A10 1119747 SAM.gov Q&A.pdf

PDF 143 KB Posted

Attached to
Romero Camuesa & Arroyo Seco Retaining Wall Replacements
Solicitation number
12970224R0015
Issued by

About this file

This document is a set of Questions and Answers related to a federal contract opportunity for the Romero Camuesa & Arroyo Seco Retaining Wall Replacements project. The key details are:

The project consists of removing and replacing failed retaining walls at two sites on National Forest System Roads in the Los Padres National Forest in California. The required work includes structural excavation, installation of rip-rap and rockfall netting, construction of new mechanically stabilized earth walls, roadway reconditioning, and surveying/staking of the new walls. A site visit is scheduled for April 15-16, 2024, and the bid due date has been extended to May 1, 2024. The solicitation number is 12970224R0015 and it is being issued by the USDA Forest Service. Attendence at the site visits is encouraged but not mandatory. Additional details were provided on the rockfall netting system, soil conditions, and bid bond requirements in response to vendor questions.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Received Answers Is there a cost estimate , budget or ballpark figure for the project listed? Is there an actual start date for the project?

The magnitude has been added to the SAM.gov posting and the estimated start date is June 3, 2024.

Can you specify what time are the site visits? Please see below from the original SAM.gov posting.

Where can the plans be found for the above mentioned project? Please follow the link to access the attachments: https://sam.gov/opp/67230bc03722486783c727c7c6186cf3/view

We are interested in attend the job walks on April 15th and 16th. Has there been a time designated for these site visits yet? I didn’t see a time in the provided docs.

Please see below from the original SAM.gov posting.

Regarding the subject project, is attendance to either or both site visits mandatory? Will the site visits be taking place at the actual work sites? Or, will they be facilitated at the indicated fire station and camp ground?

Attending both site visits are encouraged, as this is considered within the evaluation factors. The site visits will begin at a meeting point and will move to the actual project site.

Looking to verify the site visit of 10AM PST for both days. That is correct.

Confirming we will be meeting at 10AM on both days 4/15 and 4/16. Yes, that is correct.

Can the Government confirm what time the job walk is? Solicitation states 1000L Yes, that is correct.

Attachment 9, Davis Bacon wages are cut off. Wage rates have been reuploaded and show the entirety of their pages.

Item 62201 Excavator Rental Full Size in the past Government puts a weight this helps determine the size?

Contractor to determine the necessary equipment to complete the project based on their bid. The site visit will allow the contractor an opprotunity to determine the necessary equipment as well.

Could you please provide an Engineers Estimate. The solicitation provides the magnitude and schedule of items for the project.

What is the percentage of bid bond for Romero Camuesa & Arroyo Seco Retaining Wall Replacements project?

The bid guarantee shall be 20% of the bid price.

For the rock fall netting is the intent to use soil nails for anchors ?

No this is a wrapped system. The intent is that the rockfall netting is functioning as additional reinforcement (installed in horizontal layers, wrapped around the face to provide additional containment of the special rock embankment.

Is a soils report available?

There is not a soils report available. At the Romero Camuesa site, assume all conglomerate that may be encountered is excavatable.

The geology is different on the Arroyo Seco site, but it is assumed the granite at the site is decomposed and excavatable. If hard rock is encountered that provide an adequate foundation for the retaining walls, the wall height will be adjusted to accommodate the shallower bedrock depth than what is assumed in the drawing.

Any chance of more information for the netting and anchor system specific specifications?

See rockfall netting requirements below. This rockfall netting is not draped along the face of the wall typical to most rockfall netting installations. Instead, it is installed in horizontal lifts wrapped around the face as shown on sheet C-13. Gabion wire mesh material is adequate for this application.

Any chance of extending bid date? The bid date will be extended to May 1, 2024.

https://sam.gov/opp/67230bc03722486783c727c7c6186cf3/view