4-26KP06 Bingham HS Transformer Replacement - Drawings.pdf
PDF 1 MB Posted
- Attached to
- Bingham High School - Transformer Relocation
- Solicitation number
- 26KP06
- Issued by
- Salt Lake County, Utah
About this file
This is a set of electrical drawings for a transformer relocation project at Bingham High School issued by the Jordan School District in South Jordan, Utah. The project involves relocating the west utility transformer from Bingham High School to Copper Canyon Elementary School, located at 8917 Copper Wood Drive in West Jordan, Utah. The drawings include a power plan at 1/8" = 1'0" scale showing the transformer vault specifications (100–250 kVA capacity), a demolition power plan at 1/4" = 1'0" scale, and a partial one-line diagram. The project is identified as Bid Number 26KP06 with a December 2025 timeline. General notes specify that contractors must verify all equipment dimensions and locations, confirm electrical loads and connection requirements before beginning work, review applicable shop drawings, and ensure all fire-rated penetrations are properly sealed to maintain fire ratings in accordance with NEC code requirements.
The drawings establish that contractors must consult all applicable contract documents and shop drawings to ensure proper rough-in locations for equipment, wiring devices, and other electrical components. The document notes that due to the small scale of the drawings, contractors must verify the actual location of all devices with the owner's representative prior to installation. No specific pricing information, set-asides, incumbent contractor details, or funding sources are provided within these technical drawings; these details would be contained in separate bid documents and specifications for the IFB issued by the Jordan School District Purchasing Department in accordance with Utah Code Annotated Chapter 63G-6a.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR THE
BID NUMBER
26KP06
DECEMBER 2025
B
IN
G H
A M
H
IG
H S
C H
O O
L R
E L
O C
A T
E D
W E
S T
U T
IL
IT
Y T
R A
N S
F O
R M
E R
J O
R D
A N
S C
H O
O L
D
IS
T R
IC
T
E1
ELECTRICAL
YARD SITE
C O
P P
E R
C A
N Y
O N
E L
E M
E N
T A
R Y
C
O P
P E
R W
O O
D D
R W
E S
T J
O R
D A
N U
T A
H
POWER PLAN
1/8" = 1’−0" 0 2’ 4’ 8’
DEMOLITION POWER PLAN
1/4" = 1’−0" 0 2’ 4’ 8’
GENERAL NOTES
1. VERIFY ALL EQUIPMENT DIMENSIONS AND LOCATIONS BEFORE BEGINNING ROUGH IN. CONSULT ALL
APPLICABLE CONTRACT DRAWINGS AND SHOP DRAWINGS TO INSURE NEC CODE CLEARANCES
REQUIRED AROUND ALL ELECTRICAL EQUIPMENT.
2. CONTRACTOR SHALL VERIFY ALL ELECTRICAL LOADS (VOLTAGE, PHASE, CONNECTION
REQUIREMENTS, ETC.) OF ALL EQUIPMENT FURNISHED UNDER ALL DIVISIONS, INCLUDING ALL EXISTING
EQUIPMENT TO BE RE−USED. REVIEW ALL SHOP DRAWINGS AND EXISTING EQUIPMENT BEFORE
BEGINNING ROUGH IN.
3. SEE APPLICABLE SHOP DRAWINGS FOR ROUGH IN LOCATION OF ALL EQUIPMENT, WIRING DEVICES, ETC.
4. ALL PENETRATIONS OF FIRE RATED FLOORS, WALLS, AND CEILINGS SHALL BE SEALED WITH
APPROVED MATERIAL TO MAINTAIN FIRE RATING OF SURFACE PENETRATED.
6. SINCE THE DRAWINGS ARE A SMALL SCALE IT IS IMPOSSIBLE TO LOCATE DEVICES EXACTLY WHERE
THEY ARE DESIRED. VERIFY THE ACTUAL LOCATION OF ALL DEVICES WITH THE OWNERS
REPRESENTATIVE,
DEMOLITION NOTES
NO SCALE
PARTIAL ONE−LINE DIAGRAM
BLDG
STEEL
WATER
MAIN
TRANSFORMER VAULT (1000−2500KVA)Q006DIAGRAM