4-4 - SCOPE CPA Chiller Plant Updates.pdf
PDF 8 MB Posted
- Attached to
- 26RFCSP30 CPA Chiller Plant Update
- Solicitation number
- 26RFCSP30
- Issued by
- Williamson County, Texas
About this file
This is a Scope of Work document for a Construction Manager at Risk (CMAR) and General Contractor (GC) procurement issued by Williamson County for the Cedar Park Annex (CPA) Chiller Plant Update project. The project involves a one-for-one replacement of major mechanical equipment serving the facility's hot water and chilled water systems, along with replacement of a roof-mounted outside air handling unit located at 350 Discovery Boulevard, Cedar Park, Texas. The Contractor shall furnish all labor, materials, equipment, supervision, coordination, and services necessary to deliver a complete, fully functional, and code-compliant project, including all utilities, piping, insulation, controls, structural supports, housekeeping pads, and appurtenances required for proper installation and operation. The scope of work encompasses mechanical demolition, new equipment installation, construction administration, full-time onsite supervision by an experienced Field Superintendent, project close-out procedures including equipment testing and startup, and coordination with the Architect/Engineer and County throughout all project phases. The project is governed by the 2021 International Building Code, 2020 National Electrical Code, and applicable Texas Accessibility Standards, with design prepared by O'Connell Robertson Architecture and Engineering.
The CMAR/GC is responsible for complete accounting records, payment processing, change order coordination, material coordination, scheduling coordination, construction administration including safety programs and shop drawing review, full-time onsite supervision, disputes resolution, and project closeout including final inspections, punch list preparation, and compilation of all product data, warranties, manuals, and red-line drawings for delivery to the County. The contract requires the GC to maintain a designated representative for County coordination and ensure the superintendent remains on-site full-time from construction start through substantial completion, with on-site supervision required thereafter whenever work is underway. Payment procedures involve review of contractor pay requests through the A/E, coordination and verification of subcontractor estimates, and secure County approval before change order work is completed. All materials, facilities, and ancillary services necessary for performance must be provided by the GC, with the County providing inspection services, material testing, and verification testing independent of the GC.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 – Scope – CMAR/ GC Page 1 of 3 Form rev. 01/2024
4 – Scope of Services for GC
All services provided are to be performed in conjunction with the A/E and County.
Architects and Engineers (A/E) Before selecting GC, County has selected and designated an A/E who shall prepare the construction documents for the Project and who has full responsibility for complying with, the laws relating to architectural and engineering services in Texas including, but not limited to, the Texas Engineering Practice Act (Occupations Code Chapters 1001 and 1051), as applicable.
Personnel Respondent shall maintain a staff of properly trained and experienced personnel to ensure satisfactory performance under this Contract.
- Respondent shall assign to County a designated representative who will be responsible for the coordination and administration of County's requirements.
- County will insist that the superintendent be on the job full time (all day/all working days) from the start of construction through substantial completion. After substantial completion, on-site respondent supervision will be required at any time work is under way at the site.
Project Execution Except as otherwise set forth in the Contract between County and GC and other Contract Documents, County shall provide or contract for, independently of GC, the inspection services, the testing of construction materials engineering, and the verification testing services necessary for acceptance of the facility by County.
Construction Cost
- Complete accounting records of work performed on the Project
- Review all pay requests and process for payment through A/E
- Review and prepare summary application for payment based on the Contractors' Certificate of
Payment and material vendors' invoicing
- Coordinate change orders, verify subcontractors' estimates as reasonable and accurate, secure
County's approval before change order work is completed
- Provide all necessary materials, facilities, and ancillary services (such as cleanup) necessary for provision of the Services not being provided by the subcontractor(s) when necessary for the performance of the Services during construction and for completion of the construction
Construction Scheduling
- Review County's anticipated opening date and develop project schedule
- Sequence schedule to support contract documents and opening date and recommend any necessary corrective actions
4 – Scope – CMAR/ GC Page 2 of 3
- Attend milestone review meetings with County and Project team immediately before commencing each Project phase
- At the milestone review meetings, assist County in identifying goals for the upcoming work, examine the performance of the Project team against the goals in the preceding phase, and propose corrective measures as necessary or appropriate.
- Coordinate and expedite the ordering and delivery of materials, especially those requiring a long lead time
Construction Administration
- Provide on-site job trailer, temporary fencing, temporary utilities, and other services as appropriate
- Schedule, conduct, and report with the A/E on weekly meetings with subcontractors
- Require safety programs and certificates of insurance from subcontractors
- Monitor and supervise safety programs of subcontractors and verify compliance with laws and regulations
- Coordinate interpretation of the meaning and intent of drawing and specification and assist in resolution of questions
- Review all shop drawings and submittals from subcontractors
- Keep records of all documents at the job site, including red-line changes
- Administer construction contracts prepared by County
- Coordinate necessary testing services
- Record progress of Project
Fulltime Onsite Supervision
- Experienced Construction Field Superintendent on site daily, every workday, to monitor work and progress of the Project
- Manage subcontractor performance
- Monitor and enforce County construction conditions
- Visual inspections of workmanship and special inspections as needed to verify quality of work, and maintenance to specifications
- Written progress reports to County and A/E submitted weekly during contractor meetings
- Arrange for delivery and storage of all material purchased by County
- Coordinate contract scheduling, monitor contractor labor force, verify delivery of contractor materials
Disputes and Resolution
- Assist County and A/E with review and management of claims
- Mediate conflicts between Contractor and County, if necessary
- Mediate conflicts between A/E and County, if necessary
Project Close Out
- Supervise subcontractors' final testing and start-up of utilities, operations systems and equipment
- Walk through and prepare "punch list" with County, A/E and consulting engineers
4 – Scope – CMAR/ GC Page 3 of 3
- Participate in final inspection with County and A/E
- Prepare equipment operational manuals and provide preventive maintenance plan
- Verify appropriate training and in-service has been provided by subcontractors for County
- Supervise completion of punch list items
- Compile all product data, samples, warranties, manuals, red line drawings, keys, maintenance stock, extra materials, and other information or materials to be provided to County
- Coordinate Project substantial completion and final payments with A/E and County
Plans, Drawings, and Specifications Attached below:
811 BARTON SPRINGS ROAD, SUITE 900
AUSTIN, TEXAS 78704
Architecture - Engineering - Interiors
350 DISCOVERY BLVD
CEDAR PARK , TX 78613
WILLIAMSON COUNTY
BUILDING CODE ANALYSIS
OWNER:
OR PROJECT NUMBER:
PROJECT:
LOCATION:
JURISDICTION:
APPLICABLE CODES:
PROJECT REGISTRATION:
WILLIAMSON COUNTY
2515.00
CPA CHILLER PLANT UPGRADE
350 DISCOVERY BOULEVARD
CEDAR PARK, TX 78613
CITY OF CEDAR PARK
2021 INTERNATIONAL BUILDING CODE
2020 NATIONAL ELECTRICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL FIRE PREVENTION CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2012 TEXAS ACCESSIBILITY STANDARDS
TABS2026002980
Revisions:
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :2
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
CPA CHILLER PLANT UPDATE
350 DISCOVERY BOULEVARD, CEDAR PARK, TX 78613
10/30/25
CONTRACT DOCUMENTS
Mission: We believe every project has a mission and strive to design environments that have a purpose that extend far beyond form and function.
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
COVER SHEET
G1.0
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
TAS COMPLIANCE NOTE:
THIS PROJECT DOES NOT QUALIFY AS AN ALTERATION
PER TAS 106.5.5.
Drawing Index
Sheet Number Sheet Name
GENERAL
G1.0 COVER SHEET
MECHANICAL
M1.1 MECHANICAL NOTES, SYMBOLS AND ABBREVIATIONS
M2.1 MECHANICAL DEMOLITION PLAN - FIRST FLOOR
M2.2 MECHANICAL DEMOLITION PLAN - SECOND FLOOR
M2.3 MECHANICAL DEMOLITION PLAN - ROOF
M3.1 MECHANICAL NEW WORK PLAN - FIRST FLOOR
M3.2 MECHANICAL NEW WORK PLAN - SECOND FLOOR
M3.3 MECHANICAL NEW WORK PLAN - ROOF
M6.1 MECHANICAL HYDRONIC RISER DIAGRAMS
M7.1 MECHANICAL CONTROLS
M7.2 MECHANICAL CONTROLS
M7.3 MECHANICAL CONTROLS
M7.4 MECHANICAL CONTROLS
M8.1 MECHANICAL SCHEDULES
M9.1 MECHANICAL DETAILS
M9.2 MECHANICAL DETAILS
ELECTRICAL
E1.1 ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS
E2.1 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
E2.3 ELECTRICAL DEMOLITION PLAN - ROOF
E3.1 ELECTRICAL POWER PLAN - FIRST FLOOR
E3.3 ELECTRICAL POWER PLAN - ROOF
NO. DESCRIPTION DATENO. DESCRIPTION DATE
11/13/2025
HVAC EQUIPMENT
AC AIR CONTROL
ACC AIR COOLED CHILLER
AP ACCESS PANEL
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BV BALANCING VALVE
CH CHILLER
CC DX COOLING COIL
CHP CHILLED WATER PUMP
CRU CONDENSATE RETURN UNIT
CT COOLING TOWER
CU CONDENSING UNIT
CV CONSTANT VOLUME TERMINAL UNIT
CWP CONDENSER WATER PUMP
DHP DUCT HEAT PIPE
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
ESG ELECTRIC STEAM GENERATOR
ET EXPANSION TANK
FCU FAN COIL UNIT
FCV FLOW CONTROL VALVE
FF FILTER FEEDER
FH FUME HOOD
GEF GENERAL EXHAUST FAN
H HUMIDIFIER
HCU HUMIDITY CONTROL UNIT
HC HEATING COIL
HP HEAT PUMP
HRU HEAT RECOVERY UNIT
HWP HEATING WATER PUMP
KEF KITCHEN EXHAUST FAN
KH KITCHEN EXHAUST HOOD
KSF KITCHEN SUPPLY FAN
L LOUVER
MAU MAKE-UP AIR UNIT
MASF MAKE-UP AIR SUPPLY FAN
ML MIXING LATERAL
OAI OUTSIDE AIR INTAKE
OAU OUTSIDE AIR UNIT
OAF OUTSIDE AIR FAN
PCHP PRIMARY CHILLED WATER PUMP
PF PURGE FAN
PTHP PACKAGED TERMINAL HEAT PUMP
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
PV PENTHOUSE VENTILATOR
RH RADIANT HEATER
RF RELIEF FAN
RPZ REDUCED PRESSURE BACK FLOW PREVENTER
RTU SINGLE PACKAGED (ROOFTOP) AIR CONDITIONING UNIT
SCHP SECONDARY CHILLED WATER PUMP
SEF SMOKE EVACUATION FAN
SF SUPPLY FAN
SPF SMOKE PURGE FAN
PACU PACKAGED AIR CONDITIONING UNIT
UH UNIT HEATER
V / VAV VARIABLE VOLUME AIR TERMINAL UNIT
WSHP WATER SOURCE HEAT PUMP
NOT ALL WILL
APPEAR ON
THE DRAWINGS
BDD BACKDRAFT DAMPER
ERU ENERGY RECOVERY UNIT
ERV ENERGY RECOVERY VENTILATOR
FFU FAN FILTER UNIT
IU VARIABLE REFRIGERANT FLOW INDOOR UNIT
OU VARIABLE REFRIGERANT FLOW OUTDOOR UNIT
LEF LAB EXHAUST FAN
MB MIXING BOX
SAF SUPPLY AIR FAN
VFD VARIABLE FREQUENCY DRIVE
RAF RETURN AIR FAN
T
SP
SPS
PM
SD
FSD
FD
DD
#H
CO2
CO
NOT ALL WILL
APPEAR ON
THE DRAWINGS
M
20x8 SA
BOTTOM CONNECTION (45° OR 90°)
CAPPED OUTLET (TOP CONNECTION)
GATE VALVE
BALANCING VALVE
BUTTERFLY VALVE
CHECK VALVE
STRAINER
BALL VALVE
DROP (OR RISE) IN PIPE
SIDE CONNECTION (TEE)
DN
SYMBOL
DIRECTION OF SLOPE (OR PITCH)
DIRECTION OF FLOW
UNION
PIPING
IDENTIFICATION SYMBOL IDENTIFICATION
SMOKE DAMPER
FIRE/SMOKE DAMPER
FIRE DAMPER
UP
MITERED ELBOW (NO TURNING VANES)
PRESSURE GAUGE
TRIPLE DUTY VALVE
THERMOWELL
DUCTWORK
HVAC SYMBOL SCHEDULE
MOTORIZED CONTROL DAMPER
SUPPLY DUCT DROP DOWN
RECTANGULAR DUCT; SIZE INDICATES INSIDE
FREE INSIDE AIRWAY WIDTH (SIDE SHOWN) X
DEPTH, TYPE
GENERAL
FLEXIBLE DUCT
MITERED ELBOW (WITH TURNING VANES)
TO EXISTING
HUMIDISTAT (#= ZONE CONTROLLED)
SMOKE DETECTOR
MANUAL VOLUME DAMPER
SPACE STATIC PRESSURE SENSOR
NEW POINT OF CONNECTION
RADIUS ELBOW
REMOVE BACK TO HERE
THERMOSTAT OR TEMP SENSOR
(#= ZONE CONTROLLED)
RETURN DUCT RISE UP
(4-WAY THROW U.N.O.)
SUPPLY AIR DIFFUSER (CEILING)
RETURN DUCT DROP DOWN
OR GRILLE (CEILING)
RETURN/EXHAUST AIR REGISTER
INCLINED RISE OR DROP
SUPPLY DUCT RISE UP
TOP CONNECTION (45° OR 90°)
2-WAY CONTROL VALVE
THERMOMETER
STEAM TRAP
ELL TURNED UP (RISER)
ELL TURNED DOWN
PLUG VALVE
3-WAY CONTROL VALVE
CARBON DIOXIDE SENSOR
(#= ZONE CONTROLLED)
ROOM PRESSURE MONITOR
DUCT STATIC PRESSURE SENSOR
CARBON MONOXIDE SENSOR
(#= ZONE CONTROLLED)
GAUGE TAP (PETE'S PLUG)
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
PUMP
16 RA
ROUND DUCT; SIZE INDICATES INSIDE FREE
INSIDE AIRWAY DIAMETER, TYPE
16x8 EA
OVAL DUCT; SIZE INDICATES INSIDE FREE INSIDE
AIRWAY WIDTH (SIDE SHOWN) X DEPTH, TYPE
EXHAUST DUCT RISE UP
EXHAUST DUCT DROP DOWN
CLEANOUT
AIR VENT
M
DRAIN
METER
AIRFLOW OUT
AIRFLOW IN
REDUCER
WALL MOUNTED SUPPLY REGISTER/GRILLE
WALL MOUNTED RETURN REGISTER/GRILLE
WALL MOUNTED EXHAUST REGISTER/GRILLE
DPT
WYE SPLIT FITTING
PIPE-MOUNTED DIFFERENTIAL
PRESSURE SENSOR~
EPO EMERGENCY POWER OFF
DUCT CONTINUATION
DUCT CROSSING (DASHED LINES CROSS UNDER)
PIPE CONTINUATION
Ø
Ø
GENERAL ABBREVIATIONS
ABV. ABOVE
LG. LONG/LENGTH
A.F.F. ABOVE FINISH FLOOR
MAT'L. MATERIAL
MFR. MANUFACTURER
ALUM. ALUMINUM
MAX. MAXIMUM
APPROX. APPROXIMATELY
MECH. MECHANICAL
ARCH. ARCHITECT/ARCHITECTURAL
MIN. MINIMUM
BD. BOARD
MISC. MISCELLANEOUS
B.O. BOTTOM OF MTD. MOUNTED
B.O.D. BOTTOM OF DUCT MTL. METAL
B.O.P. BOTTOM OF PIPE N.C. NORMALLY CLOSED
BLDG. BUILDING/BUILDINGS N.I.C. NOT IN CONTRACT
BMS BUILDING MANAGEMENT SYSTEM
NO. NUMBER
CLG. CEILING
N.O. NORMALLY OPEN
C.L. CENTERLINE
N.T.S. NOT TO SCALE
COL. COLUMN O.C. ON CENTER
CONC. CONCRETE
CV CONSTANT VOLUME
O.D. OUTSIDE DIAMETER
CONST. CONSTRUCTION
OPN'G. OPENING
CONT. CONTINUOUS
PL. PLATE
CORR. CORRIDOR
PL. PLATE
CSA COLD SUPPLY AIR
PVC POLYVINYLCHLORIDE
DEMO. DEMOLITION
RAD. RADIUS
DIA. DIAMETER
REINF. REINFORCE/REINFORCING
DIM. DIMENSION
REQ'D. REQUIRED
DDC DIRECT DIGITAL CONTROLS
RA RETURN AIR
DWG. DRAWING/DRAWINGS
DN. DOWN
RTU ROOFTOP UNIT
EA. EACH
SCHED. SCHEDULE
ELEC. ELECTRICAL
SECT. SECTION
ELEV. ELEVATION
SHT. SHEET
EQ. EQUAL
SIM. SIMILAR
EQUIP. EQUIPMENT
SPECS. SPECIFICATIONS
EXP. EXPANSION
STL. STEEL
EXIST. EXISTING
STRUCT. STRUCTURAL
EXH. EXHAUST
SA SUPPLY AIR
FOB FLAT ON BOTTOM
SUSP. SUSPENDED
FOT FLAT ON TOP
T.O. TOP OF
FT. FOOT/FEET
T.O.D. TOP OF DUCT
GA. GAUGE
T.O.P. TOP OF PIPE
GALV. GALVANIZED
TYP. TYPICAL
GYP. GYPSUM
U.N.O. UNLESS NOTED OTHERWISE
HT. HEIGHT
VAV VARIABLE AIR VOLUME
HORIZ. HORIZONTAL
VERT. VERTICAL
HSA HOT SUPPLY AIR
I.D. INSIDE DIAMETER
VRF VARIABLE REFRIGERANT FLOW
IN. INCH/INCHES
W/ WITH
W/O WITHOUT
BAS BUILDING AUTOMATION SYSTEM
OA OUTSIDE AIR
B.F. BELOW FLOOR
B.G. BELOW GRADE
U.G. UNDERGROUND
RLA RELIEF AIR
INSUL. INSULATE/INSULATION
AFMS AIR FLOW MEASURING STATION
(E) EXISTING TO REMAIN
HVAC PIPING
CHS CHILLED WATER SUPPLY
CHR CHILLED WATER RETURN
HWS HEATING WATER SUPPLY
HWR HEATING WATER RETURN
CWS CONDENSER WATER SUPPLY
CWR CONDENSER WATER RETURN
CWTT CONDENSER WATER TO TOWER
CWFT CONDENSER WATER FROM TOWER
G NATURAL GAS
CD CONDENSATE DRAIN
DCW DOMESTIC COLD WATER
HPS HIGH PRESSURE STEAM (>= 75 PSI)
MPS MEDIUM PRESSURE STEAM (16-75 PSI)
LPS LOW PRESSURE STEAM (<=15 PSI)
PCR PUMPED CONDENSATE RETURN
FIN FIN WATER CONDENSATE FROM COOLING COILS
CR STEAM CONDENSATE RETURN (GRAVITY)
LS LOOP SUPPLY
LR LOOP RETURN
RS REFRIGERANT SUCTION
RL REFRIGERANT LIQUID
R REFRIGERANT LINE SET
HG HOT GAS
NOT ALL WILL
APPEAR ON
THE DRAWINGS
P____ PRIMARY CHILLED/HEATING WATER (E.G. 'PCHS')
S____ SECONDARY CHILLED/HEATING WATER (E.G. 'SCHS')
PCD PUMPED CONDENSATE DRAIN
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :2
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL NOTES,
SYMBOLS AND
ABBREVIATIONS
M1.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
1. VERIFY ALL DIMENSIONS AFFECTING EACH ITEM OF THE WORK.
2. FOR CLARITY PURPOSES, NOT ALL EQUIPMENT, DUCTWORK, PIPING, ETC. MAY
BE SHOWN IN EACH VIEW.
3. COORDINATE VERY CLOSELY WITH OTHER TRADES CONCERNING WORK ABOVE
CEILINGS, WORKING OUT CONFLICTS PRIOR TO INSTALLATION OF THE WORK.
4. SEAL PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, FLOORS AND
PARTITIONS USING "UL" APPROVED SEALANT AND/OR METHODS.
5. DUCT SIZES SHOWN ON PLANS ARE INSIDE FREE AIRWAY DIMENSIONS IN
INCHES. THE FIRST FIGURE IN THE DUCT DIMENSION IS THE FACE SHOWN OR
INDICATED.
6. ANY WORK THAT WILL REQUIRE THE CONTRACTOR TO WORK OUTSIDE THE
CONSTRUCTION AREA SHALL BE COORDINATED WITH THE GENERAL
CONTRACTOR.
7. REFER TO GENERAL DRAWINGS/SPECIFICATIONS CONCERNING PHASING OF THE
CONSTRUCTION WORK.
8. MAINTAIN THE BUILDING IN A SAFE, WEATHERTIGHT CONDITION.
9. COORDINATE THE LOCATION OF ROOF & WALL PENETRATIONS WITH
STRUCTURAL ELEMENTS. PROVIDE AT NEW WALL PENETRATIONS SLEEVES 1"
LARGER IN DIAMETER THAN THE PIPE INSULATION & EXTENDING 1-1/2" BEYOND
FINISHED SURFACES. FILL ANNULAR SPACE WITH FIRESTOPPING INSULATION &
CAULK.
10. ALL HVAC SYSTEMS SHALL BE ENERGIZED, TESTED, ADJUSTED & BALANCED AS
SPECIFIED.
11. ROUTE PIPING TO UNITS TO AVOID CLEARANCE AREAS FOR ACCESS PANELS,
CONTROLS ENCLOSURES, ETC.
GENERAL NOTES
1. ALL CONSTRUCTION/DEMOLITION INDICATED ON THE DRAWINGS REFLECTS
ASSUMPTIONS CONCERNING EXISTING CONDITIONS BASED ON THE AVAILABLE
INFORMATION, VISITS TO THE JOB SITE, AND LOCATIONS/ARRANGEMENTS OF
EXISTING FACILITIES. IT SHALL BE INCUMBENT UPON EACH CONTRACTOR TO
VISIT THE SITE PRIOR TO BIDDING AND SATISFY THEMSELVES AS TO THE
EXISTING CONDITIONS.
2. ANY WORK THAT WILL REQUIRE THE CONTRACTOR TO WORK OUTSIDE THE
DEMOLITION/CONSTRUCTION AREA SHALL BE COORDINATED WITH THE GENERAL
CONTRACTOR.
3. REFER TO GENERAL DRAWINGS/SPECIFICATIONS CONCERNING PHASING OF THE
DEMOLITION & CONSTRUCTION WORK.
4. CUT & PATCH TO ACCOMMODATE THE WORK UNLESS NOTED OTHERWISE. ALL
OPENINGS IN EXISTING WALLS, CEILING, FLOORS, AND DUCTS RESULTING FROM
DEMOLITION WORK OR NEW WORK SHALL BE PATCHED TO MATCH EXISTING,
UNLESS NOTED OTHERWISE. ALL ROOF PENETRATIONS REMAINING AFTER
DEMOLITION SHALL BE TEMPORARILY SEALED WATERTIGHT BY THE MECHANICAL
CONTRACTOR AND PATCHED BY AN APPROVED ROOFING CONTRACTOR. ALL
ROOF PATCHING AND SEALING SHALL MAINTAIN THE ROOF WARRANTY (AS
APPLICABLE).
5. IF ANY ASBESTOS CONTAINING MATERIAL IS DISCOVERED OR SUSPECTED, THE
CONTRACTOR SHALL IMMEDIATELY CEASE ANY & ALL WORK IN THAT AREA.
COVER THE EXPOSED MATERIAL IN PLASTIC CONTAINMENT WITHOUT
DISTURBING THE EXPOSED MATERIAL & CONTACT THE ENGINEER.
6. FOR EQUIPMENT, DUCTWORK OR PIPING THAT IS INDICATED TO BE REMOVED,
THE RELATED SUPPORT APPARATUS SHALL ALSO BE REMOVED, UNLESS NOTED
OTHERWISE. THIS INCLUDES REMOVAL OF THE EQUIPMENT'S RELATED
CONCRETE HOUSEKEEPING PAD AND PATCHING THE CONCRETE FLOOR
SMOOTH TO MATCH THE EXISTING.
7. SALVAGED EQUIPMENT SHALL BE REMOVED TO A SITE OF THE OWNER'S
CHOOSING. DEMOLISHED EQUIPMENT THAT THE OWNER DOES NOT WANT TO
SALVAGE SHALL BE REMOVED FROM SITE BY THE CONTRACTOR.
GENERAL NOTES - RENOVATIONS
1. INTERNATIONAL BUILDING CODE (2021 EDITION) WITH ANY APPLICABLE LOCAL
AMENDMENTS.
2. INTERNATIONAL MECHANICAL CODE (2021 EDITION) WITH ANY APPLICABLE LOCAL
AMENDMENTS.
3. INTERNATIONAL PLUMBING CODE (2021 EDITION) WITH ANY APPLICABLE LOCAL
AMENDMENTS.
4. INTERNATIONAL FUEL GAS CODE (2021 EDITION) WITH ANY APPLICABLE LOCAL
AMENDMENTS.
5. INTERNATIONAL ENERGY CONSERVATION CODE (2021 EDITION) WITH ANY
APPLICABLE LOCAL AMENDMENTS.
6. ASHRAE 62.1-2022: VENTILATION STANDARD FOR ACCEPTABLE INDOOR AIR
QUALITY.
7. NFPA 101-2021: LIFE SAFETY CODE.
8. NFPA 90A-2021: STANDARD FOR INSTALLATION OF AIR-CONDITIONING AND
VENTILATING SYSTEMS.
9. NFPA 241: STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND
DEMOLITION OPERATIONS (2022 EDITION).
CODE COMPLIANCE
NO. DESCRIPTION DATE
TRUE NORTH PLAN NORTH
N
N
1. REFER TO SHEET M1.1 FOR GENERAL MECHANICAL NOTES
THAT SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS
NOTED OTHERWISE IN THE KEYED NOTES.
2. ALL EXISTING DUCTWORK, PIPING SIZES & LOCATIONS ARE
TAKEN FROM AVAILABLE RECORD DOCUMENTS & SITE
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
3. WHERE WALL SENSORS ARE LOCATED NEAR LIGHT
SWITCHES, GROUP ALL BACKBOXES TOGETHER IN
ORDERLY FASHION WITH CONSISTENT SPACING
BETWEEN. COORDINATE WALL SENSOR LOCATIONS WITH
ARCHITECTURAL PLANS TO AVOID CASEWORK, WALL
PANELS, ETC. DO NOT INSTALL SENSORS BEHIND DOOR
SWINGS.
4. COORDINATE ALL PAINTING REQUIREMENTS FOR
EXPOSED ELEMENTS WITH DIV 23 SPECIFICATIONS AND
ARCHITECTURAL RCP SHEETS.
GENERAL NOTES
26x16 OA
14x12 EXH x1
E
X H
12x10 EXH 12x10 EXH
10x10 EXH 8x6 EXH
8x4 EXH x1
E
X H x1
E
X H x1
E
X H
14x10 EXH 12x10 EXH
10x6 EXH 8x5 EXH
4"CHR
4"CHS
UP TO FLOOR ABOVE
26x16 EXH
DN FROM FLOOR ABOVE
26x16 OA
M2.1 2 3
M2.1
C1707
C1705
C17N
C1704
C1706
C1709 C1711
C17W
C1710
C1713 C1715
C1718
C1720
C17C
C1717
C1719
C17
C1701
C1721
C17E
C1722
C1736
C1738
C1737
C1739
C1744
PUMP ROOM
C1112
MECH.
C1110 STAIR 2
C1735
C17S
C1740
C1741
C1742
C1743
C1731
C1732
C1733
C1730
C1702
C1703
STAIR 1
C1101
C1100
C11
ELEV. 1
C1102
IT
C1106
C1104
C1103
C1105
C1107
C1200
C12E
C1201
C1202
C1204
C1205
C1206
C1207
C1208
C1723
C1724
C1726
C1109
C1401
C1403
C1405
C14
C1408
C1406
C1404
C1402
C1400
C1203
C12S
C1115
C1700
ACC-1
EXISTING TO REMAIN
TO BE REMOVED
AHU-4
AHU-2
AHU-3
AHU-9
AHU-14 AHU-12 AHU-11
AHU-13 AHU-8
AHU-10
AHU-6
AHU-1
AHU-7 AHU-5
6 TYP
7 TYP
TYP
TYP
TYP
7TYP
1TYP
1TYP
1 TYP
MECH.
C1110
PUMP ROOM
C1112
C1737 C1738
STAIR 2
x1
O
A x1
S
A x1
S
A x1
S
A x1
S
A
18x12 SA
12x12 SA
12x12 SA
12x12 SA
14x10 SA
20x10 SA
30x16 SA x1
S
A x1
S
A x1
S
A
12x8 OA x1
O
A
26x16 OA
26x16 OA
14x12 OA
16x12 OA
12x10 OA
AHU-4
AHU-2
AHU-1
AHU-7
AHU-9
AHU-14
AHU-11
AHU-5
AHU-6
AHU-3
AHU-10
AHU-8
AHU-13
MECH.
C1110
PUMP ROOM
C1112
C1737 C1738
STAIR 2
C11
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL
DEMOLITION PLAN - FIRST
FLOOR
M2.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND - DEMO
1 PRIOR TO ANY DEMOLITION WORK, PRE-TAB AHU HW AND CHW
COILS TO REBALANCE POST CONSTRUCTION.
2 PRIOR TO ANY DEMOLITION WORK, PRE-TAB CHILLED WATER
AND HOT WATER PUMPS TO MATCH POST CONSTRUCTION.
3 DEMOLISH EXISTING CHILLED WATER AIR SEPARATOR AND
ASSOCIATED CHILLED WATER RPZ. HOLD EXISTING PIPING FOR
RECONNECTION TO NEW AIR SEPARATOR.
4 DEMOLISH EXISTING HOT WATER AIR SEPARATOR. HOLD
EXISTING PIPING FOR RECONNECTION TO NEW AIR
SEPARATOR.
5 DEMOLISH EXISTING CHILLED WATER AND HOT WATER
EXPANSION TANKS AND ALL ACCESSORIES ENTIRELY.
6 DEMOLISH ALL EXISTING INSULATION FROM PIPING AND
EQUIPMENT WITHIN PUMP ROOM. HOLD ALL PIPING FOR NEW
INSULATION.
7 DEMOLISH PIPING AS NECESSARY TO INSTALL BYPASS FOR
FLUSHING ON HW AND CHW PIPING UPSTREAM OF ISOLATION
VALVES. REFER TO EXISTING AHU COIL PIPING DETAIL. BYPASS
SHALL BE SAME PIPE DIAMETER AS HW/CHW SUPPLY AND
RETURN PIPING TO UNIT.
8 DEMOLISH EXISTING CHILLED WATER AND HOT WATER FILTER
FEEDERS AND ALL ACCESSORIES ENTIRELY.
9 DEMOLISH EXISTING HYDRONIC PUMP AND ALL ACCESSORIES
ENTIRELY. DEMOLISH EXISTING PUMP PAD. DEMOLISH
HYDRONIC PIPING FROM PUMP UP TO AND INCLUDING
ISOLATION VALVES. EXISTING VFDS FOR EACH PUMP SHALL
REMAIN FOR RECONNECTION.
SCALE: 1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - LEVEL 1
SCALE: 1/8" = 1'-0"2
MECHANICAL PIPING
DEMOLITION PLAN -
LEVEL 1 - MECHANICAL
ROOM
SCALE: 1/8" = 1'-0"3
MECHANICAL
DUCTWORK DEMOLITION
PLAN - LEVEL 1 -
MECHANICAL ROOM
NOTE:
PRIOR TO WORK STARTING, CONTRACTOR SHALL PROVIDE A
PHASING PLAN TO THE ENGINEER. ON A LONG WEEKEND, (3) DAYS,
COMPLETELY DRAIN THE HYDRONIC SYSTEM; REPLACE ALL
ISOLATION VALVES SERVING THE PUMPS IN THE PUMP ROOM;
INSTALL BYPASSES ON ALL AHUS; FLUSH BOTH THE HW AND CHW
SYSTEM UTILIZING THE OLD PUMPS. ALL OTHER WORK MAY BE
COMPLETED OUTSIDE OF THIS (3) DAY SPAN.
N
1. REFER TO SHEET M1.1 FOR GENERAL MECHANICAL NOTES
THAT SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS
NOTED OTHERWISE IN THE KEYED NOTES.
2. ALL EXISTING DUCTWORK, PIPING SIZES & LOCATIONS ARE
TAKEN FROM AVAILABLE RECORD DOCUMENTS & SITE
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
3. WHERE WALL SENSORS ARE LOCATED NEAR LIGHT
SWITCHES, GROUP ALL BACKBOXES TOGETHER IN
ORDERLY FASHION WITH CONSISTENT SPACING
BETWEEN. COORDINATE WALL SENSOR LOCATIONS WITH
ARCHITECTURAL PLANS TO AVOID CASEWORK, WALL
PANELS, ETC. DO NOT INSTALL SENSORS BEHIND DOOR
SWINGS.
4. COORDINATE ALL PAINTING REQUIREMENTS FOR
EXPOSED ELEMENTS WITH DIV 23 SPECIFICATIONS AND
ARCHITECTURAL RCP SHEETS.
GENERAL NOTES
34x18 EXH
36x24 OA
14x10 EXH18x12 EXH 14x8 EXH x1
E
X H x1
O
A
UP FROM FLOOR BELOW
DN TO FLOOR BELOW
M2.2 2 3
M2.2
C2706
C2704
C2707
C2701
C2705
STAIR 1
C2104
C2106
C21E
C2105
C2103 C2601
BOILER RM.
C2107
C2200
C2201
C22
C2202
C2203
C2204
C2206
C2207
C2213
C2214
C2205
C2211
C2212
C2210
C2216
C2215
C2217
C2218
C2219
STAIR 2
C211S
MECH.
C2110
C211SW
C2602
C2603
C2513
C2512
C2511
C2510
C2503
C2502 C2501
C2505
C2506
C2507
C2504
C2515
C2607
C2605
C2604
C2703
C1210
C2600
C26N
C26E
C2101
ELEV 1
C21W
C21 x1
E
X H
EXISTING TO REMAIN
TO BE REMOVED
TYP
AHU-17
AHU-16
AHU-15
AHU-20 AHU-21
AHU-19
AHU-22 AHU-23 AHU-24
AHU-25
AHU-26
AHU-18
TYP
TYP
TYP
TYP
UP TO OAU-1
B-1
TYP
TYP
TYP
BOILER RM.
C2107
C2601
MECH.
C2110
C21E x1
S
A x1
S
A x1
S
A
18x12 SA
20x12 SA x1
S
A x1
S
A x1
S
A x1
S
A x1
S
A x1
S
A x1
O
A
26x12 SA
36x24 OA
B-1 AHU-15
AHU-17 AHU-16
AHU-20 AHU-21
20x14 OA32x18 OA
AHU-19 AHU-22 AHU-23 AHU-24
AHU-25
AHU-26
AHU-18
6x4 OA 12x10 OA
22x14 OA
C21E
BOILER RM.
C2107
C2601
MECH.
C2110
C211SW
C211S
C26E
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL
DEMOLITION PLAN -
SECOND FLOOR
M2.2
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND - DEMO
1 DEMOLISH ENOUGH PIPING FROM HYDRONIC BYPASS TO MAKE
ROOM FOR NEW HYDRONIC FLOW METER.
2 DEMOLISH PIPING AS NECESSARY TO INSTALL BYPASS FOR
FLUSHING ON HW AND CHW PIPING UPSTREAM OF ISOLATION
VALVES. REFER TO EXISTING AHU COIL PIPING DETAIL. BYPASS
SHALL BE SAME PIPE DIAMETER AS HW/CHW SUPPLY AND
RETURN PIPING TO UNIT.
3 PRIOR TO ANY DEMOLITION WORK, PRE-TAB AHU HW AND CHW
COILS TO REBALANCE POST CONSTRUCTION.
SCALE: 1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - LEVEL 2
SCALE: 1/8" = 1'-0"2
MECHANICAL PIPING
DEMOLITION PLAN -
LEVEL 2 - MECHANICAL
ROOM
SCALE: 1/8" = 1'-0"3
MECHANICAL
DUCTWORK DEMOLITION
PLAN - LEVEL 2 -
MECHANICAL ROOM
NOTE:
PRIOR TO WORK STARTING, CONTRACTOR SHALL PROVIDE A
PHASING PLAN TO THE ENGINEER. ON A LONG WEEKEND, (3) DAYS,
COMPLETELY DRAIN THE HYDRONIC SYSTEM; REPLACE ALL
ISOLATION VALVES SERVING THE PUMPS IN THE PUMP ROOM;
INSTALL BYPASSES ON ALL AHUS; FLUSH BOTH THE HW AND CHW
SYSTEM UTILIZING THE OLD PUMPS. ALL OTHER WORK MAY BE
COMPLETED OUTSIDE OF THIS (3) DAY SPAN.
N
1. REFER TO SHEET M1.1 FOR GENERAL MECHANICAL NOTES
THAT SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS
NOTED OTHERWISE IN THE KEYED NOTES.
2. ALL EXISTING DUCTWORK, PIPING SIZES & LOCATIONS ARE
TAKEN FROM AVAILABLE RECORD DOCUMENTS & SITE
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
3. WHERE WALL SENSORS ARE LOCATED NEAR LIGHT
SWITCHES, GROUP ALL BACKBOXES TOGETHER IN
ORDERLY FASHION WITH CONSISTENT SPACING
BETWEEN. COORDINATE WALL SENSOR LOCATIONS WITH
ARCHITECTURAL PLANS TO AVOID CASEWORK, WALL
PANELS, ETC. DO NOT INSTALL SENSORS BEHIND DOOR
SWINGS.
4. COORDINATE ALL PAINTING REQUIREMENTS FOR
EXPOSED ELEMENTS WITH DIV 23 SPECIFICATIONS AND
ARCHITECTURAL RCP SHEETS.
GENERAL NOTES
OAU-1
2"CHS
2"CHR
1 1/4"HWS
1 1/4"HWR
EXISTING TO REMAIN
TO BE REMOVED
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL
DEMOLITION PLAN -
ROOF
M2.3
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND - DEMO
1 DEMOLISH OUTDOOR AIR UNIT AND ALL ACCESSORIES
ENTIRELY. DEMOLISH ALL CONDENSATE PIPING. DEMOLISH
CHILLED WATER AND HOT WATER PIPING BACK TO ROOF
PENETRATION AND HOLD FOR RECONNECTION TO NEW.
DEMOLISH CONTROL WIRING CONDUIT BACK TO ROOF
PENETRATION AND HOLD FOR RECONNECTION TO NEW.
EXISTING ROOF CURB TO REMAIN AND BE REUSED.
2 DISCONNECT EXISTING BOILER FLUE PIPING SUPPORTS FROM
AHU. TEMPORARILY SUPPORT BOILER FLUE UNTIL IT IS
RECONECTED TO NEW AHU.
SCALE: 1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - ROOF
N
1. REFER TO SHEET M1.1 FOR GENERAL MECHANICAL NOTES
THAT SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS
NOTED OTHERWISE IN THE KEYED NOTES.
2. ALL EXISTING DUCTWORK, PIPING SIZES & LOCATIONS ARE
TAKEN FROM AVAILABLE RECORD DOCUMENTS & SITE
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
3. WHERE WALL SENSORS ARE LOCATED NEAR LIGHT
SWITCHES, GROUP ALL BACKBOXES TOGETHER IN
ORDERLY FASHION WITH CONSISTENT SPACING
BETWEEN. COORDINATE WALL SENSOR LOCATIONS WITH
ARCHITECTURAL PLANS TO AVOID CASEWORK, WALL
PANELS, ETC. DO NOT INSTALL SENSORS BEHIND DOOR
SWINGS.
4. COORDINATE ALL PAINTING REQUIREMENTS FOR
EXPOSED ELEMENTS WITH DIV 23 SPECIFICATIONS AND
ARCHITECTURAL RCP SHEETS.
GENERAL NOTES
x1
E
X H x1
E
X H x1
E
X H x1
O
A
26x16 OA
12x10 EXH14x10 EXH x1
E
X H
12x10 EXH12x10 EXH
14x12 EXH
4"CHR
4"CHS
UP TO FLOOR ABOVE
DN FROM FLOOR ABOVE
M3.1 2 3
M3.1
C1707
C1705
C17N
C1704
C1706
C1709 C1711
C17W
C1710
C1713 C1715
C1718
C1720
C17C
C1717
C1719
C17
C1701
C1721
C17E
C1722
C1736
C1738 C1737
C1739
C1744
PUMP ROOM
C1112
MECH.
C1110
STAIR 2
C1735
C17S
C1740
C1741
C1742
C1743
C1731
C1732
C1733
C1730
C1702
C1703
STAIR 1
C1101
C1100
C11
ELEV. 1
C1102
IT
C1106
C1104
C1103
C1105
C1107
C1200
C12E
C1201
C1202
C1204
C1205
C1206
C1207
C1208
C1723
C1724
C1726
C1109
C1401
C1403
C1405
C14
C1408
C1406
C1404
C1402
C1400
C1203
C12S
C1115
C1700
ACC-1
140 CFM
190 CFM
50 CFM
75 CFM190 CFM
110 CFM
100 CFM
330 CFM
330 CFM
40 CFM
450 CFM
45 CFM
80 CFM
130 CFM
NEW WORK
EXISTING TO REMAIN
3"HWR
2"HWR
4"CHR
TYP
3"HWS
4"CHR
4"CHS
AHU-4AHU-2
AHU-1
AHU-7
AHU-3 AHU-10
AHU-8AHU-13
AHU-9
AHU-14 AHU-12
AHU-11
AHU-5
AHU-6
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP C1737
C1738
PUMP ROOM
C1112
MECH.
C1110
STAIR 2
C11
HWP-1
CHWP-2
CHWP-1
HWP-2
AS-1
AS-2
AHU-2
AHU-1
AHU-7
AHU-9
AHU-14
AHU-12
AHU-11
AHU-5
AHU-6
AHU-4
AHU-3 AHU-10
AHU-8AHU-13
x1
S
A x1
S
A x1
S
A x1
S
A x1
O
A
12x12 SA
12x12 SA
18x12 SA
30x16 SA
20x10 SA
14x10 SA
12x12 SA x1
S
A x1
S
A x1
S
A
STAIR 2
C11
MECH.
C1110
PUMP ROOM
C1112
C1737C1738
C
F M
C
F M
1,150 CFM
175 CFM
110 CFM
C
F M
325 CFM
150 CFM
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL NEW
WORK PLAN - FIRST
FLOOR
M3.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND
1 INSTALL NEW HYDRONIC PUMP ON NEW 6" TALL CONCRETE
PAD. CONNECT TO EXISTING VFD. INSTALL NEW ISOLATION
VALVE AND RECONNECT TO EXISTING HYDRONIC PIPING.
2 INSTALL NEW CHILLED WATER AIR SEPARATOR IN EXISTING
CHILLED WATER PIPING. INSTALL NEW RPZ MOUNTED IN
SAME LOCATION AS EXISTING.
3 INSTALL NEW HOT WATER AIR SEPARATOR IN EXISTING HOT
WATER PIPING.
4 INSTALL NEW EXPANSION TANK IN SAME LOCATION AS
PREVIOUS. EXPANSION TANKS SHALL HANG HORIZONTALLY
FROM ABOVE.
5 INSTALL NEW CHILLED WATER FILTER FEEDER ON NEW 6"
TALL CONCRETE PAD.
6 INSTALL NEW CHILLED WATER FILTER FEEDER ON NEW 6"
TALL CONCRETE PAD.
7 DRAIN AND FLUSH ENTIRE CHILLED WATER AND HOT WATER
PIPING SYSTEMS AS SPECIFIED.
8 INSTALL NEW INSULATION ON ALL PIPING AND EQUIPMENT
WITHIN PUMP ROOM AS SPECIFIED.
9 INSTALL NEW BYPASS ON CHW AND HW PIPING COILS
UPSTREAM OF THE ISOLATION VALVES. REFER TO EXISTING
AHU COIL PIPING DETAIL.
10 TAB TO MATCH PRE-TAB VALUES ON EXISTING HW AND CHW
COILS.
11 FURNISH AND INSTALL NEW CHILLED WATER RETURN FLOW
METER IN LOCATION INDICATED.
SCALE: 1/8" = 1'-0"1
MECHANICAL NEW WORK PLAN - LEVEL 1
SCALE: 1/8" = 1'-0"2
MECHANICAL PIPING
PLAN - LEVEL 1 -
MECHANICAL ROOM
SCALE: 1/8" = 1'-0"3
MECHANICAL
DUCTWORK PLAN -
LEVEL 1 - MECHANICAL
ROOM
N
1. REFER TO SHEET M1.1 FOR GENERAL MECHANICAL NOTES
THAT SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS
NOTED OTHERWISE IN THE KEYED NOTES.
2. ALL EXISTING DUCTWORK, PIPING SIZES & LOCATIONS ARE
TAKEN FROM AVAILABLE RECORD DOCUMENTS & SITE
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
3. WHERE WALL SENSORS ARE LOCATED NEAR LIGHT
SWITCHES, GROUP ALL BACKBOXES TOGETHER IN
ORDERLY FASHION WITH CONSISTENT SPACING
BETWEEN. COORDINATE WALL SENSOR LOCATIONS WITH
ARCHITECTURAL PLANS TO AVOID CASEWORK, WALL
PANELS, ETC. DO NOT INSTALL SENSORS BEHIND DOOR
SWINGS.
4. COORDINATE ALL PAINTING REQUIREMENTS FOR
EXPOSED ELEMENTS WITH DIV 23 SPECIFICATIONS AND
ARCHITECTURAL RCP SHEETS.
GENERAL NOTES
34x18 EXH
36x24 OA
14x10 EXH18x12 EXH 14x8 EXH x1
E
X H
B-1
UP FROM FLOOR BELOW
DN TO FLOOR BELOW
DD
DD
C2706
C2704
C2707
C2701
C2705
STAIR 1
C2104
C2106
C21E
C2105
C2103 C2601
BOILER RM.
C2107
C2200
C2201
C22
C2202
C2203
C2204
C2206
C2207
C2213
C2214
C2205
C2211
C2212
C2210
C2216
C2215
C2217
C2218
C2219
STAIR 2
C211S
MECH.
C2110
C211SW
C2602
C2603
C2513
C2512
C2511
C2510
C2503
C2502 C2501
C2505
C2506
C2507
C2504
C2515
C2607 2606C2605
C2604
C2703
C1210
C2600
C26N
C26E
C2101
ELEV 1
C21W
C21
M3.2 2 3
M3.2
300 CFM
300 CFM
65 CFM
55 CFM
860 CFM
180 CFM
60 CFM60 CFM
140 CFM
85 CFM
55 CFM
860 CFM
50 CFM
70 CFM
300 CFM
x1
E
X H
NEW WORK
EXISTING TO REMAIN
AHU-15
AHU-17
AHU-16
AHU-20 AHU-21
AHU-22
AHU-19
AHU-23 AHU-24
AHU-25
AHU-26
AHU-181
TYP
TYP
TYP
TYP
B-1
TYP
TYP
TYP
TYP
BOILER RM.
C2107
C2601
MECH.
C2110
C21E
B-1
AHU-17 AHU-16
AHU-21AHU-20
AHU-15
AHU-19 AHU-22 AHU-23 AHU-24
AHU-25
AHU-26
AHU-18BOILER RM.
C2107
C21E
MECH.
C2110
C2601
55 CFM
440 CFM
105 CFM
,0
C
F M
C
F M
1,000 CFM
385 CFM
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL NEW
WORK PLAN - SECOND
FLOOR
M3.2
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND
1 INSTALL NEW HYDRONIC FLOW METER IN EXISTING
HYDRONIC BYPASS PIPING.
2 INSTALL NEW DUCT DETECTOR IN EXISTING OAU
DUCTWORK. INSTALL IN LOCATION ABOVE ACCESSIBLE
CEILING. REMOVE AND PROTECT CEILING TILES AND GRID
AS NEEDED TO INSTALL DUCT DETECTORS. REINSTALL
CEILING GRID AND TILES AT COMPLETION OF WORK.
3 INSTALL NEW BYPASS ON CHW AND HW PIPING COILS
UPSTREAM OF THE ISOLATION VALVES. REFER TO EXISTING
AHU COIL PIPING DETAIL.
4 TAB TO MATCH PRE-TAB VALUES ON EXISTING HW AND CHW
COILS.
SCALE: 1/8" = 1'-0"1
MECHANICAL NEW WORK PLAN - LEVEL 2
SCALE: 1/8" = 1'-0"2
MECHANICAL PIPING
PLAN - LEVEL 2 -
MECHANICAL ROOM
SCALE: 1/8" = 1'-0"3
MECHANICAL
DUCTWORK PLAN -
LEVEL 2 - MECHANICAL
ROOM
N
1. REFER TO SHEET M1.1 FOR GENERAL MECHANICAL NOTES
THAT SHALL APPLY TO ALL SHEETS IN THIS SET UNLESS
NOTED OTHERWISE IN THE KEYED NOTES.
2. ALL EXISTING DUCTWORK, PIPING SIZES & LOCATIONS ARE
TAKEN FROM AVAILABLE RECORD DOCUMENTS & SITE
OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
3. WHERE WALL SENSORS ARE LOCATED NEAR LIGHT
SWITCHES, GROUP ALL BACKBOXES TOGETHER IN
ORDERLY FASHION WITH CONSISTENT SPACING
BETWEEN. COORDINATE WALL SENSOR LOCATIONS WITH
ARCHITECTURAL PLANS TO AVOID CASEWORK, WALL
PANELS, ETC. DO NOT INSTALL SENSORS BEHIND DOOR
SWINGS.
4. COORDINATE ALL PAINTING REQUIREMENTS FOR
EXPOSED ELEMENTS WITH DIV 23 SPECIFICATIONS AND
ARCHITECTURAL RCP SHEETS.
GENERAL NOTES
OAU-1
CD
2"CHS
2"CHR
1 1/4"HWS
1 1/4"HWR
NEW WORK
EXISTING TO REMAIN
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL NEW
WORK PLAN - ROOF
M3.3
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
KEYNOTE LEGEND
1 INSTALL NEW OUTDOOR AIR UNIT ON EXISTING ROOF CURB.
2 RECONNECT EXISTING BOILER FLUE SUPPORTS TO OAU.
3 ROUTE NEW UNIT CONDENSATE PIPING, INSULATED AND
JACKETED AS SPECIFIED, TO NEAREST ROOF DRAIN. MATCH
UNIT DISCHARGE SIZE.
4 INSTALL NEW CHILLED WATER AND HOT WATER PIPING,
INSULATED, JACKETED, AND HEAT TRACED AS SPECIFIED,
FROM EXISTING PIPING TO NEW UNIT CONNECTIONS.
REPLACE TOP OF ROOF PIPE PENETRATION HOUSING
WEATHERTIGHT.
SCALE: 1/8" = 1'-0"1
MECHANICAL NEW WORK PLAN - ROOF
4" CHR
F F
4" CHS
CWP-1
CWP-2
A S
-1
ET-1
CH-1
FSAHU-11AHU-12
C H
S
C H
R
C H
S
C H
R
2-1/2" CHR
2-1/2" CHS
-1
/4
C H
S
-1
/4
C H
R
AHU-8AHU-5AHU-6
2" CHR
2" CHS
AHU-14AHU-9AHU-13AHU-7AHU-1
1-1/2" CHR
1-1/2" CHS
AHU-3AHU-2AHU-4AHU-10
3" CHS
3" CHR
C H
S
C H
R
3" CHS
3" CHR
LEVEL 1
LEVEL 2
AHU-24
ROOF
AHU-25
2" CHS
2" CHR
AHU-26AHU-21
1" CHS
1" CHR
AHU-18AHU-23AHU-22
1-1/4" CHS
1-1/4" CHR
3" CHS
3" CHR
AHU-19
3" CHS
3" CHR
2-1/2" CHS
2-1/2" CHR
2-1/2" CHS
2-1/2" CHR
2" CHS
2" CHR
AHU-15
2" CHS
2" CHR
AHU-17AHU-16
1-1/4" CHS
1-1/4" CHR
AHU-20
COIL
32.5 GPM
COIL
32.5 GPM
OAU-1
-1
/4
C H
S
-1
/4
C H
R
3/4" CHR
3/4" CHS
-1
/4
C H
S
-1
/4
C H
R
NOTE: REFER TO PRE-TAB
DOCUMENTATION FOR FLOW RATES
(GPM) OF EXISTING AIR HANDLING
UNIT COILS.
A S
-2
ET-2
HWP-2
HWP-1
3" HWR
3" HWS
AHU-11AHU-12
2-1/2" HWS
2-1/2" HWR
2-1/2" HWS
-1
/4
H W
S
-1
/4
H W
R
AHU-8AHU-5AHU-6
2" HWR
2" HWS
AHU-14AHU-9AHU-13AHU-7AHU-1
1-1/4" HWR
1-1/4" HWS
AHU-3AHU-2AHU-4AHU-10
2-1/2" HWS
3" HWR
-1
/2
H W
S
H W
R
2-1/2" HWS
2-1/2" HWR
LEVEL 1
LEVEL 2
AHU-24
ROOF
AHU-25
1-1/4" HWS
1-1/4" HWR
AHU-26AHU-21
3/4" HWS
3/4" HWR
AHU-18AHU-23AHU-22
1" HWS
1" HWR
2" HWS
2-1/2" HWR
AHU-19
2" HWS
2-1/2" HWR
2" HWS
3" HWR
1-1/4" HWS 1-1/4" HWR
2" HWS
3" HWR
AHU-15AHU-17AHU-16
1-1/4" HWS
1-1/4" HWR
AHU-20
COIL
10.3 GPM
COIL
10.3 GPM
OAU-1
H W
S
H W
R
1/2" HWR
1/2" HWS
-1
/4
H W
S
-1
/4
H W
R
NOTE: REFER TO PRE-TAB
DOCUMENTATION FOR FLOW RATES
(GPM) OF EXISTING AIR HANDLING
UNIT COILS.
FS
B-1
2-1/2" HWR
2-1/2" HWR
2-1/2" HWR
2-1/2" HWS
3" HWR
3" HWR
H W
R
-1
/2
H W
R
3" HWR
1" HWS
1" HWR
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL
HYDRONIC RISER
DIAGRAMS
M6.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
NOT TO SCALE1
CHILLED WATER RISER - AIR-COOLED CHILLER, VARIABLE PRIMARY PUMPING
NOT TO SCALE2
HEATING WATER RISER - BOILER, CONSTANT VOLUME PUMPING
NOTE: SAFETY DEVICES DIFFER PER AHU
FAN
MOTOR
MOTOR
OVERLOADS
NL
A
H
O
LOW
PRESS
SAFETY
HIGH
PRESS
SAFETY
FREEZE
STAT
FIRE
ALARM
DDC
START/
STOP
SAFETY RELAY BOARD (AHU'S)
WHERE EXISTING ALARM PRIORITIES ARE ESTABLISHED IN EXISTING BAS, MATCH EXISTING PRIORITIES AND OWNER PREFERENCES FOR
NEW ALARMS. WHERE ALARMS ARE NOT ALREADY IDENTIFIED, THIS SECTION COVERS ALL GENERAL ALARMS.
THIS SECTION COVERS ALL GENERAL ALARMS NOT SPECIFICALLY REFERENCED IN EACH INDIVIDUAL SEQUENCE, AS WELL AS
REQUIREMENTS FOR ALL ALARMS.
• ALL ALARMS SHALL INCLUDE A TIME/DATE STAMP USING THE STANDALONE CONTROL MODULE TIME AND DATE.
• EACH ALARM SHALL BE CONFIGURED IN TERMS OF LEVEL, LATCHING, ENTRY DELAY, EXIT DEADBAND, AND POSTSUPPRESSION
PERIOD
• AN OPERATOR SHALL BE ABLE TO SORT ALARMS BASED ON LEVEL, TIME/DATE, AND CURRENT STATUS
• ALARMS SHALL BE REPORTED WITH THE FOLLOWING INFORMATION, AT A MINIMUM:
1. DATE AND TIME OF THE ALARM
2. LEVEL OF THE ALARM
3. DESCRIPTION OF THE ALARM
4. EQUIPMENT TAGS FOR THE UNITS IN ALARM
THERE SHALL BE FOUR LEVELS OF ALARM:
• LEVEL 1 - LIFE-SAFETY MESSAGE
• LEVEL 2 - CRITICAL EQUIPMENT MESSAGE
• LEVEL 3 - URGENT MESSAGE
• LEVEL 4 - NORMAL MESSAGE
MAINTENANCE MODE: OPERATORS SHALL HAVE THE ABILITY TO PUT ANY DEVICE (E.G. AHU) IN/OUT OF MAINTENANCE MODE. ALL ALARMS ASSOCIATED WITH A DEVICE IN MAINTENANCE MODE WILL BE SUPPRESSED *EXCEPT* FOR LIFE-SAFETY ALARMS. IF A DEVICE IS IN MAINTENANCE MODE, ISSUE A DAILY LEVEL 3 ALARM AT A SCHEDULED TIME (DEFAULT: 08:00, TO BE CONFIRMED WITH OWNER)
INDICATING THAT THE DEVICE IS STILL IN MAINTENANCE MODE.
ENTRY DELAYS: ALL ALARMS SHALL HAVE AN ADJUSTABLE DELAY TIME SUCH THAT THE ALARM IS NOT TRIGGERED UNLESS THE ALARM CONDITION IS 'TRUE' FOR THE DELAY TIME. DEFAULT ENTRY DELAYS SHALL BE AS FOLLOWS;
• LEVEL 1 ALARMS: 1 SECOND
• LEVEL 2 ALARMS: 10 SECONDS
• LEVEL 3 ALARMS: 1 MINUTE
• LEVEL 4 ALARMS: 5 MINUTES
EXIT HYSTERESIS: EACH ALARM SHALL HAVE AN ADJUSTABLE TIME-BASED HYSTERESIS (DEFAULT: 5 SECONDS) TO EXIT THE ALARM.
ONCE SET, THE ALARM DOES NOT RETURN TO NORMAL UNTIL THE ALARM CONDITIONS HAVE CEASED FOR THE DURATION OF THE HYSTERESIS. EACH ANALOG ALARM SHALL HAVE AN ADJUSTABLE PERCENT-OF-LIMIT-BASED HYSTERESIS (DEFAULT: 0% OF THE ALARM THRESHOLD, I.E., NO HYSTERESIS; ALARM EXITS AT THE SAME VALUE AS THE ALARM THRESHOLD) THE ALARMED VARIABLE REQUIRED TO EXIT THE ALARM. ALARM CONDITIONS HAVE CEASED WHEN THE ALARMED VARIABLE IS BELOW THE TRIGGERING THRESHOLD BY THE
AMOUNT OF THE HYSTERESIS.
EXAMPLE OF EXIT HYSTERESIS
IF A HIGH-TEMPERATURE ALARM IS TRIGGERED AT 100°F AND HAS AN EXIT HYSTERESIS OF 5% FOR 1 MINUTE, THE ALARM WILL REMAIN ACTIVE UNTIL THE ALARMED TEMPERATURE DROPS BELOW 95°F (100°F MINUS 5%) CONTINUOUSLY FOR 1 MINUTE.
LATCHING: ANY ALARM CAN BE CONFIGURED AS LATCHING OR NONLATCHING. A LATCHING ALARM REQUIRES ACKNOWLEDGMENT FROM THE OPERATORS BEFORE IT CAN RETURN TO NORMAL, EVEN IF THE EXIT DEADBAND HAS BEEN MET. A NONLATCHING ALARM DOES NOT
REQUIRE ACKNOWLEDGMENT. DEFAULT LATCHING STATUS IS AS FOLLOWS:
• LEVEL 1 & 2 ALARMS: LATCHING
• LEVEL 3 & 4 ALARMS: NON-LATCHING
POSTEXIT SUPPRESSION PERIOD: TO LIMIT ALARMS, ANY ALARM MAY HAVE AN ADJUSTABLE SUPPRESSION PERIOD SUCH THAT, IF THE ALARM IS TRIGGERED, ITS POSTSUPPRESSION TIMER IS TRIGGERED AND THE ALARM MAY NOT TRIGGER AGAIN UNTIL THE
POSTSUPPRESSION TIMER HAS EXPIRED. DEFAULT SUPPRESSION PERIODS ARE AS FOLLOWS:
• LEVEL 1 ALARMS: 0 MINUTES
• LEVEL 2 ALARMS: 5 MINUTES
• LEVEL 3 ALARMS: 24 HOURS
• LEVEL 4 ALARMS: 7 DAYS
ALARMS
T
H L
DPT
H
T
DSD
T
ES
CS
DO
DI AI
AO
FM
DA
FS
T H
SPS
CO2
FS
CO2
H L
F
IL
T E
R
AFMS
OS
CONTROLS SYMBOLS LEGEND
MOTOR
END SWITCH
DIGITAL OUTPUT - START/STOP
HOUSED FAN
CURRENT SWITCH
DIGITAL INPUT ANALOG INPUT
ANALOG OUTPUT
PUMP
FLOW METER
FLOW SWITCH
DIFFERENTIAL PRESSURE
TRANSDUCER WITH HIGH
AND LOW PRESSURE
PORTS
HYDRONIC TEMPERATURE
SENSOR WITH
THERMOWELL
(SIZE TO CENTER OF PIPE)
PLENUM / PLUG FAN
AVERAGING DUCT
MOUNT
TEMPERATURE SENSOR
DUCT MOUNT
TEMPERATURE
PROBE (SIZE TO CENTER OF
DUCT/AIRSTREAM)
DUCT MOUNT
HUMIDITY
SENSOR
MOTORIZED DAMPER ACTUATOR
SPACE TEMPERATURE SENSOR SPACE HUMIDITY SENSOR
STARTER
LOW VOLTAGE OR
CONTROLS
WIRING
WIRING BY OTHERS
(HIGH VOLTAGE OR FIRE
ALARM)
BAS COMM WIRING
ROOF MOUNTED EXHAUST FAN
ELECTRIC STRIP HEATER
DUCT MOUNT CO2 SENSOR
COMBINATION STARTER/VFD
SPACE CO2 SENSOR
GAS FIRED HEATER
FLOAT SWITCH
STATIC PRESSURE
SENSOR (DUCT OR
SPACE)
COMPRESSOR
REVERSING VALVE
LOW LIMIT SWITCH WITH
NORMALLY OPEN AND
CLOSED
CONTACTS
SINGLE BLADE DAMPER
AXIAL FAN
POLY OR COPPER TUBING
FOR PRESSURE SENSORS
GAUGE PRESSURE SENSOR
AIR FLOW MEASURING STATION
ANALOG PRESSURE GAUGE
AVERAGING FLOW
RING WITH HIGH AND
LOW PICKUPS
FILTER
DUAL POLE HIGH/LOW
PRESSURE SAFETY
SWITCH
(NO & NC)
CHILLED (CHW), HOT (HW),
OR PREHEAT WATER
(PHW)
COIL
DIRECT EXPANSION
COOLING OR HOT GAS
REHEAT COIL
OPPOSED BLADE DAMPER
BACK DRAFT DAMPER
(BAROMETRICALLY
CONTROLLED)
AVERAGING FLOW
CROSS WITH HIGH AND
LOW PICKUPS
DUCT SMOKE DETECTOR
SPACE OCCUPANCY SENSOR
PUSH
BUTTON
OVERRIDE
HW
COIL
DX
OR
HGRH
COIL
DI
T
CO2
T
H L
DPT
FM
DA
T
OS
SPS
AO
AI
DSD
T
H
AFMS
H L
F
IL
T E
R
FS
CS
H
CO2
DO
P
TWO WAY CONTROL VALVETHREE WAY CONTROL VALVE
HEAT/ENERGY
TRANSFER
MATERIAL
LC
LIGHTING CONTROL PANEL
B-ASC
IP (ETHERNET)
COMMUNICATION
WEB-ACCESSIBLE
INTERFACE
IT NETWORK
B-ASC
B-ASC
B-CAC
BACNET
BUILDING
CONTROLLER
(B-BC)
1. PROVIDE NEW BACNET CONTROLLERS AND DEVICES FOR ALL EQUIPMENT AT FIELD
LEVEL, AUTOMATION LEVEL AND MANAGEMENT LEVEL AS SPECIFIED.
2. CONTRACTOR SHALL COORDINATE WITH OWNER'S IT STAFF TO PROVIDE ETHERNET
NETWORK CONNECTIONS.
BACNET SYSTEM ARCHITECTURE
B-CAC
B-ASC
B-ASC
B-ASC
CONTROLS WORK GENERAL NOTES
1. EXPAND EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM AS SPECIFIED IN
SECTION 23 09 23. MEET ALL OWNER'S STANDARDS & REQUIREMENTS AS APPLICABLE.
2. FOR THE PURPOSES OF THESE CONTROLS DRAWINGS AND THE BAS SPECIFICATION,
"BUILDING AUTOMATION SYSTEM" (BAS), "BUILDING MANAGEMENT SYSTEM" (BMS), AND
"ENERGY MANAGEMENT CONTROL SYSTEM" (EMCS) SHALL BE SYNONYMOUS.
3. ALL FINAL IT NETWORK TERMINATIONS SHALL BE COORDINATED WITH THE OWNER.
4. ELECTRICAL TRADE SHALL PROVIDE 120V POWER FOR THE BUILDING CONTROLLER(S).
THE CONTROLS INSTALLING CONTRACTOR (CIC) SHALL COORDINATE WITH THE GENERAL
CONTRACTOR AS NEEDED.
5. ALL ROOM INFORMATION ON THE GRAPHICAL FRONT-END SHALL MATCH FINAL ROOM
NAME AND NUMBER DESIGNATIONS; COORDINATE WITH OWNER AND ARCHITECT.
6. ALL SCHEDULES, SETPOINTS, LIMITS, AND CONTROL POINTS SHALL BE ADJUSTABLE BY
THE OWNER AT THE FRONT-END REGARDLESS OF INDICATION IN THE DRAWINGS AND
SPECIFICATIONS.
7. IT SHALL BE THE RESPONSIBILITY OF THE PRIME CONTRACTOR TO ENSURE THE
COORDINATION OF PROPER DECOMMISSIONING AND DISCONNECTION/REMOVAL OF OLD
CONTROL SYSTEM COMPONENTS THAT WILL NOT BE REUSED. OLD DATABASE GRAPHICS
AND SEQUENCES OF OPERATION SHALL BE CLEANED UP, OLD CONDUIT AND WIRING
REMOVED, OLD DEVICES AND CONTROLLERS SALVAGED AND RETURNED TO THE OWNER
IN A TIMELY MANNER. ANY CONTROLLERS AND/OR FIELD DEVICES DAMAGED OR LOST
DURING THE REMOVAL PROCESS SHALL BE REPAIRED AND/OR REPLACED AT NO COST TO
THE OWNER.
MS/TP
COMMUNICATION
OUTSIDE AIR TEMPERATURE/HUMIDITY SENSOR:
DEMOLISH EXISTING OUTDOOR AIR TEMPERATURE AND HUMIDITY SENSORS. FURNISH AND INSTALL ONE OUTSIDE AIR TEMPERATURE & HUMIDITY SENSOR WITH WEATHER SHADE ACCESSORY IN SAME LOCATION AS EXISTING.
BMS WATER METER:
FURNISH AND INSTALL METER ON CHILLED WATER MAKE UP WATER LINE EQUAL TO BADGER RECORDALL TURBO SERIES METER (SIZED TO MATCH LINE SIZE) WITH HR-LCD REGISTER/TRANSMITTER WITH LCD DISPLAY (ORDER CABLE LENGTH AS NECESSARY TO TIE METER INTO BMS); METER MUST BE NSF 61 COMPLIANT FOR LOW LEAD CONTENT FOR DOMESTIC WATER USE. TREND TOTAL
WATER CONSUMPTION AND LOCATE ON ENERGY DASHBOARD GRAPHICS PAGE FOR BUILDING.
MISC CONTROLS AND SEQUENCES OF OPERATION
BMS WATER METER
WM
OUTSIDE AIR
TEMP/HUMIDITY
EQUAL TO VAISALA HMS110
COMBINATION TEMP/HUMIDITY
SENSOR WITH WEATHERHOOD
AI
AI AI
HT
BAS INPUT/OUTPUT SUMMARY
NOTES
OUTSIDE AIR TEMPERATURE
DDC
COMM
CARD
CALC-
ULATED
ANALOG
OUTPUT
(AO)
DIGITAL
OUTPUT
(DO)
ANALOG
INPUT
(AI) TREND ALARM
X
BMS WATER METER (CONSUMPTION) X
METER CONSUMPTION SHALL BE DISPLAYED AT AN ENERGY DASHBOARD IN THE BAS FRONT-END.1.
NOTES
OUTSIDE AIR TEMPERATURE AND HUMIDITY
SYSTEM/EQUIPMENT
X
DIGITAL
INPUT
(DI)
MISCELLANEOUS METERS AND SENSORS
OUTSIDE AIR HUMIDITY X X
X
OUTSIDE AIR DEW POINT X X
1. REFER TO APPENDIX 4.2 IN SPECIFICATION SECTION 23 09 23
BAS FOR HVAC FOR REVISIONS REQUIRED FOR THE GRAPHICAL
FLOOR PLANS. CIC SHALL REVISE FRONT END GRAPHICS TO
INCLUDE ROOM AREAS AND ROOM NUMBERS SHOWN IN
APPENDIX.
2. REVISE "AHU-3 CID" TO READ "AHU-3 TAX OFFICE"
3. REVISE "AHU-4 PATROL ROOM" TO READ "AHU-4 TAX OFFICE"
1. REFER TO APPENDIX 4.2 IN SPECIFICATION SECTION 23 09 23
BAS FOR HVAC FOR REVISIONS REQUIRED FOR THE GRAPHICAL
FLOOR PLANS. CIC SHALL REVISE FRONT END GRAPHICS TO
INCLUDE ROOM AREAS AND ROOM NUMBERS SHOWN IN
APPENDIX.
2. REVISE "AHU-18 PARKS DEPT" TO "AHU-18 JP OFFICE"
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs
\s h y s ic k \D o c u m e n ts
\2 C
P A
C h ill e r
P la n t U p d a te
M
E P
C e n tr a l_ s h y s ic k S
K K
L .r v t
/1
/2
:4 :3
P
M
C P
A C
H
IL
L E
R P
L A
N T
U P
D A
T E
D
IS
C
O V
E R
Y B
O U
LE
V
A R
D C
E D
A R
P A
R K
TX
W
IL
LI
A
M S O
N C
O U
N
TY
10/30/25 Project No. 2515.00
CONTRACT DOCUMENTS
MECHANICAL
CONTROLS
M7.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
NOT TO SCALE5
BAS 1ST FLOOR GRAPHICS REVISIONS
NOT TO SCALE6
BAS 2ND FLOOR GRAPHICS REVISIONS
GENERAL:
THE EXISTING TO REMAIN AIR COOLED CHILLER IS ALREADY ON ALC CONTROLS. ALL EXISTING CHILLED WATER LOOP CONTROL POINTS AND ALARMS SHALL REMAIN U.N.O. TWO VFDS FOR THE CHILLED WATER PUMPS ARE ALSO EXISTING TO REMAIN BUT MUST BE INTEGRATED INTO THE EXISTING CONTROL SYSTEM. CONTROLS INSTALLING CONTRACTOR SHALL REPLACE EXISTING CHILLED WATER LOOP TEMPERATURE SENSORS, HYDRONIC DIFFERENTIAL PRESSURE TRANSDUCER, AND CHILLED WATER BYPASS CONTROL VALVE. CIC SHALL FURNISH AND INSTALL NEW FLOW METERS AND CURRENT SENSORS.
PLANT ENABLE/DISABLE:
THE CALLS FOR COOLING SHALL BE COMMUNICATED TO THE CHILLED WATER PLANT BY THE BAS. ENABLE PLANT WHEN THE NUMBER OF UNITS CALLING FOR COOLING IS EQUAL TO OR ABOVE THE ENABLE THRESHOLD OF 1 UNIT (ADJ.). DISABLE PLANT WHEN THE NUMBER OF UNITS IS EQUAL TO OR BELOW THE DISABLE THRESHOLD OF 0 UNITS (ADJ.). PROVIDE MINIMUM OFF/ON TIMES DELAYS TO PREVENT THE PLANT FROM SHORT CYCLING.
PLANT STARTUP:
ON A CALL TO ENABLE THE CHILLED WATER PLANT, ENERGIZE THE LEAD PUMP. UPON A 1 MINUTE TIME DELAY (ADJ.), ENABLE THE BOILER.
PUMP CONTROL:
THE CHILLED WATER PUMPS SHALL BE OPERATED IN A LEAD/STANDBY CONFIGURATION. THE LEAD/STANDBY SEQUENCE DESIGNATIONS SHALL BE ROTATED ON A WEEKLY BASIS TO EQUALIZE RUN-TIME HOURS ACROSS ALL PUMPS.
USING A PI-LOOP, THE PUMP SPEEDS SHALL BE MODULATED TO MAINTAIN THE REMOTE DP SETPOINT (ADJ). THE SET POINT SHALL BE INITIALLY DETERMINED BY TEST AND BALANCE AND RESET BY CONTINUOUS POLLING OF THE CHILLED WATER VALVES
ASSOCIATED WITH THE PLANT ACCORDING TO THE FOLLOWING:
INITIAL (STARTUP SET POINT) DETERMINED BY TAB
MINIMUM SET POINT 10.0 PSI
MAXIMUM SET POINT 25.0 PSI
INCREASE THRESHOLD MOST OPEN VALVE POSITION < 85% (ADJ.) FOR 5 MINUTES (ADJ.)
DECREASE THRESHOLD MOST OPEN VALVE POSITION > 95% (ADJ.) FOR 5 MINUTES (ADJ.)
INCREASE AMOUNT 1.0 PSI
DECREASE AMOUNT 0.5 PSI
INTERVAL 5 MINUTES
THE SET POINT SHALL BE OVERRIDDEN TO THE INITAL/STARTUP VALUE DETERMINED BY TAB IF A COMMUNICATION ISSUE IS DETECTED.
IF A PUMP HAS A FAILURE (BASED ON CONDITIONS OF PUMP COMMANDED TO BE ENABLED AND STATUS = OFF FOR 30 SECONDS, ADJUSTABLE), LEAD/STANDBY DESIGNATION SHALL ROTATE TO THE NEXT PUMP. FAILED PUMP SHALL DISABLE AND LABEL AS 'FAILURE' AT THE FRONT END. UPON LEAD/STANDBY RUNTIME ROTATION, FAILED PUMP LOCKOUT SHALL BE CLEARED AND PROGRAM SHALL ROTATE LEAD/STANDBY DESIGNATION. RUNTIME ROTATION SHALL ONLY OCCUR WHEN PLANT IS DISABLED.
CHILLED WATER BYPASS VALVE:
THE CHILLED WATER RETURN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .