About this file

This is a Scope of Work document from the Sierra Regional Center in Sparks, Nevada for flooring replacement in Building 8N located at 480 Galletti Way. The project involves replacing flooring in specifically highlighted sections of the building - yellow sections will receive hard tile matching existing tile in white sections, while orange sections will receive new carpet tile. The work must be completed by June 30, 2025 and will be performed Monday through Friday during daytime hours. The vendor must coordinate with the Facility Supervisor for scheduling and daily communication about progress. Sierra Regional Center maintenance staff will handle furniture moving and will select final flooring colors during a walk-through.

The vendor responsibilities include basic floor preparation, supply and installation of new tile/carpet/baseboards/transition strips, wall protection during work, and debris removal. Daily cleanup is required with all debris to be hauled away by the vendor. Payment requests must be submitted via invoice to both Anil Manocha at amanocha@adsd.nv.gov and Imran Hyman at ihyman@dcfs.nv.gov. The attached floor plan shows the layout of Building 8N with yellow sections indicating areas for hard tile replacement and orange sections indicating areas for carpet tile installation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment AA Scope of Work

Replace indicated flooring (only orange and yellow highlighted sections of attached map) of Building 8N located at 480 Galletti Way, Sparks Nevada 89431. This work must be done by June 30, 2025.

Flooring material will be hard tile in yellow sections of the map, the hard tile should closely match the existing hard tile in the white sections of the map. Flooring material will be carpet tile in orange sections of the map, the carpet tile color and material are to be determined.

Furniture will be moved by Sierra Regional Center maintenance personnel. Sierra Regional Center will select the color of the flooring upon walk-through.

1. Using flooring diagram, remove existing hard flooring and replace with new authorized flooring.

2. Yellow sections will need to be replaced with hard tile that matches existing tile in white sections.

3. Orange sections will need to be replaced with carpet tile, these sections will need to be transitioned or leveled to best accommodate the transition between carpet tiles and hard tiles.

4. Replace baseboards and thresholds with new materials to match existing newer baseboards and thresholds in white sections.

In all buildings, Vendor will:

• Provide basic floor prep to install new flooring.

• Supply and install new tile and carpet.

• Supply and install new baseboard.

• Supply and install transition strips as needed.

• Provide tarp or plastic for wall and trim protection as needed.

• Remove all trash and debris from jobsite when project is finished.

Workdays will be Monday – Friday, with start and end times coordinated with Facility Supervisor, but will not include overnight. Schedule of installation will be determined by Sierra Regional Center and awarded vendor upon final contract approval.

Expectations are as follows:

• Vendor to meet with Facility Supervisor at the beginning of the project to ensure all information is up to date and accurate.

• Communicate with maintenance staff daily to inform them of what has been completed, and what will be done the next day with any possible issues.

• Vendors to keep areas neat and debris cleaned up at the end of each day. All debris to be extracted will be hauled off by vendor.

• And finally, have a final inspection done with the Facility Supervisor to make sure that staff is completely satisfied with the installation.

Invoicing All requests for payment must be submitted via invoice to Anil Manocha at amanocha@adsd.nv.gov and to Imran Hyman at ihyman@dcfs.nv.gov .

mailto:amanocha@adsd.nv.gov mailto:ihyman@dcfs.nv.gov