This document is an engineering specification for the Lambertson magnets required for the Accumulator to Storage (ATS) Transfer Line and the Storage to Accumulator (STA) Transfer Line of the Advanced Light Source Upgrade Project (ALS-U) at the Lawrence Berkeley National Laboratory.
The specification defines the essential geometric and physics requirements, vacuum chamber specifications, magnetic field requirements, and other technical details for the Lambertson magnets. It also includes detailed requirements for the magnet assembly, yoke and pole design, alignment features, hardware, lifting/handling, and documentation. The magnets must meet tight tolerances and specifications to achieve the required magnetic field quality. The vendor is responsible for developing the detailed design, fabrication, and assembly procedures to meet these requirements. This specification is part of the LBNL RFP HW-10152024 solicitation for the Lambertson magnets for the ATS and STA transfer lines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1st Q and As HW-10152024.docx | DOCX document | |
| 5. RFP HW-10152024 Sample SubK.doc | DOC document | |
| 8a. GPs - Commercial Domestic (12-22-23).pdf | ||
| 1. RFP - HW-10152024 AR ATS-STA Lambertson Magnets.docx | DOCX document | |
| 6. AL-1208-0209C ALS-U Supplier Quality Evaluation Survey.pdf | ||
| 7. RFP HW-10152024 Rep Cert.docx | DOCX document | |
| 2. AL-1695-1519B - ATS-STA Lambertson Magnet Statement of Work.pdf | ||
| 4. Attachment A - AR ATS-STA Lambertson Septum_Compliance Matrix.xlsx | XLSX spreadsheet | |
| 8b. GPs - Commercial Foreign (12-22-23).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATS-STA Lambertson Magnet Engineering Specification Document
Mariusz Juchno Release Date: Sep 9 2024 11:01:08 AM PDT
Document Number: AL-1311-8004 Revision: A
Document Status: Released Document Type: SPECIFICATION
Category Code: AL7410
ALS-U - ACCUMULATOR TO STORAGE RING TRANSFER LINE
MAGNETS - GENERAL
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
R
Downloaded by: Windchill Watermarker
AL-1311-8004 Rev. A Doc. Status: Released Page 2 of 45
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
TABLE OF CONTENTS
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Introduction
5 Document Definitions
5.1 Specification Definition
5.2 Identification Number
5.3 Traceability
6 Lambertson Magnet Specification
6.1 Essential Geometric Physics Specifications
6.2 Vacuum Chamber Specification
6.3 Magnetic Field Requirements
7 Reference Design Parameters
7.1 Magnet and Coil Electrical Parameters
7.2 Hydraulic Circuit Parameters
7.3 Magnet Electrical Interlock Protection
8 Supports and Alignment
9 ALS-U Transfer Line Dipole Requirements adopted to Lambertson Magnet
9.1 General Requirements
9.2 Requirements of Magnet Coils
9.3 Requirements on Magnet Bus Leads
9.4 Electrical Safety Requirements
9.5 Enclosure Requirements
9.6 LCW Cooling Requirements
9.7 Assembly Level Requirements
9.8 Magnet Yoke, Pole, and Magnet Support Requirements
9.9 Alignment Fiducial Features
9.10 Hardware Requirements
9.11 Lifting, Handling, and Shipping Requirements
9.12 Documentation and Procedures
9.13 Labels, Marking, Serialization, and Painting Requirements
10 Applicable Documents
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 3 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
11 References
Lorentz force in Bend and Lambertson magnets
Beam deflection and magnetic field direction in ALS-U Lambertson magnets
Electric current and magnetic field direction
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline
2 APPROVALS
List of approvers can be found referenced in the Windchill product lifecycle management system.
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 4 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
3 ABBREVIATIONS AND ACRONYMS
A Analysis ABRV Abbreviation ALS Advanced Light Source ALS-U Advanced Light Source Upgrade AR Accumulator Ring ATS Accumulator to Storage Transfer Line BTA Booster to Accumulator Transfer Line DEMO Demonstration EPICS Experimental Physics and Industrial Control System FLEX Flexibility ID Identification INSP Inspection LBNL Lawrence Berkeley National Laboratory METH Method MPS Machine Protection System N/A Not Applicable NUM Number SEL Accumulator Ring Lambertson Extraction Septum SIL Accumulator Ring Lambertson Injection Septum SB Stored Beam SR Storage Ring STA Storage to Accumulator Transfer Line TB Transferred Beam TEST Test VERIF Verification
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 5 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
4 INTRODUCTION
The ALS-U Accelerator System Group is responsible for providing the accelerator magnets to build the Accumulator to Storage Transfer Line (ATS) and the Storage to Accumulator Transfer Line (STA). These two and mirror-symmetric transfer lines will meet in the straight section of the Storage Ring (SR), at the fast swap-out kicker, where the fresh bunches will replace the spent ones. The injection and the extraction points in the Accumulator Ring (AR) will be located in straight section ±30° away from the swap-out kicker.
Figure 4.1 Overview of the ALS-U transfer line region with the DC Lambertson septum magnets for ATS and STA transfer lines marked with green rectangles.
The injection and extraction of swapped-out beams in the AR straights will be performed using three magnets placed symmetrically for each transfer line:
Fast kicker deflecting the beam vertically by 4 mrad from/into the AR stable orbit;
Thin eddy-current septum magnet deflecting the beam vertically by 55.6 mrad;
DC Lambertson septum magnet deflecting the beam horizontally by 176.2 mrad.
Figure 4.2 Top-down view of the AR02S:SIL and AR12S:SEL Lambertson magnets.
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 6 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Figure 4.3 Components of the AR02S:SIL Lambertson.
Table 4-1 Lambertson magnets naming, location and allocated Power Supply racks Description Name Location Rack
STA Septum Injection Lambertson AR02S:SIL Accumulator Ring Sector 2 Straight S0241
ATS Septum Extraction Lambertson AR12S:SEL Accumulator Ring Sector 12 Straight S1241
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 7 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
5 DOCUMENT DEFINITIONS
5.1 Specification Definition
Shall, will, may, and should are used to define every specification listed in this document.
The definitions of these terms are as follows
May – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding.
Shall –is a specification that is contractually binding and must be implemented.
Should – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding.
Will – is used to inform intent or declaration of purpose. This is not a specification.
Example, the author will use the word ‘shall’ to indicate that a specification is contractually binding and must be implemented.
5.2 Identification Number
Each specification stated in this document shall have a unique identification (ID) number (NUM). Once an ID NUM has been assigned to a specific specification, the ID NUM cannot be changed or reassigned.
The ID NUM formant is as follows SYY-XX-QQQQQQ, where S indicates that this is a specification, YY identifies the Major Systems Level within the ALS-U project, XX is a unique identifier within the Major Systems Level, and QQQQQQ is a unique six digit number.
The unique ID numbers are assigned by the ALS-U Lead System Engineer.
5.3 Traceability
Each specification stated in this document shall have a traceability to determine the relationship between different requirements and specifications not only within this document, but also for the entire project.
6 LAMBERTSON MAGNET SPECIFICATION
6.1 Essential Geometric Physics Specifications
The essential physics specifications were developed to define the magnetics requirements for the ring. These specifications integrate physics design requirements, lattice structure, O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 8 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
and gross engineering requirements to develop a baseline model to develop the magnetics and engineering requirements.
Table 6-1 Essential Geometric Physics Specifications for DC Lambertson Magnet
ID NUM
(S09-08-)
RQMT
DEF
Specification Description
Value Unit Traceability/ Assumption
003100 Shall Beam Deflection Plane Horizontal - Beam Physics
003102 Shall Number of AR02S:SIL
Magnets 1 - Beam Physics
003104 Shall Number of AR12S:SEL
Magnets 1 - Beam Physics
003106 Shall Effective Magnetic
Length along the beam trajectory
1.000 +/- 0.0005 m Beam Physics
003108 Shall Magnet Insertion Length
(Yoke)
+0.0005 -0.002 m CAD model
003110 Should Length of the yoke base-plate 0.987 m EM numerical analysis
003116 Shall Bend Angle -10.098 (-0.17624)
Deg (Rad)
Beam Physics
003118 Shall Effective Bend Radius 5.674 m Reference
Design
003120 Should Simple Sagitta 22.016 mm Reference
Design
003122 Shall Entry/Exit Pole-Face
Angle wrt. Beam Trajectory
0/0 Deg Beam Physics
003124 Shall Magnet Geometry Straight - Reference
Design 003126 Shall Pole Geometry Sector Bend - Beam Physics
003128 Shall Min. Local Horizontal
Stay-clear 2∙(6σx+1 mm) 7.6 mm Beam Physics
003130 Shall Min. Local Vertical Stay-clear 2∙(6σy+1 mm) 3.4 mm Beam Physics
003132 Shall Magnet Gap on Beam
Reference Center
12.00 mm
Reference Design
003134 Should Inner Diameter of the Hole for the AR Stored
Beam Chamber
35.00 mm
Reference Design
003136 Shall Yoke Material
Carbon steel 1006 with magnetic anneal
Reference Design
003138 Should Yoke Construction Assembled from solid yoke parts
Reference
Design
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 9 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
ID NUM
(S09-08-)
RQMT
DEF
Specification Description
Value Unit Traceability/ Assumption
003140 Shall Magnet Assembly Mass
+5/-20 kg CAD model
6.2 Vacuum Chamber Specification
Vacuum chamber shall be fabricated and tested according to UHV Chamber and Component Production Requirements Document AL-1220-7841.
Table 6-2 Specifications for DC Lambertson Magnet Vacuum Chamber
ID NUM
(S09-08-)
RQMT
DEF
Specification Description Value Unit
Traceability/ Assumption
003200 Shall Shape of the Transferred Beam
Vacuum Chamber Racetrack - Vacuum Group
003202 Shall Shape of the Stored Beam
Vacuum Chamber Round - AR Straight
Section Vacuum Chamber Design
003204 Shall Material of the Transferred
Beam Vacuum Chamber
Non-magnetic Stainless Steel
316L or 316L(N)
Standard Practice
003206 Shall Material of the Stored Beam
Vacuum Chamber
Non-magnetic Stainless Steel
316L or 316L(N)
Standard Practice
003208 Shall
Inner Dimensions of the Transferred Beam Vacuum Chamber (magnet gap and
DN100 flange)
Racetrack Height ≥ 7.0 Width ≥ 22.0 mm Vacuum Group
003209 Shall Inner Diameter of the
Transferred Beam Vacuum Chamber (DN25 flange)
13.0 mm Vacuum Group
003210 Shall Inner Diameter of the Stored
Beam Vacuum Chamber 28.45 mm AR Straight
Section Vacuum Chamber Design
003211 Shall
Minimum clearance between vacuum chamber (or external magnetic shield) and yoke components (magnetic gap or top yoke bore)
1 mm
003212 Will Synchrotron Radiation Heat on SB Tube, max.
1.27 (ATS)
5.25 (STA)
W Heat-load Analysis
003214 Shall Achievable Ultimate Vacuum
Pressure <5.00e-10 Torr Vacuum Group
003216 Shall Magnetic permeability for vacuum chamber base material 1.01 - Vacuum Group
003217 Shall Magnetic permeability for welds or braze joints 1.04 - Vacuum Group
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 10 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
6.3 Magnetic Field Requirements
Table 6-3 Specifications of the Magnetic Field in the DC Lambertson Magnet Gap
ID NUM
(S09-08-)
RQMT
DEF
Specification Description
Value Unit Traceability/ Assumption
003300 Should Nominal By Dipole Field 1.1758 T Reference
Design
003302 Shall Nominal By Dipole Integral 1.1758 T∙m Reference
Design
003304 Shall Horizontal Good Field
Region Width 29.6 mm Reference
Design
003306 Shall Vertical Good Field Region
Height 3.4 mm Reference
Design
003308 Shall Local Uniformity of the
Field within the Good Field Region
1∙10-4 - Beam Physics
003310 Shall
Maximum Bx Dipole Integral along the Beam
Trajectory wrt. Nominal By
Dipole Integral
(176) ppm (G∙cm)
Beam Physics
003312 Shall Magnetic Field (Power
Supply) Stability (RMS) ≤20 ppm Beam Physics
Figure 6.1 Good field region of the Lambertson magnet defined along the length of the straight pole of the magnet.
Table 6-4 Specifications of the Magnetic Field in AR Stored Beam Chamber of the DC Lambertson Magnet
ID NUM
(S09-08-)
RQMT
DEF
Specification Description
Value Unit Traceability/ Assumption
003320 Shall
Field Normalization Radius for Magnetic
Measurements on the Stored Beam Trajectory
10 mm Compatibility with
AR Dipole Reference Radius
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 11 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
ID NUM
(S09-08-)
RQMT
DEF
Specification Description
Value Unit Traceability/ Assumption
003322 Shall First Field Integral (x, y) 50 + 50 G∙cm Based on
Undulator RQMT R05-10-002700
003324 Shall Integrated Normal and
Skew Quadrupole 50 G Based on
Undulator RQMT R05-10-002710
003326 Shall Integrated Normal and
Skew Sextupole 50 G/cm Based on
Undulator RQMT R05-10-002715
003328 Shall Integrated Normal and
Skew Octupole 100 G/cm2
Based on Undulator RQMT R05-10-002720
Table 6-5 Textual description of the magnet features improving the magnetic field quality
ID NUM
(S09-08-) Specification Traceability/ Assumption
003340
Flat magnetic shims (0.5 mm high, 5 mm wide) shall be machined on both sides of the flat magnet pole in order to improve the field uniformity due to lack to top/bottom symmetry.
Deliverable: mechanical tolerance analysis
EM numerical analysis
003342
The entry and the exit pole-face of the magnet shall by machined at an angle so that the vector normal to the pole-face is parallel to the entry and exit beam trajectory. The pole-face angle is introduced in order to minimize the horizontal (Bx).
EM numerical analysis
003344 The entry and the exit pole-edge should have 5x5 mm chamfer machined in order to minimize the horizontal (Bx).
EM numerical analysis
003346 The yoke roof-plate shall extend beyond the base-plate and overhang the coil-ends in order to shield the AR stored beam from the fringe field of the magnet.
EM numerical analysis
003348
The AR stored beam chamber shall be made of a non-magnetic Stainless Steel. An additional layer of ferromagnetic shielding material (e.g. μ-Metal wrap or low carbon steel tube) should be used if it is necessary to meet the magnetic field requirement.
EM numerical analysis
003350 Two 5 mm ferromagnetic plates separated by 5 mm gap shall be installed on flux-return boss-feature on both side of the magnet in order to shield the AR stored beam from the fringe field of the magnet.
EM numerical analysis
003352 Shielding plates shall be installed with a 12 mm gap to the extended yoke roof-plate for installation of the racetrack vacuum chamber.
EM numerical analysis
003354 External faces of the shielding plate assemblies shall be co-planar with external faces of the extended yoke roof-plate.
EM numerical analysis
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 12 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
7 REFERENCE DESIGN PARAMETERS
7.1 Magnet and Coil Electrical Parameters
Table 7-1 Magnet and Coil Winding Parameters
ID NUM
(S09-08-)
RQMT
DEF
Specification Description Value Unit Traceability/
Assumption
003400 Should Nominal Operating Current 241.1 A Reference
Design
003402 Should Nominal Operating Voltage 9.34 V Reference
Design
003404 Should Nominal Operating Power 2252 W Reference
Design
003406 Should Resistance 38.73± 1.0 mΩ Reference Design
003408 Should Maximum Operating Current 253.2 A Reference
Design
003410 Should Maximum Operating Voltage 9.81 V Reference
Design
003412 Should Magnet Inductance 32.1 mH Reference Design
003414 Should Maximum Slew Rate 10 A/s Power Supply Group
003416 Shall Number of Poles 1 - Reference Design
003418 Shall Number of Coils per Pole 1 - Reference
Design
003420 Should Number of Turns per Coil 48 - Reference
Design
003422 Shall Coil Conductor Material Copper CDA 101 – 105 - Standard
Practice
003424 Shall Conductor Shape Square - Reference Design
003426 Should Bare Conductor Size 9.00 x 9.00±0.15 mm2 Reference
Design
003428 Should Cooling Hole Diameter 6.0±0.1 mm Reference Design
003430 Should Conductor Corner Radius 1.5 mm Reference
Design
003432 Shall Base Layer Conductor Insulation Material Mylar - Standard
Practice
003434 Should Base Layer Insulation Thickness ½ Lap 0.1 mm Standard
Practice
003436 Shall Glass Tape Insulation Material
E-Glass or S- Glass - Standard
Practice
003438 Should Glass Tape Insulation Thickness ½ Lap 0.2 mm Standard
Practice
003440 Shall External Coil Dielectric Isolation Wrap Material
E-Glass or S- Glass - Standard
Practice
003442 Shall External Coil Dielectric
Isolation Wrap Thickness
0.5 +0.5, -0.0 mm Standard
Practice
003444 Shall Coil Impregnation Material Epoxy - Standard
Practice
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 13 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
ID NUM
(S09-08-)
RQMT
DEF
Specification Description Value Unit Traceability/
Assumption
003446 Shall Coil Impregnation Method Vacuum - Standard
Practice
003448 Should Maximum Operational Magnet Bus Voltage 30 V Standard
Practice
003450 Shall Minimum High-Pot Testing Voltage 250 V Standard
Practice
003452 Shall Minimum Resistance at
Minimum Hi-Pot Voltage
2 GΩ Standard Practice
003454 Shall Impulse Testing Protocol Required - Standard
Practice
003456 Shall Power Cable Interface, Cable Size MCM 373 - Standard
Practice
003458 Shall Power Cable Interface, Lug Manufacturer and
P/N
Thomas & Betts
54918BE-PH
- Standard
Practice
7.2 Hydraulic Circuit Parameters
Table 7-2 Magnet Hydraulic Circuit Structure
ID NUM
(S09-08-)
RQMT
DEF
Specification Description Value Unit US English
(reference) Traceability/ Assumption
003500 Shall Number of Water Circuits per Coil 2 - - Reference
Design
003502 Should Conductor Length per Coil
106.1 ± 0.3 m 348.1 ± 1 ft Reference
Design
003504 Should Conductor Cooling Hole Diameter 6.0 mm - Reference
Design
003506 Shall Design Pressure 517 kPa 75 psi Reference Design
003508 Should Minimum Circuit Flow Rate 3.27 l∙min-1 0.86 gpm Reference
Design
003510 Should Coil Circuit Water Flow Velocity 1.93 m/s 6.33 ft/s Reference
Design
003512 Should Water Temperature Rise Inside Coils 5.4 ºC 9.7 F Reference
Design
003514 Should Magnet Flow Rate 6.54 l∙min-1 1.73 gpm Reference Design
003516 Shall Operating Inflow Water Pressure 725 kPa 105 psi
Compatibility with LCW at
LBNL
003518 Should Operating Outflow Water Pressure 207 kPa 30 psi
Compatibility with LCW at
LBNL
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 14 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
7.3 Magnet Electrical Interlock Protection
Table 7-3 Electrical Interlock Specifications
ID NUM
(S09-08-)
RQMT
DEF
Specification Description Value Unit Traceability/
Assumption
003600 Will Power Supply Circuit Structure SOLO Magnet - Unique magnet per TL
003602 Shall Number of Interlock Thermal Switches per Water Circuit 1 -
Compatible with TL DC dipole interlock design
003604 Shall Number of Interlock Thermal Switches per Coil 2 -
Compatible with TL DC dipole interlock design
003606 Shall Number of Interlock Thermal Switches per Magnet 2 -
Compatible with TL DC dipole interlock design
003608 Shall Open Switch Interlock Detection Requirement
Magnet Level -
Compatible with TL DC dipole interlock design
003610 Shall Over Temp Switch Opening Req. 70 ºC
Compatible with TL DC dipole interlock design
003612 Shall Statistical Standard Deviation for Switch Opening Temp 2 ºC
Compatible with TL DC dipole interlock design
003614 Shall Switch Close Temp after Opening 35 ºC
Compatible with TL DC dipole interlock design
003616 Shall Statistical Standard Deviation for Switch Closing Temp 2 ºC
Compatible with TL DC dipole interlock design
003618 Shall Thermal Switch Voltage Specification +/- 28 VDC
Compatible with TL DC dipole interlock design
003620 Shall Thermal Switch Specification Thermik
L06-70. 05 0300/0300
Compatible with
TL DC dipole interlock design
003622 Shall Thermocouple Placed on the Water Exhaust - -
003624 Shall Thermocouple Type Specification K 1
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 15 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
8 SUPPORTS AND ALIGNMENT
Figure 8.1 Overview of the Lambertson magnet support frames.
Table 8-1 Support structure requirements
ID NUM
(S09-08-) Specification Traceability/ Assumption
003700 DC Lambertson magnet shall be supported by the six-strut system. Eng Judgment
003701 Components of the six-strut system shall be certified to be suitable and rated for intended use Eng Judgment
003702 Each Lambertson magnet has a unique support frame with a unique hole patterns interface. Hole patterns are specified in AL-1309- 9749.DRW and AL-1309-9750.DRW
Supports Group
Figure 8.2 Overview of hole patterns at the support interface of Lambertson magnets.
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 16 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Table 8-2 Lifting fixture textural requirements
ID NUM
(S09-08-) Specification Traceability/ Assumption
003710 DC Lambertson magnet shall be supplied with a removable lifting fixture. Eng Judgment
003711 Lifting fixture shall utilize swivel-type lifting eyes at designated lift points. Eng Judgment
003712 Lifting fixture shall be certified to be suitable and rated for intended use. Eng Judgment
Table 8-3 External fiducial markers textual requirements
ID NUM
(S09-08-) Specification Traceability/ Assumption
003720 DC Lambertson magnet shall be provided with permanently attached external fiducial marker posts. Eng Judgment
003721
AR02S:SIL shall be equipped with 7 fiducial marker posts and AR12S:SEL shall be equipped with 10 fiducial marker posts. The number of the fiducial markers can be revisited at the Final Design Review.
Eng Judgment
Figure 8.3 Overview of the fiducial markers locations.
Figure 8.4 Spacer post assembly with SMR nest mount.
Table 8-4 Magnet-Magnet Position Tolerances
ID NUM
(S09-S08-)
RQMT
DEF Specification Description Value Unit Traceability/ Assumption
003731 Shall X-direction magnet-to-magnet position tolerance a ± 150 μm Beam Physics
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 17 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
ID NUM
(S09-S08-)
RQMT
DEF Specification Description Value Unit
Traceability/ Assumption
003732 Shall Y-direction magnet-to-magnet position tolerance a ± 150 μm Beam Physics
003733 Shall Z-direction magnet-to-magnet position tolerance a ± 400 μm Beam Physics
003734 Shall Rotation about x-axis magnet-to-magnet angular tolerance a ± 1000 μrad Beam Physics
003735 Shall Rotation about y-axis magnet-to-magnet angular tolerance a ± 1000 μrad Beam Physics
003736 Shall Rotation about z-axis magnet-to-magnet angular tolerance a ± 600 μrad Beam Physics a The specified error interval corresponds to a 95% confidence based on a Gaussian error distribution
9 ALS-U TRANSFER LINE DIPOLE REQUIREMENTS ADOPTED TO
LAMBERTSON MAGNET
The following section was adopted from the ALS-U internal document AL-1462-7396 (BTA-MAGNETS Dipole Common Mechanical Requirements by S. Soezeri, M.
Mardenfeld, and C. Swenson) in order to unify the set of design principles across transfer line dipole magnets.
9.1 General Requirements
Number Type Description Value Reference General
Shall Specifications: Unless otherwise specified, information in drawings and specifications are to be interpreted as "SHALL" requirements. Information in "REFERENCE DESIGN" CAD models are to be interpreted as "SHOULD" or "MAY". Information in "INTERFACE CONTEXT" CAD models are to be interpreted as "WILL".
N/A
General
Shall Specifications: The drawings package includes some components defined by "space claim" volumes. For these components, the vendor has significant freedom in completing the design. While LBNL is providing a solid model "Reference Design" for these components as a guide, the vendor has the freedom to alter those designs provided they remain entirely within the specified volumes, meet the requirements listed in specifications and in the drawing notes, and meet the non-reference dimensions controlled by the drawing.
N/A
General
Shall Specifications: The drawings package includes some components defined with specific dimensions. These dimensions are shown at the assembly or interface level.
For these components, the vendor shall adhere to the dimensions and design intent of the interface drawings, while filling in the detailed piece-part level design, and ensuring that the magnet meets requirements, standard practices, and is fit for service.
N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 18 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference General
Shall Specifications: Where the vendor uses all or part of the LBNL provided design, it is still the vendors responsibility to ensure that those components meet all requirements, standard practice, and are fit for service. This holds for components defined by both "space claim" volumes AND components defined by specific dimensions. The reference design provided by LBNL is not approved for fabrication, and has not been through the full rigor of a final design review.
N/A
General
Shall Accelerator Environment: The intended operating life for the magnet assembly is 7500 hours a year for 25 years.
N/A
General
Should Accelerator Environment: The magnet assembly will be operated in a high radiation environment (X-Rays), and radiation resistant materials and components should be used wherever not cost prohibitive.
N/A
General
Shall Accelerator Environment: Polymeric based materials or others material types susceptible to radiation degradation, shall not cross the plane of the magnet on which the beam is bent. This includes, but is not limited to, electrical insulation, water hoses, terminal block housings, etc.
Exceptions may be granted based on specific approval from LBNL.
N/A
General
Should Accelerator Environment: Polymeric based materials or others material types susceptible to radiation degradation, should not cross the mid-plane of the Accumulator Ring.
The Accumulator Ring is nearby interfacing equipment shown in the "interface context models".
N/A
General
Should Accelerator Environment: Polymeric based materials or others material types susceptible to radiation degradation, should ideally remain this far above or below both the transferred beam plane and the Accumulator Ring mid-plane.
50mm
General
Shall Accelerator Environment: Hydrocarbon containing lubricants or other high vapor pressure volatiles shall not be used without explicit approval of LBNL, due to the proximity of ultra-high vacuum equipment.
N/A
General
Shall Accelerator Environment: During vacuum baking operations, magnet will see increased temperature due to heating of adjacent equipment. Magnet must be designed to withstand this temperature without degradation or disruption of alignment. During vacuum baking, magnet can assumed to be un-energized, and with the normal operation flow of cooling water flowing through coils.
50 C at pole tips, temperature of rest of assembly to be based on estimated conduction from pole tips and convection to ambient
General
Should Materials: Preferred metallic materials for non-fastener components include austenitic stainless steels, mild steels, C101 copper, and aluminum 6061-T6.
N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 19 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference General
Should Materials: Preferred nonmetallic materials for non-fastener components include G10, FR4 and polycarbonate.
N/A
General
Shall Materials: Vendor shall place appropriate magnetic permeability limitations on materials in order to facilitate achieving the magnet field requirements.
N/A
General
May Design Principles: Use of standard imperial dimensions for the size of geometric features are allowed, provided other requirements to use metric units are followed. For instance, a stock plate thickness of 0.25 inches can be used, provided it is dimensioned in metric.
N/A
General
Should Design Principles: Features, parts, hardware, and fittings should be standardized as much as reasonably possible among different components, subassemblies, and magnet families
N/A
General
Should Design Principles: Vendor should make a best effort to minimize magnet equipment obscuring visible line of sight to SMRs fiducials nests.
N/A
General
Should Design Principles: Individual components should be designed in such a way that they avoid crossing over the split-plane of the magnet as much as possible, in order to facilitate splitting magnets into upper and lower halves. If components must cross the split-plane of the magnet, they should by mounted in such a way that they can easily be removed and reinstalled, even within limited space.
N/A
General
Shall Design Principles: Minimum chamfer size on sharp edges within 30mm of electrical insulation, to avoid accidental damage of insulation.
3 mm
General
Shall Design Principles: Sharp edges, corners, and other cut or bump hazards shall be avoided where possible, or be broken with chamfers or rounding for the safety of personnel who will need to work in the confined space environment of the magnet in the accelerator tunnel.
N/A
General
Shall Maintenance: If custom tooling is required for alignment, assembly, coil replacement, lifting, or other maintenance operations foreseeable over the course of the operational life, vendor shall provide LBNL with that tooling, along with solids models, drawings, and instructions for use.
N/A
General
Shall Maintenance: Vendor shall supply production spares for the following components: hoses, thermal flow switches, alignment pins, terminal blocks, any nonstandard or specially coated hardware. For these items, the quantity of spares shall be the greater of: 1x of each type/size, or 20% overage across all magnet assemblies.
N/A
General
Shall Maintenance: Vendor shall supply production spares for the following materials: JIC fitting crush gaskets, thermosetting bus insulating tape, approved lubricants, and electrical contact aid (if used). For these items, the quantity or spares shall be equal to the quantity used in the magnet assemblies.
N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 20 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference General
Shall Maintenance: Vendor shall supply coil fabrication tooling and winding fabrication instructions and travelers for all dipoles.
N/A
General
Should Maintenance: Vendor should supply spares for any other difficult to purchase items which may conceivably need replacement over the lifetime of the magnet.
N/A
General
Should Maintenance Access: Vendor should make a best effort to maintain general accessibility to components within the context of the nearby equipment in the accelerator tunnel, by reviewing the "Interface Context Models" throughout the design phase. Specific components that shall have maintenance access are called out in the relevant sections.
N/A
General
Shall Maintenance Access: Vendor shall make a best effort to not obstruct access to vacuum equipment which is near to, and transits through the bore, of the magnet to allow for flange assembly, leak checking, vacuum support adjustment, etc.
This includes minimalizing protrusion of equipment (e.g.
bus leads, enclosures, coil supports, etc.) into the axial space between magnets, as well as being cognizant of pumps, vacuum supports, and other equipment which will be near the magnets when they are installed in the accelerator tunnel. See the "Interface Context Models".
N/A
9.2 Requirements of Magnet Coils
Number Type Description Value Reference
Coils 001 Shall Interface: Coil and coil supports shall fit entirely within the
"space-claim" volumes defined by the drawings.
AL-1309-9749.DRW
AL-1309-9750.DRW
Coils 002 Shall
Interface: The electrical bus lead shall egress from the coil in a place that is consistent with the "space-claims" defined by the drawings
AL-1309-9749.DRW
AL-1309-9750.DRW
Coils 003 Should
Interface: Final manufactured coil size should be kept as small as reasonable while achieving other requirements, due to limited space between magnet assemblies once installed in the tunnel.
N/A
Coils 004 Shall
Design: Vendor shall design an appropriate coil winding pattern, conductor size, insulation build up, resin type, and potting process compatible with other magnetic, electrical, and hydraulic requirements. Stated below are the LBNL reference values which were used for concept development.
N/A
Coils 005 Deleted Deleted Deleted
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 21 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference
Coils 006 Shall Design: Vendor shall choose coil winding helicity. Winding helicity shall be consistent with other requirements. N/A
Coils 007 Deleted Deleted Deleted
Coils 008 Shall
Design: Coil conductor shall be of the following material, for good conductivity, and especially for compatibility with deionized water systems. The conductor requirements shall be per specification ASTM B188-09:
CDA C10100
Coils 009 Should Design: Preferred copper hardness:
Soft annealed temper (O60) as defined in ASTM Specification B601-09
Coils 010 Shall
Design: Coils shall be free of resin rich areas, resin poor areas, and voids. Internal volumes of coils not occupied by conductors shall be filled with G10 spacers or epoxy filled glass roving.
N/A
Coils 011 Shall Design: Minimum insulation voltage hi-pot 2X Max Operating
Voltage + 1000V
Coils 012 Shall Design: Minimum insulation resistance via megger 2 Gohm
Coils 013 Shall
Coil Supports: Coil shall be securely clamped in place by appropriate supports. These supports shall provide a preload force which seats the coil against the yoke. Support shall resist magnetic forces, gravity forces, and motion due to changing magnetic fields, and misalignment during transport.
N/A
Coils 014 Should
Coil Supports: G10 shims should be used between coils and surfaces they seat against, to protect the coil surfaces, and to provide capability for fine adjustment of coil position. G10 is selected for known resistance to synchrotron radiation, mechanical stability/creep resistance, and insulating characteristics
N/A
Coils 015 Shall
Coil Supports: Coil supports and shims shall be designed in such a way that the removal and replacement of a coil is repeatably located, and that the coil is protected from any point loads or undue stress. Specific attention should be paid to positional repeatability of the coil location with respect to the front and back yoke faces (defined along magnet Z-axis) and the pole faces (reference axis unique to direction of beam bend)
Coil positioning repeatability: 0.5 mm
Coils 016 Shall
Coil Supports: Coil supports shall be made of hard tempered aluminum and/or G10 due to avoid undesirable magnetic effects proximate to the good field region
N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 22 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference Coils 017 Should Reference coil design: Build type VPI
Coils 018 Should Reference coil design: Potting compound DGEBA epoxy
Coils 019 Should Reference coil design: Main circuit, turn insulation, 1st layer, material Mylar tape
Coils 020 Should Reference coil design: Main circuit, turn insulation, 1st layer, wraps 1x layer, half lapped total thickness 0.1mm
Coils 021 Should Reference coil design: Main circuit, turn insulation, 2nd layer, material E-Glass or S-Glass tape
Coils 022 Should Reference coil design: Main circuit, turn insulation, 2nd layer, wraps 1x layer, half lapped total thickness 0.4mm
Coils 023 Should Reference coil design: Main circuit, layer to layer insulation, material
Omitted in point design. May be included per vendor discretion
Coils 024 Deleted Deleted Deleted
Coils 025 Deleted Deleted Deleted
Coils 026 Should Reference coil design: Ground wrap: total thickness 0.5mm
9.3 Requirements on Magnet Bus Leads
Number Type Description Value Reference
Bus 001 Shall Interface: The bus leads shall fit entirely within their "space-claim" volume as defined by the drawings.
AL-1309-9749.DRW
AL-1309-9750.DRW
Bus 002 Shall Interface: Terminal blocks shall be provided with sufficient terminals for thermal flow switches.
AL-1309-9749.DRW
AL-1309-9750.DRW
Bus 003 Shall Interface, Maintenance: Terminal blocks shall fit entirely within the "space-claim" volume as defined by the drawings. N/A
Bus 004 Deleted Deleted N/A
Bus 005 Shall Interface: Bus leads flags must be sized to accept the main power electrical lug stated in the electrical design requirements section. N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 23 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference
Bus 006 Shall
Design: Air cooled bus jumpers (for the main coil circuit) shall be sized for the following temperature rise. This sizing shall make consideration for restricted airflow within the electrical safety enclosure, electrical contact resistance, and spreading resistance. Bus jumper cooling may take credit for conduction from nearby water flow. Sizing may be done per code, calculation, or test.
30 C temperature rise over a 40 C ambient
Bus 007 Should
Design: The following is a reference ampacity of bus bars routed through enclosures. Vendor may use other ampacities as justified by code or calculation.
1000 Amps / in^2
Bus 008 Shall
Design: Bus routing in the reference CAD model only used to establish the "space-claim" dimensions. Vendor is responsible for designing the bus routing in agreement with this document.
AL-1309-9749.DRW
AL-1309-9750.DRW
Bus 009 Shall
Design: The reference CAD design show the electrical bus routing standardized across magnet variants such that the upper lug is "+" and the lower lug is "-". Vendor may flip this convention, if necessary for winding helicity, after LBNL authorization.
N/A
Bus 010 Should
Design: It is preferred that water cooled bus lead water fittings are brazed onto the copper conductor, to ensure a leak tight seal.
Fittings are described in the cooling requirements section.
N/A
Bus 011 Deleted Deleted N/A
Bus 012 Shall
Flags: Bus lead and electrical flag contact design should follow an appropriate industry practice regarding size, contact area, clamping force, fastener torque, fastener size, surface finish, flatness, hardness, bus flag thickness, and other practical design factors.
CDA Publication 22 or other recognized standard practice
Bus 013 Shall
Flags: Braze joints between copper bus and lead flags shall be designed appropriately to achieve the temperature requirements listed above.
N/A
Bus 014 Shall
Flags: Vendor shall determine where an appropriate plating or contact aid between electrical contact surfaces, and incorporate into the design as appropriate. Use of high vapor pressure or non-UHV compatible materials requires LBNL approval.
N/A
Bus 015 Shall
Fasteners: Electrical contacts for bus flags, power cable lugs, and bus jumpers shall be designed with through holes. Bolts for electrical contacts shall be fastened with a nut with washer, or nut plate. Copper surfaces must be protected from bearing of the nut or bolt head with a hardened flat washer. Washers and nut plates shall be large enough to promote even clamping force.
N/A
Bus 016 Shall Fasteners connecting electrical contacts for bus flags, power cable lugs, and bus jumpers shall be 316 stainless steel. N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 24 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference
Bus 017 Shall
Fasteners connecting electrical contacts for bus flags, power cable lugs, and bus jumpers shall include Belleville washer(s).
Belleville washers shall be sized such that the required joint clamping force is achieved before the Belleville washer is flat, to allow residual travel to compensate for thermal expansion without loss of preload.
N/A
Bus 018 Shall
Routing: Bus lead routing should follow best practice to minimize field errors, and aid in achieving the magnet field requirements specified elsewhere. This includes maintaining reasonable distances between the leads and the good field region and routing "+" and "-" leads adjacent to each other.
N/A
Bus 019 Shall
Routing: Water cooled bus routing shall minimize the number and sharpness of bends as much as reasonable, to reduce coolant turbulence. Minimum allowed bend radius is twice the conductor OD (side length for square conductors).
N/A
Bus 020 Shall
Routing: The position of the main electrical power cable interface points in the reference design have been selected to allow the large diameter cables to route over the edge of the welded structures to which the magnets are mounted ("rafts") without tight bend radii. This feature must be maintained. See "Interface Context Models".
N/A
Bus 021 Shall
Routing, Maintenance: Routing of bus leads shall facilitate splitting the magnet assembly into upper and lower parts. Bus leads on the lower magnet half must not interfere with removing the upper magnet half by hoisting it vertically.
N/A
Bus 022 Deleted Deleted N/A
Bus 023 Shall
Support: Water cooled bus leads shall have bracketry providing mechanical fixation to the yoke, near the point of bus egress from the coil. These supports shall protect the point of egress from any stresses due to motion of the bus leads
N/A
Bus 024 Shall
Support: Water cooled bus leads shall have bracketry providing mechanical fixation to the yoke, near the water fittings which join to coolant hoses. These supports shall protect the bus leads from any stresses due to hose motion or tightening of fittings.
N/A
Bus 025 Should Support: Water cooled bus lead support brackets near water fittings should grasp the fitting, and not the bus lead. N/A
Bus 026 Shall
Support: Water cooled bus leads shall have bracketry which support the weight of the main circuit power cable, to prevent gravity induced creep. These brackets may be designed to grab the cable itself or the bus lead.
N/A
Bus 027 Deleted Deleted N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 25 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference Bus 028 Deleted Deleted N/A
Bus 029 Shall
Support: All bus lead support shall grasp the lead firmly to prevent any relative motion or wiggling, for instance, by wrapping the lead with glass cloth shim to ensure a tight fit up, or other method.
N/A
Bus 030 Shall
Maintenance Access: Terminal blocks should be positioned and oriented to maintain access as best as reasonably achievable.
The routing of wires to terminal blocks shall be done in such a way that they may be easily removed and replaced in the context of crowded accelerator tunnel. See "Interface Context Models" for references.
N/A
Bus 031 Shall
Maintenance Access: The design of bus leads, bus bars, and other components inside of the electrical enclosure shall allow sufficient access for wrenches, removal of power cables, and disassembly of bus bars, with a minimal removal of the electrical enclosure. This disassembly must be possible within the crowded context of nearby equipment in the accelerator tunnel
- see "Interface Context Models"
N/A
9.4 Electrical Safety Requirements
Number Type Description Value Reference
Elec Saf.
001 Shall Grounding: All metal components not intentionally designed to be electrically energized shall have a path to ground N/A
Elec Saf.
002 Should Grounding: A single ground point for the entire assembly is preferred with all grounded components electrically connected. N/A
Elec Saf.
003 Shall Grounding: Ground wire size #2, AWG
Elec Saf.
004 Shall
Grounding: Ground point lug interface must be compatible with both of these lug parts, by including an appropriate tapped hole and either a spot face or an area free of paint/anticorrosive.
Vendor: Blackburn Parts: CTL1-14 and
CTL2-14
Elec Saf.
005 Shall
Standards: All current carrying conductors, electrical junctions, and energized surfaces shall EITHER be insulated according to an appropriate nationally recognized standard, OR have exposed surfaces contained within an electrical safety enclosure. This includes, for instance, water fittings and thermal flow switches at the same potential as electrical bus.
N/A
Elec Saf.
006 Shall
Standards: Electrical safety enclosures shall protect workers from electrical hazards, according to the following standards, and be "finger safe", including at the areas where conductors, cables, or hoses cross its boundary.
IEC 60529
IP2X Finger
Elec Saf.
007 Shall Standards: COTS Electrical components must be ROHS compliant. N/A
O ffi cia lly
R ele as ed to th e L
BN
L D oc um en t C on tro l C en te r
Re lea se d:
S ep te m be r 9 th , 2
D
CC
A ut h Ke y:
Q
6B
FG
7D
AL-1311-8004 Rev. A Doc. Status: Released Page 26 of 45
Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Number Type Description Value Reference
Elec Saf.
008 Shall
Standards: COTS electrical components must either be UL listed, or meet an equivalent safety standard, and be appropriately rated for their service ampacity.
N/A
Elec Saf.
009 Shall
Insulation: Bus leads, where not otherwise contained within an isolation enclosure, shall be insulated with a NEMA grade C-2 expandable braided fiberglass sleeving with elastomer coating, per NEMA TF-1 type 5. This includes main coil water cooled bus and jumpers. The preferred brand, listed here, shall be used unless otherwise approved.
Varglas (Varflex Corp.), or equivalent
Elec Saf.
010 Should Insulation: Preferred insulation material for miscellaneous wires, e.g., thermal flow switches, etc. Bus lead insulation is stated above.
NEMA Class
200MW 36
Elec Saf.
011 Shall
Insulation: Electrical insulating material not otherwise contained inside of an isolation enclosure shall not cross…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .