435797 Pre-Quote Meeting Questions and Answers.docx

DOCX document 19 KB Posted

Attached to
Request for Quote 435797 for Installation of NSLS-II NEXT-II Beamline Shielding Enclosures
Solicitation number
435797
Issued by

About this file

This document contains questions and answers from a pre-quote meeting for Request for Quote 435797 issued by the Department of Energy Office of Science. The RFQ is for the installation of beamline shielding enclosures at the NSLS-II NEXT-II facility. Questions addressed scope of work details such as whether the system would be partially assembled at the factory, whether any floor levelling would be required of the contractor, floor penetration depths for doors, noise protocols for disruptive work, whether pre-existing utilities would need to be removed, responsibilities for electrical and lighting work, whether lead gaskets would be supplied in rolls or sheets, approved fastener types for concrete walls, how Unistrut would be attached, and how lead gaskets would be fastened to the floor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 435797

RFQ 435797, NSLS-II NEXT-II Installation of Beamline Shielding Enclosures Pre-Quote & Site Walk-thru Meeting

10/23/23 9:00 – 12:00 AM ET

Questions & Answers Question 1: Has system been assembled and disassembled?

Answer 1: The system will be partially assembled at the factory to check fit-up.

Question 2: Will any pre-levelling of the slab be required of the Contractor?

Answer 2: No, any levelling of the hutch wall will be accomplished with lead shims (this should be minimal).

Question 3: How deep are the floor penetrations for the door trenches?

Answer 3: 2 inches.

Question 4: Is hammering considered noisy work?

Answer 4: Daily toolbox meetings will occur to discuss the day’s work and any work that includes disruptive noise or vibration will be planned accordingly as to not disrupt sensitive equipment.

Question 5: Floor flashing of lead is not preformed; it is flat, correct?

Answer 5: Yes, floor flashing of lead is not preformed. This is to be bent up by Contractor during installation.

Question 6: Will pre-existing compressed air and water stub outs be removed before installation?

Answer 6: No, those are staying and will deliver utilities to the hutch, but will not interfere with the hutch installation.

Question 7: Will contractor be responsible for electrical?

Answer 7: No, contractor will not be responsible for electrical work; this is BSA’s responsibility. Contractor will only be responsible for temporary lighting.

Question 8: Will lead gaskets come in roll or sheets?

Answer 8: Lead gaskets will come in pre-cut, flat strips, some trimming will be required.

Question 9: What type of fasteners will go into the concrete walls?

Answer 9: Expansion type anchors. All fasteners are provided by BSA.

Question 10: Is the Unistrut welded to the panels or does the Contractor need to fasten it?

Answer 10: The Unistrut pre-welded to the panels. Any Unistrut on concrete walls is installed by the Contractor using hardware by BSA.

Question 11: How does the lead gasket get fastened to the floor?

Answer 11: The lead gets hammered flat to the floor with a wood block to eliminate any gaps between the gasket and the floor. Anchoring the panels to the floor hold the lead gaskets in place.

Question 12: Who is responsible for touch-up paint?

Answer 12: All paint for touch-up is supplied by Contractor. Paint must be applied by brush or roller, no spraying allowed.