4. Attachment A - AR ATS-STA Lambertson Septum_Compliance Matrix.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
LBNL RFP HW-10152024 AR ATS-STA Lambertson Magnets
Solicitation number
Not on record
Issued by

About this file

This document is an Attachment A - Compliance Matrix for the RFP LBNL_AR_ATS_STA_Lambertson_Magnets, which is for the fabrication and provision of Lambertson septum magnets for the Accumulator to Storage (ATS) Transfer Line and the Storage to Accumulator (STA) Transfer Line that are part of the Advanced Light Source Upgrade Project (ALS-U) at Lawrence Berkeley Laboratory.

The Compliance Matrix outlines the key technical requirements, deliverables, manufacturing capabilities, past performance, and quality assurance expectations for the Lambertson magnets. Specifically, it requires the offeror to demonstrate compliance with the ALS-U Statement of Work, ESD specifications, and delivery timeline. The offeror must also provide details on their manufacturing resources, project management support, subcontractor experience, and quality assurance processes. Up to two examples of past performance on similar accelerator magnet projects are required, along with resumes of key personnel. The quality assurance requirements include completion of a QA survey, certifications, quality manuals, and examples of non-conformance reports and material travelers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment A - Lambertson Magnet Technical Volume Compliance Matrix
FactorSub-FactorDescriptionComplianceComments - Please provide a narrative of each of your responses
Factor 1Ability to meet technical requirements
ALS-U SOWATS-STA Lambertson Magnet Statement of Work (SOW)
Section 2Scope
Section 3Deliverables
Section 4Testing and Reports
Section 5Management
Section 6Engineering
Section 7Shipping, Handling, and Storage
Section 8Quality Assurance
ALS-U ESDATS-STA Lambertson Magnet Specification (ESD)
Section 6Lambertson Magnet Specifications
Section 7Reference Design Parameters
Section 9ALS-U Transfer Line Dipole Requirements adopted to Lambertson Magnet
Factor 2Deliverables
aA detailed delivery schedule or timeline including all areas referenced above
bProposed lead times and the ability to meet the projected delivery schedules
cProposed carrier and estimate of total shipping costs
dThe offeror may also propose an alternate delivery schedule that would result in a cost avoidance and ultimately a better overall value to the Laboratory
Factor 3Manufacturing capabilities and capacity (including lower-tier subcontractors)
aIdentify your resources and project management support that are adequate to deliver these devices
bOutlines of equipment, space, and processes that are sufficient to produce the Lambertson magnet parts and complete the magnet assembly
cProvide a synopsis of your experience in working together with lower-tier-subcontractors
Factor 4Past performance producing similar products - Submit up to 2 similar/comparable projects within the last 3 years
1Overall Similar Project Experience
aSubmit up to 2 successfully planned and executed similar/comparable projects under similar circumstances and schedule requirements
bIncluded should be the client/customer technical and business contact information (name, title, telephone number, and/or e-mail address)
cIdentify corrective action for any issues or problems encountered during past performance of similar contracts
2Prior experience with Lambertson septum magnets or accelerator grade DC magnets instrumented with UHV beam chamber
aProvide examples of experience with comparable Lambertson septum magnets or accelerator grade DC magnets instrumented with UHV beam chamber
bIdentify how many years of experience in manufacturing Lambertson septum magnets or accelerator grade DC magnets instrumented with UHV beam chamber, and the components required in this procurement
cProvide information on any budget and/or schedule variances that occurred on projects comparable with Lambertson septum magnet or accelerator grade DC magnet instrumented with UHV beam chamber
3Key Project Personnel
aProvide an organizational chart for this project
bSupply resumes for the individuals listed on the organizational chart
Factor 5Quality Assurance
aCompletion of the ALS-U QA survey – AL-1208-0209
bIndication of all current certifications for production standards such as ISO programs
cA quality manual or quality plan that outlines the processes that will be utilized to ensure ALS-U QC standards are satisfied
dExample of a standard non-conformance report and the change approval process
eExample of a material and assembly shop traveler
fA quality assurance management plan; indicate whether the project manager will handle quality monitoring or if a separate individual responsible for managing data and feedback
gSpecify how calibration certificates are tracked, stored, and monitored
hIf the Offeror intends is to utilize sub-contractors, provide a list of potential subcontractors

File details come from the government source that posted it. Updated .