4-EED3 DRFP Questions and Answers Response Document 80GSFC20R0026.pdf
PDF 373 KB Posted
- Attached to
- Earth Observing System Data and Information System (EOSDIS) Evolution and Development (EED)-3 Federal contract opportunity
- Solicitation number
- 80GSFC20R0026
About this file
This document summarizes a solicitation for the Earth Observing System Data and Information System (EOSDIS) Evolution and Development (EED)-3 contract opportunity. The National Aeronautics and Space Administration Goddard Space Flight Center is seeking proposals for services to continue improving hardware and software systems within EOSDIS for the Earth Science Data and Information System Project. Offerors are invited to submit proposals in response, with an anticipated award date of June 1, 2021 and contract effective date of September 1, 2021. The contract will have a period of performance of five years and be performed predominantly offsite at the contractor's facilities. A 90-day phase-in period will be conducted under a separate firm-fixed-price contract issued at award. The solicitation instructions direct offerors to proposed rates within Attachment B and respond to scenarios and statements of work. The solicitation also provides details on use of government property, organizational conflict of interest requirements, evaluation criteria, and response due date of October 12, 2020.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question # Document Section Page Subject Question/Comment Government's Response
Enclosure 1
Sections B - M F.3 19
GSFC 52.237-92 Place of Performance (Nov 2013) includes GSFC and Distributed Active Archive Centers
(DAACs) as places of performance. Enclosure 2, GPM-
Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions assigned all hours as offsite.
Enclosure 2 includes offsite hours only. Will the
Government modify Enclosure 2 to include onsite hours consistent with GSFC 52.237-92?
Work performed under the EED-3 contract will be performed primarily offsite; as such, on-site hours have been excluded from Enclosure 2. However, offerors should clearly delineate on- and off-site rates in Attachment B, if needed during the contract term.
Enclosure 1
Sections B - M G.2 20 - 21
1852.216-76 Award Fee for Service Contracts (Jun 2018), subparagraph (b) reads Beginning 12 months after the effective date of this contract, the Government shall evaluate the Contractor's performance every 12 months to determine the amount of award fee earned by the contractor during the period.
Will the Government consider evaluating the 90 day phase-in period separate from the contract year 1? This will allow the Government to evaluate contract year 1 and subsequent year's performance and cost together as part of the 12 month evaluation cycle.
Contract Phase-in will be performed under a separate FFP contract vehicle and will not be evaluated with contract year 1 performance.
Enclosure 1
Sections B - M L.8 147
1852.231-71 Determination of Compensation
Reasonableness (Apr 2015). The proposal shall include a total compensation plan. Per paragraph (d) The offeror shall require all service subcontractors provide, as part of their proposal, the information identified in (a) through (c) of this provision for cost reimbursement or non-competitive fixed-price type subcontracts having a total potential value expected to exceed the threshold for requiring certified cost or pricing data as set forth in FAR
15.403-4.
1. Is a Total Compensation Plan required for T&M/LH subcontracts?
2. Can significant subcontractors submit TCP narratives directly to the Government, if deemed to include proprietary cost data?
1. Consistent with provision 1852.231-71, service subcontractors, as part of their proposal, must provide the information identified in (a) through (c ) for cost reimbursement or non-competitive fixed price type subcontracts having a potential value expected to exceed the threshold for requiring certified cost or pricing data. If a cost reimbursement or non-competitive fixed price type contract has a T&M or LH structure, a plan is required. 2.
Yes; significant subcontractors can submit TCP narratives directly to the Government if deemed to include proprietary cost data.
Enclosure 1
Sections B - M L.11 104-107
GSFC 52.209-301 Notice of Potential Conflicts of Interest
(Jan 2020), subparagraph (g)(1) requires that offerors identify potential OCI with planned work.
1. Does the Government require the offeror and its proposed subcontractors to provide a list of planned work?
2. If the answer to #1 is yes, can this listing be limited to
NASA contract and subcontract proposals submitted and under evaluation? Otherwise, the listing could potentially include many records with no relevance to the work to be performed under this contract.
3. If the answer to #1 is yes, can subcontractors provide their listing of planned work directly to NASA given the data may be considered competition sensitive?
1. Yes, the Government requires offerors and proposed subcontractors to provide a list of planned work. GSFC
52.209-301(g)(1) reads: "This includes recently performed
(within 2 years prior to the proposal due date), currently performed, or planned work (including future competitive proposals), whether as a prime contract holder or a subcontractor." 2. This listing cannot be limited. 3. Yes;
subcontractors may provide their listing of planned work directly to NASA.
Enclosure 1
Sections B - M L.14(a) 111 All SF33s require original signatures.
Please clarify if electronic signatures are acceptable if offerors are submitted electronically via LFT System.
All SF 33s require original or electronic signature.
Enclosure 1
Sections B - M L.14(a) 111 The required fill-ins in Sections B-K must be completed.
With regards to Sections B-J, are the only fill-ins required indicated by "TBP" is Section H.11 and J.1? If other fill-ins are required for Sections B-J, then please provide the
Section to be completed.
Fill-in indicators are included throughout Enclosure 1
Sections B - M
Enclosure 1
Sections B - M L.15 115-116
GSFC 52.215-205 Proposal Marking and Delivery instructs offerors to submit proposals electronically via
NASA LFT. SF33 Blocks 8 and 9 indicate proposals are to be delivered to GSFC, Bldg 22, RM C39E.
Given GSFC site access is restricted due to the coronavirus pandemic, please confirm that proposals are to only be submitted electronically via LFT.
All proposals are to only be submitted electronically via
LFT.
Enclosure 1
Sections B - M L.17(a) 127
GSFC 52.215-223 Cost Volume (IDIQ Services - GPM)
(Dec 2018) reads, in part, "CAS Disclosure Statement shall be submitted to NASA with the proposal in the Offer
Volume". See L.14 GSFC 52.215-203 Offer Volume
(Mar 2019) (c)(8) Cost Accounting Standards. "If the
Offeror has not submitted a Disclosure Statement, but would fall under CAS compliance if awarded the resultant contract, then a CAS Disclosure Statement shall be submitted as part of your proposal in this volume. "
If an offeror has previously submitted its Disclosure
Statement to the offeror's Cognizant ACO, then is the offeror required to include a copy of its Disclosure
Statement with its proposal?
Offerors are required to include Disclosure Statements with proposals.
Enclosure 1
Sections B - M M.4 150
GSFC 52.215-323 Cost Evaluation Factor (IDIQ Services)
(June 2014) reads in part, "The total FFP phase-in price and the proposed and probable Government Pricing Model evaluated cost (including proposed fee amount) will be presented to the Source Selection Authority as well as any cost risk associated with the proposal."
1. L.3 52.216-1 Type of Contract does not list FFP type for phase-in; furthermore a FFP CLIN is not included. Please clarify Phase-In contract type.
2. The incumbent contractor will likely require less resources to transition the contract. Will the Government exclude phase-in from the total evaluated price, and review phase-in proposal only for resource realism and reasonableness, as to not provide the incumbent an unfair price advantage?
1. The phase-in will be accomplished under a separate
Firm-Fixed-Price contract vehicle; see L.15, L.16, M.4. 2.
The phase-in will not be excluded from the total evaluated price.
10 Exhibit 1A N/A N/A There are no directed values listed for Travel/ODCs for non-management direct labor costs.
Please confirm offerors are not to propose Travel/ODCs in support of non-management direct labor.
Offerors are not to propose Travel/ODCs in support of non-management direct labor.
11 Enclosure 5 N/A N/A Contract Historical Data
Please provide updated data for Software Engineer DL rates, or confirm the accuracy of the data provided by the
Incumbent. Given there’s an approximate $2/hr difference between Sr and Pr when the only difference between the categories is 4 years of experience.
The Government reviewed the rates and they are accurate.
12 Enclosure 5 N/A N/A Contract Historical Data
Please provide updated data for Software Developer DL rates, or confirm the accuracy of the data provided by the
Incumbent. Software Developer is less than Software
Developer Sr.
The Government reviewed this rate and it is accurate.
13 Enclosure 5 N/A N/A Contract Historical Data
Please provide updated data for Systems Engineer DL rates, or confirm the accuracy of the data provided by the
Incumbent. Given there’s an approximate $40/hr difference between Sr and Pr when the only difference between the categories is 4 years of experience.
The Government reviewed this rate and it is accurate.
14 Enclosure 5 N/A N/A Contract Historical Data
Please provide updated data for Discipline Engineer DL rates, or confirm the accuracy of the data provided by the
Incumbent. Given there’s an approximate $30/hr difference between Sr. and Pr when the only difference between the categories is 7 years of experience.
The Government reviewed this rate and it is accurate.
Enclosure 1
Sections B - M
Section G
Contract
Administration
20 Requirements
Section G.2 (b), "Beginning 12 months after the effective date of this contract, the Government shall evaluate the
Contractor's performance every 12 months to determine the amount of award fee earned by the contractor during the period."
In order have award fee criteria best align with current areas of emphasis, would the Government consider revising the award fee period from 12 months to 6 months in duration?
The Government does not intend to change the award fee performance evaluation period from 12 months to 6 months in duration.
Enclosure 1
Sections B - M L.11(b) 104 - 105 Proposal Instructions
The OCI instructions state "(b) Description of Potential
Conflict. The nature of this OCI is: Unequal Access to
Information.
(1) The contractor OCI concerns are: The EED-3 contractor will have access to the proprietary rate information of ESDIS commercial cloud services providers." Is this the only potential OCI that NASA is concerned about?
Yes; This is the specific OCI that was identified for EED-
3.
EOSDIS EED-3 DRFP QUESTIONS AND ANSWERS
Enclosure 1
Sections B - M M.3 146 Evaluation Factors for Award
M.3 states: "The Mission Suitability evaluation will take into consideration whether the resources proposed are consistent with the proposed efforts and accomplishments associated with each subfactor". There are no requirements, however, to propose resources associated with the offerors proposed approaches to the Scenarios.
Please clarify how this will be evaluated.
“Resources,” in this case, applies to an offeror’s approach to address the scenarios such as the proposed use of subcontractor resources and corporate management resources as addressed in Subfactor B.
Enclosure 1
Sections B - M N/A 131 Requirements
Attachment B instructions on RFP page 131
"The direct labor categories proposed must reflect all labor categories and levels within each individual labor category anticipated to perform the requirements of the Statement of Work and should range from entry level to the most senior level."
Does the government intend for Attachment B to include labor categories and levels not provided in D. Gov Pricing
Model Non-Management Direct Labor Categories? i.e. For future task orders, will Attachment B be used for the IDIQ rates and is it intended that contractors provide a list of categories not used in the pricing of this proposal?
Yes; Attachment B will be used for future task orders.
Contractors should provide a list of categories for the skill mix that will be used for contract performance.
Enclosure 2
Government
Pricing Model
Direct Labor
Categories and
Hours Table
2 Requirements
There is a shift downward in the LOE for several labor categories between CY1 and CY2. NASA may want to consider the impact of a smaller team over time with the possibility of introducing additional cloud services into the ecosystem. It is currently atypical to find a cloud developer that has experience in multiple systems.
The shift is due to hrs. in CY1 allocated for a contract transition as well as some development work expected to transition into an ops/maintenance mode.
Enclosure 6
Performance
Evaluation
Plan
Section B.2 18 Requirements
How does the Government intend to address changes or circumstances beyond the control of an Offeror (i.e.
COVID-19)? Suggest language such as, "The PEB will give consideration to changed support requirements and/or other changes beyond the Contractor’s control that impact performance." be included in this section.
The Government will continue to provide equitable means of addressing impacts outside of the control of the contractor. Suggestion received and considered.
Exhibit 13 Past
Performance
Questionnaire
N/A N/A Requirements
The Past Performance Questionnaire asks "Does a corporate or business relationship exist between the firm being evaluated and your organization?" We do not understand what is meant by "corporate business relationship". As a customer evaluating a contractor, there is obviously customer/contractor relationship. What sort of relationships is NASA interested in here? Please clarify this question.
Disclose all business or corporate relationships (e.g.
prime/subcontractor relationships, partnerships, teaming arrangements, joint-ventures).
Enclosure 1
Sections B - M
Section B
Supplies/Servic es
7 Requirements
Section B.3, Item #17, The schedule for Safety & Health
Reporting is "monthly/ quarterly reports and as required".
Please provide clarification whether "/" between the two words means "and" where both monthly and quarterly reports are required or whether "/" means "or" where quarterly reports are required only if there are incidents to report.
The "/" between the words monthly and quarterly means
"or."
Enclosure 1
Sections B - M
Enclosure C, Section F.3 19 Requirements
Specifies that "GSFC, Contractor’s facility, and
Distributed Active Archive Centers (DAACs)" are all places of performance. But other documents specify that onsite rates should only be used for GSFC. Please confirm that onsite is for work performed at GSFC only.
Yes, onsite work is for work performed at GSFC.
Enclosure 1
Sections B - M
Section G
Contract
Administration
20 Requirements
Section G.2 (b), "Beginning 12 months after the effective date of this contract, the Government shall evaluate the
Contractor's performance every 12 months to determine the amount of award fee earned by the contractor during the period."
Is the start of the contract defined as the completion of the
FFP Phase-In tasks, which would be day 91 of the contract?
Yes. The contract effective date begins upon the completion of the 90 day Phase-in.
Enclosure 1
Sections B - M
Section L.8 &
L.16 (c)
Subfactor B.4
Pg. 102 and
Pg. 122 Proposal Instructions
L.8 and L.16 both require a Total Compensation Plan.
Neither paragraph references the other. Please confirm that both L.8 and L.16 refer to the same plan, that there are not 2 separate Total Compensation Plans deliverable with the proposal.
Both L.8 and L.16 refer to the same plan.
Enclosure 1
Sections B - M L.13 (b)(2) 110 Proposal Instructions
Proposal instructions exclude a List of Acronyms from the
Page Limitations of Volume IV. Is this the only volume expected to include a List of Acronyms? If a List of
Acronyms is included in Volume II, can it also be excluded from the Page Limitations.
List of Acronyms will be excluded from page limitations.
Enclosure 1
Sections B - M L.13 110 Proposal Instructions
Instructions state that "Electronic foldout pages count as an equivalent number of 8-1/2" x 11 pages." Should we interpret that "equivalent" means each foldout counts as 1 page, or each 11x17 foldout counts as 2 pages?
Each 11x17 foldout counts as 2 pages.
Enclosure 1
Sections B - M L.13 (b)(1) 110 Proposal Instructions
For purposes of volume formatting, would the Government accept the plans excluded from the page count (Total
Compensation Plan, Phase-in Plan and Small Business
Subcontracting Plan) be included as Appendices in the volume and submitted as separate electronic files?
Yes.
Enclosure 1
Sections B - M L.14 (c) (1) 112 Proposal Instructions
"State whether all business systems, including but not limited to accounting, property control, purchasing, estimating, and employee compensation, which require
Government acceptance or approval…"
In accordance with DFAR 252.242-7005, Contractor
Business Systems the six business systems which are subject to Government acceptance or approval are 1) accounting system, 2) earned value management system,
3) estimating system, 4) material management and accounting system, 5) property management system, and
6) purchasing system. Employee compensation is not included as a separately accepted or approved business system. Please confirm an acceptable response to Section
L.14 (c) (1) includes the six business systems defined in
DFAR 252.242-7005, which does not separately address employee compensation as a business system.
An acceptable response will address all business systems listed in the solicitation, including, but not limited to employee compensation.
Enclosure 1
Sections B - M and
Attachment B
N/A 44 Requirements
Attachment B: "Task Plan proposals must utilize the not-to-exceed rates and factors delineated below for pricing all task orders contemplated or issued…"
Section I.1 clauses: 52.215-10 PRICE REDUCTION FOR
DEFECTIVE CERTIFIED COST OR PRICING DATA
(AUG 2011), 52.215-11 PRICE REDUCTION FOR
DEFECTIVE CERTIFIED COST OR PRICING DATA –
MODIFICATIONS (AUG 2011), 52.215-13
SUBCONTRACTOR CERTIFIED COST OR PRICING
DATA – MODIFICATIONS (OCT 2010)
The Section I clauses imply future task orders will be bid compliant with FAR 15.408, Table 15-2 requiring certification that costs are current, accurate, and complete.
If current rates and factors exceed the Attachment B not to exceed factors then contractors will not be able to certify costs as current, accurate, and complete. How does the
Government intend to address for future task orders?
During contract performance the contractor will be required to utilize the not to exceed rates in Attachment B when submitting its task plan. If an issue arises where a contractor cannot certify a rate in Attachment B during contract performance it will be addressed during contract administration.
31 Attachment H N/A N/A N/A
"The NF 533M need not be submitted in months in which an NF 533Q is submitted."
The NF 533M report provides a lower level of detail than the NF 533Q. Please confirm the Government does not require both formats on months when the NF 533Q is due provided the difference content.
The Government requires both formats, 533M and 533Q, during the months a 533Q is due. Attachment H updated.
Enclosure 6
Performance
Evaluation
Plan
N/A Pg. 1 and Pg.
Requirements
"The plan is unilaterally established by the Government and may be revised at any time to redirect emphasis in accordance with Section V of this plan."
"The Government may unilaterally change this plan, as covered in Section V and not otherwise requiring mutual agreement under the contract, provided the Contractor receives notice of the changes 30-days prior to the beginning of the evaluation period to which the changes apply."
Please confirm the Government cannot make unilateral changes to award fee criteria during an active award fee period.
The Government cannot make a unilateral changes to award fee criteria during an active award fee period.
Enclosure 6
Performance
Evaluation
Plan
N/A 14 Requirements Are the "TBD" values filled in by the Offeror during the
EED-3 competitive proposal or as task orders are issued?
TBDs in the Performance Evaluation Plan will be updated by the Government after contract award.
Enclosure 1
Sections B - M L.15 115 Proposal Instructions
Instructions state "All electronic submissions must be searchable and shall not contain scanned documents".
There are proposal requirements, however, that can most readily be addressed through the inclusion of a scanned document. One example would be the approval of our business systems (L.14 (c) (1) which requires "evidence of an adequate accounting system". Our evidence is a letter from the appropriate Government administrative office that is typically provided via a pdf scan of an original letter. These would normally be included in our proposal as scanned documents. Is this acceptable? Are there other acceptable exceptions?
Yes, this would be an acceptable exception; however, all other documents should follow the proposal instructions in
Section L.
Enclosure 1
Sections B - M L.17 N/A Proposal Instructions
In order to understand the Government's expectations for material and travel pricing purposes, can the Government provide annual plug values for material and travel?
Plug values for Material, Travel, and Other ODCs have been provided in RFP section L.16.
36 QASP General N/A Requirements
How does the QASP correspond to the Award Fee sections, considering that there is often but not always overlap (e.g., cost management)?
The QASP is not intended to correspond to Award Fee sections.
37 QASP General N/A Requirements
How often should we expect to need to coordinate inspection for NASA QA surveillance/inspections? Once a month? At Program Increment Planning and SAFe
Demos?
No particular cadence or frequency has been determined for Quality Assurance surveillance/inspection at this time.
38 QASP General N/A Requirements
Will the final version of the QASP have Acceptable
Quality Levels/performance thresholds defined to assist in prioritizing resourcing?
The QASP is a top-level document not meant to supersede thresholds to be defined in task orders.
39 QASP General N/A Requirements
Performance Evaluation Plan: Within each subsection, what are the weightings? For instance, under Technical
Performance there are several sections: Technical
Requirements, Innovation, Personnel Management, etc.
What are the weightings for each of these subsections?
Knowing the weightings will help us define resource allocation to better give the customer the desired outcomes/value.
We are not providing weightings for subsections at this time.
Enclosure 1
Sections B - M L.13 (b)(1) 110 Proposal Instructions
Proposal instructions excludes the Small Business
Subcontracting Plan from the volume II page limitations.
The Small Business Utilization subfactor, however, includes both a requirement for the Small Business
Subcontracting Plan and for a Commitment to the Small
Business Program. We are assuming that both sections are excluded from the page limitations. Is this correct?
Correct; The Small Business Subcontracting Plan and the
Commitment to the Small Business Program are excluded from the page limitations.
Enclosure 1
Sections B - M L.13 (b)(2) 110 Proposal Instructions
Please clarify that Offerors are not limited to Times New
Roman font for diagrams, schedules, charts, tables, artwork, and photographs.
Offerors are limited to Times New Roman font for diagrams, schedules, charts, tables, artwork, and photographs.
Enclosure 1
Sections B - M L.13 (b)(1) 110 Proposal Instructions
Please clarify that Compliance Matrices and Lists of
Acronyms are excluded from page limitations in all volumes.
The Compliance Matrices and Lists of Acronyms are excluded from page limitations in all volumes.
Enclosure 1
Sections B - M
L.16(c)
Subfactor A, A.1, and A.2
Scenarios
118 Proposal Instructions
Please clarify that the Offeror's Technical Proposal is only required to address SOW paragraphs that apply to the scenarios, and is not required to address every paragraph in the SOW.
Offerors are not required to address every paragraph in the
Statement of Work.
Enclosure 1
Sections B - M
L.13(b)(1) table;
L.16(c), Subfactor B.
B.5
110, 124 Proposal Instructions
We request the government confirm that the Award Fee plan is outside the page limits for the Mission Suitability volume.
The Award Fee Plan is outside of the page limits for the
Mission Suitability Volume.
Enclosure 1
Sections B - M
L.13(b)(1) table;
L.16(c), Subfactor C, (b)
Commitment to
Small Business
110, 126 Proposal Instructions
Please confirm the Commitment to Small Business
Program requirement is part of the Small Business Plan and is outside page limits for the Mission Suitability volume.
The Small Business Program requirement is part of the
Small Business Plan and is outside of the page limits for the Mission Suitability Volume.
Attachment C
Government
Furnished
Property
N/A N/A
The Government will make the Government property listed in Attachment C available for use in performance of the contract resulting from this solicitation, on a no-charge-for-use basis in accordance with FAR 52.245-1, Government Property. The offeror shall notify the
Government, as part of its proposal, of its intention to use or not use the property.
The following data will assist offerors to determine if they intend to use the property listed in Attachment C:
1. The acquisition date for property listed in Attachment C with location code EDF or HDF.
2. Please indicate if a support service contract is in place, if so the expiration date of contract, for all servers, network, and storage equipment with location code EDF or
HDF.
1. The acquisition dates for all property listed in Attachment
C are not readily available and will not be provided at this time. 2. Support service contract information is not readily available and will not be provided at this time. The minimum requirements for the Government Property List have been met, per FAR 45.201.
Attachment C
Government
Furnished
Property
N/A N/A N/A
Please provide documentation for the EDF data center in the EOSDIS EED-3 online Reference Library.
Specifically, please provide architecture diagrams, cabling diagrams, rack elevation diagrams, test plans, test procedures, and test data for the EDF data center.
EED-2 CO requesting from contractor for inclusion in the EED-
3 eLibrary. 8/21.
Enclosure 1
Sections B - M L.18 142 Proposal Instructions
1. Will the Government please define “recent”? That is, should Offerors provide the most recent or all evaluations in the past three years?
2. If multiple evaluations exist (e.g., CPARs and award fee evaluation results), should Offerors provide all evaluations?
1. Provide all evolutions in the past three years.
2. If multiple evaluations exist, offerors must provide them all.
Enclosure 1
Sections B - M M.3 146 Evaluation Factors for Award
Since the RFP does not require offerors to propose staffing in the Mission Suitability volume, we request that this section either be deleted or expanded to include a definition of what specific contractor proposed resources are being evaluated.
“Resources,” in this case, applies to an offeror’s approach to address the scenarios such as the proposed use of subcontractor resources and corporate management resources as addressed in Subfactor B.
Enclosure 1
Sections B - M L.18(a) 140 Proposal Instructions
Such a high an annual dollar value threshold prevents offerors from presenting specialized, high value subcontractors for past performance evaluation because they do not meet the current definition of “significant subcontractors.” We recommend the Government lower the definition of significant subcontractors for past performance purposes to those that are estimated to meet/exceed an average annual cost/fee of $4M.
We are not changing the definition of significant subcontractors at this time.