3c. Drawings P13920142.pdf

PDF 12 MB Posted

Attached to
REPLACE BOILERS MAT BUILDING AT U. S. COAST GUARD, ANT NEW YORK, BAYONNE, NEW JERSEY, PSN 13920142
Solicitation number
70Z0G125BSYN00010
Issued by

About this file

This is a set of engineering drawings for a boiler replacement project at the U.S. Coast Guard ANT New York facility in Bayonne, Hudson County, New Jersey (Project #13920142). The drawings detail the removal of two existing oil-fired boilers and associated equipment from the MAT (Maintenance Augmentation Team) Building, and the installation of new natural gas-fired condensing boilers with supporting systems.

The drawings include site plans showing contractor staging areas, mechanical floor plans, piping diagrams, equipment schedules, and detailed specifications for the new heating plant installation. Key components include two 725 MBH natural gas boilers, circulation pumps (P-1 and P-2 rated at 45 GPM), boiler venting through modified existing openings, new gas service connections, and a building automation system for temperature control. The drawings specify requirements for temporary heat during construction, demolition of existing fuel oil systems, and modification of the mechanical room to accommodate the new gas-fired heating plant. Reference drawings from the original building construction (RD-1 through RD-8) are included to provide additional context about existing conditions and systems.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE

PL

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NE

W

JE

RS

EY

GE

NE

RA

L

CO

VE

R

SH

EE

T

MAT BUILDING

G-001

P1

P1

2G -0

.d wg

US

CG

C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

MICHAEL CAROSOTTO, PE 08 AUG 2024

MICHAEL CAROSOTTO, PE

DAVID DILL

CO

NS

TR

UC

TI

ON

A

UG

U.S. COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

TECHNICAL DIRECTOR

BRANCH CHIEF

APPROVING OFFICIAL DATE

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

U.S. COAST GUARD

CIVIL ENGINEERING UNIT

PROVIDENCE

CG ANT NEW YORK

BAYONNE, HUDSON COUNTY, NEW JERSEY

13920142 REPLACE BOILERS MAT BUILDING

MAT BUILDING

EXCEL

LE

N C E I N

E N G I N E E R I N G

U . S . C O A S T G U

A R

D

CIVIL

ENGINEERING UNIT

PROVIDENCE

C

I

UN

TE

D

1 07 9

ST

EAT S

T

RD

GUA

OAS

SUMMARY OF WORK

1. REMOVE (2) EXISTING OIL FIRED 650 MBH CAST IRON SECTIONAL BOILERS AND OTHER CENTRAL HEATING PLANT EQUIPMENT; REPLACE WITH NATURAL GAS FIRED CONDENSING BOILERS, INCLUDING AIR INLET AND VENT PIPING, INSULATION, SUPPORTS, PIPING, PUMPS, EXPANSION TANK.

2. REMOVE EXISTING 2000 GALLON #2 HEATING OIL DOUBLE WALL STEEL ABOVE GROUND STORAGE TANK (AST-1)

AND ALL FUEL PIPING, BOTH ABOVE AND BELOW GROUND.

3. EXTEND NATURAL GAS PIPING FROM POINT OF CONNECTION AT EXISTING UNDERGROUND UTILITY SERVICE

PIPING TO BOILERS.

OBI #1: PROVIDE TEMPORARY HEAT

1. REFERENCE DRAWINGS ARE SELECTED FROM A SET OF APPROXIMATELY 61 DRAWINGS

PREPARED FOR THE USCG FACILITIES DESIGN & CONSTRUCTION CENTER (FD&CC) BY

RAYTHEON ENGINEERING & CONSTRUCTION, PROJECT DESCRIPTION “MOTBY NEW ANT /

CUTTER BUILDING”, FD&CC PROJECT NUMBER 01-95-1005, DATED 06-03-1996.

2. REFERENCE DRAWINGS ARE PROVIDED TO PROVIDE ADDITIONAL GENERAL INFORMATION,

AND, WHERE REFERENCED IN THE DRAWINGS, TO INDICATE ADDITIONAL DETAILS

REGARDING THE WORK REQUIRED.

NORTH

PLAN

TRUE N

NORTH

PLAN

TRUE N

DRAWING INDEX

SHEET ID SHEET # SHEET TITLE

G-001 01 COVER SHEET

G-101 02 SITE STAGING / COORDINATION PLAN

C-101 03 PARTIAL SITE UTILITY PLAN

C-501 04 DETAILS

M-001 05 LEGEND & NOTES

MD401 06 ENLARGED DEMOLITION PLANS

M-101 07 FLOOR PLAN

M-401 08 ENLARGED FLOOR PLANS

M-501 09 DETAILS

M-601 10 SCHEDULES

M-901 11 PHOTOGRAPHS

M-902 12 PHOTOGRAPHS

REFERENCE DRAWING LIST

REF DWG # SHEET ID DESCRIPTION

RD-1 HV-1 MECHANICAL AIR FLOW DIAGRAM

RD-2 HV-2 HOT WATER/ FUEL OIL DIAGRAM

RD-3 HV-3 AIR CONDITIONING AND VENTILATION

RD-4 HV-4 HEATING

RD-5 HV-5 HVAC DETAILS & SYMBOLS

RD-6 HV-6 HVAC SCHEDULES

RD-7 HV-7 HVAC SCHEDULES

RD-8 E-5 POWER PLANS

1. PROVIDE ALL MATERIAL, LABOR AND SUPERVISION ASSOCIATED WITH PROVIDING A TEMPORARY OIL-FIRED

HEATING HOT WATER GENERATOR ("BOILER"), AS REQUIRED TO:

SUPPLY HEATING HOT WATER (30% PROPYLENE GLYCOL SOLUTION) AT 200°F (NOMINAL 20°F TEMPERATURE

DROP) TO HEAT THE BUILDING.

MINIMUM OUTPUT CAPACITY: 1,000 MBH; HEATING OIL WILL BE PROVIDED BY THE GOVERNMENT.

CONNECT/DISCONNECT TO/FROM EXISTING SERVICES AS REQUIRED TO SUPPLY HEATING HOT WATER TO THE MAT BUILDING, INCLUDING HEATING HOT WATER SUPPLY AND RETURN PIPING, ELECTRIC, AND DOMESTIC

WATER.

DILL.DAVID.COLBY.1218495555

Digitally signed by

DILL.DAVID.COLBY.1218495555

Date: 2024.08.19 15:27:36 -04'00'

Digitally signed by

CAROSOTTO.MICHAEL.P.1021033398

Date: 2024.08.20 15:51:48 -04'00'

W

W

WW

W

W

W

W

C

C

C

C

C

C

C CC

W W W

W

WWW

C

C

X X

X X X

X X

X

X X

X

X

X X X

X X X X X X X X

X

X

X X X X X X X

X

RE

PL

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

GE

NE

RA

L

SI

TE

S

TA

GI

NG

CO

OR

D.

P

LA

N

MAT BUILDING

G-101

P1

P1

2G -1

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

GENERAL AREA OF WORK

APPROXIMATE LOCATION

OF CONTRACTORS

STAGING AREA. TO BE

CONFIRMED AT

PRE-CONSTRUCTION MTG

NORTH

PLAN

TRUE N

REFER TO M-101 FOR

INTERIOR PARTITIONS AND

OTHER INFORMATION

A5 SITE STAGING/ COORDINATION PLAN

1"=20'

20' 40'0

WATERFRONT

OPS BUILDING

(MAT BLDG)

TRANSFORMER

SWITCHGEAR

WV

X

METAL

SH

ED

BUILDING

1 STORY

HYD

WV

POLE

FLAG

FU

EL

ST

W V

TA

NK

WV

FU

EL

W C

W

AVEMENT

ASPHALT RAMP

5'-0" MIN

E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

X X X X

X

X

X X X X

E

E

E

E

E

E

E

E

W W

W W

W W

W W

W W

W W

W W

W W

W

W W

W W

W W

W W

W W

W W

W W

WV T

T

T T

T T

T T

T T

T T

T T

T

S

S

S

S

S

TRIP BOX

FOR GATE

NG

NG

NGNGNGNGNG T

STST

STST

ST

ST

ST

ST

ST

ST

ST ST

NG

PI

VW W W W W W

NG

NG

NG

NG

NG

E

E

E

E

E

E

X X

X X X

X X

X

X X

X

X

X X X

X X X

RE

PL

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

CI

VI

L

PA

RT

. S

IT

E

UT

IL

IT

Y

PL

AN

MAT BUILDING

C-101

P1

P1

2C -1

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

PROVIDE BURIED NATURAL GAS PIPE.

NOMINAL 1 PSI DISTRIBUTION PRESSURE.

TEE FOR FUTURE CONNECTION TO "WATERFRONT

OPS BUILDING" ASSUME 1,000 CFH NG LOAD

PROVIDE NATURAL GAS PIPING AT

APPROXIMATE LOCATIONS INDICATED, IN

ACCORDANCE WITH UTILITY COMPANY (PSEG)

AND CONTRACT DOCUMENT REQUIREMENTS.

MAT BUILDING

PROPOSED GAS METER LOCATION.

PROVIDE AS REQUIRED BY GAS

UTILITY.

ACCESS GATE OPEN POSITION

ACCESS GATE CLOSED POSITION

KEY NOTES (APPLY TO THIS SHEET ONLY)

R & D CONTENTS OF DOUBLE WALL STEEL AST. ASSUME 6" OF

LIQUID AND OTHER MATERIALS REMAIN IN BOTTOM OF TANK.

R & D AST IN ACCORDANCE WITH APPLICABLE FEDERAL,

STATE, AND LOCAL REGULATIONS AND REQUIREMENTS.

R & D EXISTING REINFORCED CONCRETE PAD BELOW AST.

FOR BIDDING PURPOSES ASSUME 8' X 13' X 12" THICK.

REMOVE 23.5' X 16' CONCRETE PAVEMENT AROUND PAD.

RESTORE SURFACE PER DETAIL E8/C-501.

MAINTAIN OPERATION OF ACCESS GATE DURING

CONSTRUCTION

CONNECT TO EXISTING NATURAL GAS PIPING OWNED BY

GAS UTILITY. COMPLY WITH GAS UTILITY REQUIREMENTS.

PROVIDE 4'X4'X6" CONCRETE PAD W/ 4' TALL POURED

CONCRETE WALL. SEE C-501 FOR ADDITIONAL INFO AND

REQUIREMENTS.

PROVIDE BOLLARDS; MINIMUM 2, SEE DETAIL

E2/C-501.

ACCESS GATE CONTROL BOX / INTERCOM.

EXISTING 2,000 GALLON

OIL TANK, AST-1, AND

CONCRETE PAD TO BE

REMOVED. SEE D7/M-902

EXISTING 6" ROUND X 7' CONCRETE BOLLARDS IN

PLACE TO PROTECT SLIDING ACCESS GATE.

REMOVE AND REPLACE AS REQUIRED TO PROVIDE

BURIED NATURAL GAS PIPING. FOR BIDDING

PURPOSES ASSUME R & RPL 8 BOLLARDS

GENERAL NOTES

1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS AND SYMBOLS USED ON C-SERIES DWGS.

2. UNLESS OTHERWISE INDICATED, ALL UTILITIES SERVICES INDICATED ARE BURIED /

UNDERGROUND.

3. EXCAVATION WORK REQUIRED FOR INSTALLATION OF NATURAL GAS PIPING SHALL NOT

BLOCK THE INGRESS OR EGRESS OF VEHICULAR TRAFFIC, INCLUDING USCG VEHICLES,

DELIVERY VEHICLES, AND EMERGENCY SERVICES VEHICLES. WHEN EXCAVATION, WORK IN

OPEN EXCAVATIONS, BACKFILL OR OTHER SIMILAR ACTIVITIES ARE NOT IN PROGRESS,

PROVIDE TRAFFIC-RATED COVERS ACROSS OPEN EXCAVATIONS TO ALLOW PASSAGE OF

VEHICLES. OPEN EXCAVATIONS SHALL NOT BE LEFT UNATTENDED; PROVIDE CONSTRUCTION

FENCES OR OTHER BARRIERS AROUND WORK AREAS DURING NON-CONSTRUCTION PERIODS.

B4 PARTIAL SITE UTILITY PLAN - EXISTING

SCALE: 1"=10'

0 10' 20'

NORTH

PLAN

TRUE N

INSTALL APPROX 20 LINEAR FEET (10'X10') OF 6'

TALL CHAINLINK FENCE W/ ACCESS GATE SEE

A2/C-101

A3 C-501

INSTALL NATURAL GAS LINE BETWEEN EXISTING

ACCU AND EXISTING POST INDICATOR VALVE

TRANSFORMER

X

C1

C2

C3

C4

C5

C6

C7

C4

C6

C3

C2

C1

C5 C7

10.0'

10.0'

4.0'

4.0'

4.0' 3.0'3.0'

A2 FENCE PLAN

SCALE: NTS

A2 C-101

X

X X

X X

X X

X X

SWITCHGEAR

EXISTING 10' TALL FENCE

PROVIDE

FENCE

NOTES:

1. PROVIDE FENCE INCLUDING POSTS, TOP RAILS, BOTTOM RAILS,

AND BRACES. SEE SPECIFICATIONS

2. PROVIDE SUBMITTAL ON ALL FENCING MATERIALS

INSTALL FENCE POSTS IN

ACCORDANCE WITH SPECIFICATIONS

SECTION 32 31 13 - 3.2

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

CI

VI

L

DE

TA

IL

S

MAT BUILDING

C-501

P1

P1

2C -5

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

4.5" BITUMINOUS BINDER

COURSE (2 COURSES)

8" COMPACTED

BASE COURSE

1.5" BITUMINOUS WEARING

COURSE

EXISTING BITUMINOUS

PAVEMENT TO REMAIN

EXISTING BASE

LAYER

EXISTING SUBGRADE

COMPACTED

SELECT

BACKFILL

SLOPE

SEE NOTE 1

SAWCUT CLEAN VERTICAL EDGE

AND TACK COAT

MILL EXISTING PAVEMENT 1.5"

THICK BY 12" WIDE TO PROVIDE

STAGGERED JOINT AND TACK

COAT

12" COMPACTED

SUBBASE COURSE

1'1'

PROPOSED PIPE W/ TRACER WIRE

MAGNETIC WARNING AND

IDENTIFICATION TAPE, INSTALL

12" BELOW FINISH GRADE

8" MIN

12" MIN

PIPE DIA

6" MIN PIPE

COMPACT SUBGRADE

COMPACTED BEDDING MATERIAL

8" MIN

PAVING AND

SUBGRADE AS

SPECIFIED

SEE TYP PAVEMENT

SECTION

BEDDING

PIPE ZONE

COMPACTED SELECT BACKFILL

CONNECT TO EXISTING

VALVED/CAPPED PUBLIC

SERVICE ELECTRIC & GAS

(PSEG) GAS RISER LOCATED

INSIDE CG PROPERTY LINE

FENCING, NEAR EXISTING

PROTECTIVE BOLLARDS. SEE

PHOTO A3/M-901 FOR

ADDITIONAL INFORMATION.

CONTACT UTILITY AND COMPLY

WITH UTILITY COMPANY

REQUIREMENTS FOR THIS

INSTALLATION.

PIPING PROVIDED BY

CONTRACTOR. PIPING

INSPECTED BY GAS

SUPPLIER. PROVIDE IN

ACCORDANCE WITH

NFPA 54 AND GAS

SUPPLIER

REQUIREMENTS.

GRADE

HDPE PIPING

THREADED CONNECTION

ABOVE GRADE

STEEL PIPING

GRADE

ANODELESS RISER

YELLOW INSULATED TRACER

WIRE, TAPE TO PIPING

NOTE: PROVIDE THIS ANODELESS PIPE RISER AT ALL PIPING

LOCATIONS WHERE PIPING TRANSITIONS FROM ABOVE TO BELOW

GRADE.

8" CAST IRON PIPE SLEEVE.

FILL ANNULUS W/ SAND.

" M

IN

" M

IN

8"

BUTT FUSION ELBOW

BUTT FUSION

JOINT TYP. (2)

PLACES NOTES:

1. THE NEW BITUMINOUS PAVEMENT SHALL MAINTAIN THE PREVIOUS

DRAINAGE GRADES, SLOPES, AND ELEVATIONS TO SLOPE TOWARDS

DRAINAGE STRUCTURES.

2. EXCAVATION SLOPE STABILITY AND THE PROTECTION OF EXISTING

STRUCTURES AND UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY.

EXCAVATED SLOPE FOR PIPE

EXCAVATION, SEE NOTE 2

D9 M-501

NOTE 1

NOTES:

1. FOR ADDITIONAL INFORMATION AND REQUIREMENTS SEE A5/M-501.

2. FIELD VERIFY LOCATION, BURIAL DEPTH AND ARRANGEMENT OF EXISTING BURIED UTILITIES. NAT. GAS PIPING SHALL BE PROVIDED TO AVOID EXISTING UTILITIES. PROVIDE RECORD DRAWING INDICATING ACTUAL

LOCATIONS OF EXISTING SERVICES AND GAS PIPING PROVIDED.

DEPTH AS REQ'D,

MIN 24" BELOW

GRADE. SEE A8/C-501

EXISTING SANITARY SEWER

EXISTING FP WATER

EXISTING DOM. WATER

EXISTING ELEC

EXISTING TEL. / DATA

NOTE 1

NOTES:

1. DEPTH AS REQUIRED, MINIMUM 24". VERIFY WITH GAS UTILITY AND

ADJUST TO SUIT EXISTING CONDITIONS, INCLUDING AS REQUIRED

TO AVOID CONFLICTS WITH EXISTING BURIED UTILITIES. DOCUMENT

INSTALLED DEPTH ON PROJECT RECORD DRAWINGS.

SLOPE CONC SURFACE

TO DRAIN

6"Ø CONCRETE FILLED SCH 80 STEEL PIPE,

PROVIDE 6" NOMINAL PLASTIC BOLLARD COVER,

COLOR SAFETY YELLOW

4'-0"

4'-0"

6"

CONCRETE FOOTING

24"

E2 BOLLARD DETAIL

SCALE: NTS E4 TYPICAL ANODELESS RISER DETAIL

SCALE: NTS

E8 PAVEMENT RESTORATION DETAIL

SCALE: 1"=1'

A3 GAS SERVICE SCHEMATIC

SCALE: NTS A8 TYP. PIPE BACKFILL DETAIL

SCALE: NTS

INSTALL METER,

REGULATOR, AND

OVERPRESSURE

DEVICE AS REQ'D BY

UTILITY COMPANY

MER

0 1" 2"1/2"

F&I 4'X4'X6" CONC SLAB W/ #4 BAR EACH

WAY@ 12".O.C. 2" BELOW SURFACE.

F&I 4' TALL X 4' LONG X 8" THICK

POURED WALL W/ (1) #4 BAR @ 12" O.C.

TIE VERTICAL INTO HORIZONTAL W/

(1) 12" L BAR @ 12" O.C.

(2) EXISTING BOLLARDS

PROVIDE CONC. SLAB W/

POURED WALL FOR GAS

METER

EXISTING CG FENCE

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NE

W

JE

RS

EY

M

EC

HA

NI

CA

L

LE

GE

ND

N

OT

ES

MAT BUILDING

M-001

P1

P1

2M -0

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

GENERAL NOTES:

1. THE SITE IS LOCATED AT ANT NY, IN BAYONNE, NEW JERSEY.

2. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF

THESE DRAWINGS AND SPECIFICATIONS.

3. THE CONTRACTOR SHALL CONDUCT THE WORK OF THIS PROJECT SO AS NOT TO INTERFERE WITH THE WORK OF OTHER PROJECTS AT THE SITE, INCLUDING COORDINATING THE WORK AS REQUIRED THROUGH THE COR. ANY

UNRESOLVED ISSUES SHALL BE BROUGHT TO THE ATTENTION OF THE COR IMMEDIATELY.

4. COORDINATE ACCESS TO THE FACILITY AND THE PROJECT WORK AREAS WITH THE COR. LIMITED ON-SITE PARKING

IS AVAILABLE. SCHEDULE ALL DELIVERIES WITH THE COR.

5. ALL CONTRACTOR PERSONNEL MUST SIGN-IN AND SIGN-OUT DAILY AT THE RECEPTION DESK IN THE LOBBY. A FACILITY BADGE WILL BE ISSUED TO EACH CONTRACTOR EMPLOYEE AT SIGN-IN AND MUST BE RETURNED AT SIGN-OUT. IN ADDITION TO THE FACILITY BADGE, EACH CONTRACTOR EMPLOYEE MUST CARRY A PERSONAL PHOTO

ID ANY TIME THEY ARE ON SITE.

6. SUBMIT A TYPED LIST ON COMPANY LETTERHEAD OF ALL CONTRACTOR RELATED VEHICLES (WORK AND PERSONAL)

THAT WILL BE LEFT UNATTENDED WITHIN THE FACILITY TO THE COR.

7. PREPARE A TYPED LIST ON COMPANY LETTERHEAD OF ALL CONTRACTOR EMPLOYEES WHO WILL BE ON SITE.

DELIVER AS DIRECTED BY THE COR. THE LIST SHALL CONTAIN NAME, DATE OF BIRTH, PLACE OF BIRTH AND SOCIAL

SECURITY NUMBER.

8. DO NOT ENTER PRIVATE ROOMS/AREAS WITHOUT A GOVERNMENT ESCORT.

9. UTILITY SIZES AND LOCATIONS, WHEN SHOWN ON THESE DRAWINGS, ARE CONSIDERED APPROXIMATE. THE ACTUAL SIZE AND LOCATION OF UTILITIES MAY VARY FROM THOSE SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS OF ALL UTILITIES, GRADES, AND DIMENSIONS PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL NOTIFY THE COR OF ANY DISCREPANCIES, IN WRITING, PRIOR TO BEGINNING AFFECTED WORK.

THE CONTRACTOR SHALL MAKE PROVISIONS TO ENSURE UTILITY LINES ARE PROTECTED AND SUPPORTED AND

REMAIN IN CONTINUOUS OPERATION, UNLESS OTHERWISE NOTED.

10. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE ORDERING ANY MATERIAL, COMMENCING ANY FABRICATION, OR PERFORMING ANY WORK. THE CONTRACTOR SHALL NOTIFY THE USCG KO, IN WRITING, OF ANY CONDITIONS OR DIMENSIONS WHICH VARY FROM THOSE SHOWN IN THE DRAWINGS

AND INCORPORATE SUCH VARIATIONS IN THE CONSTRUCTION AS APPROVED BY THE USCG.

11. EXISTING CONSTRUCTION, INCLUDING UTILITIES, DRAINAGE, AND OTHER MISCELLANEOUS WORK WHICH IS TO

REMAIN, SHALL BE UNDISTURBED AND PROTECTED BY THE CONTRACTOR.

12. LIMITED WATER AND POWER ARE AVAILABLE ON SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

CONNECTIONS AS NEEDED AS APPROVED BY THE COR.

13. THE USCG WILL PROVIDE A STAGING AREA WITHIN THE PROPERTY FOR THE CONTRACTOR'S USE AS SHOWN ON THE DRAWINGS OR AS PROVIDED BY THE KO DURING THE PRECONSTRUCTION MEETING. THE CONTRACTOR SHALL

STORE CONSTRUCTION MATERIALS WITHIN ITS DESIGNATED STAGING AREA SEE G-101.

14. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. SAFETY PROVISIONS SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS.

15. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP CONSTRUCTION PROCEDURES AND SEQUENCING TO ENSURE THE PROTECTION OF EXISTING AND PROPOSED STRUCTURES AND THE SAFETY AND PROTECTION OF USCG PERSONNEL, CONSTRUCTION PERSONNEL, AND THE PUBLIC, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER. THIS INCLUDES THE ADDITION OF NECESSARY TEMPORARY SUPPORTS (E.G., BRACING, SHORING, GUYS, TIEDOWNS, ETC.). SUCH TEMPORARY MATERIAL SHALL BE DESIGNED BY THE CONTRACTOR AND SHALL REMAIN THE

PROPERTY OF THE CONTRACTOR.

16. ALL RIGGING EQUIPMENT & SYSTEMS SHALL BE INDEPENDENT OF EXISTING STRUCTURAL & BUILDING ELEMENTS. NO

LOADS SHALL BE IMPOSED ON EXISTING BUILDING.

17. THE WORK SHALL BE CONDUCTED IN A MANNER THAT WILL MINIMIZE INTERRUPTIONS TO THE DAILY OPERATIONS OF

USCG.

18. THE CONTRACTOR SHALL MAKE ALL EFFORTS TO MINIMIZE DAMAGE TO EXISTING SURFACES OR SERVICES DURING THE COURSE OF THIS PROJECT. ALL AREAS DISTURBED DURING DEMOLITION OR CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL CONDITION BY THE CONTRACTOR, UNLESS OTHERWISE SHOWN OR NOTED.

19. PROVIDE DUMPSTERS/CARTING SERVICE AS REQUIRED FOR CONTRACT RUBBISH REMOVAL DAILY. REMOVE ALL ITEMS MADE SPARE OR GENERATED AS RUBBISH FROM THE SITE AND DISPOSE OF LEGALLY. COORDINATE

DUMPSTER LOCATION AND DROP-OFF/PICKUP SCHEDULE WITH THE COR.

20. THE CONTRACTOR SHALL OBTAIN, DAILY, A HOT WORK PERMIT FROM THE USCG FOR ALL WELDING, TORCH CUTTING, AND OTHER HOT WORK.

ENVIRONMENTAL PROTECTION PLAN:

1. IN ORDER TO PROTECT THE PROJECT AREA FROM HAZARDOUS MATERIALS RELEASES DURING THE COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING PREVENTATIVE MEASURES TO AVOID ANY

ENVIRONMENTAL IMPACTS. THESE MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO:

1.1. ALL EQUIPMENT PROPOSED TO BE UTILIZED BY THE CONTRACTOR SHALL BE IN GOOD WORKING CONDITION

AND INSPECTED DAILY FOR LEAKS.

1.2. A SPILL KIT AND ABSORBENT MATERIALS SHALL BE ON SITE AT ALL TIMES DURING CONSTRUCTION

OPERATIONS.

1.3. NO FUEL SHALL BE ALLOWED TO BE STORED ON SITE. ALL FUEL SHALL BE BROUGHT TO THE SITE DAILY.

1.4. ALL FUEL TRANSFER OPERATIONS SHALL BE CONDUCTED IN AN EFFICIENT AND SAFE MANNER IN ACCORDANCE WITH THE CONTRACTOR'S OPERATIONS MANUAL. OIL ABSORBENT DIAPERS SHALL BE PLACED UNDER ALL

EQUIPMENT DURING FUELING OPERATIONS.

1.5. ALL HYDRAULIC EQUIPMENT SHALL BE PROPERLY MAINTAINED AND RECORDED IN WEEKLY LOGS AS TO

REQUIREMENTS FOR AND ACTUAL MAINTENANCE COMPLETED.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEANUP AND REMEDIATION OF ANY HAZARDOUS MATERIAL

RELEASES.

CONSTRUCTION SEQUENCING:

1. THE CONTRACTOR SHALL MINIMIZE IMPACTS TO PEDESTRIAN AND VEHICULAR ACCESS . ANY CLOSURE OF PEDESTRIAN OR VEHICULAR ACCESS DUE TO CONSTRUCTION SHALL BE REQUESTED A MINIMUM OF 30 DAYS IN

ADVANCE OF THE PROPOSED ACTION.

2. AREAS OF THE FACILITY NOT UNDER CONSTRUCTION SHALL REMAIN IN OPERATION DURING CONSTRUCTION. KEEP

ALL CONSTRUCTION ACTIVITIES AND PERSONNEL CLEAR OF FACILITY OPERATIONS.

ELEVATION

SECTION

DETAIL

CROSS-REFERENCE LEGEND

INDICATES REFERENCE QUADRANT SHEET LOCATION

SHEET WHERE SECTION/DETAIL/ELEVATION

IS TAKEN

INDICATES REFERENCE QUADRANT ON DESTINATION SHEET

SHEET WHERE SECTION IS SHOWN

INDICATES REFERENCE QUADRANT ON DESTINATION SHEET

SHEET WHERE DETAIL IS SHOWN

INDICATES REFERENCE QUADRANT ON DESTINATION SHEET

SHEET WHERE ELEVATION IS SHOWN

TRUE NORTH DIRECTION

INDICATES REFERENCE QUADRANT SHEET LOCATION

NORTH

PLAN

TRUE N

X# VIEW TITLE (REQUIRED)

VIEW TITLE (OPTIONAL)

SCALE:

XX###

X#

X#

XX###

X#

XX###

X# VIEW TITLE (REQUIRED)

SCALE:

PHOTOGRAPH

X#

XX###

INDICATES LOCATION ON SHEET INDICATED

INDICATES DIRECTION OF PHOTO TAKEN

INDICATES SHEET WHERE PHOTO APPEARS.

LOCATION OF SYMBOL ON PLAN INDICATES

APPROX POSITION OF CAMERA

A.F.F ABOVE FINISHED FLOOR

ALT ALTERNATE

APD AIR PRESSURE DROP

ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS

BD BREECHING DUCT

BLDG BUILDING

BMP BEST MANAGEMENT PRACTICES

CEU CIVIL ENGINEERING UNIT

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CL CENTER LINE

CLG CEILING

CO CLEAN OUT

COMM COMMUNICATIONS

CONC CONCRETE

CONN. CONNECTION

CONT CONTINUOUS

COR CONTRACTING OFFICER'S REPRESENTATIVE

DIA/Ø DIAMETER

DS DOWNSPOUT

DWG DRAWING

DWH DOMESTIC WATER HEATER

E ELECTRIC

(E) EXISTING

EA EACH

E.A. EXHAUST AIR

EL. ELEVATION

ETR EXISTING TO REMAIN

FL FLOOR

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

FT FOOT/FEET

G NATURAL GAS

GALV GALVANIZED

GPM GALLONS PER MINUTE

HP HORSE POWER

I.D. INSIDE DIAMETER

IN INCH(ES)

INV. INVERT

KO CONTRACTING OFFICER

L LENGTH

LBS POUNDS

LDR LEADER

LF LINEAR FEET

LG LONG

MAT MAINTENANCE AUGMENTATIN TEAM

MAX MAXIMUM

MBH 1000 BRITISH THERMAL UNITS PER HOUR

MCA MIN CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MIN MINIMUM

N.C. NORMALLY CLOSED

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

N.O. NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OBI OPTIONAL BID ITEM

OD OUTSIDE DIAMETER

P.D. PRESSURE DROP

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

QTY QUANTITY

R.A. RETURN AIR

R&D REMOVE AND DISPOSE

R&R REMOVE AND REINSTALL

R&RPL REMOVE AND REPLACE

REF REFERENCE

REQ'D REQUIRED

RL REFRIGERANT LIQUID

RPUID REAL PROPERTY UNIQUE IDENTIFIER

RO ROUGH OPENING

RS REFRIGERANT SUCTION

S.A. SUPPLY AIR

SAF SUPPLY AIR FAN

SF SQUARE FEET

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS' NATIONAL ASSOCIATION

SPECS SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

ST STAIRS

STA STATION

STD STANDARD

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UG UNDERGROUND

U.O.N UNLESS OTHERWISE NOTED

USACE UNITED STATES ARMY CORPS OF ENGINEERS

USCG UNITED STATES COAST GUARD

w/ WITH

W WATER

& AND

@ AT

' FEET/FOOT

" INCHES

< LESS THAN

> GREATER THAN OR EQUAL

% PERCENTAGE

± PLUS/MINUS

CONNECTION OF NEW TO EXISTING

T

MOTORIZED DAMPER

THERMOSTAT

FAN SWITCH

PUMP #1

LOUVER

BUTTERFLY VALVE

CHECK VALVE

BALANCING VALVE

PRESSURE RELIEF VALVE

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

DRAIN VALVE

STRAINER

PIPE GUIDE

FLEXIBLE PIPE CONNECTOR

PRESSURE GAUGE W/ GAUGE COCK

THERMOMETER

MANUAL AIR VENT

PIPE TURNING UP

PIPE TURNING DOWN

DIRECTION OF PITCH DOWN

DIRECTION OF FLOW

STRAINER W/ BLOW DOWN VALVE

HEATING HOT WATER SUPPLY PIPING

HEATING HOT WATER RETURN PIPING

UNION

LEGEND AND ABBREVIATIONS (NOT ALL SYMBOLS AND ABBREVIATIONS ARE USED)

DRAWING KEY NOTE DESIGNATION,

GATE VALVE

GLOBE VALVE

PHASE OR DIAMETER

EMERGENCY FUEL CUT-OFF SWITCH

BOILER # 1

PIPE ANCHOR

VALVE #1

APPLY WHERE INDICATED

SENSING BULB

NATURAL GAS

POINT OF DISCONNECTION.

NOTE: NOT ALL POINTS OF DIS-

CONNECTION ARE INDICATED. REVIEW

DRAWINGS, INCLUDING KEY NOTES AND

DRAWING NOTES, CAREFULLY TO DETER-

MINE WORK REQUIRED.

ISOLATION VALVE

TO BE REMOVED

SEWER

PIPE CONNECTION THREADED OR

FLANGED UNLESS OTHERWISE INDICATED.

NOT ALL PIPE SECTION CONNECTIONS

ARE INDICATED

BOILER # 2

WV

WATER VALVE

BOLLARDS

STAIRS

W

EXISTING STREET LIGHT

DOMESTIC COLD WATER

STORM WATER

WV

WATER VALVE

VIBRATION ISOLATOR

NATURAL GAS METER

ELECTRIC

WATER

TELEPHONE

REFRIGERANT LIQUID

REFRIGERANT GAS

PRESSURE REDUCING VALVE

FUNNEL DRAIN

DISCONNECT & REMOVE HWS PIPING FROM LAST FLANGE IN THIS AREA,

INCLUDING INSULATION, PUMPS, SUPPORTS, VALVES, & ACCESSORIES.

REMOVE PIPING BACK TO EACH BOILER.

DISCONNECT & REMOVE EXISTING EXPANSION TANK

REMOVE BOILERS, BURNERS, CONTROLS & ACCESSORIES. SEE

C8/M-901

DOMESTIC HOT

WATER HEATER,

EXISTING TO REMAIN

(ETR)

COMPLETELY REMOVE OIL FROM BURIED PIPING. REMOVE FUEL

PIPING, VALVES, AND ACCESSORIES BETWEEN AST-1 AND FLOOR

PENETRATIONS IN THIS AREA, POINT "B". INFILL FLOOR OPENING

W/ CONCRETE. MATCH EXISTING FLOOR ELEVATION.

DISCONNECT AND REMOVE BREECHING, INSULATION, SUPPORTS,

& ACCESSORIES BETWEEN EACH BOILER & ROOF, INCLUDING

BOILER VENT CAP ABOVE ROOF. PATCH AND REPAIR ROOF AS

REQUIRED TO SUPPORT INSTALLATION OF BOILER VENT PIPING

FOR REPLACEMENT BOILERS. SEE PHOTO C8/M-901, E1/M-901

BURIED FUEL OIL

PIPING. FOR

CONTINUATION SEE

M-101

FIRE PROTECTION SERVICE

IN THIS AREA

DISCONNECT & REMOVE HWR PIPING FROM VERTICAL PIPING

SECTION IN THIS AREA

FUEL OIL PIPING

AT GRADE FOR

CONTINUATION

SEE M-101

COMPLETELY REMOVE OIL FROM ABOVEGROUND FUEL PIPING.

REMOVE PIPING BETWEEN AST-1 AND BOILERS.

SEE D4/M-902

D1

D2

D3

D4

D5

D6

D7

D1

D2

D3 D4

D5

D6

POINT "B"

D8 COVER INSIDE FACE OF EACH LOUVER (1 IN EACH DOOR) WITH 24

GA. GALVANIZED SHEET-METAL. FASTEN IN PLACE WITH RIVETS.

SEE PHOTO D4/M-902 FOR ADDITIONAL INFORMATION, INCLUDING

APPROXIMATE SIZE AND LOCATION.

FIRE PROTECTION

SERVICE IN THIS AREA

INFILL FLOOR OPENING

W/ CONCRETE. MATCH

EXISTING FLOOR

ELEVATION.

D7

D8

D8

RE

PL

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

M

EC

HA

NI

CA

L

EN

LA

RG

ED

D

EM

OL

IT

IO

N

PL

AN

S

MAT BUILDING

MD401

P1

P1

2M D4

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

KEY NOTES (APPLY TO THIS DRAWING ONLY):

0 4' 8'2'

B2 1ST FLOOR PARTIAL DEMO PLAN-MECH ROOM-EXISTING

SCALE: 1/4" = 1'-0" B7 1ST FLOOR PARTIAL DEMO PLAN-MECH ROOM-EXISTING

SCALE: 1/4" = 1'-0"

NORTH

PLAN

TRUE N

C8 M-901

A8 M-901

E8 M-901

E3 M-901

C3 M-901

A1 M-901

E1 M-901

141139

119 120

116117

107105

108106104

3/4" F.O.S.D2

D1

CU-1 (E)

D3

D4

AC-1 (E)

POINT "A" 7

RE

PL

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

AN

T

NY

BA

YO

NN

E

NJ

M

EC

HA

NI

CA

L

FL

OO

R

PL

AN

MAT BUILDING

M-101

P1

P1

2M -1

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

0 8'4' 16'

A2 1st FLOOR PLAN - MECHANICAL - EXISTING

SCALE: 1/8" = 1'-0"

NORTH

PLAN

TRUE N

KEY NOTES: APPLY TO THIS DRAWING ONLY

D1

D2

AST

B2

MD401

REMOVE PIPING AT GRADE IN THIS AREA, INCLUDING

PHYSICAL PROTECTION.

DRAIN, DISCONNECT AND

REMOVE ABOVE GROUND

TEMPORARY FUEL PIPING

BETWEEN BOILERS AND AST-1

5 AC-1 (E) EXISTING IN

MECHANICAL MEZZANINE TO

REMAIN.

B2 M-401

B7

MD401

B7 M-401

D3 DRAIN & REMOVE UNDERGROUND

FUEL PIPING BETWEEN AST-1, AT

APPROX. POINT "A" & MECH ROOM.

SAWCUT EXISTING PAVEMENT /

CONCRETE PAVEMENT. BACKFILL

AND RESTORE W/ ASPHALT

PAVEMENT. SEE D7/M-902

D4 REMOVE AST-1 AND ASSOCIATED TANK

MONITORING & LEAK DETECTION SYSTEM

(MLDS) PANEL, INCLUDING PANEL AND

CABLES AND CONDUIT BETWEEN SENSORS

IN TANK TRANSITION/LOW POINT SUMP AND

MLDS PANEL, AND CABLES AND CONDUIT

BETWEEN MLDS PANEL AND POWER PANEL

PP-1. REMOVE BREAKER AND PROVIDE

BLANK COVER.

D7 M-902

6 APPROX LOC'N OF MLDS. FIELD

VERIFY.

D1/D4 M-902

7 EXISTING CONDENSING UNIT

CU-1(E) AND ASSOCIATED RL, RS

PIPING BETWEEN CU-1(E) AND

AC-1(E) TO REMAIN.

VEST

B-2B-1

C.T. CAB. &

UTILITY METER

MDP

P-1 FED FROM PP-1, 25, 27, 29

P-2 FED FROM PP-1, 31, 33, 35

VEST

B-2B-1

REMOVE AND ENLARGE EXISTING

OPENING. REFER TO D9/M-501 AND

A1/M-901

BOILER VENT PIPING UP THRU EXISTING

OPENING.

SUPPORT PIPING MAX 8' O.C.

P-3A,P-3B CIRCULATORS.FEED FROM PP-1. PROVIDE CIRCUITS

PP1

E3P3A

E2P-2

E1P-1

E1

E2

E3

HWSHWS

HW

S

HW

S

HWR HWR

HW

R

EXP-1

EXISTING ELECTRIC FIRE

PUMP CONTROLLER ON CONC

HOUSEKEEPING PAD

EXISTING POST

INDICATING VALVE

PROVIDE OUTDOOR AIR SENSOR INSIDE VENTILATED SUNSHIELD.

EXTEND AND CONNECT SIGNAL CABLE TO BOILER CONTROLS.

M1

EXISTING STORAGE TYPE ELECTRIC DOMESTIC HOT WATER

HEATER DHW-1(E) ON CONCRETE HOUSEKEEPING PAD IN THIS

AREA TO REMAIN.. SEE E1/M-901 FOR APPROXIMATE LOCATION.

M2

M2 M1

BOILER VENT PIPING UP THRU NEW ROOF

PENETRATION.

GN-1 GN-2

GN-1 GN-2

GN-3P3B

EXISTING REFRIGERANT

PIPING TO REMAIN

DRAIN CONNECTION W/ VALVE AT

BOTTOM OF VERTICAL VENT. PROVIDE

SUBMITTAL ON VENT PIPING BETWEEN

BOILER AND VENT CAP ABOVE ROOF.

GAS SERVICE ENTRANCE

TIGHT TO BUILDING SEE

A5/M-501

P-1

PP-1

25,27,29 P-2

PP-1

31,33,35

400A/400A FUSE

TERMINATE GAS METER OUTPUT CABLES IN 4” X 4” JUNCTION BOX ON WALL,

48” ABOVE FINISHED FLOOR IN THIS AREA, OR AT LOCATION APPROVED BY

COR. TERMINATE WITH WIRE NUTS, BEHIND COVER ON J-BOX.

M3

M3

PROVIDE PIPING & PUMPS SUPPORTED

ON EXISTING SUPPORT FRAME. SEE

A1/M-501 AND PHOTO E3/M-901.

SF-1

RE

PL

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

M

EC

HA

NI

CA

L

EN

LA

RG

ED

F

LO

OR

P

LA

NS

MAT BUILDING

M-401

P1

P1

2M -4

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

GENERAL NOTES - GN # :

1. CONDUIT TO REMAIN, RUN REPLACEMENT CABLES FOR PUMPS P-1,

P-2 (3#12,1#12G)

2. PROVIDE REPLACEMENT PUMPS WITH MOTOR STARTERS

3. PROVIDE BOILER CIRCULATOR PUMPS AS SPECIFIED.

4. THE ELECTRICAL INFORMATION DEPICTED ON THESE DRAWINGS IS

BASED ON RECORD INFORMATION. FIELD VERIFY EXISTING

CONDITIONS. NOTIFY COR IN WRITING OF ANY DISCREPANCIES.

5. HWS AND HWR PIPING OFFSET FOR CLARITY. PROVIDE PIPING TO

ENSURE REQUIRED DISTANCES ARE MAINTAINED FROM

ELECTRICAL EQUIPMENT BELOW. SEE D3/M-501 FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

0 4' 8'2'

B2 1ST FLOOR PARTIAL PLAN-MECH ROOM HYDRONIC PIPING

SCALE: 1/4" = 1'-0" B7 1ST FLOOR PARTIAL PLAN-MECH ROOM AIR INLET AND BOILER VENT PIPING

SCALE: 1/4" = 1'-0"

NORTH

PLAN

TRUE N

KEY NOTES (APPLY TO THIS DRAWING ONLY)

A5 M-501

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

M

EC

HA

NI

CA

L

DE

TA

IL

S

MAT BUILDING

M-501

P1

P1

2M -5

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

VALVE, TYP

GATE

B-1

EXISTING

CONCRETE

PAD

EXISTING

FLOOR

EXISTING

EXTERIOR

WALL

ISOLATION

VALVE, TYP.

GRADE

ANODELESS RISER (TYP),

SEE DETAIL E4 C-501 FOR

ADDITIONAL INFORMATION

FOR CONT. SEE

C-101

A5 GAS PIPING SCHEMATIC

SCALE: NTS

A1 INLINE PUMP DETAIL

SCALE: NTS

HWS TO SYSTEM

HWR FROM SYSTEM

D3 BOILER SCHEMATIC PIPING DETAIL

SCALE: NTS

4"

P-2

D9 WALL PENETRATIONS

SCALE: NTS

EXP-1

P R V

P-3A

3/4"

3" 3"

3/4"

3" 3"

B-2

4"

PRESSURE

REGULATING VALVE

SUPPORT FROM BUILDING STRUCTURE, TYP.

VIBRATION ISOLATOR, TYP.

REDUCER / INCREASER TYP.

NOTE:

1. ARRANGEMENT OF GAS PIPING, METER, AND PRV SHALL

COMPLY WITH GAS UTILITY REQUIREMENTS.

2. ALL GAS PIPING ABOVE GROUND, INTERIOR AND EXTERIOR

SHALL BE PAINTED YELLOW.

A9 GAS VENT ROOF PENETRATION DETAIL

SCALE: NTS

P-1

INLINE SYSTEM HW CIRC PUMP,

REFER TO A1/M-501 FOR ADD'L INFO

& REQMTS, TYP.

WEATHER CAP

STORM COLLAR

EXISTING CURB TO REMAIN. CAP

EXISTING CURB WITH NEW CURB

CAP

REMOVE EXISTING 20"Ø

PENETRATION THRU

STEEL ROOF

PROVIDE SUPPORT

BLOCKING AS REQ'D

ROOF SUPPORT

BAND AND

STRAPS. FASTEN

SECURELY TO

STRUCTURE.

NOTE:

1. FOR BIDDING PURPOSES, PROVIDE GAS VENT FOR EACH BOILER AS

INDICATED. MODIFY EXISTING OPENING AND PROVIDE SUPPORTS

AS REQ'D. FIELD VERIFY ALL EXISTING CONDITIONS. PROVIDE

SUBMITTAL ON PROPOSED GAS VENT MATERIALS & ARRANGEMENT.

2. PROVIDE HIGH TEMPERATURE RATED (+212°F CONTINUOUS USE)

PIPE FLASHING FOR METAL ROOFS.

SIDE BY SIDE 6" Ø AIR INLET PIPING. NOMINAL ROUGH OPENING

24"W X 12" H, TO SUIT AIR INLET PIPING AND COLLARS.

PROVIDE METAL FRAMING AROUND PERIMETER OF OPENING.

PROVIDE AIR INLET PIPING WITH GALVANIZED STEEL COLLARS

ON INTERIOR AND EXTERIOR SURFACES. SEAL WEATHER

TIGHT. PROVIDE PT BLOCKING FOR ROUGH OPENING TO SUIT

PIPING INSTALLATION

F9 COMBUSTION AIR INLET OPENING

SCALE: NTS

HWR

KEY NOTES (APPLY TO THIS DRAWING ONLY)

HWS

NATURAL GAS PIPING. REFER TO A5/M-501 FOR PIPE SIZES & OTHER INFO &

REQUIREMENTS. PROVIDE AS REQUIRED BY NFPA 54 AND GAS SUPPLIER. PROVIDE

SUBMITTAL ON PRESSURE TESTS FOR REVIEW BY COR AND GAS SUPPLIER

CONNECT TO EXISTING SYSTEM PIPING. REFER TO B2/MD401

IMMERSION WELL AND TEMPERATURE SENSOR. EXTEND TO BOILER

CONTROL SYSTEM.

EXTEND EXISTING CW PIPING AND CONNECT TO SYSTEM PIPING.

BOILER CIRC PUMP. LOCATION INDICATED SCHEMATICALLY. MOUNT

AND SUPPORT IN POSITION/ORIENTATION AS RECOMMENDED BY

MNFR. LOCATE TO FACILITATE MAINTENANCE AND ACCESS AROUND

BOILERS. REFER TO A1/M-501 FOR ADDITIONAL RQMTS.

NOTE:

1. AIR INLET PIPING SHALL BE IN COMPLIANCE W/

RECOMMENDATIONS & REQUIREMENTS OF BOILER

MANUFACTURER

NOTE:

1. AIR INLET AND VENT PIPING NOT SHOWN. SEE B7/M-401. COORDINATE

INSTALLATION OF SAME WITH ELECTRICAL COMPONENTS.

HEATING HOT WATER BOILER, CONDENSING TYPE. PROVIDE ON

EXISTING CONCRETE HOUSEKEEPING PAD. LOCATE TO PROVIDE

ACCESS FOR SERVICE, MAINTENANCE AND REPAIR AS

RECOMMENDED BY MANUFACTURER, AND TO MINIMIZE THERMAL

STRESS ON CONNECTED PIPING AND VENT MATERIALS.

PROVIDE BOILER RELIEF VALVE TO RELIEVE FULL CAPACITY OF BOILER, BASIS OF DESIGN

WATTS 740 3/4” X 1”, 925,000 BTU/HR, 30 PSI. EXTEND DISCHARGE PIPING AT FULL SIZE OF

RELIEF CONNECTION, TERMINATE OVER 6” FUNNEL DRAIN. EXTEND FUNNEL DRAIN DISCHARGE

PIPING TO DISCHARGE VERTICALLY OVER FLOOR DRAIN. LOCATE SO THAT RELIEF VALVE AND

PIPING DO NOT HAMPER INSTALLATION OR REPAIR OF AIR INLET OR VENT CONNECTION PIPING.

DO NOT LOCATE ANY PIPE CONNECTIONS ABOVE ELECTRICAL COMPONENTS.

3/4" DRAIN VALVE WITH THREADED CAP AT HWR PIPING. LOCATE TO AVOID

MAINTENACE PERSONNEL TRAFFIC AROUND BOILER.

BOILER CONDENSATE DRAIN PIPING CONNECTED AT FULL SIZE OF BOILER CONDENSATE

DRAIN CONNECTION. PROVIDE ACID NEUTRALIZATION CHAMBER, SIZE AND CAPACITY AS

RECOMMENDED OR FURNISHED BY BOILER MNFR.

P-3B

18" LENGTH OF 6" Ø PIPE. CONNECT TO 3" PIPING WITH

CONCENTRIC REDUCER AND INCREASER

3/4"

B-1 B-2

3/4"

SF-1

PROVIDE ONE NEW 6"

PENETRATION IN CURB

CAP.

DRIP LEG

(TYP)

UNION (TYP)

BALL VALVE

(TYP)

4"

POINT OF USE

GAS

REGULATOR

(TYP)

3/4" 3/4"

REMOVE AIR SEPARATOR, CLEAN, REINSTALL

UNION (UP TO 2-1/2")

FLANGE (3" & OVER)

BALANCING VALVE

CHECK VALVE

PRESSURE GAUGE

W/GAUGECOCK, TYP

Y-STRAINER W/

BLOW-OFF VALVE

ELBOW DOWN. COVER OPENING WITH BIRDSCREEN.

6" Ø AIR INLET PIPING. EXTEND AND CONNECT TO BOILER

1, TYP. FOR BOILER 2.

REMOVE EXISTING LOUVER, APPROX SIZE 16"X16".

ENLARGE OPENING IN EXISTING INSULATED METAL

PARTITION AS REQUIRED TO ACCOMODATE COMBUSTION

AIR INLETS. SEE F9/M-501.

F9 M-501

4 4

6 6 88

5 5

7 7

NG

NG

HWR HWS

NGNG

HOSE CONNECTION

WITH CAP

DRAIN VALVE

SHOT FEEDER FASTENED TO

FLOOR. SEE PLANS FOR

APPROX. LOCATION

3"

6"

3"

PROVIDE GAS METER IN RUNOUT PIPING TO EACH BOILER. EXTEND

AND CONNECT OUTPUT CABLE TO LOCATION INDICATED ON M-401 -

NOTE M3

EXTEND CONDENSATE NEUTRALIZATION DRAIN TO DISCHARGE

VERTICALLY OVER FLOOR DRAIN.

NOTE:

1. PUMP AND PIPING SHALL BE SUPPORTED TO FACILITATE PUMP REPLACEMENT.

PROVIDE ONE NEW 6"

ROOF PENETRATION

(2 VENTS TOTAL)

1" GAS VENT

3"

1" GAS PRESSURE REGULATING VENT. EXTEND OUT THRU WALL.14

MM 12 12

NGNG NG

NG

CORE DRILL THRU EXISTING CMU PARTITION. PROVIDE GALV

STEEL PIPE SLEEVE, SIZE AS REQ'D TO PROVIDE 1/2" ANNULUS.

SUPPORT PIPING ON BOTH SIDES OF PARTITION. IN-FILL W/

CAULK. SEAL WEATHER TIGHT. FINISH WITH ONE PIECE

ESCUCHEON/ COLLAR ON BOTH SIDES

HANGER SUPPORTS BOTH

SIDES, OR SUPPORT FROM

FLOOR OR VERTICAL

STRUCTURE

IN-LINE

PUMP

AS(E)

3"

GROUNDIND/BONDING CABLE BONDED TO GAS PIPING. BONDED AS

REQUIRED BY NEC SECTION 250.104

NG

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

M

EC

HA

NI

CA

L

SC

HE

DU

LE

S

MAT BUILDING

M-601

P1

P1

2M -6

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

1. CENTRAL HEATING PLANT DESCRIPTION

THE PROPOSED MAINTENACE AUGMENTATION TEAM (MAT) BUILDING CENTRAL HEATING PLANT CONSISTS OF 2 CONDENSING TYPE NATURAL GAS FIRED BOILERS, ASSOCIATED BOILER CIRCULATION PUMPS, AND SYSTEM CIRCULATION PUMPS, ALL SPECIFIED FOR REPLACEMENT AS PART OF THIS PROJECT. THE CENTRAL HEATING PLANT SUPPORTS TERMINAL HEATING EQUIPMENT INCLUDING HW COILS IN AIR HANDLING UNITS, FAN COIL UNITS AND UNIT HEATERS. AHU HV-1 PROVIDES MAKE-UP AIR FOR THE AIR EXHAUSTED BY VARIOUS GENERAL EXHAUST FANS. THE HW COIL IN HV-1 IS SPECIFIED TO HAVE AN ENTERING AIR TEMPERATURE OF 14 DEGREES F. ACCORDINGLY, THE HYDRONIC HEATING SYSTEM MUST CIRCULATE WATER WITH A 30% PROPYLENE GLYCOL SOLUTION. THE HEATING HOT WATER SUPPLY TEMPERATURE IS SPECIFIED TO REMAIN AS ORIGINALLY DESIGNED WHEN THE MAT BUILDING WAS CONSTRUCTED. WITH A NOMINAL ΔT OF 20 DEGREES F, THIS LIMITS CONDENSING TO MILDER HEATING CONDITIONS. IF, IN THE FUTURE, ALL TERMINAL HEATING EQUIPMENT IS REPLACED, IT IS RECOMMENDED THAT THE EQUIPMENT BE SELECTED WITH PERFORMANCE (HIGHER ΔT, LOWER FLOW RATE) TO SUPPORT A WIDER RANGE OF

CONDENSING OPERATIONS.

2. GENERAL

PROVIDE CONTROL COMPONENTS, NOT INCLUDED INTEGRAL TO BOILER, ON A CONTROLS BACKBOARD IN THE VICINITY OF THE BOILERS AND CIRCULATION PUMPS. THIS INCLUDES CONTROL PANELS, SELECTOR SWITCHES, RUN-HOUR METERS, ALARM LIGHTS AND OTHER INDICATORS. CONTROLS BACKBOARD SHALL BE ¾” MARINE PLYWOOD, NOMINAL SIZE 48 ” X 48 ” BUT AS REQUIRED TO ACCOMMODATE ALL COMPONENTS TO BE MOUNTED THEREON, AND FASTENED TO WALL SECURELY; PAINTED BLACK, 2 COATS GLOSS FINISH.

3. SEQUENCE OF OPERATIONS

A. THE HEATING PLANT SHALL OPERATE WHENEVER THE OUTSIDE AIR TEMPERATURE IS LESS THAN 60 DEGREES F ADJUSTABLE (ADJ.).

B. OUTDOOR AIR TEMPERATURE RESET. THE HEATING PLANT SHALL OPERATE SO THAT THE HEATING HOT WATER SUPPLIED TO THE SYSTEM IS 200 DEGREES F (ADJ) AT 10 DEGREES F OUTDOOR AIR

TEMPERATURE (OAT) AND 150 DEGREES (ADJ) AT 60 DEGREES F OAT. PROVIDE AN OUTDOOR AIR SENSOR AT APPROXIMATE LOCATION INDICATED.

C. EACH BOILER AND ITS ASSOCIATED BOILER CIRCULATION PUMP SHALL BE INTERLOCKED. BOILER SHALL NOT BE ENABLED TO OPERATE UNTIL ITS ASSOCIATED CIRCULATION PUMP IS ENERGIZED AND FLOW

THROUGH THE SAME PROVEN WITH A FLOW SWITCH.

D. BOILERS SHALL OPERATE IN LEAD-LAG MODE. PROVIDE A MANUAL LEAD - LAG BOILER SELECTOR SWITCH LABELED AS SUCH, WITH POSITIONS LABELED FOR B-1 AND B-2. BASED ON THE SYSTEM HEATING

HOT WATER SUPPLY (HWS) SENSOR, THE LEAD BOILER SHALL OPERATE UNTIL THE HWS TEMPERATURE FALLS 10 DEGREES F (ADJ) BELOW THE HWS SETPOINT, WHEN THE LAG BOILER SHALL BE ENERGIZED.

PROVIDE CONTROLS TO OPTIMIZE BOILER EFFICIENCY, AND TAKE ADVANTAGE OF THE MOST EFFICIENT BOILER OPERATING EFFICIENCY UNDER PART OR FULL LOAD CONDITIONS OF THE BOILERS. BASIS - OF - DESIGN EQUIPMENT CAN BE OPERATED BASED ON SUPPLY TEMPERATURE CONTROL, GAS FLOW RATE CONTROL, OR A COMBINATION OF BOTH. DISCUSS WITH COR PRIOR TO PREPARATION OF CONTROLS SUBMITTAL, AND PROVIDE A COMPREHENSIVE CONTROLS SUBMITTAL, INTEGRATING CONTROLS THAT ARE INTEGRAL TO BOILERS PROVIDED WITH THE SEQUENCES OF OPERATIONS SPECIFIED.

INCLUDE PRODUCT SHEETS, SCHEMATIC DIAGRAMS, AND WRITTEN CONTROL SEQUENCES. UPDATE THIS DRAWING WITH THE SAME AS A RECORD DRAWING AT PROJECT CLOSEOUT.

E. PROVIDE A RUN-HOUR METER FOR EACH BOILER, MOUNTED ON THE CONTROLS BACKBOARD WITH A LABEL THAT IDENTIFIES THE ASSOCIATED BOILER. RUN-HOUR METER SHALL BE USED BY OPERATIONS

PERSONNEL TO ENSURE APPROXIMATELY EQUAL RUN-TIME FOR EACH BOILER.

F. PROVIDE EACH BOILER WITH A RED “ BOILER FAILURE ” LAMP AND ALARM LABELED AS SUCH, MOUNTED ON THE CONTROLS BACKBOARD. IF A BOILER IS COMMANDED TO OPERATE BUT FAILS TO DO SO, BOILER FAILURE LAMP FOR THE ASSOCIATED AND LABELED BOILER SHALL ILLUMINATE. LAMP SHALL REMAIN ILLUMINATED UNTIL THE CAUSE FOR THE FAILURE HAS BEEN CORRECTED, AND BOILER IS

OPERATING.

G. PROVIDE EACH BOILER WITH A NATURAL GAS METER, TO ALLOW CORRELATION OF HEATING CONSUMPTION BY EACH BOILER (AND THE HEATING PLANT) CORRELATED WITH OUTSIDE AIR TEMPERATURE.

H. HEATING HOT WATER DISTRIBUTION PUMPS SHALL OPERATE IN ONLINE - STANDBY MODE. PROVIDE A SELECTOR SWITCH TO INDEX EITHER PUMP AS THE ONLINE PUMP. OPERATION OF EACH PUMP SHALL

BE CONFIRMED BY A FLOW SWITCH IN THE DISCHARGE PIPING OF EACH PUMP. THE ONLINE PUMP SHALL OPERATE WHENEVER THE OUTSIDE AIR TEMPERATURE IS LESS THAN 60 DEGREES F (ADJ.). UPON A “ NO FLOW ” FAILURE OF THE LEAD PUMP, AN ALARM SHALL SOUND AT THE CONTROLS BACKBOARD AND THE STANDBY PUMP SHALL START.

I. PROVIDE EACH PUMP WITH A RED “ PUMP FAILURE ” LAMP AND ALARM LABELED AS SUCH, MOUNTED ON THE CONTROLS BACKBOARD. IF EITHER PUMP IS COMMANDED TO OPERATE BUT FAILS TO DO SO, PUMP FAILURE LAMP FOR THE ASSOCIATED AND LABELED PUMP SHALL ILLUMINATE. LAMP SHALL REMAIN ILLUMINATED UNTIL THE CAUSE FOR THE FAILURE HAS BEEN CORRECTED, AND BOILER IS

OPERATING.

J. PROVIDE A RUN-HOUR METER FOR EACH HW DISTRIBUTION PUMP, MOUNTED ON THE CONTROLS BACKBOARD, WITH A LABEL THAT IDENTIFIES THE ASSOCIATED PUMP. RUN-HOUR METER SHALL BE USED BY

OPERATIONS PERSONNEL TO ENSURE APPROXIMATELY EQUAL RUN-TIME FOR EACH PUMP.

HEATING PLANT DESCRIPTION & SEQUENCES OF OPERATION

AC

E

BO

IL

ER

S

M

AT

B

UI

LD

IN

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

M

EC

HA

NI

CA

L

PH

OT

OG

RA

PH

S

MAT BUILDING

M-901

P1

P1

2M -9

.d wg

US

CG

, C

EU

P

RO

VI

DE

NC

E

KI

LV

ER

T

ST

SU

IT

E

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

REMOVE EXISTING EXPANSION TANK, ET-1

NOTE:COPPER FUEL PIPING IN PLACE, TO BE REMOVED.

EXISTING FLOOR DRAIN TO REMAIN

FIRE PROTECTION PIPING SHOWN FOR

COMPLETENESS ONLY. NO WORK TO

OCCUR ON FIRE PROTECTION SYSTEM

SUPPORT PUMPS AND

PIPING ON EXISTING FRAME.

REMOVE PIPING FROM

FLANGE BACK TO BOILER

E3 INLINE PUMPS, ACCESSORIES

NTS

C3 AC CONDENSER CU-1

NTS

E8 EXISTING BOILERS

NTS

C8 BOILERS, BREECHING

NTS

A8 FIRE PROTECTION PIPING IN MECHANICAL ROOM

NTS

REMOVE AND REINSTALL

CU-1 INCIDENTAL TO NG

INSTALLATION

REMOVE BREECHING, INSULATION, SUPPORTS, ACCESSORIES.

A3 EXISTING NAT. GAS SERVICE AT PROP LINE

NTS

NATURAL GAS RISER.

EXISTING FENCE LINE

BOILER AIR INLET THRU

EXISTING LOUVER

OPENING. MODIFY AS

REQ'D

SEE D9/M-501

BOILER VENT THRU

EXISTING OPENING.

REMOVE EXISTING CHIMNEY

(B-2) AND NEW

PENETRATION (B-1). SEE

DETAIL A9/M501

A1 PARTIAL WEST ELEVATION AT MECH/ELEC

NTS

E1 CHIMNEY HANGERS

NTS

THREADED RODS EXTEND

THRU GYPSUM WALLBOARD

(GWB) APPROX 12" INTO

CHANNEL HUNG FROM

ROOF RAFTERS.

SELECTIVELY DEMO AND

REPAIR GWB. SUPPORT B-1,

B-2, AIR INLET AND VENT

PIPING FROM SAME

STRUCTURE ABOVE.

REMOVE EXISTING BOILERS, BURNERS, PIPING, SUPPORTS,

ACCESSORIES, CONTROLS. REMOVE EXISTING ELECTRICAL

COMPONENTS AND ASSOCIATED WIRING BACK TO PANEL PP-1.

HOUSEKEEPING PADS TO REMAIN.

AC

E

BO

IL

ER

S

M

AT

B

LD

G

CG

A

NT

N

EW

Y

OR

K

BA

YO

NN

E

NJ

M

EC

HA

NI

CA

L

PH

OT

OG

RA

PH

S

MAT BUILDING

M-902

P1

P1

2M -9

.d wg

US

CG

C

IV

IL

E

NG

IN

EE

RI

NG

U

NI

T

PR

OV

ID

EN

CE

KI

LV

ER

T

ST

, S

UI

TE

W

AR

W

IC

K, R I 0

SV

ER

AP

A, C

HR

IS

TO

PH

ER

CS

JJ

M

JJ

M

DC

D

CO

NS

TR

UC

TI

ON

A

UG

US COAST GUARD

CIVIL ENGINEERING

DE

SI

GN

ED

B Y:

DE

SC

RI

PT

IO

N

M

AR

K

ED

IT

ED

B Y:

DA

TE

CH

EC

KE

D

BY

DR

AW

N

BY

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

SH

EE

T

OF

US

CG

P

RO

JE

CT

N

UM

BE

R

US

CG

F

IL

EN

AM

E

A/ E

CO

M

PA

NY

CO

NS

UL

TI

NG

A

/E

US

CG

P

RO

JE

CT

M

AN

AG

ER

A/

E

PR

OJ

EC

T

NO

SHEET ID

M

EA

SU

RE

M

EN

T

BA

R:

1"

HA

LF

S

IZ

E

1/ 2"

US

CG

D

RA

W

IN

G

SE

RI

ES

N

UM

BE

R

D1 ABOVE GROUND FUEL PIPING

SCALE: NTS D4 PHYSICAL PROTECTION

FUEL PIPING WITH

SCALE: NTS D7 AST-1

SCALE: NTS

POINT "A". ABANDONED, BURIED

FUEL OIL PIPING BETWEEN

POINT "A" AND POINT "B" TO BE

REMOVED. SEE B2/MD401

PSN 13920142 REPLACE BOILERS MAT BUILDING

REFERENCE DRAWING RD-1

REFERENCE DRAWING RD-2

REFERENCE DRAWING RD-3

REFERENCE DRAWING RD-4

REFERENCE DRAWING RD-5

REFERENCE DRAWING RD-6

REFERENCE DRAWING RD-7

REFERENCE DRAWING RD-8

File details come from the government source that posted it. Updated .