This document is a Questions and Answers (Q&A) related to a federal contract opportunity for the Romero Camuesa & Arroyo Seco Retaining Wall Replacements project. The project involves the removal and replacement of failed retaining walls at two sites on National Forest System Roads in the Los Padres National Forest in California.
The key details include: the project magnitude has been added to the SAM.gov posting, the estimated start date is June 3, 2024, there will be two mandatory site visits on April 15-16, 2024 starting at 10:00 AM local time, the bid guarantee shall be 20% of the bid price, and contractors must survey and stake the new retaining walls, test imported materials, and implement soil erosion and pollution control measures. Relevant attachments, including Davis-Bacon wage rates, are available through the SAM.gov link provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Received Answers Is there a cost estimate , budget or ballpark figure for the project listed? Is there an actual start date for the project?
The magnitude has been added to the SAM.gov posting and the estimated start date is June 3, 2024.
Can you specify what time are the site visits? Please see below from the original SAM.gov posting.
Where can the plans be found for the above mentioned project? Please follow the link to access the attachments: https://sam.gov/opp/67230bc03722486783c727c7c6186cf3/view
We are interested in attend the job walks on April 15th and 16th. Has there been a time designated for these site visits yet? I didn’t see a time in the provided docs.
Please see below from the original SAM.gov posting.
Regarding the subject project, is attendance to either or both site visits mandatory? Will the site visits be taking place at the actual work sites? Or, will they be facilitated at the indicated fire station and camp ground?
Attending both site visits are encouraged, as this is considered within the evaluation factors. The site visits will begin at a meeting point and will move to the actual project site.
Looking to verify the site visit of 10AM PST for both days. That is correct.
Confirming we will be meeting at 10AM on both days 4/15 and 4/16. Yes, that is correct.
Can the Government confirm what time the job walk is? Solicitation states 1000L Yes, that is correct.
Attachment 9, Davis Bacon wages are cut off. Wage rates have been reuploaded and show the entirety of their pages.
Item 62201 Excavator Rental Full Size in the past Government puts a weight this helps determine the size?
Contractor to determine the necessary equipment to complete the project based on their bid. The site visit will allow the contractor an opprotunity to determine the necessary equipment as well.
Could you please provide an Engineers Estimate. The solicitation provides the magnitude and schedule of items for the project.
What is the percentage of bid bond for Romero Camuesa & Arroyo Seco Retaining Wall Replacements project?
The bid guarantee shall be 20% of the bid price.
https://sam.gov/opp/67230bc03722486783c727c7c6186cf3/view