This is a Basis of Design Report prepared by Jacobs Consultants for the Great Lakes Water Authority (GLWA) regarding the rehabilitation of the Screened Final Effluent (SFE) Pump Station at the Detroit Water Resource Recovery Facility. The project involves replacing an existing 50-year-old SFE pump station with a new, right-sized facility and implementing a comprehensive treatment system for secondary effluent reuse throughout the facility. The new SFE pump station will have an initial firm capacity of 60 million gallons per day (mgd) with space for future expansion to 84 mgd, utilizing six vertical turbine pumps (five in service plus one standby) with constant-speed 500 horsepower motors operating at 4,160 volts. The project also includes construction of cloth disk filtration, chemical storage and feed systems for sodium hypochlorite and caustic, booster pump systems for intermediate and high-pressure secondary water distribution, a sulfur dioxide carrier water pumping system near the Dechlorination Facility, backup hypochlorite feed capability, and associated electrical, instrumentation, control, civil, structural, architectural, and mechanical systems. The Progressive Design-Build delivery method is being used with NORESCO as the Prime Contractor and Jacobs providing design services, with Phase 1 targeting 60% design completion.
The project addresses cost reduction and operational resilience by replacing potable water with treated secondary effluent (designated Low Pressure Secondary Water or LPSW) as the primary source for most secondary water uses throughout the facility, with potable water serving as an emergency backup. The design establishes a new 16-inch potable water connection to the existing Detroit Water and Sewerage Department main on Jefferson Avenue with reduced pressure zone backflow prevention, and a filtered water storage tank with 76,517 gallons capacity will be constructed beneath the filter room. Stormwater management will comply with City of Detroit requirements, and the project will require permits from the Michigan Department of Environment, Great Lakes, and Energy; the City of Detroit; and the Detroit Water and Sewerage Department. The facility is being constructed over existing secondary effluent conduits north of the existing pump station, with new pavement and utility infrastructure to support 50-year design life for buried piping and equipment.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rehabilitation of the SFE Pump Station Basis of Design Report - Updated
Revision: Updated Final
Rehabilitation of the SFE Pump Station Contract Number: 2000970
August 15, 2025
Rehabilitation of the SFE Pump Station Basis of Design Report - Updated
Client name: NORESCO for the Great Lakes Water Authority
Project name: Rehabilitation of the SFE Pump Station
Client reference: Contract Number: 2000970 Project no: C6A18000
Document no: 19660-10819660-108 Project manager: Allen Gelderloos. P.E.
Revision: Updated Final Prepared by: Jacobs
Date: August 15, 2025 File name: SFE_PS_BOD_Updated_Final-08-
Jacobs Consultants, Inc.
30800 Telegraph Road Suite 4900 Bingham Farms, MI 48025-4710 United States
T +1.248.633.1440 www.jacobs.com
Copyright © 2025.
All rights reserved. The concepts and information contained in this document are the property of the Jacobs group of companies. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Jacobs, the Jacobs logo, and all other Jacobs trademarks are the property of Jacobs.
NOTICE: This document has been prepared exclusively for the use and benefit of Jacobs’ client. Jacobs accepts no liability or responsibility for any use or reliance upon this document by any third party.
230606111851_4c723a30 i
Executive Summary
Project Overview The Screened Final Effluent (SFE) Pump Station (PS) conveys water from the secondary effluent conduits to various treatment processes at the Detroit Water Resource Recovery Facility (WRRF). Uses of SFE water include incinerator scrubber water, biosolids dryer scrubber water, belt filter press wash water, elutriation water for gravity thickeners, and other various process and washdown uses. The existing SFE PS is nearly 50 years old and in poor condition, and its pumps are inefficient because they are oversized.
The WRRF also uses a large amount of potable water at a significant annual cost to Great Lakes Water Authority (GLWA). (After potable water from the water main along Jefferson Avenue goes through backflow preventers or break tanks on the WRRF site, the water is considered non-potable water, or secondary water [SW], which is the term used in this report). Providing treatment for SFE and replacing SW with treated SFE has been identified as both a cost-saving measure and a means to provide resiliency in case of a water main failure.
An Alternatives Evaluation Report was prepared and submitted to GLWA in April 2022. The findings and recommendations from the Alternatives Evaluation Report, along with a supplemental Engineering Design Abstract (EDA) submitted to GLWA on June 20, 2022, are summarized in Section 2.
This report provides the Basis of Design Report (BODR) for the recommended facilities and improvements related to a new SFE PS, SFE treatment system, and other ancillary pumping and backup disinfection systems.
The project is being delivered using a Progressive Design-Build delivery method under two phases. Jacobs is providing design services and NORESCO is the Prime Contractor.
Project Objectives This project is intended to accomplish the following objectives:
Replace the existing SFE PS with a new PS. The new PS will be “right-sized” to meet the current and anticipated future SFE demands and reduce energy costs.
Increase WRRF resiliency to a potable water main failure through the use of treated SFE (referred to as Low Pressure Secondary Water, or LPSW) as a primary source of SW water, with potable water as a readily available backup. Refer to Section 1.2 for further description of the improvements provided by this project.
Reduce WRRF operating costs by providing treatment to a portion of the SFE flow to make it suitable to replace SW uses throughout the WRRF.
Proposed SFE Pump Station Based on a review of existing and proposed SFE uses, the proposed SFE PS will have 60-mgd firm capacity (i.e., capacity with largest unit out of service). The proposed PS will be located north of the existing PS location, over the secondary effluent channels and use vertical turbine pumps, similar to the existing PS.
The proposed placement of pumps will position half of the pumps in the East Effluent Channel and half in the West Effluent Channel to allow one of these channels to be taken out of service, if necessary, and maintain current maximum day SFE supply. Table ES-1 provides the design criteria for the proposed SFE pumps.
230606111851_4c723a30 ii
Table ES-1. Design Criteria for Proposed SFE Pumps and Ancillary Equipment
Parameter Value
SFE Pumps
SFE pump type, number of stages Vertical Turbine, 2 stages
Initial number of pumps (duty + standby) 6 (5 + 1)
Initial pump station firm capacity 60 mgd (5 pump in service)
Ultimate number of pumps (duty + standby + space for future) 8 ( 5 + 1 + 2)
Ultimate pump station firm capacity 84 mgd (7 pumps in service)
Capacity per pump 12.0 mgd at 187 feet TDH
TDH – minimum 163 feet
TDH – maximum 187 feet
Pump Drive Type Constant Speed
Motor size 500 hp
Motor Voltage 4,160V
Motor Speed 1,180 rpm hp = horsepower rpm = revolutions per minute
TDH = total dynamic head
V = volt(s)
VFD = variable-frequency drive
Complex II Incineration Quench Water Booster Pumps The new SFE Pump Station is designed to operate at a lower PS discharge pressure (about 65 to 70 pounds per square inch [psi]) compared to the existing PS discharge pressure (about 95 to 105 psi). It was found during the Alternatives Evaluation that providing a separate booster pumping system for the scrubber quench water in Complex II (C-II) Incineration would significantly reduce overall energy costs.
The proposed system includes two skids of two booster pumps each.
Increased Resiliency Provided by this Project One of the objectives of this project is to increase the WRRF resiliency to a water main failure by providing LPSW. Table ES-2 summarizes the primary and backup water supply included in this project to increase WRRF resiliency to a major potable water main failure.
Table ES-2. Summary of Increased Resiliency Provided by this Project
Water Use or Process Primary Water Supply Backup Water Supply
LPSW and IPSW LPSW Potable Water
HPSW Potable Water LPSW
SO2 Carrier Water DRO Potable Water
Chlorination Existing chlorine gas system using potable water as carrier water
Sodium hypochlorite from Hypo Building with SFE as carrier water
230606111851_4c723a30 iii
SFE Treatment The Alternatives Evaluation Report presented three alternatives for SFE filtration: cloth disk filters, granular media pressure filters, and granular media gravity filters. Cloth disk filters were selected in the EDA for implementation based on construction cost, simplicity, and footprint.
There will be two cloth disk filters, each with 14 disks, located in the Filter Room. Water will be pumped by the filter feed pumps (vertical turbine pumps) from the secondary effluent conduits to the filters.
Sodium hypochlorite (NaOCl) and sodium hydroxide (caustic, or NaOH) will be injected into filtered water upstream of a static mixer. Sodium hypochlorite is added to meet chlorine demand and limit nitrifier growth (and biofilm formation) in the distribution system. Caustic is added to match potable water alkalinity and limit sloughing of pipe scale in the distribution system. Downstream of the static mixer, water will drop through the floor into a filtered water storage tank (FWST). Sodium hypochlorite and caustic will each be stored in an indoor storage tank within a common chemical containment wall.
Connections of Treated SFE to Secondary Water System LPSW will be supplied using LPSW pumps from the FWST to the existing low, intermediate, and HPSW systems within the plant as either the primary or backup water supply. These connections will occur in the Machine Shop Basement. Modifications to these water supplies under this project are described as follows.
LPSW: LPSW will be pumped from the FWST into the LPSW system. The connection of LPSW to the LPSW system will be in the Machine Shop Basement. When the FWST reaches low level (indicating a sudden large increase in LPSW use in the plant), LPSW will be supplemented with potable water fed to the FWST. This will avoid large fluctuations in filtered water feed rates, which could negatively affect filtration performance.
IPSW: IPSW will be obtained from the LPSW system piping in the Machine Shop Basement and boosted to IPSW pressure by a new skid-mounted booster pump system in the basement.
HPSW: HPSW will remain on the potable water system and continue to be obtained from the existing break tanks in the Machine Shop Basement. New, right-sized HPSW pumps will be provided. As backup to potable water, LPSW will fill the break tank and be boosted using the same HPSW pumps.
Polymer makedown and boiler makeup are currently supplied by LPSW. These processes are considered too sensitive to use the proposed LPSW for supply. Therefore, the proposed HPSW system will feed these applications using pressure-reducing valves to achieve the proper feed pressure. This approach will ensure that potable water quality water will continue to be fed to these processes. LPSW will be provided as emergency backup.
Backup Potable Water Supply Potable water will serve as both a supplemental supply and a complete backup to the LPSW water supply.
An 16-inch potable water connection to the 42-inch Detroit Water and Sewerage (DWSD) water main on Jefferson Avenue will feed the Filter Room. Backflow prevention will be provided using reduced pressure zone (RPZ) backflow preventers. Figure ES-1A through Figure ES-1C provide schematics of the potable water connection to the LPSW system and three potential operating scenarios, described below:
1. Typical Operation: Filtered water feeds the FWST and the LPSW pumps convey the LPSW to the Machine Shop Basement for distribution to the secondary water system. No potable water is used in this operating scenario.
2. Supplemental Potable Water Supply: When the FWST reaches low level (indicating a sudden large increase in LPSW use in the plant), potable water will supplement the LPSW being fed to the FWST.
This will avoid large fluctuations in filtered water feed rates, which could negatively affect filtration performance.
230606111851_4c723a30 iv
3. Potable Water as Secondary Water Backup: If a low water pressure (below an adjustable setpoint) occurs on the LPSW line feeding the Machine Shop Basement, the pressure control valve on the potable water bypass will automatically open and allow potable water to either provide the complete secondary water demand, or supplement the LPSW pumps.
230606111851_4c723a30 v
Sulfur Dioxide Carrier Water Carrier water used for conveying sulfur dioxide to the point of application in the Detroit River Outfall (DRO) is currently supplied by potable water. Under this project, plant effluent will be pumped from an existing DRO access shaft near the Dechlorination Facility to feed the existing carrier water booster pumps.. A new building with the carrier water pumps and strainers will be provided near the DRO access shaft to pump the water from the DRO. Potable water will be connected to the plant effluent water (referred to as DRO) with reduced pressure zone (RPZ) backflow preventers and a pressure sustaining valve to allow potable water backup to the carrier water supply. When the pumped DRO flow is less than needed (due to insufficient carrier water or a failure of the carrier water pumps), flow will be automatically supplemented with potable water.
Chlorination Carrier Water and Sodium Hypochlorite Backup Carrier water for conveying chlorine to the point of application at the Detroit WRRF site is currently supplied by potable water. The possibility of replacing this potable water with LPSW was evaluated and determined to be infeasible due to the risk of explosion when organic nitrogen or ammonia react with chlorine in the chlorine injectors. Potable water will continue to be used as carrier water for the chlorine injectors.
Alternatives for providing backup to the chlorination system were developed in the Alternatives Evaluation Report. The recommended alternative included in this project involves a backup hypochlorite feed system to feed hypochlorite from the Hypo Building to the existing chlorine solution diffuser feed locations in the secondary effluent conduits. The backup feed pumps will be located in the Hypo Building next to the existing hypochlorite feed pump skids. The pumps will pump hypochlorite into one of three chlorine solution feed lines, which will be isolated from the chlorine solution system during emergency operation and allow hypochlorite to be fed to the current diffuser feed point. SFE carrier water will be added to the feed line to provide mixing of the hypochlorite at the point of injection.
230606111851_4c723a30 vi
Contents Executive Summary ............................................................................................................................................................ i
Project Overview ....................................................................................................................................................................... i Project Objectives ..................................................................................................................................................................... i Proposed SFE Pump Station ................................................................................................................................................ i Complex II Incineration Quench Water Booster Pumps ........................................................................................... ii Increased Resiliency Provided by this Project .............................................................................................................. ii SFE Treatment ......................................................................................................................................................................... iii Connections of Treated SFE to Secondary Water System ...................................................................................... iii Backup Potable Water Supply ........................................................................................................................................... iii Sulfur Dioxide Carrier Water ............................................................................................................................................... v Chlorination Carrier Water and Sodium Hypochlorite Backup .............................................................................. v
Acronyms and Abbreviations ......................................................................................................................................... ix
1. Introduction ........................................................................................................................................................ 1-1
1.1 Project Overview and Objectives ..................................................................................................................... 1-1
1.2 Increased Resiliency Provided by this Project ............................................................................................ 1-1
1.3 Locations of Facilities and Key Areas Described in Report ................................................................... 1-2
2. Summary of Alternatives Evaluation Report Findings and Recommendations ................................. 2-1
2.1 SFE Pump Station and Related Systems ...................................................................................................... 2-1
2.2 Complex II Incineration Quench Water Booster Pumps ......................................................................... 2-1
2.3 SFE Treatment ........................................................................................................................................................ 2-1
2.4 Connections of Treated SFE to Secondary Water System ..................................................................... 2-1
2.5 Sulfur Dioxide Carrier Water ............................................................................................................................. 2-2
2.6 Chlorination Carrier Water and Sodium Hypochlorite Backup ............................................................ 2-2
3. Design Development ........................................................................................................................................ 3-1
3.1 Introduction ............................................................................................................................................................. 3-1
3.2 Process ...................................................................................................................................................................... 3-1
3.3 Electrical ................................................................................................................................................................ 3-40
3.4 Instrumentation and Control ......................................................................................................................... 3-43
3.5 Site Civil.................................................................................................................................................................. 3-48
3.6 Structural ............................................................................................................................................................... 3-54
3.7 Architectural ......................................................................................................................................................... 3-59
3.8 Building Mechanical .......................................................................................................................................... 3-61
4. Permitting Plan .................................................................................................................................................. 4-1
4.1 Michigan Department of Environment, Great Lakes, and Energy ...................................................... 4-1
4.2 City of Detroit .......................................................................................................................................................... 4-1
4.3 Detroit Water and Sewerage Department ................................................................................................... 4-1
230606111851_4c723a30 vii
Appendices Appendix A Referenced Design Drawings Appendix B Screened Final Effluent Hydraulic Model Review and Calibration Appendix C Detroit WRRF SFE Pump Station – Computational Fluid Dynamics Analysis Appendix D Detroit WRRF SFE PS Transients Surge Analysis Appendix E Geotechnical Investigation Report
Tables Table ES 1. Design Criteria for Proposed SFE Pumps and Ancillary Equipment ......................................................... ii Table ES 2. Summary of Increased Resiliency Provided by this Project ......................................................................... ii Table 1-1. Summary of Increased Resiliency Provided by this Project ...................................................................... 1-2 Table 3-1. Existing SFE Pump Information ........................................................................................................................... 3-2 Table 3-2. Flow Correction Factors .......................................................................................................................................... 3-6 Table 3-3. Current SFE Usage by Use and Location .......................................................................................................... 3-9 Table 3-4. SFE System Pressures with Constraint of 50 psi for Complex II Incineration Quench Water ... 3-11 Table 3-5. SFE System Pressures with Constraint of 40 psi for Complex II Incineration Booster Pumps . 3-11 Table 3-6. Current and Projected SFE Usage by Use and Location .......................................................................... 3-14 Table 3-7. Design Criteria for Proposed SFE Pumps and Ancillary Equipment ................................................... 3-15 Table 3-8. Basis for TDH for New SFE Pump Station with Boosted Quench Water ............................................ 3-16 Table 3-9. Flow Metrics for 12 mgd Pumps, Peak Flow, Option 2, Scenario 1 .................................................... 3-17 Table 3-10. Flow Metrics for 12 mgd Pumps, Peak Flow, Option 2, Scenario 6 ................................................. 3-20 Table 3-11. Weight of Various Equipment ......................................................................................................................... 3-21 Table 3-12. Filter Feed, LPSW Pump and Potable Water Fill Control Based on FWST WSE ........................... 3-24 Table 3-13. Filter Design Criteria ........................................................................................................................................... 3-25 Table 3-14.Filtered Water Storage Tank Design Criteria .............................................................................................. 3-27 Table 3-15. LPSW Pump Design Criteria ............................................................................................................................. 3-28 Table 3-16. Chemical Feed System Design Criteria ....................................................................................................... 3-29 Table 3-17. Chemical Feed System Pipe and Fitting Specifications ........................................................................ 3-30 Table 3-18. Secondary Containment Design Criteria .................................................................................................... 3-31 Table 3-19. IPSW Booster Pump Design Criteria ............................................................................................................. 3-32 Table 3-20. HPSW Pump Design Criteria ............................................................................................................................ 3-33 Table 3-21. SFE Scrubber Water Requirements for Each Incinerator ...................................................................... 3-34 Table 3-22. Quench Water Booster Pump Design Criteria .......................................................................................... 3-34 Table 3-23. Incinerator Strainer Flows and Capacity ..................................................................................................... 3-36 Table 3-24. SO2 Carrier Water and Booster Pumps Design Criteria ......................................................................... 3-37 Table 3-25. Backup Hypochlorite Feed System Design Criteria ................................................................................ 3-39 Table 3-26. Summary of the NEC Area Classification, Ventilation, and Fire Protection Requirements ..... 3-40 Table 3-27. Preferred Equipment Manufacturers ........................................................................................................... 3-43 Table 3-28. Yard Piping Materials ......................................................................................................................................... 3-53 Table 3-29. HVAC Space Design Criteria ............................................................................................................................ 3-62
Figures Figure 1-1. Location of Key Areas and Facilities Described in this Report ............................................................... 1-3 Figure 3-1. Plan View of the Existing SFE Pump Station ................................................................................................. 3-3 Figure 3-2. Schematic of the Existing SFE Pump System ............................................................................................... 3-4 Figure 3-3. SFE Yard Piping ........................................................................................................................................................ 3-5
230606111851_4c723a30 viii
Figure 3-4. Historical SFE Daily Flows for 3-Year Period ................................................................................................ 3-6 Figure 3-5. Frequency Plot of SFE Flows Over 3-Year Period ....................................................................................... 3-7 Figure 3-6. Hourly SFE Flows for 1-Year Period ................................................................................................................. 3-8 Figure 3-7. SFE Pump Station Discharge Pressure for 3-Year Period ..................................................................... 3-12 Figure 3-8. Pump Curve Illustrating Increased Head at Lower Flows ...................................................................... 3-13 Figure 3-9. Streamlines Corresponding to Potential Moderate Vortices in the Pumps, 12 MGD Pumps, Peak
Flow, Option 2, Scenario 1 ........................................................................................................................................... 3-18 Figure 3-10. Streamlines Corresponding to Potential Weak Vortices (no vortices shown), 12 mgd Pumps, Peak Flow, Option 2, Scenario 6 with Fillets ......................................................................................................... 3-19 Figure 3-11. Critical Dimensions of the Fillets with 12 MGD pumps ...................................................................... 3-20 Figure 3-12. Overall Process Flow Diagram ...................................................................................................................... 3-23 Figure 3-13. Cloth Disk Filter Cut-Away View ................................................................................................................... 3-25 Figure 3-14. Proposed Location for Skid-Mounted Quench Water Booster Pumps .......................................... 3-35
230606111851_4c723a30 ix
Acronyms and Abbreviations ˚F degree(s) Fahrenheit
AASHTO American Association of State Highway and Transportation Officials
AASI Aqua-Aerobic Systems Incorporated ach air changes per hour
ACI American Concrete Institute
ADWF average dry weather flow
AFD adjustable frequency drive
ANSI American National Standards Institute
ASCE American Society of Civil Engineers
ASD allowable stress design
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers, Inc.
ASTM American Society for Testing and Materials
BDF biosolids drying facility
BOD basis of design cf cubic feet
CFD computational fluid dynamic
CGD Combustible Gas Detection
Cl2 chlorine
DC direct current
DRO Detroit River Outfall
EB electrical building
EDA Engineering Design Abstract
EGLE Michigan Department of Environment, Great Lakes, and Energy
FKE FK Engineering
FRP fiber-reinforced plastic
ft. (ft) feet ft2 square feet
FWST filtered water storage tank gal. gallon(s)
GLWA Great Lakes Water Authority gph gallons per hour
230606111851_4c723a30 x gpm gallon(s) per minute
HP high pressure hp horsepower
HPSW high-pressure secondary water
HSC hydraulic system centers
HVAC heating, ventilation, and air conditioning
I/O input/output
IBC International Building Code
ICEA Insulated Cable Engineers Association
IECC International Energy Conservation Code
IEEE Institute of Electrical and Electronic Engineers
IES Illuminating Engineers Society
IMC International Mechanical Code
IP intermediate pressure
IPC International Plumbing Code
IPSW intermediate-pressure secondary water
ISA Instrument Society of America lb/ft2 pound per square foot lb/ft3 pound per cubic foot
LPSW low-pressure secondary water
MBC Michigan Building Code
MCC motor control center mg/L milligram per liter mgd million gallons per day
NaOCl sodium hypochlorite
NaOH sodium hydroxide
NEC National Electric Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
Nos. number(s)
O&M operations and maintenance
OIT operator interface terminals
OSHA Occupational Safety and Health Act
230606111851_4c723a30 xi
P&ID piping and instrumentation diagram
PF peak flow
PLC programmable logic controller
POR preferred operating range
PS pumping station psi pounds per square inch psig pounds per square inch gauge rpm revolutions per minute
RRO Rouge River Outfall
SCADA supervisory control and data acquisition
SESC Soil Erosion and Sediment Control sf square feet
SFE screened final effluent
SMACNA Sheet Metal and Air Conditioning Contractor’s National Association
SO2 sulfur dioxide
SP submersible pump
SQL structured query language
SW secondary water
TDH total dynamic head
TEFC totally enclosed, fan cooled
TSS total suspended solids
UL Underwriters Laboratory
UPS uninterruptible power supply
UV ultraviolet
VFD variable-frequency drive
WRRF Water Resource Recovery Facility
WSE water surface elevation
230606111851_4c723a30 1-1
1. Introduction
1.1 Project Overview and Objectives
The Screened Final Effluent (SFE) Pump Station (PS) conveys water from the secondary effluent conduits to various treatment processes at the Detroit Water Resource Recovery Facility (WRRF). Uses of SFE water include incinerator scrubber water, biosolids dryer scrubber water, belt filter press wash water, elutriation water for gravity thickeners, and other various process and washdown uses. The existing SFE PS is nearly 50 years old and in poor condition, and its pumps are inefficient because they are oversized.
The WRRF also uses a large amount of potable water at a significant annual cost to Great Lakes Water Authority (GLWA). (After potable water from the water main along Jefferson Avenue goes through backflow preventers or break tanks on the WRRF site, the water is considered non-potable water, or secondary water [SW], which is the term used in this report). Providing treatment for SFE and replacing SW with treated SFE has been identified as both a cost-saving measure and a means to provide resiliency in case of a water main failure.
An Alternatives Evaluation Report was prepared and submitted to GLWA in April 2022. The findings and recommendations from the Alternatives Evaluation Report, along with a supplemental Engineering Design Abstract (EDA) submitted to GLWA on June 20, 2022, are summarized in Section 2.
This report provides the Basis of Design Report (BODR) for the recommended facilities and improvements related to a new SFE PS, SFE treatment system, and other ancillary pumping and backup disinfection systems.
This project is intended to accomplish the following objectives:
Replace the existing SFE PS with a new PS. The new PS will be “right-sized” to meet the current and anticipated future SFE demands and reduce energy costs.
Increase WRRF resiliency to a potable water main failure through the use of treated SFE (referred to as Low Pressure Secondary Water, or LPSW ) as a primary source of SW water, with potable water as a readily available backup. Refer to Section 1.2 for further description of the improvements provided by this project.
Reduce WRRF operating costs by providing treatment to a portion of the SFE flow to make it suitable to replace SW uses throughout the WRRF.
The project is being delivered using a Progressive Design-Build delivery method under two phases. Jacobs is providing design services and NORESCO is the Prime Contractor. Phase 1 will provide a 60% Design and allow for NORESCO to generate a Lump Sum.
1.2 Increased Resiliency Provided by this Project
As noted previously, one of the objectives of this project is to increase the WRRF resiliency to a water main failure by providing treated LPSW. Increased resiliency is provided by the following improvements:
1. For existing low-pressure secondary water (LPSW) and Intermediate pressure secondary water (IPSW), LPSW (treated SFE) will replace potable water as the primary source of water. The new LPSW will be produced through filtration and chemical addition (sodium hypochlorite to provide a monochloramine residual and sodium hydroxide to provide alkalinity) of the secondary effluent. Potable water will serve as the backup water supply to the LPSW and IPSW through a connection of a potable water line to the LPSW line with proper backflow prevention.
2. For high-pressure secondary water (HPSW), potable water will remain the primary source of water, based on the need for higher water quality for this supply. As a short-term emergency backup (i.e., two
230606111851_4c723a30 1-2 to three days), LPSW will be piped to feed a HPSW break tank to serve as a readily available backup water supply.
3. For sulfur dioxide carrier water at the Dechlorination Facility, screened secondary effluent (referred to as Detroit River Outfall [DRO]) will replace potable water as the primary source of carrier water. DRO will be pumped from the DRO access shaft near the Dechlorination Facility to a connection with backup potable water and then routed to the sulfur dioxide carrier water booster pumping system.
Potable water will serve as the backup water supply through a connection in the Maintenance Room, which will provide reduced pressure zone (RPZ) backflow prevention.
4. For chlorine carrier water at the Chlorination Facility, the possibility of replacing potable water with LPSW was evaluated and determined to be infeasible due to the risk of explosion when organic nitrogen or ammonia react with chlorine in the chlorine injectors. Potable water will continue to be used as carrier water for the injectors.
5. Alternatives for providing backup to the chlorination system were developed in the Alternatives Evaluation Report. The recommended alternative included in this project involves a backup hypochlorite feed system to feed hypochlorite from the Hypo Building to the existing chlorine solution diffuser feed locations in the secondary effluent conduits. The backup feed pumps will be located in the Hypo Building next to the existing hypochlorite feed pump skids. The pumps will pump hypochlorite into a feed line to one of the three chlorine solution lines, which will be isolated from the chlorine solution system and allow hypochlorite to be fed to the current diffuser feed point. SFE carrier water will be added to the feed line to provide mixing of the hypochlorite at the point of injection.
Table 1-1 summarizes the primary and backup water supply previously described and included in this project to increase WRRF resiliency to a major potable water main failure.
Table 1-1. Summary of Increased Resiliency Provided by this Project
Water Use or Process Primary Water Supply Backup Water Supply
LPSW and IPSW LPSW Potable Water
HPSW Potable Water LPSW
SO2 Carrier Water DRO Potable Water
Chlorination Existing chlorine gas system using potable water as carrier water
Sodium hypochlorite from Hypo Building with SFE as carrier water
1.3 Locations of Facilities and Key Areas Described in Report Figure 1-1 provides an aerial view of the location of key areas and facilities described in this report.
Appendix A provides additional details in site plan drawings referenced in this report.
230606111851_4c723a30 1-3
Figure 1-1. Location of Key Areas and Facilities Described in this Report
230606111851_4c723a30 2-1
2. Summary of Alternatives Evaluation Report Findings and Recommendations
This section summarizes the recommendations for the SFE PS and treatment systems from the Final Alternatives Evaluation Report, dated July 5, 2022. It also includes recommendations contained in the EDA, dated June 20, 2022.
2.1 SFE Pump Station and Related Systems
The Alternatives Evaluation Report recommended a new SFE PS at a location over the secondary effluent conduits, north of the existing SFE PS. The recommended firm capacity of the PS was 60 mgd. Various alternative pump combinations were evaluated, and an alternative with six variable speed pumps was the recommended alternative.
During 30% design review, GLWA requested space be provided for two additional, similarly sized SFE pumps, for a total space of eight pumps. Also, GLWA requested that the variable speed drives be replaced with constant speed pumps, based on historical issues with variable speed drives.
2.2 Complex II Incineration Quench Water Booster Pumps
The new SFE Pump Station is designed to operate at a lower PS discharge pressure (about 65 to 70 pounds per square inch [psi]) compared to the existing PS discharge pressure (about 95 to 105 psi). It was found during the Alternatives Evaluation that providing a separate booster pumping system for the scrubber quench water in Complex II (C-II) Incineration would significantly reduce overall energy costs.
The proposed system includes four skids of booster pumps, one skid for each pair of incinerators, and is described further in Section 3.2.4.
Based on GLWA preference, the system was changed to two skids of two pumps each distributing to all eight incinerators.
2.3 SFE Treatment
The Alternatives Evaluation Report presented three alternatives for SFE filtration: cloth disk filters, granular media pressure filters, and granular media gravity filters. Cloth disk filters were selected in the EDA for implementation based on construction cost, simplicity, and footprint.
There will be two cloth disk filters, each with 14 disks, located in a building. There will be a platform between the two filters, accessed by stairs.
Sodium hypochlorite (NaOCl) and sodium hydroxide (caustic, or NaOH) will be injected into filtered water upstream of a static mixer. Sodium hypochlorite is added to meet chlorine demand and limit nitrifiers growth (and biofilm formation) in the distribution system. Caustic is added to match potable water alkalinity and limit sloughing of pipe scale in the distribution system. Downstream of the static mixer, water will drop through the floor into a filtered water storage tank (FWST). It is impractical to pump sodium hypochlorite from the Hypo Building to the SFE treatment area. Therefore, sodium hypochlorite and caustic will each be stored in an indoor storage tank within a common chemical containment area.
Metering pumps will be near the containment wall with their wet ends inside the containment area.
2.4 Connections of Treated SFE to Secondary Water System
LPSW will be supplied to the existing low, intermediate, and HPSW systems within the plant as either the primary or backup water supply. These connections will occur in the Machine Shop Basement.
Modifications to these water supplies under this project are described as follows.
230606111851_4c723a30 2-2
LPSW: Treated SFE will be pumped from the FWST into the LPSW system. The connection to the LPSW system will be in the Machine Shop Basement. When the filtered water storage tank reaches low level (indicating a sudden large increase in LPSW use in the plant), treated SFE will be supplemented with potable water fed to the FWST. This will avoid large fluctuations in filtered water feed rates, which could negatively affect filtration performance.
IPSW: IPSW will be obtained from the LPSW system piping in the Machine Shop Basement and boosted to IPSW pressure by a new skid-mounted booster pump system in the basement.
HPSW: HPSW will remain on the potable water system and continue to be obtained from the existing break tanks in the Machine Shop Basement. New, right-sized HPSW pumps will be provided. As backup to potable water, LPSW will fill the break tank and be boosted using the same HPSW pumps.
Polymer makedown is currently supplied by LPSW. This process is considered too sensitive to use the proposed LPSW (treated SFE) for supply. Therefore, the proposed HPSW system will feed these applications using pressure-reducing valves to achieve the proper feed pressure. This approach will ensure that potable water quality water will continue to be fed to these processes.
During the Basis of Design phase for this project, boiler makeup was thought to be supplied by LPSW.
Further investigation during 60% design discovered it was connected to the potable water system.
Because of the potable water supply, it is not possible to connect the LPSW (treated SFE) to the potable water system. It was decided during 60% design to keep the boiler makeup water solely on the potable water system.
2.5 Sulfur Dioxide Carrier Water
Carrier water used for conveying sulfur dioxide to the point of application in the Detroit River Outfall (DRO) is currently supplied by potable water. Under this project, plant effluent will be pumped from an existing DRO access shaft near the Dechlorination Facility to feed the existing carrier water booster pumps.
A new building with the carrier water pumps and strainers will be provided near the DRO access shaft to pump the water from the DRO. Potable water will be connected to the plant effluent water (referred to as DRO) with reduced pressure zone (RPZ) backflow preventers and a pressure sustaining valve to allow potable water. When the pumped DRO flow is less than needed (due to insufficient carrier water or a failure of the carrier water pumps), flow will be automatically supplemented with potable water.
The proposed system is described further in Section 3.2.5.
2.6 Chlorination Carrier Water and Sodium Hypochlorite Backup Carrier water for conveying chlorine to the point of application at the Detroit WRRF site is currently supplied by potable water. The possibility of replacing this potable water with treated SFE was evaluated and determined to be infeasible due to the risk of explosion when organic nitrogen or ammonia react with chlorine in the chlorine injectors. Potable water will continue to be used as carrier water for the injectors.
Alternatives for providing backup to the chlorination system were developed in the Alternatives Evaluation Report. The recommended alternative included in this project involves a backup hypochlorite feed system to feed hypochlorite from the Hypo Building to the existing chlorine solution diffuser feed locations in the secondary effluent conduits. The backup feed pumps will be located in the Hypo Building next to the existing hypochlorite feed pump skids. The pumps will pump hypochlorite into a feed line to one of the three chlorine solution lines, which will be isolated from the chlorine solution system during emergency operation and allow hypochlorite to be fed to the current diffuser feed point. SFE carrier water will be added to the feed line to provide mixing of the hypochlorite at the point of injection.
The proposed system is described further in Section 3.2.6.
230606111851_4c723a30 3-1
3. Design Development
3.1 Introduction
This section describes the BOD for the recommended elements of this project, as described in Section 2.
The descriptions are provided by design discipline, as follows:
Process Electrical Instrumentation and Control Site Civil Structural Architectural Building Mechanical
3.2 Process
This section provides BOD information for the following process-related tasks included in this project:
SFE PS
SFE treatment including filter feed pumps, filters, treated SFE pumps, and chemical storage and feed systems
Connections and modifications to LPSW, IPSW, and HPSW in the Machine Shop Basement
C-II Incineration quench water booster system
SO2 carrier water system
Backup hypochlorite feed as backup to chlorine solution
Secondary effluent sampling system
3.2.1 SFE Pump Station
3.2.1.1 Background Information for Existing SFE Pump Station and System The existing SFE PS is located on top of the secondary effluent conduits north of the Administration Building. There are eight vertical turbine 2-stage pumps, with a total capacity of about 180 mgd.
Table 3-1 provides the existing pump information. The secondary effluent is screened through a strainer (one per pump) where suspended solids larger than 1/32 of an inch are removed. The strainers are backwashed to prevent clogging. Currently, the operations staff manually perform backwashing; however, an automatic backwash system had been previously installed and was operational. The backwash water is returned to the head of the treatment plant through the plant drains.
Figure 3-1 presents a plan view of the existing SFE PS, and Figure 3-2 provides a schematic view of the SFE pump and discharge piping.
230606111851_4c723a30 3-2
Table 3-1. Existing SFE Pump Information
Pump Design Information Pumps 1, 3, 4, 5, 7, and 8 Pumps 2 and 6
Manufacturer Peerless Peerless
Size/model 32HXS 26HXS
Type Vertical Turbine Vertical Turbine
Flow, gpm (mgd) 13,000 (25.2) 10,500 (15.2)
TDH (rated), feet 185 186
Motor, hp 1,000 600
Motor, voltage 4,160 4,160
Speed, rpm 885 1,180 hp = horsepower rpm = revolutions per minute TDH = total dynamic head
230606111851_4c723a30 3-3
Figure 3-1. Plan View of the Existing SFE Pump Station
Source: GLWA SFE Standard Operating Procedure Manual
SFE PUMP
STRAINER (TYP.)
BACKWASH
VALVE (TYP.)
DISCHARGE VALVE (TYP.)
CHECK VALVE
SF
E
PR
ES
SU
R
E M
AI
N
SF
PR
ES
SU
R
E M
AI
BA
C
K W
A
SH
H
EA
D
R
BACKWASH SUPPLY
VALVE (TYP.)
BO
O
ST
ER
P U
M P
R O
O M
EL
EC
TR
IC
AL
B U
IL
D
IN
G
TO
Y
AR
D
PI
TO
Y
AR
D
230606111851_4c723a30 3-4
Figure 3-2. Schematic of the Existing SFE Pump System
Source: GLWA SFE Standard Operating Procedure Manual
3.2.1.2 Existing SFE Distribution System
Figure 3-3 presents the SFE distribution system around the plant site. SFE flow is monitored by two transit time flow meters, with one meter on the 60-inch main and one meter on the 48-inch main. The flow to the Biosolids Drying Facility (BDF) is not measured through these meters; it is separately measured at the BDF.
The major uses of SFE are at the following locations; Section 3.2.1.5 provides the measured or calculated flows at each location:
Incineration Complex II Sludge Processing Complex A Sludge Processing Complex B Sludge Dewatering Complexes I and II
BDF
PS-1 - Rack and Grit Complex Hypo Building Primary Clarifiers
FLOW INDICATOR
MANUAL VALVE
PRESSURE GAUGE
M MOTOR ACTUATOR
BUTTERFLYL VALVE
PRESSURE SWITCH
DIFFERENTIAL PRESSURE SWITCH
PRESSURE REGULATOR
HAND STRAINER
SYMBOL LEGEND
3-5
Figure 3-3. SFE Yard Piping
3-6
3.2.1.3 Evaluation of Historical SFE Usage
Figure 3-4 shows the daily average SFE flow through the three flow meters, the 24-inch, 48-inch, and 60-inch. The average daily flow for the 3 years (from June 2018 to May 2021) varied from 15 to 38 mgd, with an average of 24 mgd. The flow data from Ovation were revised by applying the correction factors obtained from dye tests conducted by the GLWA Wastewater Analytics Task Force. Table 3-2 provides the correction factors for the three flow meters. Figure 3-5 provides a frequency plot of the 3 years of flow data. Figure 3-6 provides hourly data to illustrate the relatively limited fluctuations in SFE flow that occur throughout the day. Table 3-3 details the current SFE usage by use and location.
Table 3-2. Flow Correction Factors
Period 24 Inch Flow Meter 48 Inch Flow Meter 60 Inch Flow Meter
June 2018 to April 2020 1.0000[a] 0.9585 0.9958
May 2020 to October 2021 1.1560 0.9844 1.1560 [a] Correction factor of 1.0000 was determined to be from May 2019 to April 2020. The same correction factor is assumed for June 2018 to April 2019.
Figure 3-4. Historical SFE Daily Flows for 3-Year Period
3-7
Figure 3-5. Frequency Plot of SFE Flows Over 3-Year Period
3-8
Figure 3-6. Hourly SFE Flows for 1-Year Period
230606111851_4c723a30 3-9
Table 3-3. Current SFE Usage by Use and Location
SFE Use Type No. of Units In Service Total No. of Units Flow per Unit, gpm Typical SFE Usage, gpm Source of Flow Information
C-II Incineration Scrubber Water 4 8 2,120 8,480 Scrubber manufacturer P&ID; review of SCADA
C-II Incineration Strainer Backwash -- -- -- 400 5% of C-II Incineration Scrubber Water
Complex A Thickener Makeup Water 4 6 600 2,400 Site observation and O&M staff input
Complex B Thickener Makeup Water 4 6 600 2,400 Site observation and O&M staff input
BDF Scrubber Water 3 4 600 1,800 90 percentile of flow rate for each train from SCADA data
C-I BFP Washwater 0 10 100 0 From BFP manufacturer specs
C-I BFP Conveyor Washwater 0 1 50 0 Estimated usage
C-II BFP (Upper Level) Washwater 6 12 100 600 From BFP manufacturer specs
C-II (Dewater and Incin) Conveyor Washdown 4 6 100 400 Estimated usage
C-II BFP (Upper Level) Strainer Backwash -- -- -- 30 5% of C-II Dewatering Washwater
PS 1 Rack and Grit -- -- -- 60 Two hose bibs for typical usage; Grit Channel flushing for maximum usage
C-II Incineration Wet Ash Booster Pump 0 1 1,600 0 Wet ash has not been used in 10 years; Incinerator Ash Study recommended maintaining
Primary Tank Cleaning -- -- -- 0 Based on 3 hoses at 600 gpm each
SFE PS Strainer Backwash -- -- -- 840 5% of Current Use Flow
Subtotal of Current Uses, gpm
17,410
Subtotal of Current Uses, mgd 25.1
No. = number O&M = operations and maintenance P&ID = piping and instrumentation diagram SCADA = supervisory control and data acquisition
230606111851_4c723a30 3-10
3.2.1.4 Evaluation of SFE Distribution System Pressure Requirements
In collaboration with the ongoing WRRF Yard Piping Upgrades project, a hydraulic model of the SFE distribution system was updated, verified, and calibrated to existing conditions under this SFE PS project.
Appendix B provides a description of the hydraulic model investigation.
Jacobs and Applied Science, Inc. investigated minimum pressure requirements for SFE uses throughout the WRRF. The pressure requirement of 50 psi for the Complex II Incineration quench water (located on the fourth floor of the building) is the existing controlling pressure requirement.
Table 3-4 presents pressures at various locations throughout the plant and various SFE PS flow scenarios (that is, minimum, average, and anticipated design capacity). As shown, to meet the 50 psi quench water pressure requirement, the SFE header pressure at the existing SFE PS location must be about 90 psi.
The next highest-pressure requirement in the SFE distribution system is 40 psi at the inlet of the existing booster pumps on the first floor for each venturi scrubber in Complex II Incineration.