This document contains drawings and specifications for a federal contract opportunity related to the replacement of failed retaining walls at two locations on the Los Padres National Forest.
The key details are:
- The project consists of the removal and replacement of failed retaining walls at one site on National Forest System Road 19S09 (Arroyo Seco) and one site on National Forest System Road 15N15 (Romero Camuesa), both on the Los Padres National Forest.
- The required work includes the removal of a failed block wall on 19S09 and a failed crib wall on 15N15, structural excavation, the installation of Class 4 rip-rap with rockfall netting, the installation of 975 square feet of new mechanically stabilized earth wall with geocomposite sheet drainage, roadway reconditioning, and installation of carsonite delineators.
- A site visit will be held on April 15-16, 2024. Contractors will meet at the San Marcos fire station on April 15 and the Arroyo Seco campground on April 16.
- The solicitation number is 12970224R0015 and the opportunity type is a solicitation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
ARROYO SECO PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
LOS PADRES NF RETAINING WALL PROJECTS
FROM THE KING CITY DISTRICT OFFICE, TURN LEFT ONTO REICH ST AND TRAVEL SOUTHWEST ON
REICH ST FOR 350 FEET, TURN LEFT ON CANAL ST AND TRAVEL FOR 0.2 MILES. MERGE ONTO US HWY
101 N AND STAY ON HW1 101 N FOR 4.1 MILES. TURN LEFT ONTO CENTRAL AVE AND IN 7.2 MILES TURN
LEFT ONTO ELM AVE. STAY ON ELM AVE FOR 4 MILES. TAKE SLIGHT LEFT ON ARROYO SECO ROAD
AND WILL ARRIVE AT DESTINATION IN 11 MILES. LAT/LONG: 36.234702/-121.490559
KING CITY
RANGER STATION
406 S. MILDRED ST.
KING CITY, CA 93930
ARROYO SECO (19S09) AND
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF
ENGINEERING
DATE
FOREST SUPERVISOR DATE
RO GEOTECHNICAL PROGRAM MANAGER DATE
3/3 0/2
2 1 0:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\20
_C
OV
ER
SH
EE
T_
US
FS
_S
TD
_C
TB
_L P_
W
AL
LS
.D
W G;
CALIFORNIA
MONTEREY AND SANTA BARBARA COUNTIES
(R05) PACIFIC SOUTHWEST REGION
LOS PADRES NATIONAL FOREST
MONTEREY AND SANTA BARBARA RANGER DISTRICTS
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVERSHEET
G-02 GENERAL NOTES AND SCHEDULE OF ITEMS
C-01 ARROYO SECO SITE OVERVIEW & EXISTING CONDITIONS
C-02 ARROYO SECO PROPOSED CONDITIONS - PLAN AND PROFILE
C-03
ARROYO SECO PROPOSED CONDITIONS - SECTION VIEWS STA 1+43
TO 1+97
C-04
ARROYO SECO PROPOSED CONDITIONS - SECTION VIEWS STA 2+13
TO 2+43
C-05 ROMERO CAMUESA SITE OVERVIEW & EXISTING CONDITIONS
C-06 ROMERO CAMUESA PROPOSED CONDITIONS - PLAN AND PROFILE
C-07
ROMERO CAMUESA PROPOSED CONDITIONS - SECTION VIEWS STA
0+10 TO 1+10
C-08
ROMERO CAMUESA PROPOSED CONDITIONS - SECTION VIEWS STA
1+35 TO 2+00
C-09
ROMERO CAMUESA PROPOSED CONDITIONS - SECTION VIEWS STA
2+50 TO 3+00
C-10 DRAINAGE DETAILS
C-11 MSE WALL DETAILS
C-12 MSE WALL INSTALLATION
C-13 ROCK BUTTRESS DETAILS
TRAVEL DIRECTIONS:
FROM MONTECITO, TAKE CA STATE HWY 192 WESTBOUND AND THEN TURN RIGHT ON EL CIELITO
ROAD. AFTER A HALF MILE TURN RIGHT ONTO NATIONAL FOREST SYSTEM ROAD 5N40/GIBRALTER
ROAD. STAY ON THIS FOR 6.25 MILES AND THEN TURN RIGHT ON EAST CAMINO CIELO. EAST CAMINO
CIELO TURNS INTO ROMERO CANYON ROAD AT 6.7 MILES. ROAD TURNS LEFT AND BECOMES ROMERO
CAMUESA ROAD AND YOU WILL ARRIVE AT SITE IN LESS THAN HALF A MILE. LAT/LONG:
34.478897/-119.590439
MONTECITO, CA
ROMERO CAMUESA
RD SITE
ROMERO CAMUESA (15N15) ROADS
ROMERO CAMUESA PROJECT LOCATION MAP
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/4 /22
:0
3 C
HU
DL
UN
DG
RE
EN
C
:\D
AT
A\
LP
_W
AL
LS
\G
EN
ER
AL
_N
OT
ES
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY AND SANTA BARBARA
RANGER DISTRICS
GENERAL NOTES AND
SCHEDULE OF ITEMS
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
G-02 002 015
1. SPECIFICATIONS: ALL WORK SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF
ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14 [U.S. CUSTOMARY UNITS]) WITH AMENDMENTS IN
THE APPLICABLE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS).
·1. THE PARENT SPECIFICATION CAN BE DOWNLOADED FROM https://highways.dot.gov/federal-lands/specs
·2. THE FSSS ARE CONTAINED IN A SEPARATE DOCUMENT.
2. LOCATIONS:
·1. ARROYO SECO ROAD - MONTEREY RANGER DISTRICT (IN KING CITY, CA)
·2. ROMERO CAMUESA ROAD - SANTA BARBARA RANGER DISTRICT (IN SANTA BARBARA, CA)
3. WORK: THE CONTRACTOR IS REQUIRED TO FURNISH ALL MATERIALS AND LABOR TO COMPLETE THE WORK AS
DETAILED IN THE SCHEDULE OF ITEMS INCLUDING:
·1. PROVIDE A SOIL EROSION CONTROL PLAN (PER SECTION 157)
·2. REMOVE THE EXISTING RETAINING STRUCTURES (SECTION 203)
·3. CONSTRUCT NEW MECHANICALLY STABILIZED EARTH RETAINING WALL AS SHOWN HEREIN (SECTION 255)
·4. CONSTRUCT NEW ROCK BUTTRESS IN FRONT OF EXISTING CRIB WALL AS SHOWN HEREIN (SECTION 252)
·5. INSTALL DOUBLE-SIDED GEOCOMPOSITE UNDERDRAIN SYSTEM (SECTION 605)
·6. PLACING AGGREGATE SURFACING ON ROAD WHEN RETAINING STRUCTURES ARE COMPLETED (SECTION
302)
·7. SEEDING (SECTION 625) ON ALL DISTURBED NATIVE GROUND AT END OF WORK
·8. INSTALL EROSION CONTROL BLANKETS (SECTION 629) ON ALL DISTURBED NATIVE GROUND AT END OF
WORK.
·9. INSTALL TRAFFIC DELINEATORS (10' O.C.)
4. SURVEYS:
·1. SITE SURVEYS WERE CONDUCTED IN MARCH 2021.
·2. A LOCAL COORDINATE SYSTEM WAS USED FOR EACH SITE WITH AN ASSUMED NORTH DIRECTION. (PLEASE
SEE THE NOTES FOR EACH SITE FOR MORE DETAILS.)
·3. DUE TO DIFFICULT SITE ACCESS AND STEEP TERRAIN, AREAS AROUND THE FAILURE WERE INTERPOLATED
(PLEASE SEE THE NOTES FOR EACH SITE FOR MORE DETAILS).
5. SITE CONDITIONS:
·1. BOTH SITES ARE IN VERY STEEP TERRAIN WITH LOOSE SOIL ON THE FILL SLOPE SIDE OF THE ROAD.
·2. BOTH SITES ARE BEHIND LOCKED GATES, COORDINATE ACCESS WITH CO.
·3. CUT SLOPE ON EITHER SITE MAY NEED TO BE STABILIZED AFTER EXCAVATION, PENDING CONTRACTOR'S
DETERMINATION. CONTRACTOR IS RESPONSIBLE FOR THIS DETERMINATION AND ANY MEASURES TAKEN.
THIS SHALL BE INCIDENTAL TO ITEM 255 WITH NO ADDITIONAL COMPENSATION FOR CUT SLOPE
STABILIZATION.
6. CLEARING LIMITS: 10 FEET BEYOND EDGE OF IMPROVEMENTS AND NEW CONTOURS.
7. UTILITIES: NO KNOWN UTILITIES AT THESE SITES
8. GEOTECHNICAL:
·1. ONLY HAND TOOL INVESTIGATIONS WERE PERFORMED. THE SITE SOILS FOR EACH ARE HIGHLY
DECOMPOSED GRANITIC MATERIALS. BEDROCK IS NOT ANTICIPATED WITHIN THE WORK AREA, HOWEVER, BEDROCK IS LIKELY DECOMPOSED AND SHOULD BE ABLE TO BE MECHANICALLY BROKEN UP WITH
EQUIPMENT.
·2. FOUNDATIONS MUST BE APPROVED BY CONTRACTING OFFICER PRIOR TO PLACEMENT OF RETAINING
STRUCTURES.
9. MATERIAL SOURCES: NO GOVERNMENT MATERIAL SOURCES ARE DESIGNATED FOR THIS CONTRACT.
CONTRACTOR WILL NEED TO PROCURE ALL MATERIALS FROM COMMERCIAL OR OTHER SOURCES.
·1. THE ONLY EXCEPTION IS SUITABLE IN-PLACE EXISTING FILL WHICH MAY BE USED IF IT MEETS THE
SPECIFICATIONS.
10. DISPOSAL: ALL MATERIAL DESIGNATED FOR REMOVAL BECOME THE PROPERTY OF THE CONTRACTOR AND ARE
TO BE DISPOSED OF BY REMOVING FROM SITE IN AN ENVIRONMENTALLY SAFE MANNER IN ACCORDANCE WITH
ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS. NO DESIGNATED GOVERNMENT WASTE SITE IS PROVIDED
FOR THIS CONTRACT.
11. SOIL EROSION AND POLLUTION CONTROL PLAN: CONTRACTOR SHALL SUBMIT A SOIL EROSION AND SEDIMENT
CONTROL PLAN TO CO FOR APPROVAL WITHIN THE TIMELINES DELINEATED IN THE SPECIFICATIONS PRIOR TO
THE BEGINNING OF WORK. (SEE SECTION 157)
12. NOXIOUS WEED CONTROL: ALL CONSTRUCTION EQUIPMENT SHALL BE CLEANED AND POWER WASHED AND
FREE OF DIRT & DEBRIS PRIOR TO ENTRY NATIONAL FOREST LANDS. CO MAY REQUIRE INSPECTION.
13. CONTRACTOR QUALITY CONTROL: SECTION 106
·1. CONTRACTOR SHALL BE REQUIRED TO PROVIDE A QUALITY CONTROL SYSTEM THAT WILL ENSURE THE
CONSTRUCTION UNDER THIS CONTRACT CONFORMS TO THE CONTRACT REQUIREMENTS.
·2. CONTRACTOR SHALL USE AN AASHTO ACCREDITED CONSTRUCTION MATERIALS TESTING LABORATORY
UNDER THIS CONTRACT.
·3. INCIDENTAL TO ITEM 154
14. METHOD OF MEASUREMENT, ACCEPTANCE, BASIS OF PAYMENT: MEASUREMENT AND PAYMENT SHALL BE
PERFORMED ACCORDING TO THE SCHEDULE OF ITEMS CONTAINED HEREIN. (SEE SECTION 106)
GENERAL NOTES: SCHEDULE OF ITEMS
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
ROCK WALL
FAILED BLOCK WALL
EDGE OF ROAD
FILL FAILURE
NATURAL GROUND
SHOULDER
NATURAL GROUND
SHOULDER
WOOD POSTS
NFSR 19S09.3
SLUMP
INTERPOLATED SURVEY AREAS
EXISTING NATIVE
SURFACED ROAD
TYP. 11 FEET WIDE
TO GREENFIELD
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 1/2
2 0 9:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\A
RR
OY
O_
SE
CO
\E
XI
ST
IN
G\
EX
IS
TI
NG
.D
W G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY RANGER DISTRICT
ARROYO SECO SITE
OVERVIEW & EXISTING
CONDITIONS
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-01 003 015
ASSUMED
Feet
0 30 60
ARROYO SECO NOTES:
GENERAL
· THE ARROYO SECO SITE HAS A FAILED BLOCK WALL AND
A ROCK WALL.
· A SITE SURVEY WAS DONE IN MARCH 2021 USING A
LOCAL COORDINATE SYSTEM AND ASSUMED NORTH
DIRECTION, NORTHING, AND EASTING COORDINATES.
· DUE TO STEEPNESS OF THE SITE, SOME OF THE SURVEY
WAS INTERPOLATED AS DESIGNATED ABOVE. IT IS
ASSUMED THE TOPOGRAPHY OUTSIDE OF THE FAILURE
ZONE IS GENERALLY CONSISTENT.
· THE GOOGLE EARTH IMAGERY UNDERLAIN THE
TOPOGRAPHIC SURFACE IS AN APPROXIMATE FIT.
· THE CONTRACTOR SHALL REMOVE ALL EXISTING BLOCK
AND ROCK WALL MATERIALS, INCIDENTAL TO ITEM 203.
·· AFTER REMOVAL OF EXISTING WALLS, STAKE NEW
WALLS FOR CO APPROVAL.
·· REMOVAL OF EXISTING POSTS DIRECTLY IN THE
CONSTRUCTION AREA ARE PERMITTED.
CP 202, 207 PLACED OUTSIDE
OF EXTENTS OF TOPO SURFACE
CP 201, 204 PLACED OUTSIDE
OF EXTENTS OF TOPO SURFACE
MATERIALS
· THE RETAINING WALL IS DESIGNED AS A WELDED WIRE
MESH MECHANICALLY STABILIZED EARTH (MSE) WALL.
· RETAINING WALL SHALL BE CONSTRUCTED IN
ACCORDANCE WITH SECTION 255 AND APPLICABLE FP-14
AND FSSS REFERENCES.
· DESIGN WAS BASED ON THE USE OF HILFIKER(R)
WELDED WIRE WALL MATERIALS. CONTRACTOR SHALL
USE HILFIKER MSE AND THE CALLED OUT MATERIALS OR
EQUAL. CONTRACTOR MAY ELECT FOR ALTERNATIVE
RETAINING WALL SYSTEMS PENDING APPROVAL BY THE
CO.
· USE MANUFACTURER'S INSTALLATION INSTRUCTIONS
AND RECOMMENDATIONS.
· CONTRACTOR MAY ELECT TO HAVE MANUFACTURER
FIELD REPRESENTATIVES ON SITE DURING INITIAL
CONSTRUCTION BUT IS NOT REQUIRED TO.
· THE FOLLOWING MINIMUM WIRE SIZES SHALL BE USED:
·· W9.5 (DIA: 0.348 IN) X 8" (PERPEDICULAR TO WALL
FACE)
·· W9.5 X 21" TRANSVERSE WIRES (PARALLEL TO WALL
FACE)
·· REINFORCING STEEL YIELD STRENGTH = 65 KSI
·· HOT DIP GALVANIZE (MIN 2.0 OZ PER SQ SF) ALL
REINFORCING STEEL AND BACKING MATS IN
ACCORDANCE WITH AASHTO M111 OR ASTM A123.
· MSE WALL SHALL HAVE CARSONITE TRAFFIC
DELINEATORS INSTALLED 9 FEET ON CENTER, AT THE
ROAD FILL SIDE. SHALL BE INCIDENTAL TO ITEM 633.
· A DOUBLE-SIDED GEOCOMPOSITE DRAIN AND HDPE
(ALTERNATIVE MATERIALS MAY BE SUBMITTED FOR
REVIEW AND CONSIDERATION) SHALL BE USED FOR
SUBSURFACE DRAINAGE.
EARTHWORK
· FILL: ALL FILL MATERIALS IN THE RETAINING WALL SHALL
MEET THE REQUIREMENTS IN SUBSECTION 704.08 (SEE
WALL DETAILS). IF ON-SITE MATERIAL MEETS
SPECIFICATIONS, IT MAY BE USED IF IT IS LOCATED WITHIN
THE FAILED ROAD PRISM SECTION. NO OTHER GROUND
MAY BE DISTURBED OR USED AS A BORROW SOURCE.
· WASTE: ANY IN-PLACE EXISTING FILL THAT IS UNSUITABLE
OR NOT IN CONFORMANCE WITH THE SPECIFICATIONS,
DEBRIS, BOULDERS, LOGS, ETC SHALL BE CONSIDERED
WASTE.
· FOUNDATION APPROVAL: PRIOR TO WALL PLACEMENT,
FOUNDATION SHALL BE APPROVED BY THE CO. IF
FOUNDATION IS SOFT, WET, PUMPING WATER, OR ANY
OTHER ADVERSE CONDITION, NOTIFY THE CO
IMMEDIATELY.
· ENDS OF WALL MUST BE KEYED INTO UNDISTURBED
GROUND. CONTRACTOR SHALL TAKE CARE TO NOT
OVER-EXCAVATE AROUND THE SIDES AND FOUNDATION OF
THE WALL. IF OVER-EXCAVATION OCCURS SUCH THAT THE
WALL MUST BE LENGTHENED OR HEIGHT INCREASED,
CONTRACTOR SHALL DO THIS WORK AT NO COST TO THE
GOVERNMENT, SUBJECT TO APPROVAL BY THE CO.
POINT TABLE
POINT #
NORTHING
20000.00
20000.00
20042.74
20028.23
20090.08
20042.17
20052.09
EASTING
20000.00
20467.97
20245.40
19921.52
20156.27
20279.24
20719.78
ELEVATION
2000.00
2016.74
2009.49
1996.40
2005.69
2008.88
2023.44
DESCRIPTION
CP TKD 1X2 FEATHER
CP TKD 1X2 FEATHER
CP TKD 1X2 FEATHER
CP TKD 1X2 FEATHER
CP TKD 1X2 FEATHER
TACKED 1X2 W FEATHER
TACKED 1X2 W FEATHER
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
ENDS OF WALL SHALL
BE BURIED WITH ON-SITE
MATERIAL THIS MAY REQUIRE
FILL AND/OR RECONTOURING.
OUTLINE OF MSE WALL
REINFORCEMENT MATS, TYP
5% SLOPE
NEW CENTERLINE
FACE OF MSE WALL
END AGGREGATE
SURFACING AT STA 2+43
AND COMPLETE TRANSITION
BACK TO EXISTING ROAD SECTION
START AGGREGATE
SURFACING AT STA 1+43
AND BEGIN TRANSITION
TO 4% INSLOPE
NATURAL GROUND SHOULDER
OUTLINE OF TOP OF
GEOCOMPOSITE DRAIN
CARSONITE MARKER
TRAFFIC DELINEATORS
AT 10' O.C.
4% ROAD
CROSS-SLOPE
L
Δ
R
L: 19.5
Δ: 14.9
R: 7 5.25
L
Δ
P
C
P
T
P
P T
P C
P
T
CREATE BENCH
IN FRONT OF WALL
5 FEET MINIMUM
IN CENTER
E L E
V A
T I O
N
F
E E
T
E L E
V A
T I O
N
F
E E
T
STATION (FEET)
WALL ALIGNMENT (AS) PROFILE
1+40 1+50 2+00 2+45
STA 1+73.00
ELEV 2006.97
M
A T
S
M
A T
S
BURY ENDS OF WALL
1:1 MAX SLOPE
BURY ENDS OF WALL
1:1 MAX SLOPE
BURY/EMBED BOTTOM
OF WALL 4 MAT LIFTS (8 FEET)
EXISTING GROUND
PROFILE IN FRONT
OF NEW MSE
RETAINING WALL
DESIGN ROAD PROFILE
TOP OF AGGREGATE SURFACING:
AGGREGATE SURFACING
SHALL BE PLACED LEVEL
WITH EXISTING SUBGRADE
EXISTING ROAD PROFILE
8 INCH SOLID PIPE
OUTLET DRAIN
8.0'
5.0'
STA 1+80.53
ELEV 1988.25
STA 1+72.26
ELEV 1992.00
STA 1+98.03
ELEV 1992.54
STA 2+13.00
ELEV 2007.96
STA 1+73.00
ELEV 1992.97
STA 2+13.00
ELEV 1993.96
BEGIN 6 INCH THICK
AGGREGATE SURFACING
STA 1+43.00
ELEV 2008.91
END 6 INCH THICK
AGGREGATE SURFACING
STA 2+43.00
ELEV 2011.39
2.4%
DESIGN ROAD PROFILE
TOP OF SUBGRADE:
SUBGRADE SHALL BE CUT IN
6 INCHES BELOW
FINISHED GRADE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 1/2
2 0 9:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\A
RR
OY
O_
SE
CO
\D
ES
IG
N\
MS
E_
PP
2.D
W G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY RANGER DISTRICT
ARROYO SECO
PROPOSED CONDITIONS
- PLAN AND PROFILE
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-02 004 015
Feet
0 10 20
ASSUMED
LAYOUT POINT TABLE
POINT #
DESCRIPTION
Aggregate Start
Alignment Wall Start
1+73 Wall Corner
2+13 Wall Corner
Alignment Wall End
Aggregate End
STA 1+25
STA 2+58
NORTHING
20057.87
20046.56
20034.24
20030.52
20042.86
20045.67
20070.63
20048.11
EASTING
20242.22
20269.18
20268.03
20308.08
20309.00
20338.78
20229.54
20353.27
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+43.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+55.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+65.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+73.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+81.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+97.00
0 10 20 30 40 500-10-20-30
BEGIN 6"
AGGREGATE SURFACING
MATCH EXISTING SLOPE
AND WIDTH AND
BEGIN TRANSITION TO
DESIGN 4% INSLOPE AND
12' ROAD WIDTH
LEAVE EXISTING CUT
SLOPES UNDISTURBED
2.5% (MATCH EXISTING)
9.8' (M
ATCH E
XIS
TIN
G W
ID
TH)
3.5% (CONTINUE TRANSITION TO DESIGN 4%)
11.6' (C
ONTIN
UE TO M
ATCH EXISTIN
G)
13.6' (C
ONTIN
UE T
O M
ATCH E
XIS
TIN
G
CURVE W
ID
ENIN
G)
EXISTING GROUND
PROPOSED FINISHED
GROUND
4% (DESIGN INSLOPE)
12.0'
BEGIN MSE WALL
(7 MAT LIFTS)
FINISHED GROUND
ENDS OF WALL MUST
BE BURIED
MAX SLOPE 1:1
EXISTING GROUND
4%
BEGIN MSE WALL
(9 MAT LIFTS)
FINISHED GROUND
EMBED WALL FOUNDATION
4 LIFTS
SLOPE WALL BENCH 5%
BEGIN MSE WALL
(7 MAT LIFTS)
FINISHED GROUND
EMBED WALL FOUNDATION
2 LIFTS
SLOPE WALL BENCH 5%
12.0'
4%
12.0'
4%
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 0/2
2 2 3:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\A
RR
OY
O_
SE
CO
\D
ES
IG
N\
MS
E_
SE
CT
IO
NS
2.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY RANGER DISTRICT
ARROYO SECO
PROPOSED CONDITIONS
- SECTION VIEWS STA
1+43 TO 1+97
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-03 005 015
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
2+13.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
2+25.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
2+43.00
0 10 20 30 40 500-10-20-30
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
2+35.00
0 10 20 30 40 500-10-20-30
END MSE WALL
FINISHED GROUND
ENDS OF WALL MUST
BE BURIED
MAX SLOPE 1:1
12.0'
4%
12.0'
4.5%
BEGIN TRANSITION BACK TO
EXISTING SLOPE AND ROAD WIDTH
CONTINUE TRANSITION BACK
TO EXISTING SLOPE AND WIDTH
5.5% (CONTINUE TRANSITION)
11.8
6.5%
.1
END 6" AGGREGATE SURFACING AND
COMPLETE TRANSITION TO MATCH
EXISTING SLOPE AND WIDTH
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 0/2
2 2 3:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\A
RR
OY
O_
SE
CO
\D
ES
IG
N\
MS
E_
SE
CT
IO
NS
2.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY RANGER DISTRICT
ARROYO SECO
PROPOSED CONDITIONS
- SECTION VIEWS STA
2+13 TO 2+43
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-04 006 015
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NFSR 5N15
SLUMP
EXISTING 18" CMP
FAILED CRIB WALL
FLOW LINE
NATURAL GROUND
SHOULDER
INTERPOLATED SURVEY AREAS
EDGE OF ROAD
EXISTING NATIVE
SURFACED ROAD
TYP. 14 FEET WIDE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/4 /22
:0
3 C
HU
DL
UN
DG
RE
EN
C
:\D
AT
A\
LP
_W
AL
LS
\R
OM
ER
O_
CA
MU
ES
A\
EX
IS
TI
NG
\E
XI
ST
IN
G.
DW
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
SANTA BARBARA RANGER
DISTRICT
ROMERO CAMUESA SITE
OVERVIEW & EXISTING
CONDITIONS
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-05 007 015
ROMERO CAMUESA NOTES:
ASSUMED
POINT TABLE
POINT #
NORTHING
10000.00
9895.46
9850.52
9986.69
10065.08
9937.90
EASTING
10000.00
10301.64
9679.43
10128.39
9927.10
10445.72
ELEVATION
1000.00
1017.12
984.45
1005.54
996.70
1021.95
DESCRIPTION
CP TKD 1X2 FEATHER
CP TKD 1X2 FEATHER
CP TKD 1X2 FEATHER
1X2 W TACK AND FEATHER
TACKED 1X2 W FEATHER
TACKED 1X2 W FEATHER
CP 102, 106 PLACED OUTSIDE
OF EXTENTS OF TOPO SURFACE
CP 103, 105 PLACED OUTSIDE
OF EXTENTS OF TOPO SURFACE
GENERAL
· THE ROMERO CAMUESA SITE HAS A FAILED CRIB WALL
WITH A ROCK BUTTRESS.
· A SITE SURVEY WAS DONE IN MARCH 2021 USING A
LOCAL COORDINATE SYSTEM AND ASSUMED NORTH
DIRECTION, NORTHING, AND EASTING COORDINATES.
· DUE TO STEEPNESS OF THE SITE, SOME OF THE SURVEY
WAS INTERPOLATED AS DESIGNATED ABOVE. IT IS
ASSUMED THE TOPOGRAPHY OUTSIDE OF THE FAILURE
ZONE IS GENERALLY CONSISTENT.
· THE GOOGLE EARTH IMAGERY UNDERLAIN THE
TOPOGRAPHIC SURFACE IS AN APPROXIMATE FIT.
· IT IS ASSUMED THE TOPO SURVEY CAPTURED THE
EXTENTS OF THE EXISTING WALLS.
MATERIALS
· THE EXISTING CRIB WALL SHALL HAVE A ROCK
BUTTRESS PLACED IN FRONT OF IT.
· ROCK BUTTRESS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH SECTION 252 AND APPLICABLE FP-14
AND FSSS REFERENCES.
· A CLASS I NONWOVEN TYPE E GEOTEXTILE SHALL BE
PLACED ON EXCAVATED SOIL PRIOR TO ROCK BUTTRESS
PLACEMENT.
EARTHWORK
· WASTE: ANY IN-PLACE EXISTING FILL THAT IS UNSUITABLE
OR NOT IN CONFORMANCE WITH THE SPECIFICATIONS,
DEBRIS, BOULDERS, LOGS, ETC SHALL BE CONSIDERED
WASTE.
· FOUNDATION APPROVAL: PRIOR TO WALL PLACEMENT,
FOUNDATION SHALL BE APPROVED BY THE CO. IF
FOUNDATION IS SOFT, WET, PUMPING WATER, OR ANY
OTHER ADVERSE CONDITION, NOTIFY THE CO
IMMEDIATELY.
· ENDS OF ROCK BUTTRESS MUST BE KEYED INTO
UNDISTURBED GROUND. CONTRACTOR SHALL TAKE CARE
TO NOT OVER-EXCAVATE AROUND THE SIDES AND
FOUNDATION OF THE BUTTRESS. IF OVER-EXCAVATION
OCCURS SUCH THAT THE BUTTRESS MUST BE
LENGTHENED OR HEIGHT INCREASED, CONTRACTOR
SHALL DO THIS WORK AT NO COST TO THE GOVERNMENT,
SUBJECT TO APPROVAL BY THE CO.
Feet
0 30 60
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
5% SLOPE
ROCK BUTTRESS
CLASS 4 RIPRAP
EXISTING CENTERLINE
START AGGREGATE
SURFACING
AT STA 0+10 AND
EXISTING 4% INSLOPE
END AGGREGATE
SURFACING
AT STA 2+90 AND
EXISTING 4% INSLOPE
NATURAL GROUND SHOULDER
L
Δ
L
.5
Δ
.5
R
L
31.2
Δ
12.6
R : 1
42.2
L
Δ
R
L
Δ
L
Δ
L
Δ
6R
L
Δ
P
P
P
P
T
P
C
P T
P C
P
P
P
P
P
P
P
P
P
KEEP EXISTING CRIB
WALL IN PLACE -
STA ~1+15 TO ~1+47
CLEAN OUT
18" CMP
SHADING REPRESENTS
EXTENTS OF NEW
ROAD SURFACING
4% ROAD
CROSS-SLOPE
CREATE BENCH IN
FRONT OF BUTTRESS
2 FEET MINIMUM
E L E
V A
T I O
N
F
E E
T
E L E
V A
T I O
N
F
E E
T
STATION (FEET)
CL-ALIGNMENT_RC PROFILE
0+00 0+50 1+00 1+50 2+00 2+50 3+003+02
DESIGN ROAD PROFILE
TOP OF AGGREGATE SURFACING:
AGGREGATE SURFACING SHALL
BE PLACED LEVEL WITH DESIGN
SUBGRADE ELEVATION
BEGIN 6 INCH THICK
AGGREGATE SURFACING
STA 0+10.00
ELEV 998.83
DESIGN ROAD PROFILE
TOP OF SUBGRADE:
SUBGRADE SHALL BE CUT IN
6 INCHES BELOW FINISHED GRADE
END 6 INCH THICK
AGGREGATE SURFACING
STA 2+10.00
ELEV 1011.44
4.5
BUTTRESS KEYWAY
BEGIN STA 1+10.00
ELEV 977.16
3 FT EMBEDMENT
BUTTRESS KEYWAY
END STA 1+60.00
ELEV 979.45
3 FT EMBEDMENT
BUTTRESS FOUNDATION
STA 1+60
ELEV 982.45
BUTTRESS FOUNDATION
STA 1+10.00
ELEV 980.16
8 INCH SOLID
PIPE OUTLET DRAIN
EXISTING GROUND
PROFILE IN FRONT
OF BUTTRESS
ROCKFALL NETTING
6 LAYERS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 1/2
2 0 9:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\R
OM
ER
O_
CA
MU
ES
A\
DE
SI
GN
\B
UT
TR
ES
S_
RC
_P
P1 .D
W G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
SANTA BARBARA RANGER
DISTRICT
ROMERO CAMUESA
PROPOSED CONDITIONS
- PLAN AND PROFILE
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-06 008 015
LAYOUT POINT TABLE
POINT #
DESCRIPTION
START AGGREGATE
STA 0+25
BUTTRESS START
BUTTRESS END
BUTTRESS START BOTTOM
BUTTRESS END BOTTOM
STA 2+00
END AGGREGATE
START EXISTING CRIB WALL
END EXISTING CRIB WALL
NORTHING
10015.74
10006.17
9985.81
9977.44
9965.03
9959.14
9972.67
9926.35
9986.18
9982.69
EASTING
9995.65
10007.33
10090.37
10131.71
10092.18
10122.65
10173.91
10250.72
10094.95
10123.86
Feet
0 20 40
ASSUMED
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
0+10
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
0+50
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+00
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+10
0 10 20 30 40 500-10-20-30-40-50
17.38' -
MATCH E
XIS
TIN
G W
ID
TH
LEAVE EXISTING CUT
SLOPES UNDISTURBED
BEGIN 6" AGGREGATE SURFACING
MATCH EXISTING SLOPE (4%) AND WIDTH
MAINTAIN 4% INSLOPE THROUGHOUT
4%
4% (DESIGN INSLOPE)
22.01' -
MATCH E
XIS
TIN
G W
ID
TH
CONTINUE 4% INSLOPE
EXISTING GROUND
PROPOSED/FINISHED GROUND
BEGIN ROCK BUTTRESS
WRAP BOTTOM IN
ROCKFALL NETTING
4% OUTSLOPED
BENCH
14.5 3'
13.88'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 0/2
2 2 3:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\R
OM
ER
O_
CA
MU
ES
A\
DE
SI
GN
\B
UT
TR
ES
S_
RC
_S
EC
TI
ON
S1
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
SANTA BARBARA RANGER
DISTRICT
ROMERO CAMUESA
PROPOSED CONDITIONS
- STA 0+10 TO 1+10
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-07 009 015
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+60
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+35
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
2+00
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
1+75
0 10 20 30 40 500-10-20-30-40-50
RETAIN EXISTING
CRIB WALL
PLACING RIPRAP
IN FRONT
14.38'
15.59'
15.21'
12.0 1'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 0/2
2 2 3:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\R
OM
ER
O_
CA
MU
ES
A\
DE
SI
GN
\B
UT
TR
ES
S_
RC
_S
EC
TI
ON
S1
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
SANTA BARBARA RANGER
DISTRICT
ROMERO CAMUESA
PROPOSED CONDITIONS
- STA 1+35 TO 2+00
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-08 010 015
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
2+50
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
2+90
0 10 20 30 40 500-10-20-30-40-50
E L
E V
A T
I O
N
F
E E
T
OFFSET (FEET)
3+00
0 10 20 30 40 500-10-20-30-40-50
13.42'
13.65'
END 6" AGGREGATE SURFACING
AT DESIGN 4% SLOPE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/3 0/2
2 2 3:
C
HU
DL
UN
DG
RE
EN
C :\D
AT
A\
LP
_W
AL
LS
\R
OM
ER
O_
CA
MU
ES
A\
DE
SI
GN
\B
UT
TR
ES
S_
RC
_S
EC
TI
ON
S1
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
SANTA BARBARA RANGER
DISTRICT
ROMERO CAMUESA
PROPOSED CONDITIONS
- STA 2+50 TO 3+00
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-09 011 015
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PREFABRICATED CONTINUOUS
GEOCOMPOSITE SHEET DRAIN
WITH FABRIC ON BOTH SIDES.
HYDRAULICALLY CONNECT TO
DRAIN COLLECTION PIPE
UNDERDRAIN SYSTEM.
WALL FACE
B
E L O
W
F
I N
I S
H E
D
G
R A
D E
EXISTING GROUND
COMPACTED FILL
BOTTOM WALL
REINFORCEMENT
SCREEN OUTLET WITH
0.5" MESH - 1.4-MM WIRE
GALVANIZED SCREEN.
SECURE SCREEN TO
OUTLET WITH GALVANIZED
CLAMPS OR WIRES.
FINISHED GROUND
MIN. SLOPE 5%,
MIN. LENGTH 5'
BACK OF WALL EXCAVATION
FINISHED GROUND
MSE DRAINAGE SYSTEM
SECTION VIEW DETAIL
NTS
PIPE END CAP
PERFORATED DRAIN PIPE SHALL
BE SLOPED TO DRAIN AT LEAST 1%
90 DEG. ELBOW AT OUTLET
PIPE CONNECTION
CONTINUOUS GEOCOMPOSITE
SHEET DRAIN
GEOCOMPOSITE SHEET DRAIN
ELEVATION VIEW DETAIL
NTS
GRANULAR BACKFILL
CONFORMING TO 703.03
8" DIA. CORRUGATED HIGH
DENSITY POLYETHYLENE
DRAINAGE PIPE (PERFORATED)
1% min
NON-PERFORATED OUTLET PIPE.
SLOPE TO MIN. 1% TO DAYLIGHT.
PROVIDE (1) OUTLET PIPE
FOR EACH LENGTH OF UNDERDRAIN.
BED IS GRANULAR BACKFILL.
GEOTEXTILE CLASS 1 (NONWOVEN).
OVERLAP TOP A MINIMUM OF 12". ENDS
MUST BE SEALED TO PREVENT LOSS OF
DRAIN AGGREGATE.
PREFABRICATED CONTINUOUS
GEOCOMPOSITE SHEET DRAIN
WITH FABRIC ON BOTH SIDES.
HYDRAULICALLY CONNECT TO
DRAIN COLLECTION PIPE.
UNDERDRAIN DETAIL
NTS
OUTLET PIPE ANCHOR
ASSEMBLY DETAIL
OUTLET PIPE
10 GAGE WIRE,
GALVANIZED
GROUND LINE
133 T POSTS
3' LONG
NTS
UNDERDRAIN OUTLET DETAIL
NTS
DRAIN DAYLIGHT PIPE
10 GALVANIZED WIRE
SECURING CLOTH
0.5-IN, 19 GAUGE GALVANIZED HARDWARE
CLOTH (12"X12" SQUARE PIECE FOLDED
OVER PIPE OUTLET)
PLACE WELL GRADED
CLASS 1 RIPRAP
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/4 /22
:5
5 C
HU
DL
UN
DG
RE
EN
C
:\D
AT
A\
LP
_W
AL
LS
\T
YP
IC
AL
S.
DW
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY AND SANTA BARBARA
RANGER DISTRICTS
DRAINAGE DETAILS
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-10 012 015
1. PERFORATED AND NON-PERFORATED PIPE SHALL BE 6 INCH CORRUGATED HIGH DENSITY POLYETHYLENE (ALTERNATIVES MAY BE SUBMITTED FOR REVIEW BY THE CO).
2. ELBOWS, CAPS, AND TEES ARE INCIDENTAL TO ITEMS 60505 AND 60506.
3. LOCATION OF OUTLET DRAINS SHALL BE APPROVED BY CO AT LEAST 30 FEET DOWNSLOPE AWAY FROM THE SLIDE AREA AND SHALL HAVE POSITIVE DRAINAGE. SITES
WITH MULTIPLE OUTLET DRAINS ARE TO BE DRAINED AT ONE OUTLET RIPRAP PAD.
4. OUTLET PIPE SHALL BE ANCHORED EVERY 15 FEET DOWNSLOPE FROM WALL DRAINING.
5. CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGING THE GEOCOMPOSITE UNDERDRAIN DURING CONSTRUCTION. ANY DAMAGE INCURRED TO DRAINAGE
COMPONENTS SHALL BE REPAIRED OR REPLACED AS APPROVED BY CO.
DRAINAGE NOTES
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
SLOPE 5%, MIN. DISTANCE
5' IN CENTER OF WALL
(SEE SECTIONS AND PROFILE VIEW)
SEE SECTIONS AND PROFILE VIEW
FOR MINIMUM EMBEDMENT OF
WALL FOUNDATION -- IN NO CASE SHALL
EMBEDMENT BE LESS THAN 4 FEET.
EXISTING RETAINING
WALL STRUCTURES
(TO BE REMOVED AND
DISPOSED OF)
4%
6" AGGREGATE SURFACING
SHALL CONFORM TO SECTION 301,
GRADING G
12'
SLOPE 1.75:1 (H:V)
WALL FILL SHALL BE SELECT GRANULAR
BACKFILL CONFORMING TO 704.08
6" CRUSHED GRAVEL LEVELING
PAD CONFORMING TO 703.06
(INCIDENTAL TO ITEM 25502)
14' MAT LENGTH
1:48 (H:V) BATTER
8"X21" WELDED WIRE MATS,
SIZED PER SPECIFICATIONS
AND DRAWING NOTES
COMPACTED
BACKFILL
3" TO 6" COBBLE
OR ROCK
4"X3" WELDED WIRE BACKING MAT
TO BE PLACED ON EACH LIFT
0.5'
2' MIN
CLASS 2 TYPE E
NONWOVEN GEOTEXTILE
T
Y P
I C
A L
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/4 /22
:5
5 C
HU
DL
UN
DG
RE
EN
C
:\D
AT
A\
LP
_W
AL
LS
\T
YP
IC
AL
S.
DW
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY AND SANTA BARBARA
RANGER DISTRICTS
MSE WALL DETAILS
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-11 013 015
1. SUBGRADE FOUNDATION AND LEVELING PAD SHALL BE COMPACTED ACCORDING TO SECTION 208, 95% MAXIMUM DRY DENSITY ACCORDING TO AASHTO T 180, METHOD C.
2. WALL FACING SHALL BE ROCK-FACED WITH GEOTEXTILE CONFORMING TO SECTIONS 207 AND 714.01. WALL FACING MATERIALS SHALL BE INCIDENTAL ITEM 25501.
3. WALL BACKFILL SHALL CONFORM TO 704.08, SELECT GRANULAR BACKFILL. BACKFILL SHALL BE PLACED IN COMPACTED LAYERS OF 6 INCHES. COMPACTION SHALL BE
DONE IN ACCORDANCE WITH SECTION 255 AND REFERENCED PORTIONS OF SECTION 209, 95% MAXIMUM DRY DENSITY ACCORDING TO AASHTO T 99, METHOD C.
4. WELDED WIRE MATERIAL SHALL BE HOT-DIPPED GALVANIZED ACCORDING TO AASHTO M111 OR ASTM A123.
5. CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGING THE WELDED WIRE GALVANIZATION. ANY DAMAGED GALVANIZATION SHALL BE REPAIRED OR REPLACED AS
APPROVED BY CO.
6. EXISTING RETAINING WALL STRUCTURES AND UNSUITABLE IN-PLACE FILL SHALL BE DISPOSED OF.
7. CONTRACTOR SHALL AVOID CUTTING INTO THE CUT SLOPE AND LEAVE EXISTING CUT SLOPES AS-IS.
8. ROAD WIDTHS OVER THE RETAINING WALL SHALL BE 12 FEET WITH 4% INSLOPE, FOR ROAD SEGMENTS BEFORE AND AFTER THE WALL, SEE APPLICABLE SECTIONS FOR
TRANSITIONS FROM EXISTING WIDTHS AND CROSS-SLOPES.
WALL NOTES
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/4 /22
:5
5 C
HU
DL
UN
DG
RE
EN
C
:\D
AT
A\
LP
_W
AL
LS
\T
YP
IC
AL
S.
DW
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY AND SANTA BARBARA
RANGER DISTRICTS
MSE WALL
INSTALLATION
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-12 014 015
NOTES: THIS PROJECT WAS DESIGNED AS A
HILFIKER WELDED WIRE MESH MSE WALL.
CONTRACTOR MAY SUBMIT A EQUAL PRODUCT.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/4 /22
:5
5 C
HU
DL
UN
DG
RE
EN
C
:\D
AT
A\
LP
_W
AL
LS
\T
YP
IC
AL
S.
DW
G;
(R05)
PACIFIC SOUTHWEST REGION
LOS PADRES
NATIONAL
FOREST
RETAINING WALL
PROJECTS
LOS PADRES NATIONAL
FOREST
MONTEREY AND SANTA BARBARA
RANGER DISTRICTS
ROCK BUTTRESS
DETAILS
03/30/2022
C.LUNDGREEN
C.LUNDGREEN
P.LANE
C-13 015 015
1. SUBGRADE FOUNDATION SHALL BE COMPACTED ACCORDING TO SECTION 208, 95% MAXIMUM DRY DENSITY ACCORDING TO AASHTO T 99, METHOD C.
2. CONTRACTOR SHALL PLACE CLASS I TYPE E NONWOVEN GEOTEXTILE ALONG ALL BUTTRESS-SOIL CONTACT SURFACES.
3. CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGING THE GEOTEXTILE AND ROCKFALL NETTING. ANY DAMAGE SHALL BE REPAIRED OR REPLACED AS APPROVED
BY CO.
4. CONTRACTOR SHALL EXERCISE REASONABLE CARE TO AVOID DAMAGING THE EXISTING CRIB WALL.
5. ROAD SHALL HAVE 4% INSLOPE THROUGHOUT AGGREGATE SURFACING. BEGINNING AND END STATIONS CORRESPOND WITH EXISTING 4% INSLOPE OR CLOSE TO.
6. ROCKFALL NETTING REINFORCEMENT LENGTHS FROM BOTTOM TO TOP: 7 FEET, 7 FEET, 6.25 FEET, 6 FEET, 5.5 FEET, AND 5.25 FEET, RESPECTIVELY.
7. CONTRACTOR WILL NEED TO USE SMALLER SIZES OF THE CLASS 4 RIPRAP IN THE REINFORCED ZONE.
BUTTRESS NOTES
PRESERVE EXISTING
CRIB WALL
WRAP ROCKFALL
NETTING OVER FACE
CLASS 4 RIPRAP
4%
ROAD W
ID
TH V
ARIE
S
EXISTING GROUND
8" DIA. CORRUGATED HIGH
DENSITY POLYETHYLENE
DRAINAGE PIPE (PERFORATED)
SEE UNDERDRAIN DETAILS
AND NOTES
5% OUTSLOPED BENCH
V
A R
I E
S
W
I T
H
C
R I B
W
A L L
V
A R
I E
S
W
I T
H
C
R I B
W
A L L
1H:1V
0.75H:1V
4'
7.5'
2.5' 2.5'
1/2H:1V
1/2H:1V
CLASS I TYPE E
NONWOVEN
GEOTEXTILE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| 2019_Coversheet_USFS_STD_ctb_LP_Walls-PLOT |
| OLE1 |
| General_Notes-PLOT |
| OLE1 |
| Existing-PLOT-AS |
| OLE1 |
| MSE_PP2-PLOT-AS |
| OLE1 |
| MSE_SECTIONS2-STA1-AS |
| OLE1 |
| MSE_SECTIONS2-STA2-AS |
| OLE1 |
| Existing-PLOT-RC |
| OLE1 |
| BUTTRESS_RC_PP1-PLOT |
| OLE1 |
| BUTTRESS_RC_SECTIONS1-STA_0+10_to_1+10 |
| OLE1 |
| BUTTRESS_RC_SECTIONS1-STA_1+35_to_2+00 |
| OLE1 |
| BUTTRESS_RC_SECTIONS1-STA_2+50_to_3+00 |
| OLE1 |
| Typicals-DRAINAGE_DETAILS |
| OLE1 |
| Typicals-WALL_DETAILS |
| OLE1 |
| Typicals-WALL_CONSTRUCTION |