.
OFFICE
OFFICE
VAULT
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PL
AN
AR
EA
"B " F
IR
ST
F
LO
O R
HV
AC
M3.1
GJKGSL
SCALE: 1/8" = 1'-0"
AREA "B" - FIRST FLOOR HVAC PLAN1
STAIR 3
STAIR 1
STAIR 2
BILLET
BILLET
BILLET
BILLET
LATRINE
LATRINE
LATRINE
LATRINE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
PHYSICAL
FITNESS
LAUNDRY
CUST.
221 LAUNDRY
CUST.
LAUNDRY
SEMI-
PRIVATE
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
SEMI-
PRIVATE
TELECOMM
203A
MECHANICAL
203BILLET
SEMI-
PRIVATE
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PL
AN
AR
EA
"A " S
EC
O
ND
F
LO
O
R
HV
AC
M3.2
GSL GJK
SCALE: 1/8" = 1'-0"
AREA "A" - SECOND FLOOR HVAC PLAN1
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
AR
EA
"B " M
EC
HA
NI
CA
L
RO
O F
PL
AN
M3.4
GJKGSL
AREA "B" - MECHANICAL ROOF PLAN1
STAIR 1
STAIR 4
STAIR 3
STAIR 2
STAIR 1
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
STORAGE
ELEV.
EQUIP.
STORAGE
SEMI-
PRIVATE
LAUNDRY
CUST.
LAUNDRY
CUST.
LAUNDRY
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
MECHANICAL
TELECOMMUNICATIONS
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
158 BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
PRIVATE
SEMI-
PRIVATE
VESTIBULE
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
LATRINE
LATRINE
LATRINE
LATRINE
BILLET
BILLET
BILLET
BILLET
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PI
PI
NG
P
LA
N
AR
EA
"A " F
IR
ST
F
LO
O R
HV
AC
M4.0
GJKGSL
AREA "A" - FIRST FLOOR HVAC PIPING PLAN1
108A
TRASH ENCLOSURE
114A
POT & PAN
QUEING
COATS/HATS
STORAGE
LOBBY
SCULLERY
MALE
FEMALE
COMPANY
SUPPLY
QUEING
STORAGE
VEG PREP
KITCHEN
SELF-SERVE
A-LINE
DINING
RESTROOM
STORAGE
STORAGE
FOOD
SERVICE
SGT
TOE
CAN WASH
DRY STORAGE
STAGING
AREA
INSULATED
CONTAINER
STORAGE
VESTIBULE
ADMIN.
OFFICE
OFFICE
OFFICE
VAULT
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PI
PI
NG
P
LA
N
AR
EA
"B " F
IR
ST
F
LO
O R
HV
AC
M4.1
GJKGSL
AREA "B" - FIRST FLOOR HVAC PIPING PLAN1
STAIR 3
STAIR 1
STAIR 2
BILLET
BILLET
BILLET
BILLET
LATRINE
LATRINE
LATRINE
LATRINE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
SEMI-
PRIVATE
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
BILLET
PHYSICAL
FITNESS
LAUNDRY
CUST.
221 LAUNDRY
CUST.
LAUNDRY
SEMI-
PRIVATE
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BATH
BATH
BATH
BATH
BATH
BATH
BATH
CORRIDOR
CORRIDOR
SEMI-
PRIVATE
TELECOMM
203A
MECHANICAL
BILLET
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
NO
RT
H
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
PI
PI
NG
P
LA
N
AR
EA
"A " S
EC
O
ND
F
LO
O
R
HV
AC
M4.2
GJKGSL
AREA "A" - SECOND FLOOR HVAC PIPING PLAN1
MECHANICAL
STAIR 5
MECHANICAL
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
EN
LA
RG
ED
M
EC
HA
NI
CA
L
PL
AN
S
M5.0
GJKGSL
BA
SE
B
ID
SCALE: 1/2" = 1'-0"
ENLARGED MECHANICAL DEMO PLAN (BASE BID)1 SCALE: 1/2" = 1'-0"
ENLARGED MECHANICAL PLAN (BASE BID)2
STAIR 5
MECHANICAL
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
EN
LA
RG
ED
M
EC
HA
NI
CA
L
PL
AN
S
M5.1
GJKGSL
AL
TE
RN
AT
E #1
SCALE: 1/2" = 1'-0"
ENLARGED MECHANICAL DEMO PLAN (ALT #1)1 SCALE: 1/2" = 1'-0"
ENLARGED MECHANICAL PLAN (ALT #1)2
STAIR 5
MECHANICAL
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
EN
LA
RG
ED
M
EC
HA
NI
CA
L
PL
AN
S
M5.2
GJKGSL
AL
TE
RN
AT
E #2
SCALE: 1/2" = 1'-0"
ENLARGED MECHANICAL DEMO PLAN (ALT #2)1 SCALE: 1/2" = 1'-0"
ENLARGED MECHANICAL PLAN (ALT #2)2
TRASH ENCLOSURE
114A
TRASH ENCLOSURE
114A
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
EN
LA
RG
ED
M
EC
HA
NI
CA
L
PL
AN
M5.4
GJKGSL
AL
TE
RN
AT
E #2
SCALE: 1/2" = 1'-0"
ENLARGED MECHANICAL PLAN (ALT#2)1
NO SCALE
MECHANICAL PIPING DIAGRAM (BASE BID)1 NO SCALE
MECHANICAL PIPING DIAGRAM (ALTERNATE #1)2
NO SCALE
MECHANICAL PIPING DIAGRAM (ALTERNATE #2)3
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
M
EC
HA
NI
CA
L
PI
PI
NG
D
IA
G
RA
M
S
M5.5
NO SCALE1 BASE-MOUNTED PUMP DETAIL
NO SCALE
FLUID COOLER SUMP BASIN DETAIL2
NO SCALE
WATER TO AIR HEAT PUMP DETAIL4
3 CLEVIS HANGER DETAIL (INTERIOR PIPING)
5 CONDENSING BOILER STACK TERMINATION DETAIL
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
M
EC
HA
NI
CA
L
DE
TA
IL
S
M6.0
PIPE ROLLER DETAIL FOR
EXTERIOR CONDENSER WATER
3 FLUID COOLER PIPING ROUTING AND SUPPORT DETAIL
1 EXTERIOR PIPE SUPPORT DETAIL
Date:
Drawn:
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
M
EC
HA
NI
CA
L
DE
TA
IL
S
M6.1
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
M
EC
HA
NI
CA
L
SC
HE
DU
LE
S
M7.0
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
M
EC
HA
NI
CA
L/
EL
EC
TR
IC
AL
S
CH
ED
UL
ES
ME1.0
SE Project No:
D at e
R ev is io n
Sheet No.
24043
08/21/2025
Checked:
Pr oj ec t T itl e:
RE
PL
AC
E
H
VA
C
UN
IT
S
IN
B
Sh ee t T itl e:
th
S tre et R ap id
C ity
, S D
Fa x:
.7
.3
Te l:
5.
7.
RC
C
AM
P
RA
PI
D (C
R8
) C
FM
O #4
REG . NO .
HTUOS ATOKAD
GARY J. KUHL RE
EN
IG
NE
LANOISSEFORP
DERETSIGER
M
EC
HA
NI
CA
L/
EL
EC
TR
IC
AL
S
CH
ED
UL
ES
ME1.1
File details come from the government source that posted it. Updated .