This is a Summary of Key Events document (Attachment F) for a pump transport service contract between Naval Sea Systems Command (NAVSEA) Norfolk Naval Shipyard (NNSY) and a contractor. The document outlines critical timeline milestones and deliverables for the transportation of pump equipment.

The contract begins April 1, 2025, and ends July 30, 2025. Key requirements include obtaining state/local permits and escorts 6 weeks before shipping, providing axle spacing and weight loading documentation 3 weeks prior to shipping, submitting personnel security information 1 week before arrival at NNSY, and arriving at NNSY within 6 weeks of notification at 6:00 AM. The contractor must arrive 2 days before loading for inspections, transport the pump to Westinghouse between 7:00 AM and 12:00 PM, provide daily driver check-ins for trips exceeding one day, and immediately report any problems or DOT discrepancies. The document includes specific requirements for documentation submission including trailer tie-down information, off-yard routes, and transportation permits.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUMP TRANSPORT SERVICE SUMMARY OF KEY EVENTS

KEY EVENT

TIMELINE

CORRESPONDING DATE/TIME

LOCATION

Contract Award
N/A
When awarded
N/A
Contract Begins
N/A
April 1, 2025
Attachment (A) Section 1.A
The Contractor shall apply for and secure all required State and Local Permits and Escorts
6 weeks from notification of the initial planned shipping date

TBD

Attachment (A) Section 2.E

The Contractor shall provide documents showing (1) the expected axle spacing and weight loadings as well as the method and calculations used to determine them and (2) the axle load limit values that will be on the permits

At least 3 weeks prior to the planned shipping date (preferably sooner, if possible)

TBD

Attachment (A) Section 2.E.1

The Contractor shall provide all required personnel information to NNSY to obtain security accesses
At least 1 week prior to the initial arrival at NNSY (preferably sooner, if possible)

TBD

Attachment (A) Section 1.B.2

The Contractor shall provide documentation to NNSY of citizenship and other information on company letter head At least 1 week prior to arrival at NNSY (preferably sooner, if possible)

Attachment (A) Section 2.P

The Contractor shall provide trailer tie-down information to NNSY
At least 1 week prior to arrival at NNSY (preferably sooner, if possible)

Attachment (B) Section 1.B

The Contractor shall provide off-yard routes to NNSY

Any time prior to arrival at NNSY (preferably as soon as possible)
Any time prior to arrival at NNSY (preferably as soon as possible)

Attachment (A) Section 2.L.1

The Contractor shall provide permits to NNSY

Any time prior to release of shipment.

Any time prior to release of shipment.

Attachment (A) Sections 1.G and 2.Q

Attachment (E) Middle of Page 2

Document No. 4311V100 Attachment (F)

ATTACHMENT (F)

PUMP TRANSPORT SERVICE SUMMARY OF KEY EVENTS

KEY EVENT

TIMELINE

CORRESPONDING DATE/TIME

LOCATION

The Contractor shall arrive at NNSY

N/A

Within 6 weeks after being notified by NNSY, at 6:00 AM or as permits allow Attachment (A) Sections 1.B.1 and 2.J

Attachment (E) Top of Page 1

The Contractor shall arrive at NNSY for inspections and equipment setup of the Transport Vehicle(s)

2 days prior to loading

TBD, at 6:00 AM or as permits allow Attachment (A) Sections 2.I and 2.J

Load Transport
N/A
TBD
N/A

The Contractor shall depart for Westinghouse (Planned Shipping Date)

N/A

TBD

Attachment (E) Top of Page 1

The Contractor shall submit problem notifications (should any occur) to NNSY

N/A

N/A Attachment (A) Section 2.F

The Contractor shall submit DOT discrepancy or detected radioactivity notifications (should any occur) to NNSY

N/A

Attachment (A) Section 2.O

Daily Driver check-ins (for loads in-transit greater than 1 day) with NNSY

Attachment (A) Sections 1.G and 2.F.1

Attachment (E) Bottom of Page 2

The Contractor shall arrive at Westinghouse

TBD, between 7:00 AM and 12:00 PM or as permits allow Attachment (A) Section 1.E.1

Attachment (E) Top of Page 1

Contract Ends
N/A
July 30, 2025
Attachment (A) Section 1.A

Notes:

1. Transport Vehicle inspections (i.e., FMCSA, State, CVSA) are not included as they are expected to be performed outside of this Contract.

2. Attachment (F) does not replace the need to observe the remaining documentation of this Contract.