4.6 APPENDIX F, CONCESSION COMMISSARY KITCHEN PREP PLAN.pdf
PDF 1 MB Posted
- Attached to
- M3L6E1 Food Hall
- Solicitation number
- 202580310
- Issued by
- Denver County, Denver City, Colorado
About this file
This document is a draft Concession Design Guidelines document for the Denver International Airport (DEN) Great Hall Completion project, prepared by Stantec Architecture, dated March 7, 2025, with a focus on Level 4 Concession Commissary Prep. The document outlines detailed plans for concession spaces on Level 4, specifically highlighting four key food and beverage locations: a Fast Casual space (M3L5W1) of 1,450 square feet, a Casual Dining with Bar space (M3L5E1) of 1,730 square feet, a Grab N Go Cafe (M2L5W1) of 800 square feet, and an F&B Food Hall (M3L6E1) of 2,430 square feet. The document provides comprehensive architectural plans, delivery routes, and spatial arrangements for these concession areas, with a total of 6,410 square feet of designated food service space.
The design guidelines include specific details about delivery logistics, with all deliveries for these spaces coming from a loading dock and utilizing freight elevators to move between Levels 5 and 6 of the terminal. The architectural plans show a meticulously planned layout with designated mechanical spaces, a hot water heater room, and carefully mapped routes for tenant spaces. The document is part of a larger project to complete and optimize the Great Hall area of the Denver International Airport, with a focus on creating efficient, well-designed food service locations that can accommodate various dining concepts and customer needs.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEN Great Hall Completion
Concession Design Guidelines| Concession Space: M3L5W1 March 7, 2025
DRAFT
The purpose of this draft is to confirm information/content/layout related to
Concession Guidelines for the terminal is at an appropriate level to be included in concession
RFPs
July 17, 2025Level 4 | Concession Commissary Prep
STANTEC ARCHITECTURE
March 07, 2025
Contents
• Concession Location Map
• General Information
• Tenant Provisions – Finishes
• Tenant Provisions – Signs
• Tenant Provisions – Utilities / Infrastructure
• Tenant Provisions – Function
• Appendix Level 6 Terminal Map
Level 5 Terminal Map
Terminal Design Inspirational Concept Images
DRAFT
July 17, 2025
Contents Level 4 - Enlarged Plan 5A Level 4 - Delivery Routes
03/07/2025 DEN Great Hall Completion 3
EXAMPLE: TYPICAL
CONCESSION M3L5W1
Mid-Size Restaurants (MR)
(1000 – 2500 SF)
Level 5
Concession Location Map – Terminal Wide
DRAFT
W1W2 EWW3W4W5W6W7
N45
N44
N43
N42
N41
N40
07/17/2025 DEN Great Hall Completion 3
Concession Commissary Prep
Level 4 - Enlarged Plan 5A
5A
N
HOT WATER
HEATER ROOM
MECH SHAFT
EXISTING
688 SF
M3L5W1 Fast Casual
1,450 sf provided
M3L6E1 F&B Food Hall
2,430 sf provided
N45
N44
N43
N42
N41
N40
N45
N44
N43
N42
N41
N40
N45
N44
N43
N42
N41
N40
M3L5E1 Casual Dining w/ Bar 1,730 sf provided
M2L5W1 Grab N Go Cafe 800 sf provided
DEN CONCESSIONS DATA
Square
Feet
SQ FT
800 SF
1,450 SF
1,730 SF
2,430 SF
6,410 SF
Project Title
GH MOD 2 - 504 (M2L5W1)
Grab and Go Cafe
GH MOD 2 - 505 (M2L5E1)
Travel Convenience Marketplace
GH MOD 3 - 507 (M3L5W1)
Fast Casual w/ Seating
GH MOD 3 - 506 (M3L5E1 & M3L5C1)
Casual Dining w/ Bar (525)
GH MOD 3 - 601 (M3L6W1)
Arrivals Lounge
GH MOD3 - 602 (M3L6E4)
Banking Services
GH MOD 3 - 603 (M3L6E1)
F&B Food Hall
DELIVERIES FOR THESE SPACES
COME FROM LOADING DOCK
Route to Tenant Spaces in Terminal; see next page for complete path
03/07/2025 DEN Great Hall Completion 3
EXAMPLE: TYPICAL
CONCESSION M3L5W1
Mid-Size Restaurants (MR)
(1000 – 2500 SF)
Level 5
Concession Location Map – Terminal Wide
DRAFT
N
N
N
E W
W
W
W
W
W
E
E
E
E
E
N
N
N
E W
W
W
W
W
W
E
E
E
E
E
07/17/2025 DEN Great Hall Completion 4
Concession Commissary Prep
Level 4 - Delivery Routes
5A
N
LEVEL 4 PLAN 5A/5C
DELIVERIES FOR THESE SPACES
COME FROM LOADING DOCK
DELIVERIES TO TENANT
SPACES WILL UTILIZE FREIGHT
ELEVATORS TO LEVEL 5 &
LEVEL 6 OF TERMINAL
TO LEVEL 5 TENANT SPACES
Route to Tenant
Spaces in Terminal
LEVEL 5 PLAN 8A/8B
LEVEL 6 PLAN 8A/8B
TO LEVEL 6 TENANT SPACES
5C
8A
5A
8B prn_denghc_concession_guidelines_M3L5C1
File details come from the government source that posted it. Updated .