This is a pricing template and exhibit for a federal contract opportunity related to exhibit fabrication and installation at USN CSFE Building 1444.
The project encompasses five major sections with detailed line items and associated costs. Section 1.0 (Administration) includes special wall panels, graphics, interactive monitors, command panels, wall refinishing and removal, doors, MIC Seabee seal, feature interactive video with programming, and wall murals. Section 3.0 (CEC) covers various murals and notables including Moreell Mural, Seabee/CEC notables, Commander Peary panel, Marvin Shields Seabee mural, Admiral Combs mural, class plaques, Stage Seals silo wall vinyl, and CEC education components. Section 4.1 (Wartime Construction) includes graphics panels and murals depicting Vietnam (48 x 54), Korea, Civic Action (multiple panels at 48 x 60), and War on Terror themes, with quantities of 148 units at 20 dollars per unit for mural work. Section 5.1 (Engineering Stories) includes Seabee Engineering mural and Engineering stories mural, both at 148 units and 20 dollars per unit. The template provides columns for quantities, unit costs, and total estimates for each line item. The pricing structure includes "Other fabricator costs" and a 10% contingency applied to the total project cost, with a final total project cost line item at the bottom of the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4.1A Artifact case, mount and label (optional)
4.1.7 Vietnam 48 x 54
4.1.8 Korea
4.2 Civic Action panel 48 x 60
4.2 Civic Action
# Item Qty Unit Cost
4.2 Civic Action panel 48 x 60
4.2.2 Antarctica
4.2.4 Bridges
4.3 Civic Action
# Item Qty Unit Cost
4.3 Civic Action panel 48 x 60
4.4 War on Terror
# Item Qty Unit Cost
4.4 War on Terror mural 148 20
5.1 Engineering Stories
# Item Qty Unit Cost
5.1 Seabee Engineering mural 148 20
5.2 Engineering stories mural 148 20
Other fabricator costs
Contingency 10%
Total project cost $