This is Addendum #1 to the Pioneer Road Improvements Project specifications and drawings issued by the City of Draper, Utah on August 28, 2026. The addendum modifies the original bidding documents for the City Hall parking lot expansion and fenced dumpster pad construction project. Key modifications include revisions to the site grading and volume summary on drawing CP-2, removal of four notes from drawing SD-01, addition of a Concrete Pipe Bollard detail, replacement of the cleanout box detail on drawing DT-4, modification of the dumpster pad concrete thickness to 8 inches, and removal of three detail standards (SD-02, SD-04, and SD-07) no longer applicable to the project. The bid schedule includes 14 items in Schedule A (mandatory items) ranging from Stormwater Pollution Prevention as a lump sum to Note 7 Grading Gravel at 402 square feet, and 11 optional items in Schedule B including clearing and grubbing, asphalt removal, site grading (185 cubic yards), and concrete sidewalk installation (737 square feet). In case of conflict between the drawings, specifications, and addendum, the addendum governs.

The addendum clarifies measurement and payment provisions for untreated base course (UDOT 2721), specifying that quantities are calculated by cubic yards for asphalt areas with no allowances made for placement outside specified dimensions, and that finish grading of the subgrade is included in the unit price. Note 7 Grading Gravel is measured and paid by square foot of area used to daylight to existing grade regardless of depth. Excavation and site grading under Schedule B are calculated by cubic yards using average areas and distances, with the unit price including excavation, sloping, hauling, spreading, compacting, and subgrade preparation to within one-half inch of established grade. All contract pricing includes full compensation for labor, materials, tools, equipment, and incidentals necessary to complete work as shown on plans and as directed by the Engineer, in accordance with UDOT Standard Specifications sections 02220, 02230, and 02240.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1020 E. Pioneer Road • Draper, Utah 84020 • 801-576-6546 • Fax: 801-576-6388 • www.draper.ut.us

ADDENDUM # 1

TO THE SPECIFICATIONS AND DRAWINGS

OF THE

PIONEER ROAD IMPROVEMENTS PROJECT

This addendum, dated August 28th, 2026, is for all contractors preparing bids for the above-mentioned project and shall be part of the contract documents.

This addendum consists of six (6) typewritten pages and zero (0) attachments. All changes, corrections, deletions, and/or additions to the initial bidding documents enumerated herein shall be included in the bidder’s proposal.

In case of any conflict between the drawings, specifications, and this addendum, the addendum shall govern.

CHANGES AND CLARIFICATIONS TO THE DRAWINGS:

1. A volume summary was added to CP-2 showing the cut and fill analysis and net cut quantity for the project, with detail that it is currently planned to be completed by Public Works and that any fine grading is to be done by the general contractor.

2. Notes 2, 4, 5, and 6 have been crossed out on SD-01 on Sheet DT-3. The “18”

SLOTTED CORRUGATED HDPE” detail on Sheet DT-1 is to govern for the pipe zone.

3. A Concrete Pipe Bollard detail has been added to DT-4.

4. SD-05 has been replaced with a new detail for the 3’x3’ internal dimension cleanout boxes on Sheet DT-4.

5. The dumpster pad concrete thickness has been modified to be 8” thick on the

“ROLL OFF DUMPSTER PAD SECTION” detail on Sheet DT-1.

6. SD-02, SD-04, and SD-07 have been removed as they are no longer used on this project.

CHANGES AND CLARIFICATIONS TO THE CONTRACT DOCUMENTS:

1. Modifications and Additions have been made to the Measurement and Payment section as follows under MEASUREMENT AND PAYMENT – SCHEDULE

A

ADDENDUM #1

28 August 2026

1020 E. Pioneer Road • Draper, Utah 84020 801-576-6546 • Fax: 801-576-6388 • www.draper.ut.us

3. Untreated Base Course

A. Specification Reference:

a. Untreated base course (UTBC) shall be UDOT 2721 and conform to the provisions in Section 02230, “Granular Materials, Flowable Fill, and Topsoil”, and Section 02240, “Backfill, Compaction, and

Embankment”, of the Standard Specifications and these special provisions.

B. Method of Measurement / Basis for Payment:

a. Quantities of untreated base course to be paid for by the cubic yard will be calculated on the basis of the dimensions shown on the plans adjusted by the amount of any change ordered by the Engineer.

C. Payment Includes:

a. The contract price paid per cubic yard for untreated base course shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in hauling and constructing untreated base course, complete in place, as shown on the plans, as specified in the Standard

Specifications and these special provisions, and as directed by the Engineer.

D. Additional Notes / Requirements:

a. No allowances will be made for untreated base course placed outside those dimensions unless otherwise ordered by the Engineer.

b. This item is intended for the asphalt area. All other necessary roadbase is to be included in the unit prices for those other items (e.g. soft spots, curb and gutter, sidewalk, concrete dumpster pad).

c. This includes any necessary finish grading on the sub-grade in preparation for placement of roadbase.

14. Note 7 – Grading Gravel

a. Shall be untreated base course (UTBC), UDOT 2721 and conform to the provisions in Section 02230, “Granular Materials, Flowable Fill, and Topsoil”, and Section 02240, “Backfill, Compaction, and

Embankment”, of the Standard Specifications and these special provisions.

B. Method of Measurement / Basis for Payment:

a. Quantities of “Note 7 – Grading Gravel” to be paid for by the square foot of area used to daylight to existing grade, regardless of depth. Will be calculated on the basis of the dimensions shown on the plans adjusted by the amount of any change ordered by the Engineer or as adjusted as necessary on site.

C. Payment Includes:

a. The contract price paid per square foot for this item shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in hauling and constructing untreated base course, complete in place, and compaction, as shown on the plans, as specified in the Standard

Specifications and these special provisions, and as directed by the Engineer.

D. Additional Notes / Requirements:

a. This item is specific to Note 7 on Sheet CP-1.

2. Modifications and Additions have been made to the Measurement and Payment section as follows under MEASUREMENT AND PAYMENT – SCHEDULE

B – OPTIONAL BID ITEMS

11. Excavation / Site Grading

a. Roadway excavation shall conform to the provisions in Section 02220, “Excavation”, and

Section 02240, “Backfill, Compaction, and

Embankment”, of the Standard Specifications and these special provisions.

B. Method of Measurement / Basis for Payment:

a. Calculated based on cubic yards.

b. Quantities of roadway excavation will be computed by means of average areas and distances between these areas. If it is impossible or impractical to measure quantities of roadway excavation by means of average areas, the

Engineer will compute the quantities of material excavated by a method which in the Engineer’s opinion is best suited to obtain an accurate determination.

C. Payment Includes:

a. Unit price shall include excavating, sloping, rounding tops and ends of excavations, hauling, depositing, spreading and compacting the material complete in place, and preparing subgrade to a grading plane not more than one-half (0.5) inch above the line and grade established by the Engineer.

b. The above price and payment shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in performing roadway excavation work completely as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

D. Additional Notes / Requirements:

3. Modifications have been made to the Bid Schedule section as follows under BID

SCHEDULE.

Bid Item

Description Quantity Unit Unit Cost Item Total

Schedule A

1 Stormwater Pollution Prevention (SWPP) 1.0 LS

Soft Spot Repair - Remove and Replace Untreated Base Course (Including WSF 315 Geotextile) 14.0 CY

3 Untreated Base Course 360.0 CY

4 Hot Mix Asphalt – PG 58/28 362.0 TON

5 Concrete Dumpster Pad 1,251.0 SF

6 Curb and Gutter – Outfall (Reverse) 180.0 LF

7 Curb and Gutter – Catch (Normal) 185.0 LF

Beef Hollow Rock Mulch (5" Deep) with Landscape Fabric 343.0 SF

9 Chainlink Fence with white privacy slats 156.0 LF

10 Chainlink Fence Gates - Small 10.5' 2.0 EA

11 Chainlink Fence Gates - Large 21' 1.0 EA

12 Concrete Bollards 4.0 EA

13 Pavement Striping and Marking 1.0 LS

14 Note 7 – Grading Gravel 402.0 SF

TOTAL

Description Quantity Unit Unit Cost Item Total

Schedule B - Optional Bid Items

1 Clearing and Grubbing 1.0 LS

2 Saw-Cut and Remove Asphalt 1,085.0 SF

3 Remove Sidewalk 372.0 SF

4 Remove Curb and Gutter 64.0 LF

5 Remove Concrete Flatwork 385.0 SF

6 Remove Existing Fences and Gates 1.0 LS

7 3'x3' Storm Drain Cleanout Box 2.0 EA

18" Perforated HDPE SD Pipe with Drain Gravel and Filter Fabric 60.0 LF

Tie-in to Existing Grade - Roto-Mill Tailings 1.0 LS

10 Concrete Sidewalk 737.0 SF

11 Excavation / Site Grading 185.0 CY

Schedule B Total

Grand Total

4. Changes have been made to the CONSTRUCTION AGREEMENT Section 3.1

B as shown below.

B. The schedule of prices awarded as separate items from the bid schedule are as follows:

Description Quantity Unit Unit Cost Item Total

Schedule A

1 Stormwater Pollution Prevention (SWPP) 1.0 LS

Soft Spot Repair - Remove and Replace Untreated Base Course (Including WSF 315 Geotextile) 14.0 CY

3 Untreated Base Course 360.0 CY

4 Hot Mix Asphalt – PG 58/28 362.0 TON

5 Concrete Dumpster Pad 1,251.0 SF

6 Curb and Gutter – Outfall (Reverse) 180.0 LF

7 Curb and Gutter – Catch (Normal) 185.0 LF

Beef Hollow Rock Mulch (5" Deep) with Landscape Fabric 343.0 SF

9 Chainlink Fence with white privacy slats 156.0 LF

10 Chainlink Fence Gates - Small 10.5' 2.0 EA

11 Chainlink Fence Gates - Large 21' 1.0 EA

12 Concrete Bollards 4.0 EA

13 Pavement Striping and Marking 1.0 LS

14 Note 7 – Grading Gravel 402.0 SF

TOTAL

Description Quantity Unit Unit Cost Item Total

Schedule B - Optional Bid Items

1 Clearing and Grubbing 1.0 LS

2 Saw-Cut and Remove Asphalt 1,085.0 SF

3 Remove Sidewalk 372.0 SF

4 Remove Curb and Gutter 64.0 LF

5 Remove Concrete Flatwork 385.0 SF

6 Remove Existing Fences and Gates 1.0 LS

7 3'x3' Storm Drain Cleanout Box 2.0 EA

18" Perforated HDPE SD Pipe with Drain Gravel and Filter Fabric 60.0 LF

Tie-in to Existing Grade - Roto-Mill Tailings 1.0 LS

10 Concrete Sidewalk 737.0 SF

11 Excavation / Site Grading 185.0 CY

Schedule B Total

Grand Total