About this file

This is a cost schedule template for Nevada's SR On Call Maintenance contract opportunity at Southern Region Parks. The schedule requires vendors to complete pricing for multiple labor categories and equipment services. The labor categories include electricians, plumbers, locksmiths, and equipment operators, each with three rate tiers: standard rate, overtime rate, and weekend/holiday rate, all priced on an hourly basis. Additionally, the schedule includes pricing for confined space work as a full team service with the same three rate tiers, backhoe equipment rental on an hourly basis, and backhoe mobilization fees for jobs within 150 miles.

Vendors are responsible for completing all shaded areas with proposed pricing and ensuring that all calculations are accurate. The schedule requires vendors to provide markup percentages for both subcontractor work and materials, along with an estimated total project value. The structure allows the government entity to evaluate pricing across different service categories and staffing scenarios, enabling flexible cost management for on-call maintenance services that may require various combinations of skilled trades, equipment, and contingent staffing levels.

View the file

Other files

File Type Posted
4.2.2 Insurance Schedule~1.pdf PDF
S3960-request-for-proposals-2026-08-06.docx DOCX document
Quote Instructions.pdf PDF
4.1.1 Terms-and-conditions-for-services~6.pdf PDF
4.3.2 Certification-regarding-lobbying~1.pdf PDF
4.1.2 Scope of work.docx DOCX document
4.2.1 Standard-form-contract~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost schedule

S3960 cost schedule
Vendor
Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct.
LineDescription and termTypePriceEst. UsageExtended
1electrician standard ratehourly$ - 0
2electrician overtime ratehourly$ - 0
3electrician weekend / holiday ratehourly$ - 0
4plumber standard ratehourly$ - 0
5plumber overtime ratehourly$ - 0
6plumber weekend / holiday ratehourly$ - 0
7confined space (full team) standard ratehourly$ - 0
8confined space (full team) overtime ratehourly$ - 0
9confined space (full team) weekend / holiday ratehourly$ - 0
10locksmith standard ratehourly$ - 0
11locksmith overtime ratehourly$ - 0
12locksmith weekend / holiday ratehourly$ - 0
13equipment operator standard ratehourly$ - 0
14equipment operator overtime ratehourly$ - 0
15equipment operator weekend / holiday ratehourly$ - 0
16backhoe ratehourly$ - 0
17backhoe mobilizationwithin 150 miles$ - 0
18markup on subcontractor workpercentage$ - 0
19markup on materialspercentage$ - 0
Estimated project value$ - 0