This is a technical standards and requirements document for electrical service installations published by Southern California Edison (SCE), not a document directly related to the federal contract opportunity for office trailer utility connections.
The SCE Electrical Service Requirements (ESR) is a comprehensive manual (2025 Fourth Quarter Issue, effective October 31, 2025) that provides detailed technical specifications and guidelines for electrical service connections, customer installations, and service equipment design and construction. Key sections cover standard distribution voltages (single-phase 120V through 33,000V three-phase); customer service voltages with minimum and maximum ranges; overhead and underground service requirements; service drop specifications including maximum lengths (typically 100 feet), clearance requirements, and attachment methods; customer-owned transformer requirements; meter socket adapters (MSAs) for distributed energy resources and EV charging on single-family residential panels rated 60-200A; customer generator installations and net generation output metering requirements; short-circuit current limitations (10,000A maximum for single-family dwellings, higher for commercial/industrial); and electric and magnetic field management techniques. The document establishes requirements for service poles, conduit sealing for hazardous areas, plug-in electric vehicle charging infrastructure, and provides contact information for SCE's 25 regional Service Planning Offices throughout Southern California territory. Administrative revisions in this issue address meter socket adapter specifications, clarifications on ringless-type meter sockets (not acceptable), and updated guidance on customer-owned transformer vault rooms. The document serves as a technical reference for electrical contractors, engineers, architects, and manufacturers but does not contain procurement information relevant to the USDA Forest Service office trailer utility connections solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001 - RFI Responses.pdf | ||
| 3. Project Specifications.pdf | ||
| 6. Contract Administration Information.pdf | ||
| 7. RFI Form.xlsx | XLSX spreadsheet | |
| 127EAW26Q0045 - Office Trailer Utility Connections.pdf | ||
| 1. Statement of Work.pdf | ||
| 2. Schedule of Items.xlsx | XLSX spreadsheet | |
| 5. Davis-Bacon Act WD # CA20260014 - May 18, 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTHERN CALIFORNIA EDISON
TRANSMISSION AND DISTRIBUTION
Electrical Service Requirements
(ESR)
2025— FOURTH QUARTER ISSUE
October 31, 2025
►SCE Public◄
Note: Printed and downloaded versions of this document are uncontrolled. In the case of a conflict between printed/downloaded and electronic versions of this document, the controlled version published on the Company portal prevails.
Copyright © 2025 Southern California Edison. All rights reserved.
No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, without the prior written permission of Southern California Edison.
Direct technical questions/comments to:
Email: Standards.Engineering@sce.com
Published by:
Transmission & Distribution • Southern California Edison
Standards & Publications, 1 Innovation Way, Pomona, California 91768-2560 mailto:Standards.Engineering@sce.com
Page 1 ►SCE Public◄
Electrical Service Requirements
Electrical Service Requirements
(ESR)
Revision Summary 2025 Fourth Quarter Issue
Effective Date: October 31, 2025
Overview The main purpose of this revision summary is to describe new revisions to this manual. (Some or all of the information may have been previously communicated to field personnel by other means.)
Table 1 lists the revisions. Clickable page/sheet numbers link directly to individual revisions or the first of a series of revisions.
Table 2 defines four types of revisions: (1) Admin (Administrative), (2) Technical, (3) New, and (4) Pilot.
Note: Admin and Technical revisions to existing standards or existing Pilot projects are identified with change bars in the left margin. New standards (as well as new pilot projects) do not receive change bars. Editorial revisions, such as corrections to spelling, do not receive change bars.
A Getting Help section provides contact information.
Table 1: Revisions
Chapter Page Description Type
ESR-1 Sheet 27-29 New section 12.9 added to the ESR: Meter Socket Adapter
(MSA)
Technical
ESR-3 Sheet 24-25 Figure 3-6: Added Note 9 - Ringless-type meter sockets are not acceptable.
Figure 3-7: Added Note 9 - Ringless-type meter sockets are not acceptable.
Amin
ESR-3 Sheet 24 Updated Figure: 3-5 Revise the burial coverage minimum depth from 30" to 24" and replace Concrete Envelope with Concrete Slurry
Admin
ESR-3 Sheet 44 Added Note 15: Ringless-type meter sockets are not acceptable.
Added Note 16: The owner or developer must consult with SCE Local Service Office prior to determining the location of service equipment.
Admin
ESR-4 Sheet 1, 8, 13 Replace all instances of Customer-Owned Transformer Room (COTR) with Customer-Owned Transformer Vault Room (COTVR).
Admin
ESR-5 Sheet 5 Clarified language by adding "meter" to specify that ringless-type meter socket enclosures shall not be installed.
Admin
ESR-9 Sheet 8 Updated Note 28: Double personnel doors are required for all hatch-type COTVRs, in addition to the equipment hatch opening.
Admin
Page 2 ►SCE Public◄
Getting Help Technical Issues If you have any comments, corrections, questions, or suggestions concerning manual revisions, please contact one of the following individuals at the numbers provided, or click on the name to send an email.
• Standards.Engineering@sce.com
Fernando A. Garcia
Director | Asset Management & Engineering
Table 2: Revision Types
Type Definition
Admin Administrative revisions do not significantly affect design, construction, maintenance or operation of the electrical distribution, substation, and transmission systems. They do not require Standards Review Team (SRT) or management approval; however, they have been approved by other organizations, as appropriate. They may include updates to material codes, updates to references, updates to standards for clarity, or deletions of outdated information.
Technical Technical revisions are engineering changes to existing standards. They affect the design, construction, maintenance or operation of the electrical distribution, substation, and transmission systems. They require SRT and management approval.
New Refers to a new standard. New technical standards require SRT and management approval.
Pilot A Pilot is an in-field evaluation of a piece of equipment or work method, with the intention of approving for standardized use. Pilot standards will have a PILOT watermark so that they are easily identified throughout this manual.
mailto: standards.engineering@sce.com mailto:standards.engineering@sce.com mailto:standards.engineering@sce.com
►SCE Public◄
PAGE
1–1
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
ESR–1: General Information
TABLE OF CONTENTS
SECTIONS AND SUBSECTIONS PAGE
1.0 Scope and Purpose 1–3
2.0 Edison Office Locations, Telephone Numbers, and Community Index 1–3
3.0 Energy Management Programs 1–16
3.1 Residential 1–16
3.2 Commercial/Industrial/Agricultural 1–16
4.0 Dig Alert 1–16
5.0 Plug-In Electric Vehicles 1–16
5.1 Customer’s Responsibility 1–16
5.2 Panel/Meter Options 1–17
6.0 Voltage Standards 1–20
6.1 Standard Distribution Voltages 1–20
6.2 Customer-Service Voltages 1–20
6.3 Customer-Utilization Voltages 1–21
7.0 Customer Transformation and Harmonic Interference 1–21
7.1 High-Voltage Service 1–22
7.2 Low-Voltage Service 1–22
8.0 Agricultural Power Service — Three-Phase, 240 V and 277/480 V 1–22
8.1 100 A Service 1–22
8.2 200 A Service 1–23
8.3 Above 200 A Service 1–23
9.0 Overhead Service 1–23
9.1 To Customer’s Service and Meter Pole 1–23
9.2 To Customer’s Building or Structure 1–23
10.0 Underground Service 1–23
10.1 To Customer’s Service and Meter Post 1–23
10.2 To Customer’s Building or Structure 1–23
11.0 Service or Meter Switch — General Requirements 1–24
12.0 Customer Generators 1–24
12.1 Equipment Review 1–25
12.2 Location and Access 1–25
12.3 Equipment Marking/Labeling 1–25
12.4 Prohibited Metering Locations 1–25
12.5 Switch and Disconnect Requirements 1–26
12.6 Voltage Standards 1–26
12.7 Safety-Socket Box with Factory-Installed Test-Bypass 1–26
EFFECTIVE DATE
►SCE Public◄
PAGE
1–2
ESR–1 10-31-2025General Information
APPROVED
SECTIONS AND SUBSECTIONS PAGE
12.8 Generation Meter Adapter (GMA) 1–26
12.9 Meter Socket Adapter (MSA) 1–27
13.0 Short-Circuit Current 1–30
13.1 10000 A and Below (100–400 Maximum Amperes Self-Contained
Type Meter Panels) 1–30
13.2 Greater than 10000 A—Multi-Family Residential (Three or More Grouped Meters), Commercial, and Industrial 1–30
13.3 Exceptional Cases 1–30
14.0 Electric and Magnetic Fields 1–30
14.1 Electric Fields 1–30
14.2 Magnetic Fields 1–31
14.3 SCE’s Corporate Electric Magnetic Fields Policy 1–31
14.4 Sources of Magnetic Fields 1–31
14.5 Magnetic Field Management Techniques 1–33
14.6 Summary 1–34
15.0 Residential Area Installations 1–35
15.1 Hazardous Areas by Class and Division 1–35
15.2 Location of Service Facilities 1–35
15.3 Electrical Y Seal Conduit Sealing Vertical Fitting and Material Application 1–35
15.4 Service Cable Replacement 1–35
FIGURES
1–1 Overhead Service 1–18 1–2 Underground Service 1–19 1–5 Sources of Magnetic Fields 1–32 1–6 Meter Panel Locations 1–33 1–7 Magnetic Field Strength Measurements — 1Ø Pad-Mounted Transformer 1–34 1–8 EYS Conduit Sealing Vertical Fitting 1–37
TABLES
1–1 Service Planning Office—Telephone Numbers and Locations 1–4 1–2 Service Center Planning Directory 1–6 1–3 Customer-Service Voltages 1–21 1–4 Customer Utilization Voltages 1–21 1–5 Short-Circuit Current 1–30 1–6 Magnetic Fields from Electrical Appliances 1–32
PAGE
1–3
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
ESR–1: General Information
1.0 Scope and Purpose
The Electrical Service Requirements (ESR) presented in this document provide detailed amplifications of certain established rules of Southern California Edison (SCE), An Edison International Company, (also referred to as the “Company”) pertaining to electrical service connections, together with customers’ installations of service wiring and service equipment. These requirements are issued for the guidance and assistance of electrical contractors, engineers, architects, and manufacturers engaged in the installation and design of electrical service wiring and service equipment. As an additional convenience, certain extracts from G.O. 95, Rules for Overhead Line Construction; G.O. 128, Rules for Construction of Underground Electric Supply and Communications Systems, of the California Public Utilities Commission (CPUC) concerning service installations have been included as references.
In localities where no local ordinance is in force and where no provision has been made for inspection by local or other authorities, the Company shall determine if a service wiring installation has been made in a safe and workman-like manner before making a service connection to such installation.
For the purpose of these requirements, the customer or any other person, firm, or corporation making a service wiring installation will be considered the “electrical contractor.”
Any unusual situation, not specifically covered in these ESRs, should be referred to the Company Service Planning Office in the location where the service is supplied. Service Planning Offices are located at various Service Centers throughout the SCE territory. To find the telephone number of the Service Planning Office nearest you, see Table 1–1.
2.0 Edison Office Locations, Telephone Numbers, and Community Index
Southern California Edison has an extensive network of Customer Service offices and telephone information numbers to serve builders, developers, and electrical contractors. Table 1–1 is an alphabetical listing of SCE Service Centers with addresses and planning office telephone numbers. Table 1–2 is an alphabetical listing of cities and communities served by the Company and indicates the SCE Service Center responsible for its service. Use this table to identify the SCE Service Center serving the geographic location for which you need assistance. The corresponding telephone number for the Service Center can be found in Table 1–1. Call this number when information is needed for new construction, relocation of metering facilities, overhead or underground wiring, temporary power poles, or any question or request that may require a technical response regarding these subjects. When calling these locations please ask for the service planner for your specific project location.
If you need additional information or technical assistance relating to these requirements, contact Gilbert Aceves at (909) 329-9445 or e-mail him at gilbert.aceves@sce.com. For administrative inquiries, such as new manuals, revisions, and so forth, call (909) 548-7108 or FAX
(909) 548-7050. In addition, you may address your technical questions to the attention of Gilbert Aceves at:
Southern California Edison Transmission and Distribution, Construction Methods 14005 S. Benson Ave.
Chino, CA 91710-7026 mailto:Gilbert.Aceves@sce.com
►SCE Public◄
PAGE
1–4
ESR–1 10-31-2025General Information
APPROVED
The General Service number, (800) 655-4555, is provided for establishing electrical service in a customer’s name, meter reading, and billing questions, requests for discontinuing service, information regarding delinquent accounts, and questions of a general nature. Information is also available on our Web site: http://www.sce.com/.
Table 1–1: Service Planning Office—Telephone Numbers and Locations
Service Center Location Telephone/
FAX Number
Antelope Valley 42060 10th Street West, Lancaster, CA 93534-4349 (661) 726-5617
FAX (661) 726-5680
Arrowhead 26364 Pine Avenue, Rimforest, CA 92378 (909) 336-4204
FAX (909) 336-4220
Barstow 30553 Rimrock Road, Barstow, CA 92311 (760) 252-6416
FAX (760) 252-6406
Bishop 4000 West Line Street, Bishop, CA 93514 (626) 302-5542
FAX (760) 873-2921
Blythe 505 West 14th Avenue, Blythe, CA 92225 (760) 921-1605
FAX (760) 922-0662
Catalina Island 2800 East Willow Street, Long Beach, CA 90806 (562) 981-8237
FAX (562) 981-8289
Compton P.O. Box 4699, Compton, CA 90224 1924 Cashdan Street, Compton, CA 90224
(310) 608-5023
FAX (310) 608-5033
Covina 800 West Cienega, San Dimas, CA 91773 (909) 592-3709
FAX (909) 357-6185
Foothill 7951 Redwood Avenue, Fontana, CA 92336 (909) 357-6516
FAX (909) 357-6113
Fullerton 1851 West Valencia Drive, Fullerton, CA 92833 (714) 870-3225
FAX (714) 870-3284
Huntington Beach 7333 Bolsa Avenue, Westminster, CA 92683 (626) 302-3039
FAX (714) 895-0188
Kernville 120 Woodland Drive, Wofford Heights, CA 93285 (760) 376-8008
FAX (760)-376-4973
Long Beach 2800 East Willow Street, Long Beach, CA 90806 (562) 981-8237
FAX (562) 981-8289
Mammoth P.O. Box 7329 3001 Chateau Road, Mammoth Lakes, CA 93546
(626) 302-5542
FAX (760) 924-4823
Monrovia 1440 South California Street, Monrovia, CA 91016 (626) 303-8489
FAX (626) 303-8406
Montebello 1000 Potrero Grande Drive, Monterey Park, CA 91755 (323) 720-5220
FAX (323) 720-5252
Ontario 1351 East Francis Street, Ontario, CA 91761 (909) 930-8591
FAX (909) 930-8438
Palm Springs 36100 Cathedral Canyon Drive, Cathedral City, CA 92234 (760) 202-4286
FAX (760) 202-4294
Redlands 287 Tennessee Street, Redlands, CA 92373 (909) 307-6791
FAX (909) 307-6714
Ridgecrest 510 South China Lake Boulevard, Ridgecrest, CA 93555 (626) 302-5542
FAX (760) 375-1554
Saddleback 14155 Bake Parkway, Irvine, CA 92618 (949) 458-4416
FAX (949) 458-4472
Menifee 26100 Menifee Road, Menifee, CA 92585 (951) 928-8290
FAX (951) 928-8377
http://www.sce.com/
PAGE
1–5
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
San Joaquin Valley P.O. Box 900, Tulare, CA 93275 2425 South Blackstone Avenue, Tulare, CA 93274
(559) 685-3235
FAX (559) 685-3287
Santa Ana 1241 South Grand Avenue, Santa Ana, CA 92705 (714) 973-5653
FAX (714) 973-5790
Santa Barbara 103 David Love Place, Goleta, CA 93117 (805) 683-5211
FAX (805) 683-5293
Santa Monica 1721 22nd Street, Santa Monica, CA 90404 (310) 315-3271
FAX (310) 315-3217
Shaver Lake P.O. Box 29, Shaver Lake, CA 93664 41694 Dinkey Creek Road, Shaver Lake, CA 93664
(559) 841-3191
FAX (559) 841-3178
South Bay 505 Maple Avenue, Torrance, CA 90503 P.O. Box 2944, Torrance, CA 90509-2944
(310) 783-9389
FAX (310) 783-9388
Tehachapi 421 West “J” Street, Tehachapi, CA 93561 (661) 823-2599
FAX (661) 823-2511
Thousand Oaks 3589 Foothill Drive, Thousand Oaks, CA 91361 (805) 494-7040
FAX (805) 494-7008
Valencia 25625 West Rye Canyon Road, Valencia, CA 91355 (661) 257-8255
FAX (661) 257-8259
Ventura 10060 Telegraph Road, Ventura, CA 93004 (805) 654-7444
FAX (805) 654-7323
Victorville 12353 Hesperia Road, Victorville, CA 92392 (760) 951-3219
FAX (760) 951-3159
Whittier 9901 Geary Avenue, Santa Fe Springs, CA 90670 (562) 903-3123
FAX (562) 903-3174
Wildomar 24487 Prielipp Drive, Wildomar, CA 92595 (951) 249-8301
FAX (951) 249-8636
Yucca Valley 6999 Old Woman Springs Road, Yucca Valley, CA 92284 (760) 369-5412
FAX (760) 369-5409
Table 1–1: Service Planning Office—Telephone Numbers and Locations (Continued)
Service Center Location Telephone/
FAX Number
►SCE Public◄
PAGE
1–6
ESR–1 10-31-2025General Information
APPROVED
Table 1–2: Service Center Planning Directory (Sheet 1 of 11)
City Service Center City Service Center
Acton Antelope Valley Azusa Monrovia
Acton Valencia Bagdad Yucca Valley
Adelanto Victorville Baker Barstow
Aerial Acres Ridgecrest Bakersfield San Joaquin Valley
Agoura Thousand Oaks Balance Rock Kernville
Agoura Hills Thousand Oaks Balboa Huntington Beach
Agua Dulce Valencia Balboa Island Huntington Beach
Agua Fria Arrowhead Baldwin Hills South Bay
Aguanga Wildomar Baldwin Hills Santa Monica
Alberhill Wildomar Baldwin Park Monrovia
Alessandro Menifee Banning Redlands
Alhambra Montebello Banning Palm Springs
Alpine Forest Antelope Valley Banning Foothill
Alpine Glen Arrowhead Bardsdale Ventura
Alpine Village San Joaquin Valley Barstow Barstow
Alta Loma Foothill Barton Flats Redlands
Alta Loma Ontario Bassett Covina
Altadena Monrovia Bear Valley Springs Antelope Valley
Amberton Ventura Beaumont Redlands
Amboy Yucca Valley Bell Compton
Anaheim Fullerton Bell Canyon Thousand Oaks
Anaheim Santa Ana Bell Gardens Compton
Angelus Oaks Redlands Bellflower Compton
Antelope Acres Antelope Valley Belltown Foothill
Anza Menifee Belmont Shore Long Beach
Apple Valley Victorville Belvedere Montebello
Arcadia Monrovia Benton Bishop
Argus Ridgecrest Beverly Hills Santa Monica
Arlington Ontario Big Bear Lake Redlands
Armona San Joaquin Valley Big Bear Lake Victorville
Arnold Heights Menifee Big Creek Shaver Lake
Arrowbear Lake Arrowhead Big Pine Bishop
Arrowhead Highlands Arrowhead Big Pines Playground Victorville
Arrowhead View Arrowhead Big Tujunga Canyon Monrovia
Artesia Long Beach Bishop Bishop
Ash Mountain San Joaquin Valley Bishop Creek Bishop
Atolia Ridgecrest Bixby Knolls Long Beach
Atwood Fullerton Bloomington Foothill
Auberry Shaver Lake Blue Cut Foothill
Avalon Catalina Blue Jay Arrowhead
Azusa Covina Blythe Blythe
PAGE
1–7
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
Bodfish Kernville Casitas Springs Ventura
Bodie Bishop Castaic Valencia
Boron Ridgecrest Catalina Long Beach
Bouquet Canyon Valencia Cathedral City Palm Springs
Box Canyon Thousand Oaks Cedar Glen Arrowhead
Bradbury Monrovia Cedar Pine Arrowhead
Brea Fullerton Cedar Slope San Joaquin Valley
Bridgeport Mammoth Cedarpines Park Arrowhead
Bryman Victorville Cerritos Long Beach
Bryn Mawr Redlands Chalfant Bishop
Buena Park Fullerton Chambless Yucca Valley
Burnt Mill Canyon Arrowhead Chapman Woods Monrovia
Burnt Mill Heights Arrowhead Charter Oak Covina
Burtons Camp Antelope Valley Chatsworth Thousand Oaks
Cabazon Palm Springs Cherry Valley Redlands
Cadiz Yucca Valley Chilao Monrovia
Cadiz Summit Yucca Valley China Lake Ridgecrest
Cajon Foothill Chino Ontario
Calabasas Thousand Oaks Chino Hills Ontario
Calico Barstow Cima Barstow
Caliente Antelope Valley City Terrace Montebello
Caliente Kernville Claremont Covina
California City Ridgecrest Claremont Ontario
California Hot Springs Kernville Colton Redlands
California Hot Springs San Joaquin Valley Commerce Compton
Calimesa Redlands Compton Compton
Camarillo Thousand Oaks Conejo Valley Thousand Oaks
Camarillo Ventura Convict Lake Bishop
Camarillo Heights Ventura Corcoran San Joaquin Valley
Camp Angelus Redlands Cornell Thousand Oaks
Camp Nelson San Joaquin Valley Corona Ontario
Camp Sabrina Bishop Corona Del Mar Huntington Beach
Canoga Park Thousand Oaks Coronita Ontario
Cantil Ridgecrest Coso Ridgecrest
Canyon Country Valencia Costa Mesa Huntington Beach
Canyon Lake Wildomar Coto de Caza Saddleback
Carbon Canyon North Orange Country Cotton Center San Joaquin Valley
Carbon Canyon Ontario Covina Covina
Carpinteria Santa Barbara Covina Monrovia
Carson Compton Cowan Heights Santa Ana
Casa Diablo Hot Springs Bishop Crest Park Arrowhead
Table 1–2: Service Center Planning Directory (Sheet 2 of 11)
City Service Center City Service Center
►SCE Public◄
PAGE
1–8
ESR–1 10-31-2025General Information
APPROVED
Crestline Arrowhead El Cerrito Ontario
Crestmore Foothill El Mirage Victorville
Crestview Bishop El Modena Santa Ana
Crowley Lake Bishop El Monte Montebello
Cucamonga Ontario El Porto South Bay
Cudahy Compton El Rio Ventura
Culver City Santa Monica El Segundo South Bay
Cuyama Valley Antelope Valley El Toro Saddleback
Cypress Fullerton Elizabeth Lake Ranch Club Antelope Valley
Daggett Barstow Ellwood Santa Barbara
Danby Yucca Valley Elsinore Wildomar
Death Valley Junction Ridgecrest Escondido Canyon Valencia
Deer Lodge Park Arrowhead Essex Yucca Valley
Del Rosa Redlands Etiwanda Foothill
Del Sur Antelope Valley Exeter San Joaquin Valley
Delano San Joaquin Valley Fallbrook Wildomar
Desert Center Blythe Fallsvale Redlands
Desert Hot Springs Palm Springs Farmersville San Jacinto Valley
Desert Lake Ridgecrest Fawnskin Victorville
Desert Springs Victorville Fenner Yucca Valley
Devore Foothill Fillmore Ventura
Diamond Bar Covina Firestone Park Compton
Dinkey Creek Shaver Lake Flintridge Monrovia
Dos Palmas Palm Springs Florence Compton
Downey Whittier Fontana Foothill
Doyle Springs San Joaquin Valley Forest Home Redlands
Duarte Monrovia Forest Park Valencia
Ducor San Joaquin Valley Fort Irwin Barstow
Dunmovin Ridgecrest Foster Park Ventura
Earlimart San Joaquin Valley Fountain Springs San Joaquin Valley
East Highlands Redlands Fountain Valley Huntington Beach
East Los Angeles Montebello Frazier Park Antelope Valley
East Pasadena Monrovia Fremont Valley Ridgecrest
East San Gabriel Montebello Fresno Shaver Lake
East Tustin Santa Ana Friendly Hills Whittier
East Whittier Whittier Friendly Valley Valencia
Eastvale Ontario Fullerton Fullerton
Eden Hot Springs Menifee Furnace Creek Ridgecrest
Edgemont Menifee Garden City Acres Ventura
Edwards Antelope Valley Garden Grove Santa Ana
Edwards Ridgecrest Gardena South Bay
Table 1–2: Service Center Planning Directory (Sheet 3 of 11)
PAGE
1–9
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
Garlock Ridgecrest Havasu Palms Blythe
Garnet Palm Springs Havilah Kernville
Gaviota Santa Barbara Hawaiian Gardens Long Beach
Giant Forest San Joaquin Valley Hawes Barstow
Gilman Hot Springs Menifee Hawthorne South Bay
Glen Avon Foothill Hector Barstow
Glen Helen Ranch Foothill Helendale Victorville
Glen Ivy Wildomar Hemet Menifee
Glendora Covina Hermosa Beach South Bay
Glenville Kernville Hesperia Victorville
Goffs Yucca Valley Hidden Hills Thousand Oaks
Golden Hills Antelope Valley Hidden Valley Antelope Valley
Goldstone Barstow Hidden Valley Thousand Oaks
Goleta Santa Barbara Highgrove Redlands
Goodhope San Jacinto Valley Highland Redlands
Gorman Antelope Valley Hinkley Barstow
Goshen San Joaquin Valley Hodge Barstow
Grand Terrace Redlands Hollydale Compton
Grandview Barstow Hollywood by the Sea Ventura
Grandview Palos Verdes South Bay Hollywood Riviera South Bay
Grangeville San Joaquin Valley Home Gardens Ontario
Granite Station Kernville Homeland Menifee
Grass Valley Arrowhead Homestead Area Antelope Valley
Green Acres Menifee Honby Valencia
Green Valley Antelope Valley Hope Ranch Santa Barbara
Green Valley Lake Arrowhead Horseshoe Bend Arrowhead
Greenhorn Kernville Hueneme Bay Ventura
Guasti Ontario Hungry Valley Antelope Valley
Guyama Thousand Oaks Huntington Beach Huntington Beach
Hacienda Heights Covina Huntington Harbour Huntington Beach
Hacienda Heights Whittier Huntington Lake Shaver Lake
Hammil Bishop Huntington Park Compton
Hanford San Joaquin Valley Idyllwild Menifee
Harbor City Compton Indian Hills Ontario
Harbor City South Bay Indian Wells Palms Springs
Harvard Barstow Industry Covina
Haskell Canyon Valencia Industry Montebello
Hasley Canyon Valencia Industry Whittier
Havasu Heights Blythe Inglewood South Bay
Havasu Lake Blythe Inyokern Kernville
Havasu Landing Blythe Inyokern Ridgecrest
Table 1–2: Service Center Planning Directory (Sheet 4 of 11)
►SCE Public◄
PAGE
1–10
ESR–1 10-31-2025General Information
APPROVED
Irvine Saddleback Lake Arrowhead Arrowhead
Irwindale Covina Lake Elizabeth Ranch Club Antelope Valley
Irwindale Monrovia Lake Elsinore Wildomar
Isla Vista Santa Barbara Lake Forest Saddleback
Ivanhoe San Joaquin Valley Lake Havasu Blythe
Ivanpah Barstow Lake Hughes Antelope Valley
Jack Ranch San Joaquin Valley Lake Isabella Kernville
Jasmine San Joaquin Valley Lake Lindero Thousand Oaks
Johannesburg Ridgecrest Lake Los Angeles Antelope Valley
Johnson Valley Yucca Valley Lake Mathews Menifee
Johnsondale Kernville Lake of the Woods Valencia
Joshua Tree Yucca Valley Lake Sherwood Thousand Oaks
June Lake Mammoth Lake Silverwood Arrowhead
Kagel Canyon Valencia Lake Tamarisk Blythe
Kaweah San Joaquin Valley Lakebrook Park Arrowhead
Keeler Bishop Lakeland Village Wildomar
Keen Camp Menifee Lakeshore Shaver Lake
Keene Antelope Valley Lakeview Menifee
Kelso Barstow Lakewood Long Beach
Kelso Yucca Valley Lancaster Antelope Valley
Kern River Kernville Landers Yucca Valley
Kernvale Kernville Larchmont Arrowhead
Kernville Kernville Las Posas Estate Ventura
Klondike Barstow Lawndale South Bay
Kramer Ridgecrest Lebec Antelope Valley
La Canada Monrovia Lee Vining Mammoth
La Conchita Ventura Leisure World Huntington Beach
La Crescenta Monrovia Leliter Ridgecrest
La Habra Whittier Lemon Cove San Joaquin Valley
La Habra Fullerton Lemon Heights Santa Ana
La Habra Heights Fullerton Lemoore San Joaquin Valley
La Mirada Whittier Lennox South Bay
La Mirada Fullerton Lenwood Barstow
La Palma Fullerton Leona Valley Antelope Valley
La Puente Covina Lido Isle Huntington Beach
La Sierra Ontario Limoneira Ventura
La Verne Covina Lindcove San Joaquin Valley
Ladera Heights South Bay Lindsay San Joaquin Valley
Laguna Beach Saddleback Linnell San Joaquin Valley
Laguna Hills Saddleback Little Lake Ridgecrest
Laguna Niguel Saddleback Little Tujunga Valencia
Table 1–2: Service Center Planning Directory (Sheet 5 of 11)
PAGE
1–11
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
Littlerock Antelope Valley Meadowbrook Arrowhead
Live Oaks Acres Ventura Meadowbrook Heights Menifee
Llano Antelope Valley Meiners Oaks Ventura
Menifee Menifee
Llano Victorville Mentone Redlands
Lockwood Valley Antelope Valley Mesa Verde Blythe
Loma Linda Redlands Mesquite Barstow
Lomita South Bay Midway Barstow
Lone Pine Bishop Midway City Huntington Beach
Long Beach Compton Mint Canyon Valencia
Long Beach Long Beach Mira Loma Foothill
Lopez Canyon Valencia Mira Monte Ventura
Los Alamitos Long Beach Miraleste South Bay
Los Angeles Compton Mission Viejo Saddleback
Los Angeles Santa Monica Modjeska Saddleback
Los Angeles South Bay Mojave Tehachapi
Los Cerritos Long Beach Mojave Ridgecrest
Los Nietos Whittier Monolith Antelope Valley
Los Serranos Ontario Monrovia Monrovia
Lucerne Valley Yucca Valley Montalvo Ventura
Lucerne Valley Victorville Montclair Ontario
Ludlow Barstow Monte Nido Thousand Oaks
Luring Pines Arrowhead Montebello Montebello
Lynn Ranch Thousand Oaks Montebello Compton
Lynwood Compton Montecito Santa Barbara
Lytle Creek Foothill Monterey Park Montebello
Malibu Beach Thousand Oaks Montrose Monrovia
Malibu Lake Thousand Oaks Moorpark Thousand Oaks
Malibu West Thousand Oaks Moorpark Ventura
Mammoth Lakes Mammoth Moorpark Home Acres Thousand Oaks
Mammoth Mountain Mammoth Moreno Menifee
Mandalay Bay Ventura Morningside Park South Bay
Manhattan Beach South Bay Morongo Indian Reservation Palm Springs
Manix Barstow Morongo Valley Yucca Valley
March Air Force Base Menifee Mount Baldy Foothill
Maricopa Ventura Montclair Foothill
Marina Del Rey Santa Monica Mount Wilson Monrovia
Maywood Compton Mountain Center Menifee
McFarland San Joaquin Valley Mountain Pass Barstow
McGee Creek Bishop Mountain Springs Yucca Valley
McMillan Manor Ventura Mupu Ventura
Table 1–2: Service Center Planning Directory (Sheet 6 of 11)
►SCE Public◄
PAGE
1–12
ESR–1 10-31-2025General Information
APPROVED
Mead Valley Menifee Muroc Ridgecrest
Murrieta Wildomar Oxnard Shores Ventura
Murrieta Hot Springs Wildomar Pacoima Canyon Valencia
Muscoy Redlands Pahrump Barstow
Naples Long Beach Painted Cave Santa Barbara
Narod Ontario Painted Hills Palm Springs
Needles Yucca Valley Palm Desert Palm Springs
Needles Landing Blythe Palm Desert Country Club Palm Springs
Neighbors Blythe Palm Springs Palm Springs
Newberry Springs Barstow Palm Springs Oasis Palm Springs
Newbury Park Thousand Oaks Palm Wells Yucca Valley
Newhall Valencia Palmdale Antelope Valley
Newport Beach Huntington Beach Palo Verde Blythe
Newport Coast Huntington Beach Palos Verdes Estates South Bay
Nipton Barstow Palos Verdes Pennisula South Bay
Norco Ontario Panorama Heights Kernville
North Edwards Ridgecrest Panorama Park Kernville
North Fork Saddle Valencia Paradise Camp Santa Barbara
North Long Beach Long Beach Paramount Compton
North Oaks Valencia Park El Moreno Menifee
North Palm Springs Palm Springs Parker Dam Blythe
North Ventura Ventura Pasadena Monrovia
Norton Air Force Base Redlands Patton Redlands
Norwalk Whittier Pearblossom Antelope Valley
Nuevo Menifee Pearsonville Ridgecrest
Nyeland Acres Ventura Pechanga Indian Reservation Wildomar
Oak Glen Redlands Pedley Foothill
Oak Hills Victorville Pelissier Village Whittier
Oak View Ventura Perris Ontario
Oakbrook Village Thousand Oaks Perris Menifee
Ocean Park Santa Monica Phelan Victorville
Ojai Ventura Pico Canyon Valencia
Olancha Ridgecrest Pico Rivera Whittier
Olive Santa Ana Pico Rivera Montebello
Ontario Ontario Pine Cove Menifee
Ontario Foothill Pine Flat San Joaquin Valley
Onyx Kernville Pine Mountain Club Valencia
Orange Santa Ana Pinon Hills Victorville
Orange Park Acres Santa Ana Pinon Pines Valencia
Oro Grande Victorville Pioneer Point Ridgecrest
Oxnard Ventura Pioneertown Yucca Valley
Table 1–2: Service Center Planning Directory (Sheet 7 of 11)
PAGE
1–13
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
Oxnard Beaches Ventura Piru Valencia
Pixley San Joaquin Valley Ridgecrest Ridgecrest
Placentia Fullerton Rimforest Arrowhead
Placerita Canyon Valencia Ripley Blythe
Plainview San Joaquin Valley Riverside Redlands
Plant 42 Antelope Valley Riverside Ontario
Point Mugu Ventura Riverside Menifee
Point of Rocks Ridgecrest Roads End Blythe
Pomona Covina Rolling Hills South Bay
Pomona Ontario Rolling Hills Estates South Bay
Pond San Joaquin Valley Romoland Menifee
Ponderosa San Joaquin Valley Rosamond Antelope Valley
Poplar San Joaquin Valley Rosemead Montebello
Poppet Flats Menifee Rossmoor Long Beach
Port Hueneme Ventura Rowco Arrowhead
Portal Heights Antelope Valley Rowland Heights Covina
Porterville San Joaquin Valley Rubidoux Foothill
Portugese Bend South Bay Running Springs Arrowhead
Posey Kernville Ryan Ridgecrest
Poso Park Kernville Sage Wildomar
Potrero Heights Montebello Saltdale Ridgecrest
Quail Valley Menifee Saltus Yucca Valley
Quartz Hill Antelope Valley San Bernardino Redlands
Rainbow Canyon Wildomar San Dimas Covina
Rancho California Wildomar San Dimas Canyon Covina
Rancho Cucamonga Foothill San Fernando Valencia
Rancho Cucamonga Ontario San Francisquito Canyon Valencia
Rancho Mirage Palm Springs San Gabriel Monrovia
Rancho Palos Verdes South Bay San Gabriel Montebello
Rancho Santa Margarita Saddleback San Jacinto Menifee
Rancho Sespe Ventura San Manuel Indian Reservation Redlands
Randsburg Ridgecrest San Marino Monrovia
Reche Canyon Redlands San Moritz Arrowhead
Red Hill Santa Ana San Pedro South Bay
Red Mountain Wildomar San Sevaine Peak Foothill
Red Mountain Ridgecrest Sand Canyon Valencia
Red Rover Canyon Valencia Santa Ana Santa Ana
Redlands Redlands Santa Ana Saddleback
Redondo Beach South Bay Santa Barbara Santa Barbara
Refugio Santa Barbara Santa Clarita Valencia
Rialto Foothill Santa Fe Springs Whittier
Table 1–2: Service Center Planning Directory (Sheet 8 of 11)
►SCE Public◄
PAGE
1–14
ESR–1 10-31-2025General Information
APPROVED
Richgrove San Joaquin Valley Santa Monica Santa Monica
Santa Paula Ventura South Pasadena Monrovia
Santa Rosa Valley Ventura South Whittier Whittier
Santa Susana Thousand Oaks Springville San Joaquin Valley
Saticoy Ventura Stallion Springs Antelope Valley
Saugus Valencia Stanton Fullerton
Scotland Foothill Stovepipe Wells Ridgecrest
Scotty’s Castle Ridgecrest Strathmore San Joaquin Valley
Seal Beach Huntington Beach Strawberry Flats Arrowhead
Seal Beach Long Beach Sugarload Kernville
Searles Ridgecrest Sulphur Mtn. Springs Ventura
Sedco Wildomar Summerland Santa Barbara
Seeley Flat Arrowhead Summit Arrowhead
Seminole Hot Springs Thousand Oaks Summit Victorville
Sequoia Crest San Joaquin Valley Summit Valley Victorville
Sequoia National Park San Joaquin Valley Sun City Menifee
Seven Oaks Redlands Sun Village Antelope Valley
Shaver Lake Shaver Lake Sungold Whittier
Shosone Barstow Sunland Monrovia
Siberia Barstow Sunny Slope Foothill
Sierra Madre Monrovia Sunnymead Menifee
Signal Hill Long Beach Sunnyslope Monrovia
Silver Strand Ventura Sunset Beach Huntington Beach
Silverado Saddleback Sunset Hills Thousand Oaks
Simi Valley Thousand Oaks Sunset Park Arrowhead
Sky Forest Arrowhead Surfside Huntington Beach
Skyland Arrowhead Susana Knolls Thousand Oaks
Sleepy Valley Valencia Switzerland Arrowhead
Smiley Park Arrowhead Tajiguas Santa Barbara
Snow Valley Arrowhead Tecopa Barstow
Snowcreek Palm Springs Tehachapi Tehachapi
South San Gabriel Montebello Temecula Wildomar
Soboba Hot Springs Menifee Temescal Canyon Menifee
Soledad Canyon Valencia Temple City Monrovia
Solemint Valencia Terminal Island Long Beach
Solromar Thousand Oaks Terra Bella San Joaquin Valley
Somis Thousand Oaks Teviston San Joaquin Valley
Somis Ventura Thousand Oaks Thousand Oaks
South El Monte Montebello Three Points Antelope Valley
South Gate Compton Three Rivers San Joaquin Valley
South Glen Avon Ontario Tick Canyon Valencia
Table 1–2: Service Center Planning Directory (Sheet 9 of 11)
PAGE
1–15
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
South Laguna Saddleback Tipton San Joaquin Valley
Toms Place Bishop Walnut Park Compton
Tonyvile San Joaquin Valley Walteria South Bay
Topanga Canyon Thousand Oaks Warm Springs Canyon Valencia
Torrance Compton Warner Tract Wildomar
Torrance South Bay Waterman Canyon Redlands
Trabuco Saddleback Waukena San Joaquin Valley
Trona Ridgecrest Weldon Kernville
Tulare San Joaquin Valley West Covina Covina
Tule Indian Reservation San Joaquin Valley West Hollywood Santa Monica
Tustin Santa Ana West Palm Springs Palm Springs
Twentynine Palms Yucca Valley West Riverside Ontario
Twin Lakes Thousand Oaks Westend Ridgecrest
Twin Lakes Bridgeport Bishop Westlake Village Thousand Oaks
Twin Lakes Mammoth Bishop Westminster Huntington Beach
Twin Peaks Arrowhead Wheelers Hot Springs Ventura
U.S. Marine Corps Barstow Whitewater Palm Springs
Universal City Valencia Whittier Montebello
Upland Ontario Whittier Whittier
Val Verde Menifee Whittier Fullerton
Val Verde Park Valencia Whittwood Whittier
Valencia Valencia Wildomar Wildomar
Valinda Covina Willow Springs Antelope Valley
Valle Vista Menifee Willowbrook Compton
Valley of Enchantment Arrowhead Wilmington South Bay
Valleyview Park Arrowhead Wilmington Long Beach
Valyermo Antelope Valley Winchester Menifee
Vasquez Canyon Valencia Windsor Hills South Bay
Venice Santa Monica Wofford Heights Kernville
Ventucopa Ventura Woodcrest Menifee
Ventura Santa Barbara Woodlake San Joaquin Valley
Ventura Ventura Woodland Hills Thousand Oaks
Verdemont Redlands Woodville San Joaquin Valley
Veterans Hospital Santa Monica Woody San Joaquin Valley
Victorville Victorville Wrightwood Victorville
View Park South Bay Yates Well Barstow
Villa Park Santa Ana Yermo Barstow
Virginia Colony Thousand Oaks Yettem San Joaquin Valley
Visalia San Joaquin Valley Yorba Linda Fullerton
Wagon Wheel Ventura Walnut Park Compton
Walker Basin Kernville Walteria South Bay
Table 1–2: Service Center Planning Directory (Sheet 10 of 11)
►SCE Public◄
PAGE
1–16
ESR–1 10-31-2025General Information
APPROVED
3.0 Energy Management Programs
Southern California Edison offers several energy management programs tailored to assist residential, commercial, industrial, and agricultural customers in minimizing energy costs. For specific information regarding these programs, please call (800) 990-7788 or (800) 655-4555.
Information is also available on our Web site: http://www.sce.com/.
3.1 Residential
Customer Assistance Programs: Edison’s Customer Assistance Programs (CAPs) are designed to help low-income customers conserve energy and control their electricity costs.
Renters and homeowners may qualify. To be eligible, Edison customers must meet specific income guidelines established by the CPUC. For more information, please call
(800) 736-4777.
3.2 Commercial/Industrial/Agricultural
New Construction: Edison’s New Construction program is targeted to builders, developers, contractors, engineers, and architects, and promotes the benefits of designing energy efficiency into projects. Incentives may be offered for energy-efficient space conditioning equipment, daylighting controls, building envelopes, and control systems which exceed state-mandated standards in California.
4.0 Dig Alert
State of California Government Code 4216 mandates that anyone doing excavation work shall call at least two working days prior to commencement of any excavation.1/ If you are performing this type of work in California or Nevada, please call Underground Service Alert at (811) or
(800) 227-2600.
5.0 Plug-In Electric Vehicles
Southern California Edison offers special electric rates and information to purchasers and operators of new Plug-In Electric Vehicles (PEVs). Electric Vehicles are defined as vehicles powered by electric motors which are licensed for street use. The purpose of this section is to assist SCE’s customers to understand the role and requirements regarding how residential and commercial customers can become PEV ready.
5.1 Customer’s Responsibility
Prior to discussing whether to elect an EV rate, customers will need to consult with a licensed electrician to determine whether their panel is appropriately sized to handle the increased load. The customer shall notify SCE of the increase of load. This is to allow the Company to assess its electrical infrastructure serving the location and determine if upgrades are necessary. It is the responsibility of the customer to ensure that the electrical
Walnut Covina Warm Springs Canyon Valencia
Yosemite Bishop Yucca Valley Yucca Valley
Yucaipa Redlands Zuma Beach Thousand Oaks
Yucca Valley Victorville
1/ This is to prevent damage to underground equipment.
Table 1–2: Service Center Planning Directory (Sheet 11 of 11)
PAGE
1–17
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
wiring and all required PEV equipment is installed according to the appropriate codes, regulations, SCE’s Electric Service Requirements and properly permitted by the local authority having jurisdiction.
5.2 Panel/Meter Options
If the customer elects to keep their existing Residential D rate, they may not need to replace their existing panel to charge their PEV at their residence. The customer will have two panel choices:
•1 Use their existing panel because adequate power capacity exists.
•2 Upgrade their panel to provide additional power capacity.
Customers should contact the local Service Planning Office for details, or contact SCE’s EV information hotline at (800) 366-7766 for assistance.
For information about the different rate choices, please access SCE’s website at http://www.sce.com/ and access the sections about rates in the SCE Tariff Books under Regulatory Information.
►SCE Public◄
PAGE
1–18
ESR–1 10-31-2025General Information
APPROVED
Below are two options for SCE overhead fed service panels. The appropriate option will depend on the customer’s panel choice.
Figure 1–1: Overhead Service
M M
Option 1 Option 2
Existing Home Panel
Residential
New Upgraded Home Panel
Existing Home kWh Meter
Existing Home kWh Meter
PAGE
1–19
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
Below are two options for SCE underground fed service panels. The appropriate option will depend on the customer’s panel choice.
Figure 1–2: Underground Service
M M
Option 1 Option 2
Existing Home Panel
Residential
New Upgraded Home Panel
Existing Home kWh Meter
Existing Home kWh Meter
UG Service Entrance UG Service Entrance
►SCE Public◄
PAGE
1–20
ESR–1 10-31-2025General Information
APPROVED
6.0 Voltage Standards
6.1 Standard Distribution Voltages
The Company will supply the following standard nominal distribution voltages to new service installations. New service installations that utilize delta-wye grounded transformers are required to bring the fourth wire to the service panel.
• Single Phase — 120 V; 120/240 V; 240 V; 240/480 V; and, depending on the location, 120/208 V; 2400 V; 12000 V; or 16500 V.
• Three Phase — 120/208 V; 240 V; 277/480-wye; 2400 V; 4160 V; and, depending on the location, 4800 V; 12000 V; 14400/24900 V; 13800 V; 16500 V; or 33000 V.
Exceptions:
A. 120/240 V four-wire delta will only be supplied under special conditions. Contact the Company local Service Planning Office for details.
B. Existing 480 V delta service installations contemplating an increase in load may continue to be served three-wire as long as the customer’s service equipment has sufficient capacity to carry the additional load. If the existing transformer bank must be changed to service the new load, the neutral shall not be grounded or run with the service. If the customer must change their service equipment, service shall be provided at 277/480 V, wye connection.
If an existing transformer bank has sufficient capacity and a new customer desires service, they may be provided a 480 V delta service.
6.2 Customer-Service Voltages
Under all normal load conditions, distribution circuits will be operated so as to maintain secondary service voltage levels at the service point within the voltage ranges specified in Table 1–3.
PAGE
1–21
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
6.3 Customer-Utilization Voltages
All customer-owned utilization equipment must be designed and rated in accordance with the utilization voltages specified by the American National Standard Institute (ANSI) C84.1, if customer equipment is to give fully satisfactory performance:
Minimum utilization voltages from ANSI C84.1 are shown for customer information only as the Company has no control over voltage drop in customer’s wiring.
7.0 Customer Transformation and Harmonic Interference
In order to prevent third harmonic interference, the following requirements will apply to the delivery of all (and only) three-phase high-, or low-voltage service to be transformed by the customer to different values.
Table 1–3: Customer-Service Voltages
Nominal Two-Wire and Multi-Wire Service Voltage
Minimum Voltages to All Services
Maximum Service Voltages on Residential and Commercial Distribution Circuits
Maximum Service Voltages on Agricultural and Industrial
Distribution Circuits
120 114 120 126
208 197 208 218
240 228 240 252
277 263 277 291
480 456 480 504
Note(s):
1. Exceptions to Voltage Limits. Voltage may be outside the limits specified when the variations are any of the following:
• Result from the temporary action of the elements.
• Are infrequent momentary fluctuations of a short duration.
• Result from service interruptions.
• Result from temporary separation of parts of the system from the main system.
• Are from causes beyond the control of the Company.
Table 1–4: Customer Utilization Voltages
Nominal Utilization Voltage
Minimum Utilization Voltage
Maximum Utilization Voltage
120 110 125
208 191 216
240 220 250
277 254 289
480 440 500
►SCE Public◄
PAGE
1–22
ESR–1 10-31-2025General Information
APPROVED
7.1 High-Voltage Service
Where the customer desires to take three-phase, high-voltage service delivery and transform the service delivery voltage to 120/208 V (wye) or 277/480 V (wye), or to install any other transformation that involves the use of a wye connection to supply the desired utilization voltage, the Company will supply, at its option, either 4,160 V; 4800 V; 7200 V;
12000 V; 16500 V; or 33000 V.
Where service to the customer is delivered directly from the Company’s 2400 V; 4160 V;
4800 V; 7200 V; 12000 V; 16500 V; or 33000 V circuits, single-phase or three-phase transformers having the same primary voltage rating as the service delivery voltage, with their primary windings connected in delta, are acceptable. In the event that the Company converts its primary distribution system from 2.4 kV delta to 4.16 kV (wye), the Company will supply the material and labor to convert an existing transformer installation to comply with this requirement.
Where service is delivered to the customer from the Company’s bank of delta-wye, wye-delta, or delta-delta connected transformers, located on the customer’s premises, the Company has no requirements for wye or delta connection of transformers installed by the customer.
7.2 Low-Voltage Service
Where three-phase service is delivered to the customer at 240 V and the customer desires to transform to a different voltage, the customer may only connect a delta primary transformer to the Company service.
Where an established three-phase, 480 V combination light-and-power service is delivered to the customer, the customer may establish a three-phase, four-wire, 277/480 V grounded neutral system on the load side of their main disconnect. An artificial neutral would be derived from an approved single winding type grounding transformer furnished and installed by the customer. This arrangement will be acceptable to the Company only in cases where the Company’s transformers are located on the customer’s premises and supply one service at three-phase, three-wire, 480 V exclusively.
8.0 Agricultural Power Service — Three-Phase, 240 V and 277/480 V
Three-phase, 240 V and 277/480 V agricultural service will be supplied by the normal method whereby the customer supplies complete service facilities. Exception: Agricultural customers relocating serviceable three-phase, 480 V, three-wire service equipment, may be provided a three-wire service.
8.1 100 A Service
Where the nameplate horsepower rating of any motor does not exceed 30 hp, 240 V or 60 hp, 277/480 V, a factory-bussed safety-socket box with a 100 A rating shall be installed.
The meter socket for 240 V service will be 5- or 7-clip, depending on the grounding of the serving transformer bank. The meter socket for 277/480 V service will be 7 clip. Consult your local Service Planning Office before purchasing or installing service equipment.
The maximum wire size or current-carrying capacity of the conductors installed in the customer’s service raceway shall not exceed that of No. 1 wire, and the conduit size of such raceway shall not exceed 1-1/2 inches. The capacity of the customer’s service switch is not limited under these conditions.
PAGE
1–23
ESR–1
EFFECTIVE DATE
10-31-2025 General Information
APPROVED
The total actual continuous operating load current, excluding motor starting current, shall not exceed 80 A.
8.2 200 A Service
Where the nameplate horsepower rating of any motor does not exceed 60 hp, 240 V or 125 hp, 277/480 V, a factory-bussed, safety-socket box with a 200 A rating shall be installed.
The meter socket for 240 V service will be 5- or 7-clip, depending on the grounding of the serving transformer bank. The meter socket for 277/480 V service will be 7 clip. Consult your local Service Planning Office before purchasing or installing service equipment.
The maximum wire size or current-carrying capacity of the conductors installed in the customer’s service raceway shall not exceed that of No. 3/0 wire and the conduit size of any such raceway shall not exceed two inches. The capacity of the customer’s service switch is not limited under these conditions.
The total actual continuous operating load current, excluding motor-starting current, shall not exceed 160 A.
8.3 Above 200 A Service
If the total actual operating load current, excluding motor-starting current, for any reason exceeds 160 A, either at the time of installation or thereafter, the customer shall at such times have complete facilities installed (at their expense) consisting of an approved instrument transformer box or an approved switchboard. See ESR–5 and ESR–6.
9.0 Overhead Service
9.1 To Customer’s Service and Meter Pole
See ESR–2.
9.2 To Customer’s Building or Structure
The Company will install overhead service drops to a building or structure adequate to support the service and meter equipment. This type of service will not be rendered to wind machine towers or columns, or similar equipment subject to excessive vibration. For these types of installations, the meter box shall be installed on a separate vibration-free structure.
The service conduit, if attached to the structure, shall descend into the concrete base and rise up into the meter structure. See ESR–2 for additional Overhead Service Information.
10.0 Underground Service
10.1 To Customer’s Service and Meter Post
See ESR–3.
10.2 To Customer’s Building or Structure
See ESR–3.
►SCE Public◄
PAGE
1–24
ESR–1 10-31-2025General Information
APPROVED
11.0 Service or Meter Switch — General Requirements
A disconnecting means with overcurrent protection is required at the meter location. In some cases, it is a single switch or circuit breaker. In other cases, where permitted by the Company and by inspection authorities, it may be a group of switches or circuit breakers, per National Electrical Code (NEC) 230–71.
A service or meter switch, as defined above, shall be furnished and installed by the customer in every service proposed to be supplied with electric energy from the Company’s system as specified in these requirements.
12.0 Customer Generators
Customer generators shall not be switched or operated in parallel with the SCE system without Company approval. Paralleling shall be in accordance with requirements of the applicable tariff schedules or special parallel generation agreements. Customers and consultants should contact the local SCE Service Planning Office for details.
When a customer has a standby generator to supply all of their load during an SCE system outage, the generator shall be connected to the load by a double-throw switch or automatic relays and switches which will isolate the load from the SCE system before the generator is connected to the load. When the SCE service is re-energized, the generator will then be isolated from the load before the load is reconnected to the SCE system.
RULE 21 NET GENERATION OUTPUT METERING
Rule 21 output metering is required for most customer-generator installations where the generator is installed and intended to operate in parallel with the SCE Distribution System for extended periods of time. Net Generation Output (NGO) metering is required to provide revenue-grade metering data for “non-bypassable charges” to the various categories of customers who serve all or a portion of their electrical energy needs from a source other than SCE. Net Generation Output metering shall be located in a customer’s circuitry at a location that will facilitate measuring “net” generator output. Customer load circuits cannot be connected between the generator and the NGO metering. Generator auxiliary loads (loads necessary for generator operation only) can be connected between the generator and the NGO metering. Net Generation Output metering may also be used by SCE for the other reasons permitted under Rule 21.f. Net Generation Output metering panels, metering switchboards, and medium-voltage metering sections shall be fabricated in a manner as specified in SCE’s Electrical Service Requirements. Net Generation Output Metering supplied by SCE shall be revenue grade and installed in equipment fabricated to the specific requirements found within this manual.
Written requests for information about Rule 21 may be mailed to SCE at the following address:
Southern California Edison Company Attention: Distributed Generation Administrator 2244 Walnut Grove…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .