4.03b 6251 018 MIP - Reference 2 (PWS).pdf
PDF 244 KB Posted
- Attached to
- O2 Canister Hydro-static Testing and Regulator Calibration Federal contract opportunity
- Solicitation number
- N0018925Q0498
About this file
This Maintenance Index Page (MIP) details maintenance requirements for a Medical Oxygen Regulator with Pressure Gauge, Naval Sea Systems Command document dated June 2024. The document outlines three primary maintenance procedures: an annual Pressure Leak Test and Flow Rate Verification (0.3 man-hours), a Lay-Up Maintenance procedure for when medical spaces are undergoing industrial work (0.1 man-hours), and a Start-Up Maintenance procedure for returning the regulator to service after prolonged idleness (0.1 man-hours). The document is marked with Distribution Statement D, authorizing access only to Department of Defense and U.S. DoD contractors, and is classified under Critical Technology with MIP Control Number 6521/518-64.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P0002 Amendment.pdf | ||
| 4.06 P0001 Amendment 8.3.pdf | ||
| N0018925Q0498.pdf | ||
| 4.03a OPNAV 4790 85 (REV. 9-97) - Reference 1 (PWS).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT D:
Distribution authorized to Department of Defense and U.S. DoD contractors only; Critical Technology; June 2024. Other requests for this document shall be referred to Naval Sea Systems Command (SEA 09M).
MIP CONTROL NUMBER: 6521/518-64 Date: June 2024
SHIP SYSTEM, SYSTEM, SUBSYSTEM, OR EQUIPMENT
Medical Oxygen Regulator with Pressure Gauge
65210
REFERENCE PUBLICATIONS
CONFIGURATION
Medical Oxygen Regulators with Pressure Gauge and Flowmeter, All types
SCHEDULING AIDS
OTHER MRC NO.
MAINTENANCE REQUIREMENT
DESCRIPTION
PERIO-
DICITY
CODE
RATES
MAN
HRS
RELATED
MAINT
64 FS37 N 1. Perform Medical Oxygen Regulator Pressure Leak Test and Verify Flow Rate.
NOTE: Accomplish this maintenance requirement when any of the following periodicities or situations occur.
a. Annually.
b. After work center receipt of regulator.
A-1R HN 0.3 None
INACTIVE EQUIPMENT
MAINTENANCE
The following requirements will be scheduled when equipment is inactivated for periods of prolonged idleness.
Lay-Up Maintenance
83 PD63 N 1. Lay Up Medical Oxygen Regulator.
NOTE: Perform Lay Up when Medical Space is undergoing industrial work causing suspension of medical services to ship.
LU-1 HN 0.1 None
Start-Up Maintenance
83 PD64 N 1. Return Medical Oxygen Regulator to Service.
NOTE: Perform maintenance requirement when Medical Space is returned to full operating status after prolonged idleness.
SU-1 HN 0.1 None
Maintenance Index Page (MIP) Page 1 of 1 SYSCOM MIP: 6521/518-64
OPNAV 4790/85 (REV. 9-97)
File details come from the government source that posted it. Updated .