Bid Schedule Summary
This is a bid schedule for the Hardscrabble Refuse Reclamation Project issued by the State of Utah Division of Oil, Gas and Mining under the Division of Purchasing. The project encompasses coal refuse waste excavation and haul, channel construction, site grading and earthwork, runoff control, revegetation of disturbed areas, and road realignment and resurfacing at an abandoned coal refuse pile in Carbon County, Utah. The bid schedule itemizes 11 major work categories with numerous sub-items, including mobilization and demobilization, access improvements, temporary drainage controls, surveying and construction staking, demolition and cleanup, borrow and storage area excavation and fill, channel and tributary material excavation and disposal, site drainage improvements, road improvements, revegetation, and non-construction costs. Quantities vary significantly across line items, ranging from single lump-sum units (LS) to large quantities such as 50,522 tons of imported riprap and 25,391 cubic yards of coal refuse excavation. A mandatory site visit is required on Friday, November 13, 2026, at 10:00 AM, meeting at the Price Field Office located at 319 North Carbonville Road, Price, Utah 84501. Attendance at the entire pre-bid meeting is mandatory, and bids from firms not on record as attending will be considered nonresponsive. The anticipated contract term is 84 calendar days from the date of notice to proceed, with a single contract award to the lowest cost responsive and responsible vendor meeting specifications and mandatory minimum requirements.
The Engineer's Estimate for this project is $7,681,574.00. The bid schedule presents all line items with zero dollar amounts populated, indicating this is a blank form awaiting contractor pricing submissions. Pricing terms require bidders to complete unit prices and lump-sum amounts for each identified work item, with subtotals provided for major work categories and a final total contract bid price required in the bid summary section. No set-asides, incumbent contractor information, or specific funding sources are identified in this bid schedule document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7-Attachment B - 007955 MasterSpecDoc.pdf | ||
| 2-Att.-A-PO-Terms-and-Conditions.docx | DOCX document | |
| 5-Attachment C - Bond Language.docx | DOCX document | |
| 6-007955 Specs Chap5BidDocs.pdf | ||
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 3-Attachment D - Mandatory Minimum Criteria (A and B).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| OWNER: | Utah Abandoned Mine Reclamation Program |
| PROJECT: | Hardscrabble Refuse Reclamation |
| SOLICITATION #: |
BID SCHEDULE
| REFERENCE SPECIFICATION | Bid Item No. | Item | Quantity | Unit | Bid Price Amount | Sub-Item Bid | |
| Price Amount | Variation in Quantity |
Unit Prices 0220/0240 1 Mobilization / Demobilization 1 LS
| 0230 | 2 | Access Improvement | 1 | LS | $ - 0 |
| 0230 | 2a | Construct Temporary Access Improvements | 1 | LS | |
| 0230 | 2b | Reclaim Temporary Access Improvements | 1 | LS |
| 0300.3.01.G | 3 | Temporary Drainage Controls | 1 | LS | $ - 0 |
| 0300 | 3a | SWPPP Management & Inspections | 1 | LS | |
| 0280 | 3b | Sediment Control Log | 1,600 | LF | |
| 3c | Heavy Duty Silt Fence | 200 | LF | ||
| 0300.3.01.G | 3d | Temporary Rock Filter Dike | 5 | EA |
4 Surveying & Construction Staking 1 LS
| 5 | Demolition & Clean Up | 1 | LS | $ - 0 | |
| 0300.3.01.C | 5a | Demolition & Clean Up | 1 | LS | |
| 0200 / 0240 | 5b | Dust Control | 1 | LS | |
| Subtotal (to bid summary) | $ - 0 | ||||
| Hardscrabble Canyon Coal Disposal, Channel, Drainage, and Roadway Improvements | |||||
| 6 | Borrow & Storage Area Excavation & Fill | 1 | LS | $ - 0 | |
| 0300.3.01.E | 6a | Excavation & Stockpile of Topsoil Material | 644 | CY | |
| 0300.3.01.E | 6b | Excavation & Stockpile of Native Material | 4,286 | CY | |
| 0300.3.01.E | 6c | Screening & Production of Riprap Material from Excavated Native Material | 857 | CY | |
| 0300.3.01.E | 6d | Placement of Native Material On-Site (Clean Cover Soil) | 966 | CY | |
| 0300.3.01.E | 6e | Place Salvaged Topsoil | 644 | CY |
| 7 | Channel & Tributary Material Excavation & Disposal | 1 | LS | $ - 0 | |
| 0.300.3.01.E | 7a | Excavate Coal Refuse | 25,391 | CY | |
| 0.300.3.01.E | 7b | Placement of Unsuitable Coal Refuse in Borrow / Storage Areas | 5,150 | CY | |
| 0300.3.01.E / 0300.3.01.F | 7c | Deliver Coal Refuse to Sunnyside Cogen | 0 | TON | |
| 7d | Dispose Unsuitable Coal Refuse @ ECDC Landfill | 25,747 | TON | ||
| 0.300.3.01.E | 7e | Excavation & Stockpile of Native Material | 30,692 | CY | |
| 0300.3.01.E | 7f | Screening & Production of Riprap Material from Excavated Native Material | 5,752 | CY | |
| 0300.3.01.F | 7g | Dispose Excess Native Material @ Carbon County Landfill (Daily Cover) | 780 | TON |
| 8 | Site Drainage Improvements | 1 | LS | $ - 0 | |
| 0300.3.01.F / 0302 | 8a | Riprap (Class A, D50=30", Produced On-Site) | 3,407 | CY | |
| 0300.3.01.F / 0302 | 8b | Riprap (Class A, D50=30", Imported) | 50,522 | TON | |
| 0300.3.01.F / 0302 | 8c | Granular Filter Material (Imported) | 13,291 | TON | |
| 0300.3.01.E | 8d | Placement of Native Material On-Site (Channel, Side Slopes, Riprap Voids) | 29,912 | CY | |
| 8e | Haul & Place Riprap | 34,983 | CY | ||
| 8f | Haul & Place Granular Filter | 8,307 | CY | ||
| 0302 | 8g | Geotextile Liner | 35,441 | SY | |
| 0300.3.01.E | 8h | Excavation of Bedrock | 2,000 | SF | |
| 0302 | 8i | Tributary #1 Channel Construction | 1 | LS | |
| 0302 | 8j | Tributary #2 Channel Construction | 1 | LS | |
| 0302 | 8k | Tributary #3 Channel Construction | 1 | LS | |
| 0302 | 8l | Tributary #4 Channel Construction | 1 | LS | |
| 0302 | 8m | Tributary #5 Channel Construction | 1 | LS | |
| 0302 | 8n | Tributary #6 Channel Construction | 1 | LS | |
| 0302 | 8o | Rock Check Dam & Stilling Basin (Downstream) | 1 | LS | |
| 0303 / 0300.3.01.E | 8p | Concrete Keyway Construction (Upstream End Main Channel) | 1 | LS |
| 9 | Road Improvements | 1 | LS | $ - 0 | |
| 0301 | 9a | Road Improvement: Resurface Road Section | 3,141 | SY | |
| 0301 | 9b | Road Improvement: Reconstructed Road Section | 634 | SY | |
| 0302 | 9c | Riprap for Ditch Construction (D50=15", Imported or Produced On-Site) | 2,861 | TON | |
| 0302 | 9c | Haul and Place Riprap for Ditch Construction | 1,788 | CY | |
| 9d | New Gate (20' Wide Swing Gate) | 1 | EA | ||
| 0300.3.01.D / 0252 | 9e | Low Water Crossing #1 | 1 | LS | |
| 0300.3.01.D/ 0252 | 9f | Low Water Crossing #2 | 1 | LS | |
| Subtotal (to bid summary) | $ - 0 |
| 10 | Revegetation | 1 | LS | $ - 0 | ||
| 0300.3.01.E / 0300.3.01.H | 10a | Furnish and Place Growth Media (Topsoil) | 4,254 | CY | ||
| 10b | Scarification | 25,500 | SY | |||
| 10c | Pocking | 25,500 | SY | |||
| 10d | Straw Mulch | 5.3 | ACRE | |||
| 10e | Broadcast Seed Mix (Type) | 10.5 | ACRE | |||
| Subtotal (to bid summary) | $ - 0 | |||||
| Subtotal (Construction) | $ - 0 | |||||
| Non-Construction Costs | ||||||
| 11 | Non-Construction Costs | NA | $ - 0 | |||
| 11a | Insurance | |||||
| 11b | Bonds | |||||
| $ - 0 | TOTAL CONTRACT BID PRICE |
Summary
| OWNER: | Utah Abandoned Mine Reclamation Program |
| PROJECT: | Hardscrabble Refuse Reclamation |
| SOLICITATION #: | 0 |
BID SUMMARY
| Bid Item | Lump Sum Amount |
| Mobilization / Demobilization | $0.00 |
| Access Improvement | $0.00 |
| Temporary Drainage Controls | $0.00 |
| Surveying & Construction Staking | $0.00 |
| Demolition & Clean Up | $0.00 |
| Borrow & Storage Area Excavation & Fill | $0.00 |
| Channel & Tributary Material Excavation & Disposal | $0.00 |
| Site Drainage Improvements | $0.00 |
| Road Improvements | $0.00 |
| Revegetation | $0.00 |
Non-Construction Costs $0.00
Total Contract Bid Price $0.00