4. Price Breakdown Worksheet.docx

DOCX document 35 KB Posted

Attached to
Z2DA--Repair Exterior Finishes, Building 1 and OPC |570-21-108 | Fresno VA
Solicitation number
36C26126R0034
Issued by

About this file

This is a Cost/Price Breakdown Worksheet for Solicitation No. 36C26126R0034, a repair and renovation project at the Fresno VA Medical Center. The worksheet is a blank template designed for contractors to submit detailed pricing across multiple construction divisions and cost categories including Material, Labor, Equipment, and Other costs.

The worksheet organizes pricing by construction division codes following standard industry classification, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Furnishings, Special Construction, Plumbing, HVAC, Electrical, and Electronic Safety and Security. Contractors must provide line-item costs for each division and aggregate subtotals. The summary section requires contractors to calculate totals for Material, Labor, Equipment, and Other costs, then add Overhead, Profit, and Bonds and Insurance to arrive at the Total Proposal Base Offer for Scopes 1-5. Additionally, the worksheet includes separate line items for three add alternates: Alternate 1 (OPC Ballast Roof Replacement), Alternate 2 (Building 1 West Wing Roof Replacement), and Alternate 3 (Bridge Roof & Chapel Roof Replacement). Any additional costs must be specified separately in the breakdown section.

View the file

Other files

File Type Posted
36C26126R0034 0004.docx DOCX document
DBA WD CA20260018 dated 5_18_2026.pdf PDF
36C26126R0034 0003.docx DOCX document
VA Fresno ACM Survey.pdf PDF
RFI Responses Repair Ext. Finishes FRE.pdf PDF
36C26126R0034 0002.docx DOCX document
36C26126R0034 0001.docx DOCX document
Site Visit Sign-in 570-21-108_.pdf PDF
6. DBA WD CA20260018 dtd 1 30 2026.pdf PDF
5. Pre-Proposal Site Visit Information.pptx PPTX presentation
36C26126R0034_2.docx DOCX document
1. 570-21-108 Specifications.pdf PDF
2. 570-21-108_VA Fresno Exterior Drawings.pdf PDF
7. Factor 2 Past Performance Questionnaire.docx DOCX document
3. Requests for Information RFI_ Form.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26126R0034 Attachment – Cost/Price Breakdown Worksheet

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 - General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 03 - Concrete
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 04- Masonry
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07- Metals
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 06- Wood, Plastics and Composites
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07- Thermal and Moisture Protection
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 08- Openings
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 09- Finishes
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 12- Furnishings
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
Division Total
$
$
$
$
$
Division 13- Special Construction
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
Division Total
$
$
$
$
$
Division 22- Plumbing
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 23- Heating, Ventilating, and Air conditioning (HVAC)
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 26- Electrical
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 28- Electronic Safety and Security
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Other Costs (If applicable)
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Other Total
$
$
$
$
$
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
Total Proposal Base Offer (Scopes 1 thru 5 only) =
$
$
$
$
$
Added Alternate 1, Scope 6 (OPC Ballast Roof Replacement) included =
$
$
$
$
$

Added Alternate 2, Scope 7 (Building 1 West Wing Roof Replacement,) included =

$
$
$
$
$
Added Alternate 3, Scope 7, (Bridge Roof & Chapel Roof Replacement) Included =
$
$
$
$
$

*NOTE: All other costs may be included as a separate item and must be specified in this breakdown.