About this file
This document is a solicitation for the Earth Observing System Data and Information System (EOSDIS) Evolution and Development (EED)-3 contract. The principal purpose is to provide services for the continued improvement, reliability, availability, functionality, operability, and performance of hardware and software systems within EOSDIS for the Earth Science Data and Information System Project. The contract will be a cost-plus-award-fee indefinite delivery indefinite quantity contract with a 5-year ordering period. Offerors are invited to submit proposals by October 12, 2020 for the acquisition, which will be conducted as a full and open competition under North American Industry Classification System code 541512. The small business size standard is $30 million in average annual receipts. The contract is expected to be awarded on June 1, 2021 with an effective date of September 1, 2021. Performance will predominately be offsite at the contractor's facilities. The government will provide installation-accountable and government-furnished property. An organizational conflict of interest plan must be submitted with proposals.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS)
EVOLUTION AND DEVELOPMENT (EED)-3
RFP 80GSFC20R0026
Amendment 1
Table of Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 1852.216-85 ESTIMATED COST AND AWARD FEE (SEP 1993)
B.2 GSFC 1852.232-81 CONTRACT FUNDING (JUN 2017)
B.3 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (SEP
2017)
B.4 GSFC 52.216-90 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR
SERVICES (COST REIMBURSEMENT) (APR 2008)
B.5 GSFC 52.216-91 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST
REIMBURSEMENT) (APR 2010)
B.6 GSFC 52.232-94 ESTIMATED COST INCREASES (DEC 2005)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER
SOFTWARE (MAR 2008)
C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ/BPA) (AUG 2013)
SECTION D – PACKAGING AND MARKING
D.1 SECTION D – CLAUSES INCORPORATED BY REFERENCE
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT
EQUIPMENT (JAN 2011)
SECTION E – INSPECTION AND ACCEPTANCE
E.1 SECTION E – CLAUSES INCORPORATED BY REFERENCE
E.2 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR
2015)
E.3 GSFC 52.246-93 ACCEPTANCE – LOCATION(S) (SEP 2013)
E.4 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT
REQUIRED (APR 1989)
E.5 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
SECTION F – DELIVERIES OR PERFORMANCE
F.1 SECTION F – CLAUSES INCORPORATED BY REFERENCE
F.2 GSFC 52.217-92 PERIOD OF PERFORMANCE/EFFECTIVE ORDERING
PERIOD (JAN 2014)
F.3 GSFC 52.237-92 PLACE OF PERFORMANCE (NOV 2013)
F.4 GSFC 52.247-94 SHIPPING INSTRUCTIONS – CENTRAL RECEIVING (FEB
2016)
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 SECTION G – CLAUSES INCORPORATED BY REFERENCE
G.2 1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (JUN 2018)
G.3 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR
2018)
G.4 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE
CUSTODY OF CONTRACTORS (JAN 2017)
G.5 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT
TO FAR 52.245-1 (JAN 2011)
G.6 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017) . 25
G.7 GSFC MODIFICATION TO NFS 1852.245-71 INSTALLATION-
ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)
G.8 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS (DEC
2014)
G.9 GSFC 52.242-90 FINANCIAL MANAGEMENT REPORTING (JUN 2014)
G.10 GSFC 52.245-96 PROPERTY CLAUSE APPLICABILITY – ON-SITE AND
OFFSITE (APR 2016)
G.11 GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA
PROPERTY IN THE CUSTODY OF CONTRACTORS (JUNE 2019)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 SECTION H – CLAUSES INCORPORATED BY REFERENCE
H.2 1852.225-70 EXPORT LICENSES (FEB 2000)
H.3 1852.235-74 ADDITIONAL REPORTS OF WORK – RESEARCH
DEVELOPMENT (FEB 2003)
H.4 GSFC 52.204-99 CONTRACTOR PERSONNEL – IDENTIFICATION, ON-SITE
REPORTING, AND CHECKOUT PROCEDURES (APR 2013)
H.5 GSFC 52.211-95 GOVERNMENT PREMISES – PHYSICAL ACCESS AND
COMPLIANCE WITH PROCEDURES (FEB 2016)
H.6 GSFC 52.219-90 SMALL BUSINESS SUBCONTRACTING PLAN AND
REPORTS (NOV 2016)
H.7 GSFC 52.223-91 SAFETY AND HEALTH ADDITIONAL REQUIREMENTS
(NOV 2019)
H.8 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS
(MAR 2008)
H.9 GSFC 52.227-99 RIGHTS IN DATA (NOV 2018)
H.10 GSFC 52.236-13 ACCIDENT PREVENTION (NOV 1991) – ALTERNATE I
(NOV 1991)
SECTION I – CONTRACT CLAUSES
I.1 SECTION I - CLAUSES INCORPORATED BY REFERENCE
I.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (JUN 2016)
I.3 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT (AUG 2020)
I.4 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (OCT
2010) (DEVIATION 18-04) (JUL 2018)
I.5 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA –
MODIFICATIONS (JUN 2020) (DEVIATION 18-04)
I.6 52.216-18 ORDERING (OCT 1995)
I.7 52.216-19 ORDER LIMITATIONS (OCT 1995)
I.8 52.216-22 INDEFINITE QUANTITY (OCT 1995)
I.9 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JUN 2020)
(DEVIATION 18-01) ALTERNATE II (NOV 2016)
I.10 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
I.11 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES
(JUN 2020)
I.12 52.223-20 AEROSOLS (JUN 2016)
I.13 52.223-21 FOAMS (JUN 2016)
I.14 52.230-2 COST ACCOUNTING STANDARDS (OCT 2015) (DEVIATION 18-04)
(JUL 2018)
I.15 52.230-3 DISCLOSURE AND CONSISTENCY IN COST ACCOUNTING
PRACTICES (DEVIATION 18-04) (JUL 2018)
I.16 52.247-67 SUBMISSION OF TRANSPORTATION DOCUMENTS FOR AUDIT
(FEB 2006)
I.17 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.18 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
I.19 1852.216-80 TASK ORDERING PROCEDURE (OCT 1996)
I.20 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (FEB
2012) (DEVIATON 12-01A)
I.21 GSFC 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) – ALTERNATE II
(DEC 2007) AND ALTERNATE III (DEC 2007) AS MODIFIED BY NASA FAR
SUPPLEMENT 1852.227-14 (APR 2015)
SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER
ATTACHMENTS
J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)
SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 1852.216-85 ESTIMATED COST AND AWARD FEE (SEP 1993)
The estimated cost of this contract is to be negotiated in each task order. The maximum available award fee, excluding base fee, if any, to be negotiated in each task order. The base fee is to be negotiated in each task order. Total estimated cost, base fee, and maximum award fee to be negotiated in each task order.
(End of clause)
B.2 GSFC 1852.232-81 CONTRACT FUNDING (JUN 2017)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $TBD.
This allotment is for the Earth Observing System Data and Information System
(EOSDIS) Evolution and Development-3 (EED-3) contract and covers the following estimated period of performance: TBD.
(b) An additional amount of $TBD is obligated under this contract for payment of fee.
(c) The cumulative amount of funding obligated for payment of cost and fee under this contract is $TBD.
B.3 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (SEP
2017)
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A and Task Orders issued hereunder.
Item Description Reference Schedule Delivery
Method/Addressee(s)
Services and
Deliverables in accordance with
Attachment A, SOW
As Defined in
Attachment A, SOW
As Defined in
Attachment A, SOW
As Defined in Attachment A, SOW
Services and
Deliverables in accordance with Task
Orders Issued and the
SOW
As Defined in
Individual Task
Orders Issued
As Specified in
Individual Task
Orders Issued
As Specified in Individual
Task Orders Issued
3 Task Plans
Section B
GSFC 52.216-91
Section I
NFS 1852.216-80
As Required in
Clause NFS
1852.216-80
Applicable distribution list
4 Reports of Work
Section C
GSFC 52.235-90
Section H
NFS 1852.235-73
As Required in
Clause GSFC
52.235-90
As specified in Clause
Contract Historical
Data
Section C
GSFC 52.211-91
Attachment J
30 Days after
Contracting
Officer Request
Electronic Format/CO
NASA Financial
Management Reports
Section G
GSFC 52.242-90
Section G
NFS 1852.242-73
Attachment H
Monthly and
Quarterly in accordance with
Attachment H
Electronic Format/
Contracting Officer (CO), Contracting Officer’s
Representative (COR), Resource Analyst (RA) &
Regional Finance Office
Material Inspection and Receiving
Reports (MIRR)
(DD Form 250)
Section E
NFS 1852.246-72
Section E
GSFC 52.246-94
At Time of
Delivery
Hard Copy/CO, COR, and
Receiving & Inspection
Foreign Travel
Requests and Foreign
Travel Reports
Section G
NFS 1852.242-71
Foreign Travel
Requests–30 days in Advance of
Travel
Foreign Travel
Reports–Due within 10 business days of the completion of travel.
As specified in CO’s travel approval
Requests for
Government Property
Section G
NFS 1852.245-70
30 Days Prior to
Acquire Date Electronic Format/CO
Method/Addressee(s)
Financial Report of
NASA Property in the Custody of
Contractors (NF
1018)
Section G
NFS 1852.245-73
Annual Report by
October 15th and
Final Report
NF 1018 Electronic
Submission System (NESS)
Supplemental
Financial Report of
NASA Property in the Custody of
Contractors
Section G
GSFC 52.245-99
Monthly By the
21st of each Month and Final Report
Contractor-Held Asset
Tracking System (CHATS) at https://chats.nasa.gov
Physical Inventory of
Capital Personal
Property Reporting
Section G
NFS 1852.245-78
Within 10 Days of
Annual Physical
Inventory
Property Administrator
Reporting of
Inventions
Section G
NFS 1852.227-72
Section G
NFS 1852.227-70
Section I
FAR 52.227-11
Interim Reports
Every 12 Months
(or sooner to preserve Patent
Rights) and Final
Report within 3
Months after
Contract
Completion
Electronic or Hard Copy
Format/New Technology
Representative or Patent
Representative
Small Business
Subcontracting Plan
Reporting
Section H
GSFC 52.219-90
Section I
NFS 1852.219-75
ISR–Semi-Annual
(April 30th and
October 30th) and
Final
SSR–Annual
(October 30th)
Electronic Format/
Electronic Subcontract
Reporting System (eSRS) http://www.esrs.gov
15 Safety & Health Plan
Section H
FAR 52.236-13--
Alternate I
30 Days After
Contract Award
Electronic Format/CO
Safety & Health
Reporting
Section H
NFS 1852.223-70
Section H
NFS 1852.223-75
Section H
GSFC 52.223-91
Monthly/Quarterly
Reports and As
Required
NASA Mishap Information
System (NMIS)
Personal Identity
Verification (PIV)
Documentation and
Reporting
Section H
GSFC 52.204-99
Attachment G
10th Day of the
Month and As
Required
Electronic Format and Hard
Copy/COR & Code 240 https://chats.nasa.gov/ http://www.esrs.gov/
Method/Addressee(s)
Equal Opportunity
Reports
Section I
FAR 52.222-26
As Specified by
FAR 52.222-26
Electronic Format/CO &
Code 120
Certificate of
Insurance
Section I
FAR 52.228-7
Section I
NFS 1852.228-75
As Specified by
FAR 52.228-7
Electronic Format/CO
Subcontract
Notification
Section I
FAR 52.244-2
30 Days Prior to
Subcontract Award
Date
Electronic or Hard Copy
Format/CO
IT Security
Management Plan
Section I
NFS 1852.204-76
30 Days after
Contract Effective
Date & Annual
Updates As
Required
Electronic Format/CO
Service Contract
Reporting
Section I
FAR 52.204-15
Annually by
October 31 and
Revisions, if needed, by
November 30 https://www.sam.gov
NOTE: Unless otherwise specified, “day” means “calendar day.”
NOTE: Transportation Classification: Transportation Classifications designations, in accordance with Clause D.1, for deliverables under Item 2 will be specified in each individual task order at the time of task order issuance. Deliverables, unless specified
(electronic format, etc.), are considered Class IV and shall be shipped via the most advantageous commercial transportation means considered to be in the best interest of the
Government.
B.4 GSFC 52.216-90 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR
SERVICES (COST REIMBURSEMENT) (APR 2008)
(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $3,000,000. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $275,000,000. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.
(b) The minimum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals or exceeds the minimum amount stated in https://www.sam.gov/ paragraph (a).
(c) The maximum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals the maximum amount stated in paragraph (a).
(d) The maximum amount, if reached, precludes the issuance of further orders for supplies or services under this contract. However, reaching the maximum amount does not preclude adjustments to the dollar amounts of existing placed orders, for actions that are within the scope of the placed orders, and which are made pursuant to existing contract authority, such as the Changes clause.
(e) The maximum amount may be adjusted unilaterally by the Government on an as needed basis. Historic, current, and/or projected workload requirements will be used to determine the amount of upward adjustment. In no event will the adjusted maximum amount exceed 10% of the original maximum amount.
B.5 GSFC 52.216-91 SUPPLEMENTAL TASK ORDERING PROCEDURES
(COST REIMBURSEMENT) (APR 2010)
(a) When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the
Contractor shall prepare its estimate of the labor hours, labor categories, indirect costs, and other direct costs required to perform the task order requirements. The Contractor shall use only those appropriate labor and indirect cost rates, which may be less than but shall not exceed the rates found in Attachment B, to calculate the proposed estimated costs for all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.
(b) The Contractor’s proposed approach/pricing of the representative tasks set forth in its proposal for award of this contract shall be used as reference by the Contracting Officer in negotiating tasks with the Contractor which are issued under this contract, but only to the extent portions of a representative task are relevant to portions of a task actually issued.
(c) The Government and Contractor agree that the maximum award fee percentage specified in Attachment B shall be used to calculate the maximum available award fee dollars on all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract. The Government shall solely determine the earned award fee under the contract.
B.6 GSFC 52.232-94 ESTIMATED COST INCREASES (DEC 2005)
(a) The Contractor shall notify the Contracting Officer in writing when the Contractor has reason to believe that the total cost for performance of this contract, or any individual task order, exclusive of any fee, will be either greater or substantially less than the total estimated cost stated in this contract or in the task order. Notification shall not be delayed pending preparation of a proposal.
(b) A proposal is required to support a request for an increase in the estimated cost of the contract or the task order. The proposal should be submitted as soon as possible after the above notification but no later than 115 days before the incurred costs are expected to exceed the estimated cost. This will allow adequate time for the Government to evaluate the proposal and to mutually establish any increase in estimated cost with the Contractor.
(c)(1) The proposal shall be submitted in the following format unless some other format is directed or approved by the Contracting Officer:
Incurred costs to date
Projected cost to completion
Total cost at completion
Current negotiated estimated cost
Requested increase in estimated cost
(2) The “projected cost to completion” shall consist of the following “other than cost or pricing data” unless the Contracting Officer requests or approves the submittal of a greater or lesser amount of information:
(i) Elements of cost with supporting detail for estimated direct labor hours, direct and indirect rates, materials and subcontracts, and other elements.
(ii) Supporting explanation for the increases and projections, sufficient for the
Government to understand the reasons for the increased estimated cost.
(End of Section B)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work (Attachment A), Safety and Health Plan
(Attachment D), Contract Historical Data (Attachment J), and task orders issued hereunder.
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED
COMPUTER SOFTWARE (MAR 2008)
In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – Special Works clause (FAR
52.227-17), specified elsewhere in this contract, except for the following:
As otherwise specified by task order.
C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ/BPA) (AUG 2013)
(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished covering all Task Orders active during each month of contract performance. Reports shall address the accomplishments and progress of all work performed under each Task Order for the month being reported. Each Task Order shall be a separate report. The report shall be in narrative form and brief in content. The report shall include a description of overall Task Order progress to include technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.
(b) Final Task Order Report. The Contractor shall submit a Final Task Order Report for each completed Task Order that summarizes the results of the entire Task Order, including recommendations and conclusions based on the experience and results obtained. The Final Task Order Report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the Task Order. The final report shall also include the final incurred cost for the Task Order.
(c) Submission. The Contractor shall submit the reports required by this clause as follows:
Copies Report Type Addressee Mail Code
1 M,F Contracting Officer (CO) 210.6
1 M,F Contracting Officer's Representative (COR) TBD
1 M,F Task Monitor See Task Order
[M=Monthly Report, F=Final Report]
(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the Task Order is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report for each Task Order shall be submitted within 30 days after completion of the Task Order.
(End of Section C)
SECTION D – PACKAGING AND MARKING
D.1 SECTION D – CLAUSES INCORPORATED BY REFERENCE
1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT
EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using
NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix
Identification Symbols to Aerospace Parts Using Direct Part Marking
Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix
Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to
NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA
Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item’s operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs I and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
Goddard Space Flight Center
Building 35, Code 279
Greenbelt, MD 20771
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
(End of Section D)
SECTION E – INSPECTION AND ACCEPTANCE
E.1 SECTION E – CLAUSES INCORPORATED BY REFERENCE
52.246-3 INSPECTION OF SUPPLIES – COST REIMBURSEMENT (MAY 2001)
Note: The above clause only applies to supply orders.
52.246-5 INSPECTION OF SERVICES – COST REIMBURSEMENT (APR 1984)
Note: The above clause only applies to service task orders.
E.2 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR
2015)
(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:
(1) Via mail and marked “Advance Copy”, one copy each to the Contracting Officer, the
Contracting Officer’s Representative (if designated in the contract), and to the cognizant
Administrative Contracting Officer, if any.
(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope “CONTAINS
DD FORM 250.” This must arrive prior to the shipment.
(3) With shipment in waterproof envelope (one copy) for the consignee.
(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) or GSFC/Wallops Flight Facility (Wallops) central receiving areas, then one copy of the
DD Form 250 must be provided (via mail) to one on the following addresses depending upon whether this contract is with GSFC Greenbelt or GSFC/WFF Wallops:
Receiving and Inspection (Code 279)
Greenbelt, MD 20771
(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR
Supplement 1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.
(c) When more than one package is involved in a shipment, the Contractor shall list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words “CONTAINS DD FORM 250” on the package.
E.3 GSFC 52.246-93 ACCEPTANCE – LOCATION(S) (SEP 2013)
The Contracting Officer or authorized representative will accomplish acceptance at the following location(s):
Deliverable Item No. Location Authorized Representative
Monthly Reports GSFC
Contracting Officer (CO), Contracting Officer’s Representative
(COR), Task Monitor (TM)
Notice of Estimated Cost
Increases GSFC CO, COR, TM
Final Report GSFC CO, COR, TM
3. Task Plans GSFC CO, COR, TM
4. Reports of Work GSFC CO, COR, TM
5. Contract Historical Data GSFC CO
6. NASA Financial
Management Reports GSFC
CO, COR, Resource Analyst (RA), Finance Office (Code 155.2)
7. Material Inspection
Receiving Reports (MIRR)
(DD Form 250) GSFC CO, COR, Receiving and Inspection
8. Foreign Travel Requests and
Foreign Travel Reports GSFC CO
9. Requests for Government
Property GSFC CO
10. Financial Reports of NASA
Property in the Custody of
Contractors (NF 1018) GSFC
CO, COR, Property Administrator, NASA Industrial Property Office
11. Supplemental Financial
Reports of NASA Property in the Custody of Contractors GSFC
CO, COR, Property Administrator, NASA Industrial Property Office
12. Physical Inventory of
Capital Personal Property
Reporting GSFC
CO, COR, Property Administrator, NASA Industrial Property Office
13. Reporting of Inventions GSFC
New Technology Representative or
Patent Representative
14. Small Business
Subcontracting Plan Reporting GSFC CO
15. Safety & Health Plan GSFC CO, COR
16. Safety & Health Reporting GSFC CO, Code 350
17. Personal Identity
Verification (PIV) GSFC COR
Documentation and Report
18. Equal Opportunity Reports GSFC CO
19. Certificate of Insurance
Notifications GSFC CO
20. Subcontract Notification GSFC CO
21. IT Security Management
Plan GSFC CO
22. Service Contract Reporting GSFC CO
The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.
E.4 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT
NOT REQUIRED (APR 1989)
NASA FAR Supplement clause 1852.246‑72 of this contract requires the furnishing of a
Material Inspection and Receiving Report (MIRR) (DD Form 250 series) at the time of each delivery under this contract. However, a MIRR is not required for the following deliverable items:
Item No. Description
3 Task Plans
4 Reports of Work
5 Contract Historical Data
6 NASA Financial Management Records
8 Foreign Travel Requests and Foreign Travel Reports
9 Requests for Government Property
10 Financial Report of NASA Property in the custody of Contractors
(NF 1018)
12 Physical Inventory of Capital Personal Property Reporting
13 Reporting of Inventions
14 Small Business Subcontracting Plan Reporting
15 Safety & Health Reporting
17 Personal Identity Verification (PIV) Documentation and Reporting
18 Equal Opportunity Reports
19 Insurance Notifications
20 Subcontract Notification
21 IT Security Management Plan
E.5 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
The Contractor shall maintain records evidencing inspections in accordance with the
Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.
(End of Section E)
SECTION F – DELIVERIES OR PERFORMANCE
F.1 SECTION F – CLAUSES INCORPORATED BY REFERENCE
52.242-15 STOP-WORK ORDER (AUG 1989) – ALTERNATE I (APR 1984)
F.2 GSFC 52.217-92 PERIOD OF PERFORMANCE/EFFECTIVE ORDERING
PERIOD (JAN 2014)
The effective ordering period contract shall be for a period of five (5) years from the contract effective date of TBD.
F.3 GSFC 52.237-92 PLACE OF PERFORMANCE (NOV 2013)
The services to be performed under this contact shall be performed at the following location(s): GSFC, Contractor’s facility, and Distributed Active Archive Centers
(DAACs). Alternate places of performance may be specified in individual task orders issued.
F.4 GSFC 52.247-94 SHIPPING INSTRUCTIONS – CENTRAL RECEIVING
(FEB 2016)
Shipments of the items required under this contract shall be to:
Receiving Officer:
Building 35, Code 279
Greenbelt, Maryland 20771
Marked for:
Technical Officer: Stephen Berrick, Code 586
Building: 32
Room: TBD
Contract No.: TBD
Item(s) No.: TBD
Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.
(End of Section F)
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 SECTION G – CLAUSES INCORPORATED BY REFERENCE
1852.227-70 NEW TECHNOLOGY – OTHER THAN A SMALL BUSINESS
FIRM OR NON-PROFIT ORGANIZATION (APR 2015)
1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE
AND PATENT REPRESENTATIVE (APR 2015)
1852.227-85 INVENTION REPORTING AND RIGHTS – FOREIGN (APR 2015)
1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)
1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)
1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT
REPORTING (NOV 2004)
1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED
PROPERTY (AUG 2015)
1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY
(AUG 2015)
G.2 1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (JUN 2018)
(a) The contractor can earn award fee from a minimum of zero dollars to the maximum stated in NASA FAR Supplement clause 1852.216-85, “Estimated Cost and Award Fee” in this contract.
(b) Beginning 12 months after the effective date of this contract, the Government shall evaluate the Contractor's performance every 12 months to determine the amount of award fee earned by the contractor during the period. The Contractor may submit a self-evaluation of performance for each evaluation period under consideration. These self-evaluations will be considered by the Government in its evaluation. The Government's
Fee Determination Official (FDO) will determine the award fee amounts based on the
Contractor's performance in accordance with Enclosure 6 Performance Evaluation Plan.
The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.
(c) The Government will advise the Contractor in writing of the evaluation results. The
NASA Shared Services Center (NSSC) will make payment based on issuance of a unilateral modification by the Contracting Officer.
(d) The Contracting Officer may direct the withholding of earned award fee payments until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government's interest relative to an orderly and timely closeout of the contract. This reserve shall not exceed 15 percent of the contract's total potential award fee or $100,000, whichever is less.
(e) The amount of award fee which can be awarded in each evaluation period is limited to the amounts set forth in the Performance Evaluation Plan. Award fee which is not earned in an evaluation period cannot be reallocated to future evaluation periods.
(f)(1) Provisional award fee payments will be made under this contract pending the determination of the amount of fee earned for an evaluation period. If applicable, provisional award fee payments will be made to the Contractor on a monthly basis. The total amount of award fee available in an evaluation period that will be provisionally paid is the lesser of 80 percent or the prior period's evaluation score.
(2) Provisional award fee payments will be superseded by the final award fee evaluation for that period. If provisional payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the Contracting Officer.
(3) If the Contracting Officer determines that the Contractor will not achieve a level of performance commensurate with the provisional rate, payment of provisional award fee will be discontinued or reduced in such amounts as the Contracting Officer deems appropriate. The Contracting Officer will notify the Contractor in writing if it is determined that such discontinuance or reduction is appropriate.
(4) Provisional award fee payments will be made prior to the first award fee determination by the Government.
(g) Award fee determinations are unilateral decisions made solely at the discretion of the
Government.
G.3 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT
(APR 2018)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS
39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:
https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact
Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this
(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices.
(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
G.4 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE
CUSTODY OF CONTRACTORS (JAN 2017)
(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by NASA.
(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the
Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.
(2) The Contractor shall mail the original signed NF 1018 directly to the Goddard Space
Flight Center, Supply and Equipment Management Branch, Code 273, Greenbelt MD
20771 and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(3) One copy shall be submitted (through the Department of Defense (DOD) Property
Administrator if contract administration has been delegated to DOD) to the following address: Goddard Space Flight Center, Supply and Equipment Management Branch, Code 273, Greenbelt MD 20771, unless the Contractor uses the NF 1018 Electronic
Submission System (NESS) for report preparation and submission.
(c)(1) The annual reporting period shall be from October 1 of each year through
September 30 of the following year. The report shall be submitted in time to be received by October 31st. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes.
Therefore, it is essential that required reports be received no later than October 31st.
(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors' procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management
Report cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention. Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period.
Contractors shall have formal policies and procedures, which address the validation of
NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center
Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.
(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the contractor has a value of $10 million or more, the contractor shall also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.
(4) The Contracting Officer may, in NASA's interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.
(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.
G.5 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED
PURSUANT TO FAR 52.245-1 (JAN 2011)
For performance of work under this contract, the Government will make available
Government property identified in Attachment C – Government Property of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245-1, Government
Property, as incorporated in this contract. The Contractor shall use this property in the performance of this contract the Contractor’s facility, Distributed Active Archive Centers
(DAACs), and at other location(s) as may be approved by the Contracting Officer. Under
FAR 52.245-1, the Contractor is accountable for the identified property.
G.6 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP
2017)
(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14, Policy for Real Estate Management.
(2) NPD 8831.2, Facilities Maintenance and Operations Management.
(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy
Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor's expense.
(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.
(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting
Officer.
G.7 GSFC MODIFICATION TO NFS 1852.245-71 INSTALLATION-
ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)
(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract.
This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv).
Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:
(1) NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory
Management Manual;
(2) NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management
Procedural Requirements;
(3) NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal
Procedural Requirements;
(4) Notify the cognizant property custodian, Contracting Officer’s Representative (COR), and the Installation Security Officer immediately if theft of Government property is suspected or property cannot be located
(5) Identify Government property equipment that is no longer considered necessary for performance of the contract.
(6) Ensure that equipment is turned in to the Property Disposal Officer through the cognizant property custodian when no longer needed. This is the only acceptable procedure for disposal of Government property.
(7) Do not relocate Government property within Government premises or remove
Government property from Government premises without written approval.
(8) Ensure that Government property, including property leased to the Government, is used only for the purposes of performing the contract.
(9) Ensure that Government property is protected and conserved.
Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.
The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities.
In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.
(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and
Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the
Government, the following additional procedures apply:
(i) The Contractor's purchase order shall require the vendor to deliver the property to the installation central receiving area.
(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.
(iii) The Contractor shall establish a record for Government titled property as required by
FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.
(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government
Property (as incorporated in this contract), until its return to the installation. NASA
Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.
(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the
Contracting Officer.
(c) The following property and services are provided if checked:
____ (1) Office space, work area space, and utilities. Government telephones are available for official purposes only.
____ (2) Office furniture.
__X_(3) Property listed in Attachment K – Installation Accountable Government
Property.
(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the
Government upon its entry into Government records.
(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.
____ (4) Supplies from stores stock.
____ (5) Publications and blank forms stocked by the installation.
__X_(6) Safety and fire protection for Contractor personnel and facilities.
__X__ (7) Installation service facilities: IT Services through NASA’s End User Services
Program Office (EUSO) Enterprise contract.
__X_(8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.
__X_(9) Cafeteria privileges for Contractor employees during normal operating hours.
____ (10) Building maintenance for facilities occupied by Contractor personnel.
____ (11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the
Contracting Officer.
G.8 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS
(DEC 2014)
The following personnel are authorized to issue task orders under this contract. All designated personnel are employed by the Goddard Space Flight Center unless otherwise indicated:
Contracting Officer, Code 210.Y
G.9 GSFC 52.242-90 FINANCIAL MANAGEMENT REPORTING (JUN 2014)
(a) Requirements. This clause provides the supplemental instructions referred to in NASA
FAR Supplement (NFS) clause 1852.242-73. The NFS clause and NASA Procedural
Requirements (NPR) 9501.2E, “NASA Contractor Financial Management Reporting”, establish report due dates and other financial management reporting requirements. NPR
9501.2E permits withholding of payment for noncompliance.
(b) Supplemental instructions. (1) Monthly (NF 533M) reports are required. Quarterly
(NF 533Q) reports are also required. The reporting structure shall be in accordance with
Attachment H of Section J of this contract.
(2) As stated in NPR 9501.2E, NASA strongly encourages electronic contractor cost reporting. The preferred formats are Excel and Adobe. Contact the Contracting Officer for any E-Mail addresses that are not provided or which become noncurrent.
Distribution shall be as follows:
Contracting Officer, Malika Graham, 210.6
E-Mail: malika.graham@nasa.gov
Contracting Stephen Berrick, 586
E-Mail: stephen.w.berrick@nasa.gov
Resources Analyst, Ryan Corken, Code 155.2
E-Mail: ryan.p.corken@nasa.gov
Regional Finance Office Cost Team, Code 155.2
E-Mail: GSFC-rfocateam@lists.nasa.gov
(c) Web site. NPR 9501.2E, “NASA Contractor Financial Management Reporting:”
http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E
G.10 GSFC 52.245-96 PROPERTY CLAUSE APPLICABILITY – ON-SITE AND
OFFSITE (APR 2016)
(a) Performance of this contract requires that Contractor personnel and any furnished and/or acquired Government property be located at both Government controlled and managed premises (on-site) and at Contractor controlled and managed premises
(offsite). The requirements for control and accountability of Government property differ depending upon the location of the property. The applicability of the clauses in this contract to on-site and to off-site locations is indicated below.
(b) Clauses, if included in the contract, are applicable to both on-site and offsite locations.
FAR clause 52.245-1, “Government Property”
FAR clause 52.245-9, “Use and Charges”
NASA FAR Supplement clause 1852.245-70, “Contractor Requests for Government-
Provided Property”
NASA FAR Supplement clause 1852.245-72, “Liability for Government Property
Furnished for Repair or Other Services”
NASA FAR Supplement clause 1852.245-73, “Financial Reporting of NASA Property in the Custody of Contractors"
NASA FAR Supplement clause 1852.245-74, “Identification and Marking of
Government Equipment”
NASA FAR Supplement clause 1852.245-75, “Property Management Changes”
NASA FAR Supplement clause 1852.245-78, “Physical Inventory of Capital Personal
Property”
NASA FAR Supplement clause 1852.245-79, “Records and Disposition Reports for
Government Property with Potential Historic or Significant…