This is a bike lane construction plans document prepared by the Utah Department of Transportation (UDOT) for Project 21798, which involves striping and signage work on SR-190 (Big Cottonwood Canyon Road) at Fort Union Boulevard in the Salt Lake City area. The project encompasses removal of existing turn lane curbing, repaving of roadway sections beneath the removed curbing, removal and replacement of plowable end sections, removal and reinstallation of existing sign posts and bases, removal and replacement of signage, and installation of new green bike lane striping and sharrows. The scope includes pavement markings with specific line types (solid white lines, dotted white lines, solid yellow lines), preformed thermoplastic pavement messages featuring bike arrows and biker symbols, green-colored modified microsealing asphalt (MMA) for bike guidance areas, and signage modifications including new bicycle crossing signs and wayfinding markers. The project must be completed by May 21, 2026, with a mandatory virtual pre-bid meeting scheduled for Thursday, March 26, 2026, at 1:00 p.m. via Google Meet.
The plans detail specific construction specifications including removal of Type B5 concrete curbing from station 102+47.07 to 103+27.00, installation of flexible delineator posts, pavement grinding for grooved-in markings, and thermoplastic application for continuous pavement markings. The roadway section requires 12 inches of roadway excavation, 6 inches of granular borrow base course, geotextile separation material, and 7 inches of HMA (hot mix asphalt) pavement reconstruction. Detailed plans indicate precise station locations, right-turn offsets, and curve data for proper alignment and installation. The drawings include cross-sectional details, pavement marking specifications, bike box configurations, and bike guidance detail placements at multiple locations along the project corridor to ensure safe bicycle lane navigation through intersections and turning areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-Attachment B Scope of Work Wasatch Blvd. and BCC Request for Quote (1).docx | DOCX document | |
| 1-7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf | ||
| 2-Agency-Contract-GoodsServices-Combined-9.16.24 (2).docx | DOCX document | |
| 3-Attachment C Cost Sheet SR-210 SR-190 Striping Project Cost Sheet (1).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G M
S D
U P
M S
D
T B
X
M S
S
M S
D
U P
NO PARKING
NO PARKING
M S
S
NO PARKING
M S
S
NO PARKING
M S
D M
S S
D G
N F il e p w
/u d o t-p w .b e n tl e y
.c o m :u d o t-p w
/D o c u m e n ts /U
D O
T P r o je c ts
/R e g io n
P r o je c ts
/2
B C
C
S R
A
T
F T
U
N I O
N
M E
R G
E
L A
N E
A
N D
D
U A
L
L E
F T
/R o a d w a y
D e s ig n /2
B ik e L a n e R
D
.d g n
S
E P
D R
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
P
IN
P R
O F
E S
S
IO
N A
L E
N G
IN
E
E R
/4
/2
B C
C
S R
-1
A
T F
T U
N
IO
N
P E
R K
IN
S
E N
G
IN
E E
R
IN
G M
E R
G E
L A
N E
S -0
(3
)2
STOP
HERE
ON
RED
MILE
MILE
UTAH
INTERSTATE
BEGIN
RIGHTTURNLANE
YIELDTOBIKES
SKIAREAS
BRIGHTON
NORDIC CENTER
SOLITUDE
MAY USE
FULL LANE
STRIPING KEY:
(BIKE GUIDANCE)
- GREEN MMA
- STOP LINESL
- DOTTED WHITE LINEDWL
- BROKEN WHITE LINEBWL
- SOLID YELLOW LINESYL
- SOLID WHITE LINESWL
SIGN CODE LEGEND:
X - REMOVE SIGN
R - RELOCATE SIGN
N - NEW SIGN
X.X-X
SIGN CODE
SIGN NUMBER
SHEET NUMBER 1
.4
R T
.0
S E
C T
IO
N
R E
Q 'D
P L
O W
A B
L E
E N
D
W-01
W-02
W-03
SR-21
0 (WASATCH BLVD)
Existi ng R/
W line
Existi ng R/
W line
E x is ti n g R /W l in e
C A
N Y
O N R
D
S R -1
B
IG
C
O T
T O
N W
O O
D
F T
U N
IO
N B
L V
D
R /W l in e
E x is ti n g
SECTION REQ'D
PLOWABLE END
CONCRETE CURB TYPE B5 REQ'D (BACK TO BACK)
.9
R
T
.0
.4
R T
.0
T O
(B A
C K
T O
B A
C K
T Y
P E
B
R E
Q 'D
O
N C
R E
T E
C U
R
1.02-R
T
.3
R
T
.2
[1 .0
-R
F
R O
M
.9
R
T
.3
S
Q F
T R
E Q
'D
R E
L O
C A
T E
S
IG
N L
E S
S T
H A
N
[1 .0
-N
.0
R
T
.7
S
IG
N T
Y P
E A
-1 I
N C
H X
I
N C
H R
E Q
'D
(PROTECT-IN-PLACE)
Existing sign
(PROTECT-IN-PLACE)
Existing sign
(PROTECT-IN-PLACE)
Existing sign
12IN X 36IN
OM3-C
1.04-N
[1 .0
-N
.4
R
T
.0
S
IG
N T
Y P
E A
-2 I
N C
H X
I
N C
H R
E Q
'D
1.03-X
[1 .0
-X
.7
R
T
.8
S
Q F
T R
E Q
'D
R E
M O
V E
S
IG
N L
E S
S T
H A
N
[1 .0
-N
.5
R
T
.0
S
IG
N T
Y P
E A
-2 I
N C
H X
I
N C
H R
E Q
'D
4" SWL
.0
R T
.0
.0
R T
.0
.0
R T
.0
(S H
A R
R O
W
.0
R T
.0
.0
R T
.0
.0
R T
.0
.0
R T
.0
(B
IK
E R
.0
R T
.0
.0
R T
.0
.0
R T
.0
(B
IK
E A
R R
O W
.0
R T
.0
.0
R T
.0
.0
R T
.0
(R
IG
H T
T U
R N
A R
R O
W
T H
E R
M O
P L
A S
T
IC
R
E Q
'D
P A
V E
M E
N T
M E
S S
A G
E
P R
E F
O R
M
D
.6
R
T
.3
.8
R
T
.4
.5
R
T
.5
T
O
.2
R T
.3
.5
R
T
.8
.8
R
T
.8
.3
R
T
.8
.1
R
T
.1
T
O
.2
R T
.0
.1
R
T
.5
.6
R
T
.5
.7
R
T
.3
.8
R
T
.3
.9
R
T
.3
T
O
.4
R
T .0
T
O
G R
E E
N M
M A
R E
.3
R
T
.9
.2
R T
.3
.2
R
T
.7
.4
R T
.5
(B
IK
E G
U
ID
A N
C E
G R
E E
N M
M A
R E
.7
R
T
.2
.3
R T
.2
.3
R
T
.4
.4
R T
.7
.6
R
T
.0
.2
R T
.5
.1
R
T
.0
.3
R T
.0
T O
(4 D
W L
.9
R
T
.0
.3
R T
.9
.0
R
T
.2
.6
R T
.0
T O
(8 S
W
.9
R
T
.9
.6
R T
.4
.9
R
T
.0
.6
R
T
.0
T
O
.1
R T
.0
.3
R
T
.0
.3
R T
.0
T O
(4 S
W
.3
R
T
.3
.7
R T
.3
T O
(1
S
L
.0
R T
.0
.0
R T
.0
.0
R T
.0
.0
R T
.0
.0
R T
.0
(B
IK
E A
R R
O W
.0
R T
.8
.7
R T
.0
.0
R T
.0
.0
R T
.0
.0
R T
.0
(B
IK
E R
.9
R T
.7
.7
R T
.2
(T R
IA
N
G L
E
.0
R T
.0
.0
R T
.0
(R
IG
H T
T U
R N
A R
R O
W
M E
S S
A G
E R
E Q
'D
R E
M O
V E
P A
V E
M E
N
.2
R
T
.3
.5
R T
.8
.0
R
T
.3
.8
R T
.8
.8
R
T
.2
L
T
.0
.8
L
T
.9
.1
R
T
.0
.3
R T
.0
T O
(4 D
W
.3
R
T
.1
R
T
.1
T
O
.2
R T
.0
.0
R
T
.2
.2
R
T
.2
T
O
.1
R T
.0
.9
R
T
.6
R
T
.0
T
O
.1
R T
.0
T O
(8 S
W
.8
R
T
.4
.6
R T
.3
.5
R
T
.5
.2
R T
.3
.8
R
T
.8
.5
R T
.8
.0
R
T
.4
.2
R T
.8
.3
R
T
.0
.3
R T
.0
T O
(4 S
W L
P A
V E
M E
N T
M A
R K
IN
G
P A
IN
T
R E
Q 'D
.7
R T
.8
E N
D S
E C
T
IO
N R
E Q
'D
R E
M O
V E
P L
O W
A B
.9
R
T
.0
.7
R T
.8
T O
R E
M O
V E
C O
N C
R E
T E
C U
R B
R E
Q 'D
.0
R T
.2
P O
S T
R E
Q 'D
R E
M O
V E
F L
E X
IB
L
E D
E L
IN
E
A T
O R
DETAIL THIS SHEET.
PAVEMENT SECTION
SEE WASATCH BLVD
RE-CONSTRUCTION
PAVEMENT
HMA - 1/2 INCH REQ'D (7")
UNTREATED BASE COURSE (PLAN QUANTITY) REQ'D (6")
GRANULAR BORROW (PLAN QUANTITY) REQ'D (12")
(PLAN QUANTITY) REQ'D
ROADWAY EXCAVATION
SECTION DETAIL
WASATCH BLVD PAVEMENT
SEPARATION GEOTEXTILE REQ'D
C
DELINEATOR POST REQ'D
REMOVE FLEXIBLE
B
A
.0
R
T
.6
.0
R
T
.0
.9
R
T
.0
T
O
.0
R T
.6
T O
P A
V E
M E
N T
R E
-C O
N S
T U
C T
IO
N
4" DWL
4" SWL
SEE DT-01
GUIDANCE)
(BIKE
GREEN MMA
8" SWL
4" SWL
4" DWL
12" SL
12" SL
MESSAGE REQ'D
PAVEMENT
REMOVE
MESSAGE REQ'D
REMOVE PAVEMENT
MESSAGE REQ'D
REMOVE PAVEMENT
MESSAGE REQ'D (TYP)
REMOVE PAVEMENT
8" SWL
8" SWL
R=55.00'
SEE DT-01
GREEN MMA
SEE DT-01
GREEN MMA
R /W l in e
E x is ti n g
E x is ti n g R /W l in e
RD-01
B T
B
R O
A D
W A
Y
B
IK
E L
A N
E
D
P
.1
R
T
.0
.6
R T
.4
R
T
.0
.9
R T
.3
T O
(1 S
L
C R
O S
S W
A L
K S
I
N C
H
R E
Q 'D
T H
E R
M O
P L
A S
T
IC
S T
O P
L
IN
E
P A
V E
M E
N T
M E
S S
A G
E
P R
E F
O R
M
.0
R
T
.6
.0
R
T
.0
.9
R
T
.0
T
O
.0
R T
.6
T O
R E
M O
V E
A S
P H
A L
T P
A V
E M
E N
T R
E
.1
R
T
.0
.6
R T
.4
R
T
.0
.9
R T
.3
T O
(1
S
L
.0
R T
.0
.0
R T
.0
.0
R T
.0
(S H
A R
R O
W
.9
R T
.0
.0
R T
.0
.0
R T
.0
.0
R T
.0
(B
IK
E R
.6
R T
.0
.0
R T
.0
.0
R T
.0
(B
IK
E A
R R
O W
.0
R T
.0
.0
R T
.0
.0
R T
.0
(R
IG
H T
T U
R N
A R
R O
W
P A
V E
M E
N T
M E
S S
A G
E S
R E
Q 'D
G R
IN
D
IN
G
F O
R G
R O
O V
E D
-I
.9
R
T
.8
R
T
.8
T
O
.2
R T
.0
.0
R
T
.2
.2
R
T
.2
T
O
.1
R T
.0
.9
R
T
.6
R
T
.0
T
O
.1
R T
.0
T O
(8 S
W
.9
R
T
.9
R
T
.7
T
O
.5
R T
.8
.0
R
T
.4
.2
R T
.8
.3
R
T
.0
.3
R T
.0
T O
(4 S
W L
M A
R K
IN
G
L
IN
E S
R E
Q 'D
G R
O O
V E
D -I
N P
A V
E M
E N
T
G R
IN
D
IN
G
F O
R C
O N
T
IN
U O
U S
.2
R
T
.3
.5
R
T
.8
.0
R
T
.3
.8
R T
.8
.8
R
T
.2
L
T
.0
.8
L T
.9
.1
R
T
.0
.3
R T
.0
T O
(4 D
W L
P A
V E
M E
N T
M A
R K
IN
G
S R
E Q
'D
G R
IN
D
IN
G
F O
R G
R O
O V
E D
-I N
N
SEE NOTE 1
ON THE NORTH-EAST MAST ARM.
EXISTING "NO TURN ON RED" BLANKOUT SIGN
COORDINATE THE DETECTION WITH THE
ADJUST RADAR DETECTION FOR THE BIKE BOX.1
NOTES:
ALIGNMENT CURVE DATA
CURVE ID � RADIUS LENGTH TANGENT PI STATION NORTHING EASTING
106+71.89 396232.473 560438.68085.28170.391564.00Δ 06°14'3W-03
396008.505 560446.990 104+47.9276.32152.481394.00Δ 06°16'0W-02
395871.761 560467.164 103+09.7141.1082.191774.00Δ 02°39'1W-01
PAVEMENT CUTTING ANGLE POINTS
POINT STATION TYPE
END PAVEMENT CUTTINGRT 30.69102+47.00D
ANGLE POINTRT 31.00103+27.00C
ANGLE POINTRT 27.00103+26.92B
BEGIN PAVEMENT CUTTINGRT 26.69102+47.07A
OFFSET
24IN X 30IN
R10-6a
1.05-N
MESSAGE REQ'D
REMOVE PAVEMENT
SEE DT-01
CROSSING)
BICYCLE
(ONE-WAY
GREEN MMA
SEE DT-01
GREEN MMA
36IN X 30IN
R4-4
1.01-N
4" SWL
4" SWL
MESSAGE REQ'D
REMOVE PAVEMENT
4" DWL
[1 .0
-X
.9
R
T
.4
[1 .0
-X
.9
R
T
.4
R E
M O
V E
S
IG
N F
A C
E R
E Q
'D
E
.5
.7
0 1 0 1
P T
.8
P C
.6
P C
.6
P C
.6
P T
.0
P T
.0
E
.9
.7
1.07-X R3-17bP ENDS
1.06-X R3-17 BIKE LANE
REMOVE SIGN FACE
SIGN FACE, POST, AND BASE.
PROTECT-IN-PLACE EXISTING R4-11
Existing sign
N11°02 '49"W
N08°23' 32"W
N02°07'30"W
N08°22' 02"W
MESSAGE REQ'D
REMOVE PAVEMENT
BIKELANE
ENDS
M S
S
D G
N F il e p w
/u d o t-p w .b e n tl e y
.c o m :u d o t-p w
/D o c u m e n ts /U
D O
T P r o je c ts
/R e g io n
P r o je c ts
/2
B C
C
S R
A
T
F T
U
N I O
N
M E
R G
E
L A
N E
A
N D
D
U A
L
L E
F T
/R o a d w a y
D e s ig n /2
B ik e L a n e D
T
.d g n
S
E P
D R
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
P
IN
P R
O F
E S
S
IO
N A
L E
N G
IN
E
/2
C
S R
-1
A
T F
T U
N
IO
N
P E
R K
IN
S
E N
G
IN
E E
R
IN
G M
E R
G E
L A
N E
S -0
(3
)2
BIKE GUIDANCE DETAIL
GREEN MMA PLACEMENT DETAIL
GREEN MMA (TYP)
CONTROL POINT (TYP)
(TYP)
4" DWL
16.0 2.02.0
5.0
THIS SHEET
SEE BIKE GUIDANCE DETAIL
GREEN MMA
4" DWL
8" SWL
6.0 6.0
6.0 6.0
4" SWL
4" SWL
SR-21
0 (WASATCH BLVD)1
100+62.49 RT 26.55
103+15.25 RT 34.79
5.2
BIKE GUIDANCE THROUGH RIGHT TURN TAPER
BIKE BOX PAVEMENT MARKING DETAIL
BIKE LANE PAVEMENT MARKING DETAIL
Slope Barrier – 42 Inch
Existing Cast-In-Place Concrete Constant
(back to back)
Existing Concrete Curb Type B5
DT-01
T
B
D E
T A
IL
S
B
IK
E
L A
N E
G
L
SR-210 (WASATCH BLVD) SR-210 (
WASATCH BLVD)
12" SL
12" SL
4.0 6.0
.0
.0
.8
4" DWL
GREEN MMA
THERMOPLASTIC) (BIKER)
PAVEMENT MESSAGE (PREFORMED
(BIKE ARROW)
PAVEMENT MESSAGE (PREFORMED THERMOPLASTIC)
(BIKER)
(PREFORMED THERMOPLASTIC)
PAVEMENT MESSAGE
(RIGHT TURN ARROW)
PAVEMENT MESSAGE (PREFORMED THERMOPLASTIC)
THERMOPLASTIC) (BIKER)
PAVEMENT MESSAGE (PREFORMED
THERMOPLASTIC) (BIKE ARROW)
PAVEMENT MESSAGE (PREFORMED
17.0 6.0
6.0 6.0
33.2
8" SWL
4" SWL
GREEN MMA
Existing Crosswalk
Existing Stop Line
(back to back)
Existing Concrete Curb Type B5
Constant Slope Barrier – 42 Inch
Existing Cast-In-Place Concrete
Gutter Type B1
Existing Concrete Curb and
ONE-WAY BICYCLE CROSSING DETAIL
5.0
2.5
2.0 2.06.0
GREEN MMA (TYP)
4" DWL (TYP)
CONTROL POINT
G
N F il e p w
/u d o t-p w
.b e n tl e y .c o m
:u d o t-p w
/D o c u m e n ts
/U D
O T
P r o je c ts
/R e g io n
P r o je c ts
/2 B
C C
S
R A
T F
T U
N I O
N M
E R
G E
L
A N
E A
N D
D
U A
L L
E F
T /R o a d w a y D e s ig n /2
B ik e L a n e S
M .d g n
S
E P
D R
A W
N B
Y
A P
P R
O V
E D
B Y
A P
P R
O V
E D
SHEET NO.
U T
A H
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N
D A
T E
R E
V
IS
IO
N
S
R E
M A
R K
S D
A T
E N
O
C H
E C
K E
D B
Y
Q C
P R
O J E
C T
N U
M B
E R
P R
O J E
C T
P
IN
P R
O F
E S
S
IO
N A
L E
N G
IN
E
/2
C
S R
-1 A
T F
T U
N
IO
N
P E
R K
IN
S
E N
G
IN
E E
R
IN
G M
E R
G E
L A
N E
S -0
(3
)2
SM-01
S U
M M
A R
Y
B
IK
E L
A N
E
B T
B
D
P
| 21798_Bike Lane RD-01 |
| 21798_Bike Lane DT-01 |
| 21798_Bike Lane SM-01 |
| 21798_Bike Lane SM-01 |
File details come from the government source that posted it. Updated .