4-03 Maintenance Facility MechanicalPlans 20260901.pdf
PDF 992 KB Posted
- Attached to
- Township Maintenance Facility Addition Project
- Solicitation number
- Not on record
- Issued by
- Berks County, Pennsylvania
About this file
This is a mechanical and plumbing floor plan document for the Township Maintenance Facility Addition Project in Longswamp Township, Berks County, Pennsylvania, prepared by Hanover Engineering Associates, Inc. The project involves constructing a 30' x 160' addition to the existing maintenance facility, with mechanical work as Contract 3. The scope includes installation of six suspended propane-fired unit heaters (Modine PTC-110 units), each with 110,000 BTU input and 102,300 CFM output, complete with vent and combustion piping, propane connections, and condensate drain systems. Demolition work is specified for existing unit heaters, propane piping, flue pipes, and sump pump discharge piping, with some equipment to be salvaged and reinstalled. The drawings indicate trench drains, floor drains, and associated plumbing infrastructure throughout the facility. The sealed proposal deadline is October 12, 2026, at 1:00 p.m. via PennBid, with a non-mandatory pre-bid conference scheduled for September 25, 2026, at 9:00 a.m. at the maintenance facility location. Final questions are due October 2, 2026, and a final addendum will be issued by October 7, 2026, if required. Bidders are required to submit a 10% bid bond and must bid on all items for their respective contract, with bids remaining effective for 60 calendar days from the opening date.
The project is subject to Pennsylvania Prevailing Wage Act requirements, which contractors must include in all subcontracts. Complete bidding documents, contract forms, specifications, and drawings are available through the PennBid program at https://pennbid.bonfirehub.com. All mechanical work must comply with specifications including Schedule 40 PVC piping for drainage and vents, black steel Schedule 40 piping for natural gas applications, and pressure-reducing valves vented to atmosphere. The contractor is responsible for all permits, inspections, submittals, record drawings, pipe labeling per ASME A13.1, cleaning verification, and testing in accordance with local gas company requirements and authorities having jurisdiction. Equipment must be supported from building structure with 18 inches of service clearance from ceilings, and condensate drain piping must route to floor drains with acid neutralization kits installed prior to discharge.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
BB
C
D
C
EEE
1. REFER TO DRAWING MP-701 FOR THE GENERAL MECHANICAL NOTES.
2. REFER TO DRAWING MP-701 FOR THE MECHANICAL LEGEND.
3. REFER TO DRAWING MP-701 FOR THE EQUIPMENT SCHEDULES.
4. FOR EQUIPMENT AND MATERIAL DESCRIPTIONS REFER TO THE
PROJECT MANUAL.
5. REFER TO DRAWING MP-701 FOR MECHANICAL DETAILS.
GENERAL NOTES
Scale:1 3/16" = 1'-0"
DEMOLITION MECHANICAL AND PLUMBING PLAN
0 8'4'2'1'
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
P :61
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
9165.003
M
PD
-1
DEMOLITION KEYNOTES
A. REMOVE EXISTING UNIT HEATER AND SALVAGE TO REINSTALL IN THE
SAME LOCATION INCLUDING PROPANE VALVING. REMOVE PROPANE
PIPING AND FLUE PIPE.
B. REMOVE EXISTING UNIT HEATER, PROPANE PIPING, AND FLUE PIPE.
C. REMOVE SUMP PUMP AND DISCHARGE PIPING TO EXTERIOR.
D. ALL HEATING AND COOLING UNITS IN THIS SPACE TO REMAIN.
E. REMOVE EXISTING PROPANE PIPING TO OUTDOOR TANK.
4"
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
G G
G G
G G
G G
G G
G G
G G
G
CO D D D D D D D D D D D D D D D D D D D D D D D D D D
D D
D
D D
D D
D D
D D
D
D D
D
UH
UH
UH
UH
UH
UH
T.G. TRENCH DRAIN=501.3
BOTTOM OF SUMP=499.2
T.G. TRENCH DRAIN=502.0
BOTTOM OF SUMP=498.2
INV.=497.1
INV=498.3
INV=498.0
1/2" 1/2"
3" VENT AND
COMBUSTION THRU
WALL
3" VENT AND COMBUSTION
THRU WALL
3" VENT AND COMBUSTION THRU ROOF3" VENT AND COMBUSTION THRU ROOF
3" VENT AND COMBUSTION THRU WALL
3" VENT AND
COMBUSTION
THRU WALL
1" 1"
3"
1/2"
1/2"
1/2"
1/2"
3/4"
4"4"
3/4"
3/4"
3"
3/4"
1/2"
1"
4 4
T
T
T
T
T
T
UH-1
UH-2
UH-3
UH-4
UH-5
UH-6
FLOOR TRENCH DRAIN FLOOR TRENCH DRAIN
EXIST TRENCH DRAIN AND SUMP
EXIST. TRENCH DRAIN AND SUMP
FD
FD
3/4"
D D
D D
D
FD
FD
D
D D D
3/4"
3/4"
3/4"
3/4"
2"
2"
2"
2"
3/4" CD
FD
2" DRAIN
1" UNDERGROUND GAS
LINE TO PROPANE TANK
FD
FD
FD
FD
FD
INV=499.23
T.G.=501.23T.G.=502.19
INV=499.23 INV=499.23
D
D
D
D
D D
D D D D
3"
4"
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
9165.003
GENERAL NOTESSHEET KEYNOTES
Scale:1 3/16" = 1'-0"
MECHANICAL AND PLUMBING FLOOR PLAN
0 8'4'2'1'
M P-
11. REFER TO DRAWING MP-701 FOR THE GENERAL MECHANICAL NOTES.
2. REFER TO DRAWING MP-701 FOR THE MECHANICAL LEGEND.
3. REFER TO DRAWING MP-701 FOR THE EQUIPMENT SCHEDULES.
4. FOR EQUIPMENT AND MATERIAL DESCRIPTIONS REFER TO THE
PROJECT MANUAL.
5. REFER TO DRAWING MP-701 FOR MECHANICAL DETAILS.
GENERAL NOTES
1. REINSTALL EXISTING UNIT HEATER. PROVIDE NEW PROPANE CONNECTION
AND NEW FLUE PIPE THROUGH ROOF TO MATCH EXISTING.
2. PROVIDE GAS UNIT HEATER AT CEILING. SUPPORT UNIT FROM BUILDING
STRUCTURE. COORDINATE UNIT HEATER FINAL MOUNTING HEIGHT IN THE
FIELD WITH AN 18" SERVICE CLEARANCE FROM CEILING.
3. REFER TO DETAIL 2 ON SHEET MP-701 FOR FURTHER DETAILS.
4. REFER TO DETAIL 3 ON SHEET MP-701 FOR FURTHER DETAILS.
5. POURED CONCRETE TRENCH BY GENERAL CONTRACTOR. REFER TO
DRAWING S3.0 ON STRUCTURAL PLANS FOR FURTHER DETAILS.
6. ROUTE CONDENSATE DRAIN PIPING FROM UNIT HEATER TO NEAREST
FLOOR DRAIN. PROVIDE CONDENSATE ACID NEUTRALIZATION KIT PRIOR TO
DISCHARGE TO DRAIN.
7. PROVIDE PROPANE SHUTOFF VALVE IN VERTICAL LINE.
SHEET KEYNOTES
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
9165.003
GAS HEATER SCHEDULE
ITEM
NO.
INPUT
BTUHTYPE FUEL
BASIS OF DESIGN
MANUFACTURER
CFM VENT NOTES
MODEL
OUTPUT
BTUH VOLTAGE
UH-1 SUSPENDED 110,000PROPANE 1750 3" MODINE PTC-110102,300 120/1/60
NOTES:
1. PROVIDE MOUNTING HARDWARE FOR HANGING UNIT FROM CEILING.
2. PROVIDE VENT AND COMBUSTION PIPING.
3. PROVIDE MANUAL GAS SHUTOFF VALVE.
4. PROVIDE LOCAL DISCONNECT SWITCH.
5. PROVIDE LOW-VOLTAGE WALL MOUNTED THERMOSTAT.
6. PROVIDE CONDENSATE DRAIN ACID NEUTRALIZATION KIT.
UH-2 SUSPENDED 110,000PROPANE 1750 3" MODINE PTC-110102,300 120/1/60
UH-3 SUSPENDED 110,000PROPANE 1750 3" MODINE PTC-110102,300 120/1/60
UH-4 SUSPENDED 110,000PROPANE 1750 3" MODINE PTC-110102,300 120/1/60
UH-5 SUSPENDED 110,000PROPANE 1750 3" MODINE PTC-110102,300 120/1/60
UH-6 SUSPENDED 110,000PROPANE 1750 3" MODINE PTC-110102,300 120/1/60
M P-
1, 2, 3, 4, 5, 6
1. PIPING SHOWN IS GENERALLY DIAGRAMMATIC AND INDICATES THE
WORK TO BE PERFORMED. NOT ALL FITTINGS AND OFFSETS ARE
SHOWN. FOLLOW DRAWINGS AS CLOSELY AS FIELD CONDITIONS
ALLOW.
2. DRAIN PIPING SHALL HAVE A MINIMUM SLOPE OF 1/4" PER 1'-0".
3. ALL ELECTRICAL WORK SHALL COMPLY WITH SPECIFICATION DIVISION
26 AND THE NATIONAL ELECTRIC CODE.
4. ALL CUTTING AND PATCHING REQUIRED TO ACCOMMODATE THE
MECHANICAL WORK SHALL BE PROVIDED UNDER THE MECHANICAL
SPECIFICATIONS.
5. CONCRETE AND MASONRY FLOOR AND WALL PENETRATIONS
REQUIRED FOR NEW PIPING SHALL BE CORE DRILLED WHERE
POSSIBLE. PROVIDE SLEEVED PENETRATIONS SEALED AIRTIGHT AND
WEATHERTIGHT WITH FIRE RATED SEALANT.
6. CUT AND PATCH EXISTING WALLS, FLOORS, AND CEILINGS FOR THE
INSTALLATION OF PIPING AND CONDUIT IN FINISHED AREAS. RESTORE
AND FINISH WALLS, FLOORS, AND CEILINGS TO PRE-CONSTRUCTION
CONDITIONS. PIPING AND CONDUIT SHALL BE EXPOSED IN FINISHED
AREAS ONLY AS NOTED ON THE DRAWINGS.
7. FINISH PAINT ALL OUTDOOR IRON AND STEEL SURFACES LOCATED
ABOVE GRADE. PROVIDE ONE COAT COMPATIBLE RED OXIDE PRIMER
AND TWO FINISH COATS OF OIL ALKYD ENAMEL. COLOR AS SELECTED
BY OWNER.
8. ALL UNDERGROUND UTILITIES AND ASSOCIATED FOUNDATIONS /
STRUCTURES SHALL BE LOCATED BY THE CONTRACTOR PRIOR TO
ANY EARTH MOVING ACTIVITIES, PURSUANT TO PA ACT NO. 38, BY
NOTIFICATION TO THE PENNSYLVANIA "ONE CALL SYSTEM" AT
1-800-242-1776.
9. REMOVE ALL SOFT AND SPONGY SUBGRADE AND BACKFILL WITH
PENNDOT 2A GRAVEL BEFORE PLACING SUBBASE OR BEDDING.
10. WHERE TRENCH CROSSES BITUMINOUS PAVING, REPAIR PAVING WITH
1 1/2" THICK WEARING COURSE OVER 4" THICK BITUMINOUS
CONCRETE BASE COURSE OVER 6" THICK PENNDOT 2A AGGREGATE.
SAWCUT PAVING PRIOR TO REPAIR AND SEAL JOINTS WITH AC-20
SEAL. INSTALL ALL PAVING AND SUBGRADE MATERIALS IN
ACCORDANCE WITH PENNDOT PUBLICATION 408.
16. ALL GAS PRESSURE REGULATORS (INCLUDING REGULATORS
PROVIDED WITH GAS EQUIPMENT) SHALL BE VENTED TO ATMOSPHERE
(OUTDOORS).
17. PROVIDE ALL MISCELLANEOUS STEEL SHAPES, HANGER RODS,
STRAPS, ETC. REQUIRED FOR ALL PLUMBING SYSTEM INSTALLATIONS.
18. OUTDOOR PIPING LOCATED UNDERGROUND SHALL HAVE A MINIMUM
COVER OF 3'-0", EXCEPT AS NOTED OTHERWISE.
19. EXTEND EXTERIOR CLEANOUTS TO GRADE AND ENCASE HOUSING IN
12"x12"x6" CONCRETE PAD. RESTORE SURFACE SURROUNDING
CONCRETE PAD TO ORIGINAL CONDITION, AS PER SPECIFICATIONS.
GENERAL MECHANICAL NOTES
NATURAL GAS
EQUIPMENT DESIGNATION
VENT PIPINGV
PIPING UP
PIPING DOWN
THERMOSTAT
ITEM TO DEMOLISH
G
PRESSURE REDUCING VALVE
T
MECHANICAL LEGEND
1. SUBMITTALS:
A. PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR APPROVAL FOR
ALL EQUIPMENT. ANY PROPOSED SUBSTITUTIONS SHALL HAVE FULL
SUPPORTING TECHNICAL INFORMATION REQUIRED FOR ENGINEER'S
EVALUATION.
2. RECORD DRAWINGS:
A. PROVIDE MARKUPS UPON A CLEAN SET OF CONTRACT DRAWINGS
SHOWING ALL CONDITIONS "AS BUILT". INCLUDE ACTUAL CIRCUIT
NUMBERS, DEVIATIONS FROM CONTRACT DOCUMENTS, DIMENSIONS
TO CONCEALED EQUIPMENT, ETC.
3. PERMITS, FEES:
A. APPLY FOR AND OBTAIN ALL PERMITS REQUIRED FOR ALL WORK.
PROVIDE A CERTIFICATE OF INSPECTION FROM A RECOGNIZED
AGENCY AT THE CONCLUSION OF WORK.
4. FURNISH ALL LABOR AND MATERIALS, LIFTING EQUIPMENT, LIFTS,
LADDERS, ETC. TO INSTALL SYSTEMS IN A TIMELY MANNER.
5. ANY EXCEPTION TAKEN TO THIS SPECIFICATION AND ANY ATTACHED
DOCUMENTS SHALL BE MADE IN WRITING AT THE TIME OF BID SUBMITTAL.
UNLESS ACCEPTED IN THIS MANNER, ALL STANDARDS AND
SPECIFICATIONS HEREIN AND ON ATTACHED FORMS, ALONG WITH ANY
PURCHASE ORDER RESULTING FROM THIS BID INQUIRY WILL BE THE
BASIS OF TERMS OF THE INSTALLATION.
6. PROVIDE ALL PIPE, FITTINGS, REDUCERS, HOSES, VALVES, VALVE
LOCKING DEVICES, ACTUATORS, INSTALLATION SUPPLIES, ETC. AS
REQUIRED FOR COMPLETE INSTALLATION.
7. PIPE LABELING:
A. ALL PIPING SHALL BE LABELED AFTER COMPLETION OF PAINTING OR
INSULATION INSTALLATION.
B. PIPE LABELS SHALL BE PREPRINTED SELF-ADHESIVE PLASTIC WITH
CONTACT-TYPE PERMANENT-ADHESIVE BACKING, COLOR-CODED,
WITH LETTERING INDICATING SERVICE, AND SHOWING FLOW
DIRECTION ACCORDING TO ASME A13.1.
C. PIPE LABEL CONTENTS: INCLUDE IDENTIFICATION OF PIPING SERVICE
USING SAME DESIGNATIONS OR ABBREVIATIONS AS USED ON
DRAWINGS; ALSO INCLUDE PIPE SIZE AND AN ARROW INDICATING
FLOW DIRECTION.
D. LABEL LETTERING SHALL CONFORM TO THE FOLLOWING
REQUIREMENTS.
PIPE DIAMETER LETTER SIZE
3/4” TO 1 1/4” 1/2”
E. FLOW ARROWS MATCHING THE COLOR SCHEME OF THE SYSTEM
PIPING SHALL BE ADDED AT EACH LABEL INDICATING THE DIRECTION
OF FLOW.
F. PIPE LABEL LOCATIONS:
· WHERE PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN
FINISHED SPACES.
· NEAR EACH VALVE AND CONTROL DEVICE.
· NEAR EACH BRANCH CONNECTION, EXCLUDING SHORT TAKEOFFS
FOR FIXTURES AND TERMINAL UNITS. WHERE FLOW PATTERN IS
NOT OBVIOUS, MARK EACH PIPE AT BRANCH.
· NEAR PENETRATIONS AND ON BOTH SIDES OF THROUGH WALLS,
FLOORS, CEILINGS, AND INACCESSIBLE ENCLOSURES.
· NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF
ORIGINATION AND TERMINATION.
· SPACED AT MAXIMUM INTERVALS OF 50 FEET ALONG EACH RUN.
REDUCE INTERVALS TO 25 FEET IN AREAS OF CONGESTED PIPING
AND EQUIPMENT.
G. PIPE LABEL COLOR SCHEDULE:
· PROPANE PIPING: BLACK LETTERS ON A YELLOW BACKGROUND.
8. PIPING SUPPORTS:
A. INSTALL HANGERS AND SUPPORTS COMPLETE WITH NECESSARY
ATTACHMENTS, INSERTS, BOLTS, RODS, NUTS, WASHERS, AND
OTHER ACCESSORIES.
B. SUPPORT VERTICAL PIPING AT BASE AND AT EACH FLOOR.
C. INSTALL PIPING HANGERS AND SUPPORTS AS REQUIRED TO ENSURE
HORIZONTAL PIPING REMAINS FREE OF SAGS AND BENDS.
D. SUPPORT HORIZONTAL PIPING WITHIN 12 INCHES OF EACH FITTING,
AND COUPLING.
E. ADJUST HANGERS AND SUPPORTS TO DISTRIBUTE LOADS EQUALLY
AND TO ACHIEVE INDICATED SLOPE OF PIPE.
F. PIPE SUPPORTS SHALL BE PROVIDED AND SPACED IN ACCORDANCE
WITH THE INTERNATIONAL MECHANICAL CODE.
9. ADDITIONAL STEEL SUPPORTS AND ANCHORS AS INDICATED BY
STRUCTURAL DRAWINGS.
10. AUTOMATIC TEMPERATURE CONTROLS:
A. UNIT HEATERS SHALL BE CONTROLLED BY WALL MOUNTED
THERMOSTATS.
11. CLEANING:
A. PERFORM ELECTRICAL LOCKOUT AND TAGOUT ACCORDING TO
OWNER'S STANDARDS OR AUTHORITIES HAVING JURISDICTION.
B. REMOVE NON-ADHERED SUBSTANCES AND DEPOSITS FROM WITHIN
THE HVAC SYSTEM.
C. CONTROL ODORS AND MIST VAPORS DURING THE CLEANING AND
RESTORATION PROCESS.
D. DEBRIS REMOVED FROM THE HVAC SYSTEM SHALL BE DISPOSED OF
ACCORDING TO APPLICABLE FEDERAL, STATE, AND LOCAL
REQUIREMENTS.
E. SURFACE-CLEANING VERIFICATION: PERFORM VISUAL INSPECTION
FOR CLEANLINESS. IF NO CONTAMINANTS ARE EVIDENT THROUGH
VISUAL INSPECTION, THE HVAC SYSTEM SHALL BE CONSIDERED
CLEAN. IF VISIBLE CONTAMINANTS ARE EVIDENT THROUGH VISUAL
INSPECTION, THOSE PORTIONS OF THE SYSTEM WHERE
CONTAMINANTS ARE VISIBLE SHALL BE RE-CLEANED AND SUBJECTED
TO RE-INSPECTION FOR CLEANLINESS.
· PREPARE A WRITTEN CLEANLINESS VERIFICATION REPORT.
12. DRAIN AND VENT PIPING:
A. STORM DRAIN AND VENT PIPING SHALL BE SCHEDULE 40 PVC PIPING
WITH PVC DWV FITTINGS AND SOLVENT CEMENTED JOINTS.
B. WHERE PVC PIPE MEETS DISSIMILAR PIPE-MATERIAL USE
NON-PRESSURE TRANSITION COUPLINGS FOR DISSIMILAR PIPING
MATERIALS WITH STAINLESS STEEL STRAPS TO JOIN PIPES.
C. CONDENSATE PIPING SHALL BE SCHEDULE 40 PVC PIPING WITH PVC
DWV FITTINGS AND SOLVENT CEMENTED JOINTS. CONDENSATE
PIPING SHALL BE INSULATED WITH 1/2" THICK FIBERGLASS OR
ELASTOMERIC PIPE INSULATION.
13. NATURAL GAS PIPING (NATG) SHALL BE AS FOLLOWS:
A. PIPING AND FITTINGS 2" AND SMALLER SHALL BE ASTM A53/A53M,
BLACK STEEL, SCHEDULE 40 WITH MALEABLE IRON THREADED
FITTINGS, ASME B16.3, CLASS 150, STANDARD PATTERN.
B. ALL THREADS SHALL BE WRAPPED IN YELLOW PTFE GAS LINE
SEALANT TAPE AT MINIMUM.
C. UNDERGROUND PIPING: PE PIPE, ASTM 02513, SDR 11, SOCKET
FUSION FITTINGS WITH ANODELESS SERVICE-LINE-RISER.
D. ALL VALVES 2" AND SMALLER SHALL HAVE TAPERED PIPE THREADS.
E. ALL VALVES SHALL BE PROVIDED W/ AN INTEGRAL LOCKING HANDLE.
F. ALL VALVES ARE TO BE SUITABLE FOR NATURAL GAS SERVICE AT A
PRESSURE OF 0-30 PSI AND A MAXIMUM TEMPERATURE OF 150
DEGREES F.
G. PROVIDE UNIONS AND DIRT LEGS AT EQUIPMENT CONNECTIONS.
H. ALL HIDDEN AND EXPOSED STEEL PIPING SHALL BE PREPPED
ACCORDINGLY AND PAINTED W/ TWO COATS OF INDUSTRIAL ENAMEL,
SAFETY YELLOW.
I. ENTIRE SYSTEM AND ITS COMPONENTS SHALL MEET THE APPROVAL
OF AND SHALL BE INSTALLED, TESTED, AND INSPECTED IN
ACCORDANCE WITH THE LOCAL GAS COMPANY.
14. TESTING:
A. ROUGHING-IN INSPECTION: ARRANGE FOR INSPECTION OF PIPING
BEFORE CONCEALING OR CLOSING-IN AFTER ROUGHING-IN.
B. FINAL INSPECTION: ARRANGE FOR FINAL INSPECTION BY
AUTHORITIES HAVING JURISDICTION TO OBSERVE TESTS SPECIFIED
BELOW AND TO ENSURE COMPLIANCE WITH REQUIREMENTS.
C. TEST STORM DRAINAGE PIPING ACCORDING TO PROCEDURES OF
AUTHORITIES HAVING JURISDICTION OR, IN ABSENCE OF PUBLISHED
PROCEDURES, AS FOLLOWS:
· TEST FOR LEAKS AND DEFECTS IN NEW PIPING AND PARTS OF
EXISTING PIPING THAT HAVE BEEN ALTERED, EXTENDED, OR
REPAIRED. IF TESTING IS PERFORMED IN SEGMENTS, SUBMIT
SEPARATE REPORT FOR EACH TEST, COMPLETE WITH DIAGRAM
OF PORTION OF PIPING TESTED.
· LEAVE UNCOVERED AND UNCONCEALED NEW, ALTERED,
EXTENDED, OR REPLACED STORM DRAINAGE PIPING UNTIL IT HAS
BEEN TESTED AND APPROVED. EXPOSE WORK THAT WAS
COVERED OR CONCEALED BEFORE IT WAS TESTED.
· TEST PROCEDURE: TEST STORM DRAINAGE PIPING ON
COMPLETION OF ROUGHING-IN. CLOSE OPENINGS IN PIPING
SYSTEM AND FILL WITH WATER TO POINT OF OVERFLOW, BUT NOT
LESS THAN 10-FOOT HEAD OF WATER. FROM 15 MINUTES BEFORE
INSPECTION STARTS UNTIL COMPLETION OF INSPECTION, WATER
LEVEL MUST NOT DROP. INSPECT JOINTS FOR LEAKS.
· REPAIR LEAKS AND DEFECTS WITH NEW MATERIALS AND RETEST
PIPING, OR PORTION THEREOF, UNTIL SATISFACTORY RESULTS
ARE OBTAINED.
· PREPARE REPORTS FOR TESTS AND REQUIRED CORRECTIVE
ACTION.
SPECIFICATIONS
ABV ABOVE
BOT BOTTOM
CFM CUBIC FEET PER MINUTE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN-OUT
DET DETAIL
DIA,Ø DIAMETER
DIM DIMENSION
DN DOWN
DWG DRAWING
EA EACH
EL, ELEV ELEVATION
ESP EXTERNAL STATIC PRESSURE
EXIST EXISTING
FIXT FIXTURE
GYP GYPSUM WALLBOARD
INT INTERIOR
INV INVERT
MAX MAXIMUM
MIN MINIMUM
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
SECT SECTION
SF SQUARE FOOT
SPEC SPECIFICATION
STD STANDARD
SYS SYSTEM
TYP TYPICAL
UH UNIT HEATER
VTR VENT THROUGH ROOF
D DRAIN PIPING
CLEANOUT IN FLOORCO
COMBUSTION PIPING
CONNECTION TO EXISTING
POINT OF DISCONNECTION
Scale:1 NOT TO SCALE
HORIZONTAL PIPE PENETRATION DETAIL
TIGHTLY PACK MINERAL
WOOL OR GLASS FIBER
BETWEEN PIPE AND SLEEVE.
TIGHTLY PACK THE ENTIRE
GAP WITH MINERAL WOOL,
GLASS FIBER, OR BACKER
ROD.PIPE SLEEVE OR
SHEET METAL SLEEVE.
CAULK ENTIRE PERIMETER
ON BOTH SIDES WITH A
NON-HARDENING SEALANT.
PIPE
1. THE FOLLOWING DEFINITIONS APPLY TO THE WORK:
A. REMOVE: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT
THOSE INDICATED TO BE REINSTALLED, SALVAGED OR TO REMAIN
THE OWNER'S PROPERTY.
B. REMOVE AND SALVAGE: ITEMS INDICATED TO BE REMOVED AND
SALVAGED REMAIN THE OWNER'S PROPERTY. REMOVE, CLEAN AND
PACK OR CRATE ITEMS TO PROTECT AGAINST DAMAGE. IDENTIFY
CONTENTS OF CONTAINERS AND DELIVERY TO OWNER'S
DESIGNATED STORAGE AREA.
C. REMOVE AND REINSTALL: REMOVE ITEMS INDICATED:CLEAN,
SERVICE AND OTHERWISE PREPARE THEM FOR REUSE; STORE AND
PROTECT THEM AGAINST DAMAGE. REINSTALL ITEMS IN THE SAME
LOCATIONS OR IN LOCATIONS INDICATED.
D. EXISTING TO REMAIN: PROTECT CONSTRUCTION INDICATED TO
REMAIN AGAINST DAMAGED AND SOILING DURING SELECTIVE
DEMOLITION. WHEN PERMITTED BY THE OWNER'S
REPRESENTATIVE, ITEMS MAY BE REMOVED TO A SUITABLE,
PROTECTED STORAGE LOCATION DURING SELECTIVE DEMOLITION
AND THEN CLEANED AND REINSTALLED IN THEIR ORIGINAL
LOCATIONS.
2. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY ITEMS IDENTIFIED
TO BE REMOVED. AT THE BEGINNING OF DEMOLITION WORK THE
OWNER'S REPRESENTATIVE SHALL IDENTIFY ALL ITEMS TO BE
SALVAGED.
3. DEMOLITION SHALL BE PERFORMED IN AN ORDERLY FASHION. ALL
NECESSARY PRECAUTIONS SHALL BE TAKEN TO PROTECT EXISTING
FACILITIES FROM DAMAGE DURING CONSTRUCTION.
4. ALL DEMOLITION AND CONSTRUCTION DEBRIS SHALL BE REMOVED BY
THE CONTRACTOR THROUGH AN AUTHORIZED EPA WASTE
CONTRACTOR.
GENERAL DEMOLITION NOTES
Scale:3 NOT TO SCALE
VERTICAL 2-PIPE VENT SYSTEM DETAIL
Scale:2 NOT TO SCALE
HORIZONTAL 2-PIPE VENT SYSTEM DETAIL
1, 2, 3, 4, 5, 6
1, 2, 3, 4, 5, 6
1, 2, 3, 4, 5, 6
1, 2, 3, 4, 5, 6
1, 2, 3, 4, 5, 6
MODEL
DESCRIPTIONITEM
NO.
PIPING CONNECTIONS
PLUMBING FIXTURE SCHEDULE
SAN
MOUNTING
HEIGHT VENT CW MANUFACTURERHW
FIXTURE BASIS OF DESIGN
NOTES
NOTES:
1. PROVIDE 5" CAST IRON ADJUSTABLE STRAINER AND DEEP-SEAL TRAP MIN 4" SEAL. STRAINER SHALL BE SCREW-IN TYPE.
FD-1 FLOOR DRAIN -- 2" -- -- -- 1WADE DRAIN W-1100-MR6
| Sheets and Views |
| MPD-101-paper |
| MP-101-Mp-101 |
| MP-701-paper |
File details come from the government source that posted it. Updated .