Statement of Work Summary: USN CSFE Exhibit Project
This Statement of Work defines requirements for the creation and installation of a new exhibit at the Center for Seabees and Facilities Engineering (CSFE) building, Naval Base Ventura County, Port Hueneme, California. The project encompasses three primary service categories: architectural interior modifications, graphic mural printing and installation, and digital component setup. The Period of Performance runs from September 30, 2026, to September 30, 2027, with work conducted Monday through Friday, 0700 to 1600 hours, excluding federal holidays. The contractor is responsible for all labor, supervision, tools, materials, and transportation required to perform and install services at Building 1444, 3502 Goodspeed Street, Suite 1, Port Hueneme, CA 93043.
Architectural modifications include removing the existing wall-mounted graphic exhibit system and restoring walls to original condition with matching paint; removing three designated wing walls and repairing associated ceilings and floors using specified commercial-grade materials (Vinyl Composition Tile 'Style A' and acoustic ceiling tiles 'Style B'); relocating two 120V electrical outlets per Drawing Sheet 2.1 with work performed by a licensed electrician in accordance with the National Electrical Code; preparing all mural walls to Level 5 drywall finish with high-adhesion latex primer; constructing and installing a closet door with soffit (1.08) and special wall panel (1.01); and applying Brand X, Model Y acoustic wall paneling in Charcoal Gray across a 12' x 8' video area. Graphic and digital requirements include printing and installing 14 wall murals (4 to 50 feet long, 8'-6" tall), applying graphics to 22 glass library panels, installing one dimensional Seabee seal, and installing smaller panel-sized graphics throughout. Digital components require providing and installing a 32-inch touch screen building directory with software, server integration, and staff training, plus a 60-inch touch screen video panel with five selectable programs created using government-provided digital assets. The contractor must establish a Quality Control program and comply with Naval Base Ventura County security requirements, obtaining all necessary base access passes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1.0 Background & Scope
• Background: The Center for Seabees and Facilities Engineering (CSFE) building located in
Port Hueneme, CA, part of the Naval Base Ventura County, requires the creation and installation of a new exhibit. The project consists primarily of graphic murals, minor interior architecture modifications, and a digital component.
• Scope: This SOW defines the requirements for the USN CSFE exhibit project. The scope of work has four primary aspects: architectural interior modifications, printing and installation of graphic murals, and the setup of two digital components. The two digital components refer to government-furnished 55 to 60-inch commercial display monitors
(Brand and Model are not specified as they do not change the requirement). The contractor is responsible for physical mounting and connecting them to the designated local area network (LAN) drop. Content will be provided and managed by the
Government. The selected contractor shall provide all necessary labor, supervision, tools, materials, and transportation required to perform the services described herein and install them at the project location.
2.0 Applicable Documents
The contractor shall comply with the following documents:
• The graphics location plan and schedule on sheets 4.0-4.1 in the drawing package.
• Local base safety and environmental regulations for Naval Base Ventura County.
3.0 Specific Requirements & Tasks
The contractor shall perform the following mandatory tasks:
• Architectural Interior:
• Remove the existing wall-mounted graphic exhibit system and repair the wall to its original condition. Original condition is defined as repaired, sanded, primed, and painted. The final finish must match the surrounding wall's color and texture.
The Government will provide the matching paint color code upon award and request.
• Remove several existing wing walls and repair the ceilings and floor to match existing finishes. The contractor shall remove exactly three (3) wing walls as designated on Drawing Sheet 4.0. Floor and ceiling repairs must use matching commercial-grade materials (Vinal Composition Tile 'Style A' and acoustic ceiling tiles 'Style B') to ensure a seamless visual transition.
• Relocate or extend one or two electrical outlets as required. The contractor shall relocate exactly two (2) 120V electrical outlets to the positions marked on
Drawing Sheet 2.1. All electrical work must be performed by a licensed electrician in accordance with the National Electrical Code (NEC).
• Prepare all walls designated for murals for final installation. All walls designated for murals shall be prepared to a Level 5 drywall finish (patched, skim-coated, and sanded smooth), primed with a high-adhesion latex primer, and be completely free of dust and debris prior to mural application.
• Construct and install two new architectural components: a closet door (1.08) with soffit installation and a special wall panel (1.01).
• Apply a special wall treatment for the large video area (1.11). The 'special wall treatment' is specified as Brand X, Model Y acoustic wall paneling, color 'Charcoal
Gray' (matte finish), to be installed across the entire 12' x 8' area designated in
Room 1.11.
• Graphic Murals and Components:
• Print and install 14 wall murals, ranging from 4 to 50 feet in length and typically
8’-6” tall.
• Directly apply graphics to 22 glass panels on the library wall.
• Install one dimensional Seabee seal in the conference room.
• Install smaller, panel-sized graphics in various locations.
• Digital Elements:
• Provide and install a 32” diagonal touch screen building digital directory. This includes the software program, server integration, and providing training for
CSFE staff on its use.
• Provide and install a 60” touch screen video panel with a menu selection for 5 programs. The contractor will create each program using digital assets provided by the client.
4.0 Deliverables
(No deliverables were specified in the provided documents. This section can be updated as needed.)
5.0 Period of Performance (PoP)
The Period of Performance shall be from September 30, 2026, to September 30, 2027.
6.0 Place of Performance & Working Hours
• Location: Work shall be performed at Center for Seabees and Facilities Engineering
Building 1444, Port Hueneme, CA.
• 3502 Goodspeed Street, Suite 1 Port Hueneme, CA 93043
• Hours of Operation: Work shall be conducted during normal government working hours, 0700 to 1600, Monday through Friday, excluding Federal Holidays.
7.0 Security and Base Access
The contractor is responsible for obtaining all necessary base access passes and coordinating with the designated security Points of Contact. The contractor shall comply with all Naval Base
Ventura County security requirements.
8.0 Government Furnished Property (GFP) / Equipment (GFE)
No Government Furnished Property or Equipment will be provided.
9.0 Quality Control / Quality Assurance
The contractor shall establish a Quality Control program to ensure all work meets the specified requirements. The Quality Assurance (QA) authority for this SOW will be
, who will monitor performance and ensure all testing and deliverables meet the required standards.
10.0 Points of Contact
• Base Security POCs: