Third-Party Design Review of Screened Final Effluent Project
Solicitation number
REQ - 0007862
Issued by
Wayne County, Michigan

About this file

This supporting documentation file is a technical assessment prepared by Jacobs for the Great Lakes Water Authority (GLWA) Wastewater Reclamation and Recycling Facility (WRRF), detailing water uses and piping systems across multiple buildings and complexes. The document provides a comprehensive inventory of secondary water demands throughout the facility, organized by building location with average daily demand measurements in gallons per minute (gpm). The assessment identifies specific water uses including pump seal water, motor cooling, flushing water, mist elimination systems, and various specialized applications across 20 primary locations plus additional unnumbered uses. Piping materials documented include ductile iron (DI), galvanized steel (Galv), copper, and stainless steel (SS), with associated components such as wye strainers, pressure reducing valves, and solenoid valves. The document was prepared under the Rehabilitation of SFE Pump Station project and specifically identifies heat exchangers and water heaters that were not known during the original design phase.

The document emphasizes critical operational considerations for secondary water systems, including water quality requirements and treatment needs for sensitive equipment such as cooling condenser units and bearing systems. Demands range from zero gpm at decommissioned facilities to 282 gpm at Influent Pump Station No. 1. The assessment notes that certain systems, including the existing SFE Pump Station, will be taken out of service following new facility implementation, while other systems such as dry polymer and raw liquid polymer systems are currently inactive. The document references source information from Standard Operating Procedures (SOPs), site visits, email correspondence, and engineering drawings, providing a detailed baseline for the Third-Party Design Review of the Screened Final Effluent Project.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building Name

Avg Day

Demand

(gpm) a

Use Piping

Material

Other Components

(other than fittings and valves)

Comments / Source of Info

1 Complex I Machine Shop 0 None DI

2 Dewatering Complex II 173 Dilute Polymer Mixing Tanks C1 and Upper

Level Belt Filter Presses

Will stay on PW through HPSW

Seal water for dewatering and filter feed pumps

DI / SS from John Clark email

AHU-4 Cooling Condenser Unit (4th Floor

C-II Dewatering)

DI / Galv Water is used for in the condenser. There is a

Notice is the manual that “The use of untreated or improperly treated water in this unit could result in scaling, erosion, corrosion, algae or slime.

3 Pump Station No. 1 Rack and Grit 35 Flushing water DI / Galv

4 Influent Pump Station No. 1 282 Motor bearing cooling (Kingsbury bearing)

Copper Solonoid valves Uses IPSW; can also use HPSW, according to SOP

Pump seal water DI SOP Photo

Polymer system (in PUB; not used)

5 Incineration Complex 200 Mist elimination system (C-II) Will stay on HPSW

6 Machine Shop 15 See Complex I Machine Shop above

7 Blower Building (Decomissioned).

Not visited

97.1 Blowers out of service since about 2004.

8 Infuent Pump Station No. 2 97.1 Raw Sewage Pump seal water Copper Solonoid valves, pressure reducing valves

Flushing water in Screen Room DI

New screens will use LPSW in Screen

Room

The demand for the screens is included in the SFE BOD

Dry Polymer System (Not used) SOP indicates SFE is used

Raw liquid polymer system (Not used) SOP indicates liquid polymer system not used

9 SFE Pump Station (Existing) 44.7 Pump seal water Will be taken out of service after new SFE Station

9A SFE Pump Station (Proposed) --- No uses in the building; however, there are pressure sustaining valves

DI Pressure sustaining valves

10 Electrical Building No. 9 (Near AD-

3)

25.5 Could not find uses in EB-9. There are SW

and PW water lines in the basement

11 Sludge Pump Station No. 1 22.3 Pump seal water (w/ booster pumps) Copper Wye strainers; PRV

(Singer)

Flushing water Galv

12 Sludge Pump Station No. 2 22.3 Pump seal water (w/ booster pumps) Copper Wye strainers; PRV

(Singer)

Flushing water Galv

Sludge Pump Station No. 3 0 Pump seal water Copper wye strainers SPS-3 is included in Tble 2-4, but the demand is listed as 0

Shell and tube heat exchanger for (4) liquid drives

Galv

Flushing water Galv

13 Sludge Processing Complex A 20.1 GT Pump seal water Mostly SS;

Galv on incoming line and other locations

Wye strainers; pressure reducing valves

SST Pump seal water Galv

Flushing Water Galv

USES AND PIPING SYSTEMS FOR LPSW AND IPSW AT THE GLWA WRRF

The order of Buildings in this table is based on the Table 2-4 of the Secondary Water Demands in the Yard Piping Basis of Design. The first 20 uses are ones that had a demand greater than 0 gpm.

Other unnumbered uses at the bottom of the table represent those that were idenfitied during this evaluation.

This document prepared by Jacobs under Rehabilitation of SFE Pump Station project at the request of Noresco

Highlighted items represent heat exchangers and water heaters that were not known by Jacobs during design phase.

14 Influent Pump Station No. 1 / Rack and Grit Complex

15.6 See Influent Pump Staton No. 1 above.

See Pump Station No. 1 Rack and Grit

15 Final Clarifiers 1-25 13.4 each RAS Pump seal water Stainless and galv

Wye strainers; pressure reducing valves from SOP photo and site visit

16 Sludge Processing Complex B 10 Pump seal water (Gland water) Stainless and galv

Wye strainers; pressure reducing valves

Site visit

17 Intermediate Lift Station No. 2 240 Motor cooling Did not observe heat excangers during site visit; 2 pumps running and water flowing to all 3 cooling systems

Seal water

18 Praxair Metering Station 6.7 Did not observe any SW near Praxair

Metering Station

19 Intermediate Lift Station No. 1 160 Motor cooling Did not observe heat excangers during site visit

Seal water

20 Pump Station No. 1 Ferric Building

(Demolised in about 2024)

4.5 Replaced with new facility at PS-2

PS-1 Screening Building --- Service water (Flushing water)

Conveyor wash (?)

Rectangular Primary Sludge

Pumps

--- Pump seal water Copper

Flushing water Mostly DI, some galv

Scum Concentrator Building (for

Rectangular Clarifiers)

10 (3) Hot water heaters Galv and copper

Wye strainers on cold water feed line

Provides hot water to Scum Houses 1-7 for cleaning

CDM Demand table indicates 0 gpm demand - this is incorrect

Conquest PVI water heaters: Brochure indicates "Aqua-

PLEX tank is resistant to aqueous corrosion." Brochure also indicates Aqua-PLEX tanks is an "unlined duplex alloy."

Scum Houses 1-7 0 Scum wash down and conveyance DI

Scum Buildings 9 to 14 for

Circular Clarifiers

Hot water heaters

(2) WHs ea. in Bldgs 9, 10, 11, 12, 13.

(1) WH ea. Bldgs 8 and 14.

copper From PC-740 drawings and site visit

Manufactured by PVI

Central Air Compressor Building Not included

Air and Oil Cooling SOP states that secondary water is used to cool the air after each stage of compression, and to cool the oil used to lubricate the compressors.

Footnotes:

a. Demands from Table 2-4 of Yard Piping BOD