44DOC-S3730-cost-schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- NNCC Gym Floor Refurbishment
- Solicitation number
- 44DOC-S3730
- Issued by
- Churchill County, Nevada
About this file
This is a cost schedule spreadsheet for contract 44DOC-S3730 issued by the Nevada Department of Corrections for the Northern Nevada Correctional Center gym floor refurbishment project. The document provides a template for vendors to submit proposed pricing across 16 line items with corresponding descriptions, pricing types, estimated usage quantities, and extended costs. The spreadsheet includes space for vendors to complete shaded areas with their proposed pricing, with the vendor bearing responsibility for ensuring all calculations are accurate. An estimated project value total is calculated based on the line item submissions.
Pricing for this contract follows a cost-plus structure wherein travel expenses are allowable as billable costs and must be charged at then-current General Services Administration (GSA) rates as referenced on gsa.gov. Vendors are required to complete all pricing fields in the template, and the document emphasizes vendor accountability for mathematical accuracy in their cost submissions. No specific contract term, renewal options, set-asides, or other pricing constraints are outlined in this particular cost schedule document.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost schedule
| 44DOC-S3730 cost schedule | |||||
| Vendor | |||||
| Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct. | |||||
| Line | Description and term | Type | Price | Est. Usage | Extended |
| 1 | $ - 0 | ||||
| 2 | $ - 0 | ||||
| 3 | $ - 0 | ||||
| 4 | $ - 0 | ||||
| 5 | $ - 0 | ||||
| 6 | $ - 0 | ||||
| 7 | $ - 0 | ||||
| 8 | $ - 0 | ||||
| 9 | $ - 0 | ||||
| 10 | $ - 0 | ||||
| 11 | $ - 0 | ||||
| 12 | $ - 0 | ||||
| 13 | $ - 0 | ||||
| 14 | $ - 0 | ||||
| 15 | $ - 0 | ||||
| 16 | $ - 0 | ||||
| Estimated project value | $ - 0 | ||||
| Travel is allowed as a billable costs of this contract, at then current GSA rates. | |||||
| gsa.gov |
&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/
File details come from the government source that posted it. Updated .