3c. Drawings P13920142.pdf
PDF 12 MB Posted
- Attached to
- REPLACE BOILERS MAT BUILDING AT U. S. COAST GUARD, ANT NEW YORK, BAYONNE, NEW JERSEY, PSN 13920142
- Solicitation number
- 70Z0G125BSYN00010
About this file
This is a set of engineering drawings for a boiler replacement project at the U.S. Coast Guard ANT New York facility in Bayonne, Hudson County, New Jersey (Project #13920142). The drawings detail the removal of two existing oil-fired boilers and associated equipment from the MAT (Maintenance Augmentation Team) Building, and the installation of new natural gas-fired condensing boilers with supporting systems.
The drawings include site plans showing contractor staging areas, mechanical floor plans, piping diagrams, equipment schedules, and detailed specifications for the new heating plant installation. Key components include two 725 MBH natural gas boilers, circulation pumps (P-1 and P-2 rated at 45 GPM), boiler venting through modified existing openings, new gas service connections, and a building automation system for temperature control. The drawings specify requirements for temporary heat during construction, demolition of existing fuel oil systems, and modification of the mechanical room to accommodate the new gas-fired heating plant. Reference drawings from the original building construction (RD-1 through RD-8) are included to provide additional context about existing conditions and systems.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
PL
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NE
W
JE
RS
EY
GE
NE
RA
L
CO
VE
R
SH
EE
T
MAT BUILDING
G-001
P1
P1
2G -0
.d wg
US
CG
C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
MICHAEL CAROSOTTO, PE 08 AUG 2024
MICHAEL CAROSOTTO, PE
DAVID DILL
CO
NS
TR
UC
TI
ON
A
UG
U.S. COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
TECHNICAL DIRECTOR
BRANCH CHIEF
APPROVING OFFICIAL DATE
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
U.S. COAST GUARD
CIVIL ENGINEERING UNIT
PROVIDENCE
CG ANT NEW YORK
BAYONNE, HUDSON COUNTY, NEW JERSEY
13920142 REPLACE BOILERS MAT BUILDING
MAT BUILDING
EXCEL
LE
N C E I N
E N G I N E E R I N G
U . S . C O A S T G U
A R
D
CIVIL
ENGINEERING UNIT
PROVIDENCE
C
I
UN
TE
D
1 07 9
ST
EAT S
T
RD
GUA
OAS
SUMMARY OF WORK
1. REMOVE (2) EXISTING OIL FIRED 650 MBH CAST IRON SECTIONAL BOILERS AND OTHER CENTRAL HEATING PLANT EQUIPMENT; REPLACE WITH NATURAL GAS FIRED CONDENSING BOILERS, INCLUDING AIR INLET AND VENT PIPING, INSULATION, SUPPORTS, PIPING, PUMPS, EXPANSION TANK.
2. REMOVE EXISTING 2000 GALLON #2 HEATING OIL DOUBLE WALL STEEL ABOVE GROUND STORAGE TANK (AST-1)
AND ALL FUEL PIPING, BOTH ABOVE AND BELOW GROUND.
3. EXTEND NATURAL GAS PIPING FROM POINT OF CONNECTION AT EXISTING UNDERGROUND UTILITY SERVICE
PIPING TO BOILERS.
OBI #1: PROVIDE TEMPORARY HEAT
1. REFERENCE DRAWINGS ARE SELECTED FROM A SET OF APPROXIMATELY 61 DRAWINGS
PREPARED FOR THE USCG FACILITIES DESIGN & CONSTRUCTION CENTER (FD&CC) BY
RAYTHEON ENGINEERING & CONSTRUCTION, PROJECT DESCRIPTION “MOTBY NEW ANT /
CUTTER BUILDING”, FD&CC PROJECT NUMBER 01-95-1005, DATED 06-03-1996.
2. REFERENCE DRAWINGS ARE PROVIDED TO PROVIDE ADDITIONAL GENERAL INFORMATION,
AND, WHERE REFERENCED IN THE DRAWINGS, TO INDICATE ADDITIONAL DETAILS
REGARDING THE WORK REQUIRED.
NORTH
PLAN
TRUE N
NORTH
PLAN
TRUE N
DRAWING INDEX
SHEET ID SHEET # SHEET TITLE
G-001 01 COVER SHEET
G-101 02 SITE STAGING / COORDINATION PLAN
C-101 03 PARTIAL SITE UTILITY PLAN
C-501 04 DETAILS
M-001 05 LEGEND & NOTES
MD401 06 ENLARGED DEMOLITION PLANS
M-101 07 FLOOR PLAN
M-401 08 ENLARGED FLOOR PLANS
M-501 09 DETAILS
M-601 10 SCHEDULES
M-901 11 PHOTOGRAPHS
M-902 12 PHOTOGRAPHS
REFERENCE DRAWING LIST
REF DWG # SHEET ID DESCRIPTION
RD-1 HV-1 MECHANICAL AIR FLOW DIAGRAM
RD-2 HV-2 HOT WATER/ FUEL OIL DIAGRAM
RD-3 HV-3 AIR CONDITIONING AND VENTILATION
RD-4 HV-4 HEATING
RD-5 HV-5 HVAC DETAILS & SYMBOLS
RD-6 HV-6 HVAC SCHEDULES
RD-7 HV-7 HVAC SCHEDULES
RD-8 E-5 POWER PLANS
1. PROVIDE ALL MATERIAL, LABOR AND SUPERVISION ASSOCIATED WITH PROVIDING A TEMPORARY OIL-FIRED
HEATING HOT WATER GENERATOR ("BOILER"), AS REQUIRED TO:
SUPPLY HEATING HOT WATER (30% PROPYLENE GLYCOL SOLUTION) AT 200°F (NOMINAL 20°F TEMPERATURE
DROP) TO HEAT THE BUILDING.
MINIMUM OUTPUT CAPACITY: 1,000 MBH; HEATING OIL WILL BE PROVIDED BY THE GOVERNMENT.
CONNECT/DISCONNECT TO/FROM EXISTING SERVICES AS REQUIRED TO SUPPLY HEATING HOT WATER TO THE MAT BUILDING, INCLUDING HEATING HOT WATER SUPPLY AND RETURN PIPING, ELECTRIC, AND DOMESTIC
WATER.
DILL.DAVID.COLBY.1218495555
Digitally signed by
DILL.DAVID.COLBY.1218495555
Date: 2024.08.19 15:27:36 -04'00'
Digitally signed by
CAROSOTTO.MICHAEL.P.1021033398
Date: 2024.08.20 15:51:48 -04'00'
W
W
WW
W
W
W
W
C
C
C
C
C
C
C CC
W W W
W
WWW
C
C
X X
X X X
X X
X
X X
X
X
X X X
X X X X X X X X
X
X
X X X X X X X
X
RE
PL
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
GE
NE
RA
L
SI
TE
S
TA
GI
NG
CO
OR
D.
P
LA
N
MAT BUILDING
G-101
P1
P1
2G -1
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL AREA OF WORK
APPROXIMATE LOCATION
OF CONTRACTORS
STAGING AREA. TO BE
CONFIRMED AT
PRE-CONSTRUCTION MTG
NORTH
PLAN
TRUE N
REFER TO M-101 FOR
INTERIOR PARTITIONS AND
OTHER INFORMATION
A5 SITE STAGING/ COORDINATION PLAN
1"=20'
20' 40'0
WATERFRONT
OPS BUILDING
(MAT BLDG)
TRANSFORMER
SWITCHGEAR
WV
X
METAL
SH
ED
BUILDING
1 STORY
HYD
WV
POLE
FLAG
FU
EL
ST
W V
TA
NK
WV
FU
EL
W C
W
AVEMENT
ASPHALT RAMP
5'-0" MIN
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
X X X X
X
X
X X X X
E
E
E
E
E
E
E
E
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
WV T
T
T T
T T
T T
T T
T T
T T
T
S
S
S
S
S
TRIP BOX
FOR GATE
NG
NG
NGNGNGNGNG T
STST
STST
ST
ST
ST
ST
ST
ST
ST ST
NG
PI
VW W W W W W
NG
NG
NG
NG
NG
E
E
E
E
E
E
X X
X X X
X X
X
X X
X
X
X X X
X X X
RE
PL
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
CI
VI
L
PA
RT
. S
IT
E
UT
IL
IT
Y
PL
AN
MAT BUILDING
C-101
P1
P1
2C -1
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
PROVIDE BURIED NATURAL GAS PIPE.
NOMINAL 1 PSI DISTRIBUTION PRESSURE.
TEE FOR FUTURE CONNECTION TO "WATERFRONT
OPS BUILDING" ASSUME 1,000 CFH NG LOAD
PROVIDE NATURAL GAS PIPING AT
APPROXIMATE LOCATIONS INDICATED, IN
ACCORDANCE WITH UTILITY COMPANY (PSEG)
AND CONTRACT DOCUMENT REQUIREMENTS.
MAT BUILDING
PROPOSED GAS METER LOCATION.
PROVIDE AS REQUIRED BY GAS
UTILITY.
ACCESS GATE OPEN POSITION
ACCESS GATE CLOSED POSITION
KEY NOTES (APPLY TO THIS SHEET ONLY)
R & D CONTENTS OF DOUBLE WALL STEEL AST. ASSUME 6" OF
LIQUID AND OTHER MATERIALS REMAIN IN BOTTOM OF TANK.
R & D AST IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL REGULATIONS AND REQUIREMENTS.
R & D EXISTING REINFORCED CONCRETE PAD BELOW AST.
FOR BIDDING PURPOSES ASSUME 8' X 13' X 12" THICK.
REMOVE 23.5' X 16' CONCRETE PAVEMENT AROUND PAD.
RESTORE SURFACE PER DETAIL E8/C-501.
MAINTAIN OPERATION OF ACCESS GATE DURING
CONSTRUCTION
CONNECT TO EXISTING NATURAL GAS PIPING OWNED BY
GAS UTILITY. COMPLY WITH GAS UTILITY REQUIREMENTS.
PROVIDE 4'X4'X6" CONCRETE PAD W/ 4' TALL POURED
CONCRETE WALL. SEE C-501 FOR ADDITIONAL INFO AND
REQUIREMENTS.
PROVIDE BOLLARDS; MINIMUM 2, SEE DETAIL
E2/C-501.
ACCESS GATE CONTROL BOX / INTERCOM.
EXISTING 2,000 GALLON
OIL TANK, AST-1, AND
CONCRETE PAD TO BE
REMOVED. SEE D7/M-902
EXISTING 6" ROUND X 7' CONCRETE BOLLARDS IN
PLACE TO PROTECT SLIDING ACCESS GATE.
REMOVE AND REPLACE AS REQUIRED TO PROVIDE
BURIED NATURAL GAS PIPING. FOR BIDDING
PURPOSES ASSUME R & RPL 8 BOLLARDS
GENERAL NOTES
1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS AND SYMBOLS USED ON C-SERIES DWGS.
2. UNLESS OTHERWISE INDICATED, ALL UTILITIES SERVICES INDICATED ARE BURIED /
UNDERGROUND.
3. EXCAVATION WORK REQUIRED FOR INSTALLATION OF NATURAL GAS PIPING SHALL NOT
BLOCK THE INGRESS OR EGRESS OF VEHICULAR TRAFFIC, INCLUDING USCG VEHICLES,
DELIVERY VEHICLES, AND EMERGENCY SERVICES VEHICLES. WHEN EXCAVATION, WORK IN
OPEN EXCAVATIONS, BACKFILL OR OTHER SIMILAR ACTIVITIES ARE NOT IN PROGRESS,
PROVIDE TRAFFIC-RATED COVERS ACROSS OPEN EXCAVATIONS TO ALLOW PASSAGE OF
VEHICLES. OPEN EXCAVATIONS SHALL NOT BE LEFT UNATTENDED; PROVIDE CONSTRUCTION
FENCES OR OTHER BARRIERS AROUND WORK AREAS DURING NON-CONSTRUCTION PERIODS.
B4 PARTIAL SITE UTILITY PLAN - EXISTING
SCALE: 1"=10'
0 10' 20'
NORTH
PLAN
TRUE N
INSTALL APPROX 20 LINEAR FEET (10'X10') OF 6'
TALL CHAINLINK FENCE W/ ACCESS GATE SEE
A2/C-101
A3 C-501
INSTALL NATURAL GAS LINE BETWEEN EXISTING
ACCU AND EXISTING POST INDICATOR VALVE
TRANSFORMER
X
C1
C2
C3
C4
C5
C6
C7
C4
C6
C3
C2
C1
C5 C7
10.0'
10.0'
4.0'
4.0'
4.0' 3.0'3.0'
A2 FENCE PLAN
SCALE: NTS
A2 C-101
X
X X
X X
X X
X X
SWITCHGEAR
EXISTING 10' TALL FENCE
PROVIDE
FENCE
NOTES:
1. PROVIDE FENCE INCLUDING POSTS, TOP RAILS, BOTTOM RAILS,
AND BRACES. SEE SPECIFICATIONS
2. PROVIDE SUBMITTAL ON ALL FENCING MATERIALS
INSTALL FENCE POSTS IN
ACCORDANCE WITH SPECIFICATIONS
SECTION 32 31 13 - 3.2
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
CI
VI
L
DE
TA
IL
S
MAT BUILDING
C-501
P1
P1
2C -5
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
4.5" BITUMINOUS BINDER
COURSE (2 COURSES)
8" COMPACTED
BASE COURSE
1.5" BITUMINOUS WEARING
COURSE
EXISTING BITUMINOUS
PAVEMENT TO REMAIN
EXISTING BASE
LAYER
EXISTING SUBGRADE
COMPACTED
SELECT
BACKFILL
SLOPE
SEE NOTE 1
SAWCUT CLEAN VERTICAL EDGE
AND TACK COAT
MILL EXISTING PAVEMENT 1.5"
THICK BY 12" WIDE TO PROVIDE
STAGGERED JOINT AND TACK
COAT
12" COMPACTED
SUBBASE COURSE
1'1'
PROPOSED PIPE W/ TRACER WIRE
MAGNETIC WARNING AND
IDENTIFICATION TAPE, INSTALL
12" BELOW FINISH GRADE
8" MIN
12" MIN
PIPE DIA
6" MIN PIPE
COMPACT SUBGRADE
COMPACTED BEDDING MATERIAL
8" MIN
PAVING AND
SUBGRADE AS
SPECIFIED
SEE TYP PAVEMENT
SECTION
BEDDING
PIPE ZONE
COMPACTED SELECT BACKFILL
CONNECT TO EXISTING
VALVED/CAPPED PUBLIC
SERVICE ELECTRIC & GAS
(PSEG) GAS RISER LOCATED
INSIDE CG PROPERTY LINE
FENCING, NEAR EXISTING
PROTECTIVE BOLLARDS. SEE
PHOTO A3/M-901 FOR
ADDITIONAL INFORMATION.
CONTACT UTILITY AND COMPLY
WITH UTILITY COMPANY
REQUIREMENTS FOR THIS
INSTALLATION.
PIPING PROVIDED BY
CONTRACTOR. PIPING
INSPECTED BY GAS
SUPPLIER. PROVIDE IN
ACCORDANCE WITH
NFPA 54 AND GAS
SUPPLIER
REQUIREMENTS.
GRADE
HDPE PIPING
THREADED CONNECTION
ABOVE GRADE
STEEL PIPING
GRADE
ANODELESS RISER
YELLOW INSULATED TRACER
WIRE, TAPE TO PIPING
NOTE: PROVIDE THIS ANODELESS PIPE RISER AT ALL PIPING
LOCATIONS WHERE PIPING TRANSITIONS FROM ABOVE TO BELOW
GRADE.
8" CAST IRON PIPE SLEEVE.
FILL ANNULUS W/ SAND.
" M
IN
" M
IN
8"
BUTT FUSION ELBOW
BUTT FUSION
JOINT TYP. (2)
PLACES NOTES:
1. THE NEW BITUMINOUS PAVEMENT SHALL MAINTAIN THE PREVIOUS
DRAINAGE GRADES, SLOPES, AND ELEVATIONS TO SLOPE TOWARDS
DRAINAGE STRUCTURES.
2. EXCAVATION SLOPE STABILITY AND THE PROTECTION OF EXISTING
STRUCTURES AND UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY.
EXCAVATED SLOPE FOR PIPE
EXCAVATION, SEE NOTE 2
D9 M-501
NOTE 1
NOTES:
1. FOR ADDITIONAL INFORMATION AND REQUIREMENTS SEE A5/M-501.
2. FIELD VERIFY LOCATION, BURIAL DEPTH AND ARRANGEMENT OF EXISTING BURIED UTILITIES. NAT. GAS PIPING SHALL BE PROVIDED TO AVOID EXISTING UTILITIES. PROVIDE RECORD DRAWING INDICATING ACTUAL
LOCATIONS OF EXISTING SERVICES AND GAS PIPING PROVIDED.
DEPTH AS REQ'D,
MIN 24" BELOW
GRADE. SEE A8/C-501
EXISTING SANITARY SEWER
EXISTING FP WATER
EXISTING DOM. WATER
EXISTING ELEC
EXISTING TEL. / DATA
NOTE 1
NOTES:
1. DEPTH AS REQUIRED, MINIMUM 24". VERIFY WITH GAS UTILITY AND
ADJUST TO SUIT EXISTING CONDITIONS, INCLUDING AS REQUIRED
TO AVOID CONFLICTS WITH EXISTING BURIED UTILITIES. DOCUMENT
INSTALLED DEPTH ON PROJECT RECORD DRAWINGS.
SLOPE CONC SURFACE
TO DRAIN
6"Ø CONCRETE FILLED SCH 80 STEEL PIPE,
PROVIDE 6" NOMINAL PLASTIC BOLLARD COVER,
COLOR SAFETY YELLOW
4'-0"
4'-0"
6"
CONCRETE FOOTING
24"
E2 BOLLARD DETAIL
SCALE: NTS E4 TYPICAL ANODELESS RISER DETAIL
SCALE: NTS
E8 PAVEMENT RESTORATION DETAIL
SCALE: 1"=1'
A3 GAS SERVICE SCHEMATIC
SCALE: NTS A8 TYP. PIPE BACKFILL DETAIL
SCALE: NTS
INSTALL METER,
REGULATOR, AND
OVERPRESSURE
DEVICE AS REQ'D BY
UTILITY COMPANY
MER
0 1" 2"1/2"
F&I 4'X4'X6" CONC SLAB W/ #4 BAR EACH
WAY@ 12".O.C. 2" BELOW SURFACE.
F&I 4' TALL X 4' LONG X 8" THICK
POURED WALL W/ (1) #4 BAR @ 12" O.C.
TIE VERTICAL INTO HORIZONTAL W/
(1) 12" L BAR @ 12" O.C.
(2) EXISTING BOLLARDS
PROVIDE CONC. SLAB W/
POURED WALL FOR GAS
METER
EXISTING CG FENCE
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NE
W
JE
RS
EY
M
EC
HA
NI
CA
L
LE
GE
ND
N
OT
ES
MAT BUILDING
M-001
P1
P1
2M -0
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL NOTES:
1. THE SITE IS LOCATED AT ANT NY, IN BAYONNE, NEW JERSEY.
2. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF
THESE DRAWINGS AND SPECIFICATIONS.
3. THE CONTRACTOR SHALL CONDUCT THE WORK OF THIS PROJECT SO AS NOT TO INTERFERE WITH THE WORK OF OTHER PROJECTS AT THE SITE, INCLUDING COORDINATING THE WORK AS REQUIRED THROUGH THE COR. ANY
UNRESOLVED ISSUES SHALL BE BROUGHT TO THE ATTENTION OF THE COR IMMEDIATELY.
4. COORDINATE ACCESS TO THE FACILITY AND THE PROJECT WORK AREAS WITH THE COR. LIMITED ON-SITE PARKING
IS AVAILABLE. SCHEDULE ALL DELIVERIES WITH THE COR.
5. ALL CONTRACTOR PERSONNEL MUST SIGN-IN AND SIGN-OUT DAILY AT THE RECEPTION DESK IN THE LOBBY. A FACILITY BADGE WILL BE ISSUED TO EACH CONTRACTOR EMPLOYEE AT SIGN-IN AND MUST BE RETURNED AT SIGN-OUT. IN ADDITION TO THE FACILITY BADGE, EACH CONTRACTOR EMPLOYEE MUST CARRY A PERSONAL PHOTO
ID ANY TIME THEY ARE ON SITE.
6. SUBMIT A TYPED LIST ON COMPANY LETTERHEAD OF ALL CONTRACTOR RELATED VEHICLES (WORK AND PERSONAL)
THAT WILL BE LEFT UNATTENDED WITHIN THE FACILITY TO THE COR.
7. PREPARE A TYPED LIST ON COMPANY LETTERHEAD OF ALL CONTRACTOR EMPLOYEES WHO WILL BE ON SITE.
DELIVER AS DIRECTED BY THE COR. THE LIST SHALL CONTAIN NAME, DATE OF BIRTH, PLACE OF BIRTH AND SOCIAL
SECURITY NUMBER.
8. DO NOT ENTER PRIVATE ROOMS/AREAS WITHOUT A GOVERNMENT ESCORT.
9. UTILITY SIZES AND LOCATIONS, WHEN SHOWN ON THESE DRAWINGS, ARE CONSIDERED APPROXIMATE. THE ACTUAL SIZE AND LOCATION OF UTILITIES MAY VARY FROM THOSE SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS OF ALL UTILITIES, GRADES, AND DIMENSIONS PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL NOTIFY THE COR OF ANY DISCREPANCIES, IN WRITING, PRIOR TO BEGINNING AFFECTED WORK.
THE CONTRACTOR SHALL MAKE PROVISIONS TO ENSURE UTILITY LINES ARE PROTECTED AND SUPPORTED AND
REMAIN IN CONTINUOUS OPERATION, UNLESS OTHERWISE NOTED.
10. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE ORDERING ANY MATERIAL, COMMENCING ANY FABRICATION, OR PERFORMING ANY WORK. THE CONTRACTOR SHALL NOTIFY THE USCG KO, IN WRITING, OF ANY CONDITIONS OR DIMENSIONS WHICH VARY FROM THOSE SHOWN IN THE DRAWINGS
AND INCORPORATE SUCH VARIATIONS IN THE CONSTRUCTION AS APPROVED BY THE USCG.
11. EXISTING CONSTRUCTION, INCLUDING UTILITIES, DRAINAGE, AND OTHER MISCELLANEOUS WORK WHICH IS TO
REMAIN, SHALL BE UNDISTURBED AND PROTECTED BY THE CONTRACTOR.
12. LIMITED WATER AND POWER ARE AVAILABLE ON SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
CONNECTIONS AS NEEDED AS APPROVED BY THE COR.
13. THE USCG WILL PROVIDE A STAGING AREA WITHIN THE PROPERTY FOR THE CONTRACTOR'S USE AS SHOWN ON THE DRAWINGS OR AS PROVIDED BY THE KO DURING THE PRECONSTRUCTION MEETING. THE CONTRACTOR SHALL
STORE CONSTRUCTION MATERIALS WITHIN ITS DESIGNATED STAGING AREA SEE G-101.
14. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. SAFETY PROVISIONS SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS.
15. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP CONSTRUCTION PROCEDURES AND SEQUENCING TO ENSURE THE PROTECTION OF EXISTING AND PROPOSED STRUCTURES AND THE SAFETY AND PROTECTION OF USCG PERSONNEL, CONSTRUCTION PERSONNEL, AND THE PUBLIC, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER. THIS INCLUDES THE ADDITION OF NECESSARY TEMPORARY SUPPORTS (E.G., BRACING, SHORING, GUYS, TIEDOWNS, ETC.). SUCH TEMPORARY MATERIAL SHALL BE DESIGNED BY THE CONTRACTOR AND SHALL REMAIN THE
PROPERTY OF THE CONTRACTOR.
16. ALL RIGGING EQUIPMENT & SYSTEMS SHALL BE INDEPENDENT OF EXISTING STRUCTURAL & BUILDING ELEMENTS. NO
LOADS SHALL BE IMPOSED ON EXISTING BUILDING.
17. THE WORK SHALL BE CONDUCTED IN A MANNER THAT WILL MINIMIZE INTERRUPTIONS TO THE DAILY OPERATIONS OF
USCG.
18. THE CONTRACTOR SHALL MAKE ALL EFFORTS TO MINIMIZE DAMAGE TO EXISTING SURFACES OR SERVICES DURING THE COURSE OF THIS PROJECT. ALL AREAS DISTURBED DURING DEMOLITION OR CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL CONDITION BY THE CONTRACTOR, UNLESS OTHERWISE SHOWN OR NOTED.
19. PROVIDE DUMPSTERS/CARTING SERVICE AS REQUIRED FOR CONTRACT RUBBISH REMOVAL DAILY. REMOVE ALL ITEMS MADE SPARE OR GENERATED AS RUBBISH FROM THE SITE AND DISPOSE OF LEGALLY. COORDINATE
DUMPSTER LOCATION AND DROP-OFF/PICKUP SCHEDULE WITH THE COR.
20. THE CONTRACTOR SHALL OBTAIN, DAILY, A HOT WORK PERMIT FROM THE USCG FOR ALL WELDING, TORCH CUTTING, AND OTHER HOT WORK.
ENVIRONMENTAL PROTECTION PLAN:
1. IN ORDER TO PROTECT THE PROJECT AREA FROM HAZARDOUS MATERIALS RELEASES DURING THE COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING PREVENTATIVE MEASURES TO AVOID ANY
ENVIRONMENTAL IMPACTS. THESE MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO:
1.1. ALL EQUIPMENT PROPOSED TO BE UTILIZED BY THE CONTRACTOR SHALL BE IN GOOD WORKING CONDITION
AND INSPECTED DAILY FOR LEAKS.
1.2. A SPILL KIT AND ABSORBENT MATERIALS SHALL BE ON SITE AT ALL TIMES DURING CONSTRUCTION
OPERATIONS.
1.3. NO FUEL SHALL BE ALLOWED TO BE STORED ON SITE. ALL FUEL SHALL BE BROUGHT TO THE SITE DAILY.
1.4. ALL FUEL TRANSFER OPERATIONS SHALL BE CONDUCTED IN AN EFFICIENT AND SAFE MANNER IN ACCORDANCE WITH THE CONTRACTOR'S OPERATIONS MANUAL. OIL ABSORBENT DIAPERS SHALL BE PLACED UNDER ALL
EQUIPMENT DURING FUELING OPERATIONS.
1.5. ALL HYDRAULIC EQUIPMENT SHALL BE PROPERLY MAINTAINED AND RECORDED IN WEEKLY LOGS AS TO
REQUIREMENTS FOR AND ACTUAL MAINTENANCE COMPLETED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEANUP AND REMEDIATION OF ANY HAZARDOUS MATERIAL
RELEASES.
CONSTRUCTION SEQUENCING:
1. THE CONTRACTOR SHALL MINIMIZE IMPACTS TO PEDESTRIAN AND VEHICULAR ACCESS . ANY CLOSURE OF PEDESTRIAN OR VEHICULAR ACCESS DUE TO CONSTRUCTION SHALL BE REQUESTED A MINIMUM OF 30 DAYS IN
ADVANCE OF THE PROPOSED ACTION.
2. AREAS OF THE FACILITY NOT UNDER CONSTRUCTION SHALL REMAIN IN OPERATION DURING CONSTRUCTION. KEEP
ALL CONSTRUCTION ACTIVITIES AND PERSONNEL CLEAR OF FACILITY OPERATIONS.
ELEVATION
SECTION
DETAIL
CROSS-REFERENCE LEGEND
INDICATES REFERENCE QUADRANT SHEET LOCATION
SHEET WHERE SECTION/DETAIL/ELEVATION
IS TAKEN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE SECTION IS SHOWN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE DETAIL IS SHOWN
INDICATES REFERENCE QUADRANT ON DESTINATION SHEET
SHEET WHERE ELEVATION IS SHOWN
TRUE NORTH DIRECTION
INDICATES REFERENCE QUADRANT SHEET LOCATION
NORTH
PLAN
TRUE N
X# VIEW TITLE (REQUIRED)
VIEW TITLE (OPTIONAL)
SCALE:
XX###
X#
X#
XX###
X#
XX###
X# VIEW TITLE (REQUIRED)
SCALE:
PHOTOGRAPH
X#
XX###
INDICATES LOCATION ON SHEET INDICATED
INDICATES DIRECTION OF PHOTO TAKEN
INDICATES SHEET WHERE PHOTO APPEARS.
LOCATION OF SYMBOL ON PLAN INDICATES
APPROX POSITION OF CAMERA
A.F.F ABOVE FINISHED FLOOR
ALT ALTERNATE
APD AIR PRESSURE DROP
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
BD BREECHING DUCT
BLDG BUILDING
BMP BEST MANAGEMENT PRACTICES
CEU CIVIL ENGINEERING UNIT
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CL CENTER LINE
CLG CEILING
CO CLEAN OUT
COMM COMMUNICATIONS
CONC CONCRETE
CONN. CONNECTION
CONT CONTINUOUS
COR CONTRACTING OFFICER'S REPRESENTATIVE
DIA/Ø DIAMETER
DS DOWNSPOUT
DWG DRAWING
DWH DOMESTIC WATER HEATER
E ELECTRIC
(E) EXISTING
EA EACH
E.A. EXHAUST AIR
EL. ELEVATION
ETR EXISTING TO REMAIN
FL FLOOR
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FT FOOT/FEET
G NATURAL GAS
GALV GALVANIZED
GPM GALLONS PER MINUTE
HP HORSE POWER
I.D. INSIDE DIAMETER
IN INCH(ES)
INV. INVERT
KO CONTRACTING OFFICER
L LENGTH
LBS POUNDS
LDR LEADER
LF LINEAR FEET
LG LONG
MAT MAINTENANCE AUGMENTATIN TEAM
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS PER HOUR
MCA MIN CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MIN MINIMUM
N.C. NORMALLY CLOSED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
N.O. NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OBI OPTIONAL BID ITEM
OD OUTSIDE DIAMETER
P.D. PRESSURE DROP
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
QTY QUANTITY
R.A. RETURN AIR
R&D REMOVE AND DISPOSE
R&R REMOVE AND REINSTALL
R&RPL REMOVE AND REPLACE
REF REFERENCE
REQ'D REQUIRED
RL REFRIGERANT LIQUID
RPUID REAL PROPERTY UNIQUE IDENTIFIER
RO ROUGH OPENING
RS REFRIGERANT SUCTION
S.A. SUPPLY AIR
SAF SUPPLY AIR FAN
SF SQUARE FEET
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS' NATIONAL ASSOCIATION
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
ST STAIRS
STA STATION
STD STANDARD
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UG UNDERGROUND
U.O.N UNLESS OTHERWISE NOTED
USACE UNITED STATES ARMY CORPS OF ENGINEERS
USCG UNITED STATES COAST GUARD
w/ WITH
W WATER
& AND
@ AT
' FEET/FOOT
" INCHES
< LESS THAN
> GREATER THAN OR EQUAL
% PERCENTAGE
± PLUS/MINUS
CONNECTION OF NEW TO EXISTING
T
MOTORIZED DAMPER
THERMOSTAT
FAN SWITCH
PUMP #1
LOUVER
BUTTERFLY VALVE
CHECK VALVE
BALANCING VALVE
PRESSURE RELIEF VALVE
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
DRAIN VALVE
STRAINER
PIPE GUIDE
FLEXIBLE PIPE CONNECTOR
PRESSURE GAUGE W/ GAUGE COCK
THERMOMETER
MANUAL AIR VENT
PIPE TURNING UP
PIPE TURNING DOWN
DIRECTION OF PITCH DOWN
DIRECTION OF FLOW
STRAINER W/ BLOW DOWN VALVE
HEATING HOT WATER SUPPLY PIPING
HEATING HOT WATER RETURN PIPING
UNION
LEGEND AND ABBREVIATIONS (NOT ALL SYMBOLS AND ABBREVIATIONS ARE USED)
DRAWING KEY NOTE DESIGNATION,
GATE VALVE
GLOBE VALVE
PHASE OR DIAMETER
EMERGENCY FUEL CUT-OFF SWITCH
BOILER # 1
PIPE ANCHOR
VALVE #1
APPLY WHERE INDICATED
SENSING BULB
NATURAL GAS
POINT OF DISCONNECTION.
NOTE: NOT ALL POINTS OF DIS-
CONNECTION ARE INDICATED. REVIEW
DRAWINGS, INCLUDING KEY NOTES AND
DRAWING NOTES, CAREFULLY TO DETER-
MINE WORK REQUIRED.
ISOLATION VALVE
TO BE REMOVED
SEWER
PIPE CONNECTION THREADED OR
FLANGED UNLESS OTHERWISE INDICATED.
NOT ALL PIPE SECTION CONNECTIONS
ARE INDICATED
BOILER # 2
WV
WATER VALVE
BOLLARDS
STAIRS
W
EXISTING STREET LIGHT
DOMESTIC COLD WATER
STORM WATER
WV
WATER VALVE
VIBRATION ISOLATOR
NATURAL GAS METER
ELECTRIC
WATER
TELEPHONE
REFRIGERANT LIQUID
REFRIGERANT GAS
PRESSURE REDUCING VALVE
FUNNEL DRAIN
DISCONNECT & REMOVE HWS PIPING FROM LAST FLANGE IN THIS AREA,
INCLUDING INSULATION, PUMPS, SUPPORTS, VALVES, & ACCESSORIES.
REMOVE PIPING BACK TO EACH BOILER.
DISCONNECT & REMOVE EXISTING EXPANSION TANK
REMOVE BOILERS, BURNERS, CONTROLS & ACCESSORIES. SEE
C8/M-901
DOMESTIC HOT
WATER HEATER,
EXISTING TO REMAIN
(ETR)
COMPLETELY REMOVE OIL FROM BURIED PIPING. REMOVE FUEL
PIPING, VALVES, AND ACCESSORIES BETWEEN AST-1 AND FLOOR
PENETRATIONS IN THIS AREA, POINT "B". INFILL FLOOR OPENING
W/ CONCRETE. MATCH EXISTING FLOOR ELEVATION.
DISCONNECT AND REMOVE BREECHING, INSULATION, SUPPORTS,
& ACCESSORIES BETWEEN EACH BOILER & ROOF, INCLUDING
BOILER VENT CAP ABOVE ROOF. PATCH AND REPAIR ROOF AS
REQUIRED TO SUPPORT INSTALLATION OF BOILER VENT PIPING
FOR REPLACEMENT BOILERS. SEE PHOTO C8/M-901, E1/M-901
BURIED FUEL OIL
PIPING. FOR
CONTINUATION SEE
M-101
FIRE PROTECTION SERVICE
IN THIS AREA
DISCONNECT & REMOVE HWR PIPING FROM VERTICAL PIPING
SECTION IN THIS AREA
FUEL OIL PIPING
AT GRADE FOR
CONTINUATION
SEE M-101
COMPLETELY REMOVE OIL FROM ABOVEGROUND FUEL PIPING.
REMOVE PIPING BETWEEN AST-1 AND BOILERS.
SEE D4/M-902
D1
D2
D3
D4
D5
D6
D7
D1
D2
D3 D4
D5
D6
POINT "B"
D8 COVER INSIDE FACE OF EACH LOUVER (1 IN EACH DOOR) WITH 24
GA. GALVANIZED SHEET-METAL. FASTEN IN PLACE WITH RIVETS.
SEE PHOTO D4/M-902 FOR ADDITIONAL INFORMATION, INCLUDING
APPROXIMATE SIZE AND LOCATION.
FIRE PROTECTION
SERVICE IN THIS AREA
INFILL FLOOR OPENING
W/ CONCRETE. MATCH
EXISTING FLOOR
ELEVATION.
D7
D8
D8
RE
PL
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
M
EC
HA
NI
CA
L
EN
LA
RG
ED
D
EM
OL
IT
IO
N
PL
AN
S
MAT BUILDING
MD401
P1
P1
2M D4
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
KEY NOTES (APPLY TO THIS DRAWING ONLY):
0 4' 8'2'
B2 1ST FLOOR PARTIAL DEMO PLAN-MECH ROOM-EXISTING
SCALE: 1/4" = 1'-0" B7 1ST FLOOR PARTIAL DEMO PLAN-MECH ROOM-EXISTING
SCALE: 1/4" = 1'-0"
NORTH
PLAN
TRUE N
C8 M-901
A8 M-901
E8 M-901
E3 M-901
C3 M-901
A1 M-901
E1 M-901
141139
119 120
116117
107105
108106104
3/4" F.O.S.D2
D1
CU-1 (E)
D3
D4
AC-1 (E)
POINT "A" 7
RE
PL
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
AN
T
NY
BA
YO
NN
E
NJ
M
EC
HA
NI
CA
L
FL
OO
R
PL
AN
MAT BUILDING
M-101
P1
P1
2M -1
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
0 8'4' 16'
A2 1st FLOOR PLAN - MECHANICAL - EXISTING
SCALE: 1/8" = 1'-0"
NORTH
PLAN
TRUE N
KEY NOTES: APPLY TO THIS DRAWING ONLY
D1
D2
AST
B2
MD401
REMOVE PIPING AT GRADE IN THIS AREA, INCLUDING
PHYSICAL PROTECTION.
DRAIN, DISCONNECT AND
REMOVE ABOVE GROUND
TEMPORARY FUEL PIPING
BETWEEN BOILERS AND AST-1
5 AC-1 (E) EXISTING IN
MECHANICAL MEZZANINE TO
REMAIN.
B2 M-401
B7
MD401
B7 M-401
D3 DRAIN & REMOVE UNDERGROUND
FUEL PIPING BETWEEN AST-1, AT
APPROX. POINT "A" & MECH ROOM.
SAWCUT EXISTING PAVEMENT /
CONCRETE PAVEMENT. BACKFILL
AND RESTORE W/ ASPHALT
PAVEMENT. SEE D7/M-902
D4 REMOVE AST-1 AND ASSOCIATED TANK
MONITORING & LEAK DETECTION SYSTEM
(MLDS) PANEL, INCLUDING PANEL AND
CABLES AND CONDUIT BETWEEN SENSORS
IN TANK TRANSITION/LOW POINT SUMP AND
MLDS PANEL, AND CABLES AND CONDUIT
BETWEEN MLDS PANEL AND POWER PANEL
PP-1. REMOVE BREAKER AND PROVIDE
BLANK COVER.
D7 M-902
6 APPROX LOC'N OF MLDS. FIELD
VERIFY.
D1/D4 M-902
7 EXISTING CONDENSING UNIT
CU-1(E) AND ASSOCIATED RL, RS
PIPING BETWEEN CU-1(E) AND
AC-1(E) TO REMAIN.
VEST
B-2B-1
C.T. CAB. &
UTILITY METER
MDP
P-1 FED FROM PP-1, 25, 27, 29
P-2 FED FROM PP-1, 31, 33, 35
VEST
B-2B-1
REMOVE AND ENLARGE EXISTING
OPENING. REFER TO D9/M-501 AND
A1/M-901
BOILER VENT PIPING UP THRU EXISTING
OPENING.
SUPPORT PIPING MAX 8' O.C.
P-3A,P-3B CIRCULATORS.FEED FROM PP-1. PROVIDE CIRCUITS
PP1
E3P3A
E2P-2
E1P-1
E1
E2
E3
HWSHWS
HW
S
HW
S
HWR HWR
HW
R
EXP-1
EXISTING ELECTRIC FIRE
PUMP CONTROLLER ON CONC
HOUSEKEEPING PAD
EXISTING POST
INDICATING VALVE
PROVIDE OUTDOOR AIR SENSOR INSIDE VENTILATED SUNSHIELD.
EXTEND AND CONNECT SIGNAL CABLE TO BOILER CONTROLS.
M1
EXISTING STORAGE TYPE ELECTRIC DOMESTIC HOT WATER
HEATER DHW-1(E) ON CONCRETE HOUSEKEEPING PAD IN THIS
AREA TO REMAIN.. SEE E1/M-901 FOR APPROXIMATE LOCATION.
M2
M2 M1
BOILER VENT PIPING UP THRU NEW ROOF
PENETRATION.
GN-1 GN-2
GN-1 GN-2
GN-3P3B
EXISTING REFRIGERANT
PIPING TO REMAIN
DRAIN CONNECTION W/ VALVE AT
BOTTOM OF VERTICAL VENT. PROVIDE
SUBMITTAL ON VENT PIPING BETWEEN
BOILER AND VENT CAP ABOVE ROOF.
GAS SERVICE ENTRANCE
TIGHT TO BUILDING SEE
A5/M-501
P-1
PP-1
25,27,29 P-2
PP-1
31,33,35
400A/400A FUSE
TERMINATE GAS METER OUTPUT CABLES IN 4” X 4” JUNCTION BOX ON WALL,
48” ABOVE FINISHED FLOOR IN THIS AREA, OR AT LOCATION APPROVED BY
COR. TERMINATE WITH WIRE NUTS, BEHIND COVER ON J-BOX.
M3
M3
PROVIDE PIPING & PUMPS SUPPORTED
ON EXISTING SUPPORT FRAME. SEE
A1/M-501 AND PHOTO E3/M-901.
SF-1
RE
PL
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
M
EC
HA
NI
CA
L
EN
LA
RG
ED
F
LO
OR
P
LA
NS
MAT BUILDING
M-401
P1
P1
2M -4
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
GENERAL NOTES - GN # :
1. CONDUIT TO REMAIN, RUN REPLACEMENT CABLES FOR PUMPS P-1,
P-2 (3#12,1#12G)
2. PROVIDE REPLACEMENT PUMPS WITH MOTOR STARTERS
3. PROVIDE BOILER CIRCULATOR PUMPS AS SPECIFIED.
4. THE ELECTRICAL INFORMATION DEPICTED ON THESE DRAWINGS IS
BASED ON RECORD INFORMATION. FIELD VERIFY EXISTING
CONDITIONS. NOTIFY COR IN WRITING OF ANY DISCREPANCIES.
5. HWS AND HWR PIPING OFFSET FOR CLARITY. PROVIDE PIPING TO
ENSURE REQUIRED DISTANCES ARE MAINTAINED FROM
ELECTRICAL EQUIPMENT BELOW. SEE D3/M-501 FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
0 4' 8'2'
B2 1ST FLOOR PARTIAL PLAN-MECH ROOM HYDRONIC PIPING
SCALE: 1/4" = 1'-0" B7 1ST FLOOR PARTIAL PLAN-MECH ROOM AIR INLET AND BOILER VENT PIPING
SCALE: 1/4" = 1'-0"
NORTH
PLAN
TRUE N
KEY NOTES (APPLY TO THIS DRAWING ONLY)
A5 M-501
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
M
EC
HA
NI
CA
L
DE
TA
IL
S
MAT BUILDING
M-501
P1
P1
2M -5
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
VALVE, TYP
GATE
B-1
EXISTING
CONCRETE
PAD
EXISTING
FLOOR
EXISTING
EXTERIOR
WALL
ISOLATION
VALVE, TYP.
GRADE
ANODELESS RISER (TYP),
SEE DETAIL E4 C-501 FOR
ADDITIONAL INFORMATION
FOR CONT. SEE
C-101
A5 GAS PIPING SCHEMATIC
SCALE: NTS
A1 INLINE PUMP DETAIL
SCALE: NTS
HWS TO SYSTEM
HWR FROM SYSTEM
D3 BOILER SCHEMATIC PIPING DETAIL
SCALE: NTS
4"
P-2
D9 WALL PENETRATIONS
SCALE: NTS
EXP-1
P R V
P-3A
3/4"
3" 3"
3/4"
3" 3"
B-2
4"
PRESSURE
REGULATING VALVE
SUPPORT FROM BUILDING STRUCTURE, TYP.
VIBRATION ISOLATOR, TYP.
REDUCER / INCREASER TYP.
NOTE:
1. ARRANGEMENT OF GAS PIPING, METER, AND PRV SHALL
COMPLY WITH GAS UTILITY REQUIREMENTS.
2. ALL GAS PIPING ABOVE GROUND, INTERIOR AND EXTERIOR
SHALL BE PAINTED YELLOW.
A9 GAS VENT ROOF PENETRATION DETAIL
SCALE: NTS
P-1
INLINE SYSTEM HW CIRC PUMP,
REFER TO A1/M-501 FOR ADD'L INFO
& REQMTS, TYP.
WEATHER CAP
STORM COLLAR
EXISTING CURB TO REMAIN. CAP
EXISTING CURB WITH NEW CURB
CAP
REMOVE EXISTING 20"Ø
PENETRATION THRU
STEEL ROOF
PROVIDE SUPPORT
BLOCKING AS REQ'D
ROOF SUPPORT
BAND AND
STRAPS. FASTEN
SECURELY TO
STRUCTURE.
NOTE:
1. FOR BIDDING PURPOSES, PROVIDE GAS VENT FOR EACH BOILER AS
INDICATED. MODIFY EXISTING OPENING AND PROVIDE SUPPORTS
AS REQ'D. FIELD VERIFY ALL EXISTING CONDITIONS. PROVIDE
SUBMITTAL ON PROPOSED GAS VENT MATERIALS & ARRANGEMENT.
2. PROVIDE HIGH TEMPERATURE RATED (+212°F CONTINUOUS USE)
PIPE FLASHING FOR METAL ROOFS.
SIDE BY SIDE 6" Ø AIR INLET PIPING. NOMINAL ROUGH OPENING
24"W X 12" H, TO SUIT AIR INLET PIPING AND COLLARS.
PROVIDE METAL FRAMING AROUND PERIMETER OF OPENING.
PROVIDE AIR INLET PIPING WITH GALVANIZED STEEL COLLARS
ON INTERIOR AND EXTERIOR SURFACES. SEAL WEATHER
TIGHT. PROVIDE PT BLOCKING FOR ROUGH OPENING TO SUIT
PIPING INSTALLATION
F9 COMBUSTION AIR INLET OPENING
SCALE: NTS
HWR
KEY NOTES (APPLY TO THIS DRAWING ONLY)
HWS
NATURAL GAS PIPING. REFER TO A5/M-501 FOR PIPE SIZES & OTHER INFO &
REQUIREMENTS. PROVIDE AS REQUIRED BY NFPA 54 AND GAS SUPPLIER. PROVIDE
SUBMITTAL ON PRESSURE TESTS FOR REVIEW BY COR AND GAS SUPPLIER
CONNECT TO EXISTING SYSTEM PIPING. REFER TO B2/MD401
IMMERSION WELL AND TEMPERATURE SENSOR. EXTEND TO BOILER
CONTROL SYSTEM.
EXTEND EXISTING CW PIPING AND CONNECT TO SYSTEM PIPING.
BOILER CIRC PUMP. LOCATION INDICATED SCHEMATICALLY. MOUNT
AND SUPPORT IN POSITION/ORIENTATION AS RECOMMENDED BY
MNFR. LOCATE TO FACILITATE MAINTENANCE AND ACCESS AROUND
BOILERS. REFER TO A1/M-501 FOR ADDITIONAL RQMTS.
NOTE:
1. AIR INLET PIPING SHALL BE IN COMPLIANCE W/
RECOMMENDATIONS & REQUIREMENTS OF BOILER
MANUFACTURER
NOTE:
1. AIR INLET AND VENT PIPING NOT SHOWN. SEE B7/M-401. COORDINATE
INSTALLATION OF SAME WITH ELECTRICAL COMPONENTS.
HEATING HOT WATER BOILER, CONDENSING TYPE. PROVIDE ON
EXISTING CONCRETE HOUSEKEEPING PAD. LOCATE TO PROVIDE
ACCESS FOR SERVICE, MAINTENANCE AND REPAIR AS
RECOMMENDED BY MANUFACTURER, AND TO MINIMIZE THERMAL
STRESS ON CONNECTED PIPING AND VENT MATERIALS.
PROVIDE BOILER RELIEF VALVE TO RELIEVE FULL CAPACITY OF BOILER, BASIS OF DESIGN
WATTS 740 3/4” X 1”, 925,000 BTU/HR, 30 PSI. EXTEND DISCHARGE PIPING AT FULL SIZE OF
RELIEF CONNECTION, TERMINATE OVER 6” FUNNEL DRAIN. EXTEND FUNNEL DRAIN DISCHARGE
PIPING TO DISCHARGE VERTICALLY OVER FLOOR DRAIN. LOCATE SO THAT RELIEF VALVE AND
PIPING DO NOT HAMPER INSTALLATION OR REPAIR OF AIR INLET OR VENT CONNECTION PIPING.
DO NOT LOCATE ANY PIPE CONNECTIONS ABOVE ELECTRICAL COMPONENTS.
3/4" DRAIN VALVE WITH THREADED CAP AT HWR PIPING. LOCATE TO AVOID
MAINTENACE PERSONNEL TRAFFIC AROUND BOILER.
BOILER CONDENSATE DRAIN PIPING CONNECTED AT FULL SIZE OF BOILER CONDENSATE
DRAIN CONNECTION. PROVIDE ACID NEUTRALIZATION CHAMBER, SIZE AND CAPACITY AS
RECOMMENDED OR FURNISHED BY BOILER MNFR.
P-3B
18" LENGTH OF 6" Ø PIPE. CONNECT TO 3" PIPING WITH
CONCENTRIC REDUCER AND INCREASER
3/4"
B-1 B-2
3/4"
SF-1
PROVIDE ONE NEW 6"
PENETRATION IN CURB
CAP.
DRIP LEG
(TYP)
UNION (TYP)
BALL VALVE
(TYP)
4"
POINT OF USE
GAS
REGULATOR
(TYP)
3/4" 3/4"
REMOVE AIR SEPARATOR, CLEAN, REINSTALL
UNION (UP TO 2-1/2")
FLANGE (3" & OVER)
BALANCING VALVE
CHECK VALVE
PRESSURE GAUGE
W/GAUGECOCK, TYP
Y-STRAINER W/
BLOW-OFF VALVE
ELBOW DOWN. COVER OPENING WITH BIRDSCREEN.
6" Ø AIR INLET PIPING. EXTEND AND CONNECT TO BOILER
1, TYP. FOR BOILER 2.
REMOVE EXISTING LOUVER, APPROX SIZE 16"X16".
ENLARGE OPENING IN EXISTING INSULATED METAL
PARTITION AS REQUIRED TO ACCOMODATE COMBUSTION
AIR INLETS. SEE F9/M-501.
F9 M-501
4 4
6 6 88
5 5
7 7
NG
NG
HWR HWS
NGNG
HOSE CONNECTION
WITH CAP
DRAIN VALVE
SHOT FEEDER FASTENED TO
FLOOR. SEE PLANS FOR
APPROX. LOCATION
3"
6"
3"
PROVIDE GAS METER IN RUNOUT PIPING TO EACH BOILER. EXTEND
AND CONNECT OUTPUT CABLE TO LOCATION INDICATED ON M-401 -
NOTE M3
EXTEND CONDENSATE NEUTRALIZATION DRAIN TO DISCHARGE
VERTICALLY OVER FLOOR DRAIN.
NOTE:
1. PUMP AND PIPING SHALL BE SUPPORTED TO FACILITATE PUMP REPLACEMENT.
PROVIDE ONE NEW 6"
ROOF PENETRATION
(2 VENTS TOTAL)
1" GAS VENT
3"
1" GAS PRESSURE REGULATING VENT. EXTEND OUT THRU WALL.14
MM 12 12
NGNG NG
NG
CORE DRILL THRU EXISTING CMU PARTITION. PROVIDE GALV
STEEL PIPE SLEEVE, SIZE AS REQ'D TO PROVIDE 1/2" ANNULUS.
SUPPORT PIPING ON BOTH SIDES OF PARTITION. IN-FILL W/
CAULK. SEAL WEATHER TIGHT. FINISH WITH ONE PIECE
ESCUCHEON/ COLLAR ON BOTH SIDES
HANGER SUPPORTS BOTH
SIDES, OR SUPPORT FROM
FLOOR OR VERTICAL
STRUCTURE
IN-LINE
PUMP
AS(E)
3"
GROUNDIND/BONDING CABLE BONDED TO GAS PIPING. BONDED AS
REQUIRED BY NEC SECTION 250.104
NG
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
M
EC
HA
NI
CA
L
SC
HE
DU
LE
S
MAT BUILDING
M-601
P1
P1
2M -6
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
1. CENTRAL HEATING PLANT DESCRIPTION
THE PROPOSED MAINTENACE AUGMENTATION TEAM (MAT) BUILDING CENTRAL HEATING PLANT CONSISTS OF 2 CONDENSING TYPE NATURAL GAS FIRED BOILERS, ASSOCIATED BOILER CIRCULATION PUMPS, AND SYSTEM CIRCULATION PUMPS, ALL SPECIFIED FOR REPLACEMENT AS PART OF THIS PROJECT. THE CENTRAL HEATING PLANT SUPPORTS TERMINAL HEATING EQUIPMENT INCLUDING HW COILS IN AIR HANDLING UNITS, FAN COIL UNITS AND UNIT HEATERS. AHU HV-1 PROVIDES MAKE-UP AIR FOR THE AIR EXHAUSTED BY VARIOUS GENERAL EXHAUST FANS. THE HW COIL IN HV-1 IS SPECIFIED TO HAVE AN ENTERING AIR TEMPERATURE OF 14 DEGREES F. ACCORDINGLY, THE HYDRONIC HEATING SYSTEM MUST CIRCULATE WATER WITH A 30% PROPYLENE GLYCOL SOLUTION. THE HEATING HOT WATER SUPPLY TEMPERATURE IS SPECIFIED TO REMAIN AS ORIGINALLY DESIGNED WHEN THE MAT BUILDING WAS CONSTRUCTED. WITH A NOMINAL ΔT OF 20 DEGREES F, THIS LIMITS CONDENSING TO MILDER HEATING CONDITIONS. IF, IN THE FUTURE, ALL TERMINAL HEATING EQUIPMENT IS REPLACED, IT IS RECOMMENDED THAT THE EQUIPMENT BE SELECTED WITH PERFORMANCE (HIGHER ΔT, LOWER FLOW RATE) TO SUPPORT A WIDER RANGE OF
CONDENSING OPERATIONS.
2. GENERAL
PROVIDE CONTROL COMPONENTS, NOT INCLUDED INTEGRAL TO BOILER, ON A CONTROLS BACKBOARD IN THE VICINITY OF THE BOILERS AND CIRCULATION PUMPS. THIS INCLUDES CONTROL PANELS, SELECTOR SWITCHES, RUN-HOUR METERS, ALARM LIGHTS AND OTHER INDICATORS. CONTROLS BACKBOARD SHALL BE ¾” MARINE PLYWOOD, NOMINAL SIZE 48 ” X 48 ” BUT AS REQUIRED TO ACCOMMODATE ALL COMPONENTS TO BE MOUNTED THEREON, AND FASTENED TO WALL SECURELY; PAINTED BLACK, 2 COATS GLOSS FINISH.
3. SEQUENCE OF OPERATIONS
A. THE HEATING PLANT SHALL OPERATE WHENEVER THE OUTSIDE AIR TEMPERATURE IS LESS THAN 60 DEGREES F ADJUSTABLE (ADJ.).
B. OUTDOOR AIR TEMPERATURE RESET. THE HEATING PLANT SHALL OPERATE SO THAT THE HEATING HOT WATER SUPPLIED TO THE SYSTEM IS 200 DEGREES F (ADJ) AT 10 DEGREES F OUTDOOR AIR
TEMPERATURE (OAT) AND 150 DEGREES (ADJ) AT 60 DEGREES F OAT. PROVIDE AN OUTDOOR AIR SENSOR AT APPROXIMATE LOCATION INDICATED.
C. EACH BOILER AND ITS ASSOCIATED BOILER CIRCULATION PUMP SHALL BE INTERLOCKED. BOILER SHALL NOT BE ENABLED TO OPERATE UNTIL ITS ASSOCIATED CIRCULATION PUMP IS ENERGIZED AND FLOW
THROUGH THE SAME PROVEN WITH A FLOW SWITCH.
D. BOILERS SHALL OPERATE IN LEAD-LAG MODE. PROVIDE A MANUAL LEAD - LAG BOILER SELECTOR SWITCH LABELED AS SUCH, WITH POSITIONS LABELED FOR B-1 AND B-2. BASED ON THE SYSTEM HEATING
HOT WATER SUPPLY (HWS) SENSOR, THE LEAD BOILER SHALL OPERATE UNTIL THE HWS TEMPERATURE FALLS 10 DEGREES F (ADJ) BELOW THE HWS SETPOINT, WHEN THE LAG BOILER SHALL BE ENERGIZED.
PROVIDE CONTROLS TO OPTIMIZE BOILER EFFICIENCY, AND TAKE ADVANTAGE OF THE MOST EFFICIENT BOILER OPERATING EFFICIENCY UNDER PART OR FULL LOAD CONDITIONS OF THE BOILERS. BASIS - OF - DESIGN EQUIPMENT CAN BE OPERATED BASED ON SUPPLY TEMPERATURE CONTROL, GAS FLOW RATE CONTROL, OR A COMBINATION OF BOTH. DISCUSS WITH COR PRIOR TO PREPARATION OF CONTROLS SUBMITTAL, AND PROVIDE A COMPREHENSIVE CONTROLS SUBMITTAL, INTEGRATING CONTROLS THAT ARE INTEGRAL TO BOILERS PROVIDED WITH THE SEQUENCES OF OPERATIONS SPECIFIED.
INCLUDE PRODUCT SHEETS, SCHEMATIC DIAGRAMS, AND WRITTEN CONTROL SEQUENCES. UPDATE THIS DRAWING WITH THE SAME AS A RECORD DRAWING AT PROJECT CLOSEOUT.
E. PROVIDE A RUN-HOUR METER FOR EACH BOILER, MOUNTED ON THE CONTROLS BACKBOARD WITH A LABEL THAT IDENTIFIES THE ASSOCIATED BOILER. RUN-HOUR METER SHALL BE USED BY OPERATIONS
PERSONNEL TO ENSURE APPROXIMATELY EQUAL RUN-TIME FOR EACH BOILER.
F. PROVIDE EACH BOILER WITH A RED “ BOILER FAILURE ” LAMP AND ALARM LABELED AS SUCH, MOUNTED ON THE CONTROLS BACKBOARD. IF A BOILER IS COMMANDED TO OPERATE BUT FAILS TO DO SO, BOILER FAILURE LAMP FOR THE ASSOCIATED AND LABELED BOILER SHALL ILLUMINATE. LAMP SHALL REMAIN ILLUMINATED UNTIL THE CAUSE FOR THE FAILURE HAS BEEN CORRECTED, AND BOILER IS
OPERATING.
G. PROVIDE EACH BOILER WITH A NATURAL GAS METER, TO ALLOW CORRELATION OF HEATING CONSUMPTION BY EACH BOILER (AND THE HEATING PLANT) CORRELATED WITH OUTSIDE AIR TEMPERATURE.
H. HEATING HOT WATER DISTRIBUTION PUMPS SHALL OPERATE IN ONLINE - STANDBY MODE. PROVIDE A SELECTOR SWITCH TO INDEX EITHER PUMP AS THE ONLINE PUMP. OPERATION OF EACH PUMP SHALL
BE CONFIRMED BY A FLOW SWITCH IN THE DISCHARGE PIPING OF EACH PUMP. THE ONLINE PUMP SHALL OPERATE WHENEVER THE OUTSIDE AIR TEMPERATURE IS LESS THAN 60 DEGREES F (ADJ.). UPON A “ NO FLOW ” FAILURE OF THE LEAD PUMP, AN ALARM SHALL SOUND AT THE CONTROLS BACKBOARD AND THE STANDBY PUMP SHALL START.
I. PROVIDE EACH PUMP WITH A RED “ PUMP FAILURE ” LAMP AND ALARM LABELED AS SUCH, MOUNTED ON THE CONTROLS BACKBOARD. IF EITHER PUMP IS COMMANDED TO OPERATE BUT FAILS TO DO SO, PUMP FAILURE LAMP FOR THE ASSOCIATED AND LABELED PUMP SHALL ILLUMINATE. LAMP SHALL REMAIN ILLUMINATED UNTIL THE CAUSE FOR THE FAILURE HAS BEEN CORRECTED, AND BOILER IS
OPERATING.
J. PROVIDE A RUN-HOUR METER FOR EACH HW DISTRIBUTION PUMP, MOUNTED ON THE CONTROLS BACKBOARD, WITH A LABEL THAT IDENTIFIES THE ASSOCIATED PUMP. RUN-HOUR METER SHALL BE USED BY
OPERATIONS PERSONNEL TO ENSURE APPROXIMATELY EQUAL RUN-TIME FOR EACH PUMP.
HEATING PLANT DESCRIPTION & SEQUENCES OF OPERATION
AC
E
BO
IL
ER
S
M
AT
B
UI
LD
IN
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
M
EC
HA
NI
CA
L
PH
OT
OG
RA
PH
S
MAT BUILDING
M-901
P1
P1
2M -9
.d wg
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
SU
IT
E
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
REMOVE EXISTING EXPANSION TANK, ET-1
NOTE:COPPER FUEL PIPING IN PLACE, TO BE REMOVED.
EXISTING FLOOR DRAIN TO REMAIN
FIRE PROTECTION PIPING SHOWN FOR
COMPLETENESS ONLY. NO WORK TO
OCCUR ON FIRE PROTECTION SYSTEM
SUPPORT PUMPS AND
PIPING ON EXISTING FRAME.
REMOVE PIPING FROM
FLANGE BACK TO BOILER
E3 INLINE PUMPS, ACCESSORIES
NTS
C3 AC CONDENSER CU-1
NTS
E8 EXISTING BOILERS
NTS
C8 BOILERS, BREECHING
NTS
A8 FIRE PROTECTION PIPING IN MECHANICAL ROOM
NTS
REMOVE AND REINSTALL
CU-1 INCIDENTAL TO NG
INSTALLATION
REMOVE BREECHING, INSULATION, SUPPORTS, ACCESSORIES.
A3 EXISTING NAT. GAS SERVICE AT PROP LINE
NTS
NATURAL GAS RISER.
EXISTING FENCE LINE
BOILER AIR INLET THRU
EXISTING LOUVER
OPENING. MODIFY AS
REQ'D
SEE D9/M-501
BOILER VENT THRU
EXISTING OPENING.
REMOVE EXISTING CHIMNEY
(B-2) AND NEW
PENETRATION (B-1). SEE
DETAIL A9/M501
A1 PARTIAL WEST ELEVATION AT MECH/ELEC
NTS
E1 CHIMNEY HANGERS
NTS
THREADED RODS EXTEND
THRU GYPSUM WALLBOARD
(GWB) APPROX 12" INTO
CHANNEL HUNG FROM
ROOF RAFTERS.
SELECTIVELY DEMO AND
REPAIR GWB. SUPPORT B-1,
B-2, AIR INLET AND VENT
PIPING FROM SAME
STRUCTURE ABOVE.
REMOVE EXISTING BOILERS, BURNERS, PIPING, SUPPORTS,
ACCESSORIES, CONTROLS. REMOVE EXISTING ELECTRICAL
COMPONENTS AND ASSOCIATED WIRING BACK TO PANEL PP-1.
HOUSEKEEPING PADS TO REMAIN.
AC
E
BO
IL
ER
S
M
AT
B
LD
G
CG
A
NT
N
EW
Y
OR
K
BA
YO
NN
E
NJ
M
EC
HA
NI
CA
L
PH
OT
OG
RA
PH
S
MAT BUILDING
M-902
P1
P1
2M -9
.d wg
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
SV
ER
AP
A, C
HR
IS
TO
PH
ER
CS
JJ
M
JJ
M
DC
D
CO
NS
TR
UC
TI
ON
A
UG
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
D1 ABOVE GROUND FUEL PIPING
SCALE: NTS D4 PHYSICAL PROTECTION
FUEL PIPING WITH
SCALE: NTS D7 AST-1
SCALE: NTS
POINT "A". ABANDONED, BURIED
FUEL OIL PIPING BETWEEN
POINT "A" AND POINT "B" TO BE
REMOVED. SEE B2/MD401
PSN 13920142 REPLACE BOILERS MAT BUILDING
REFERENCE DRAWING RD-1
REFERENCE DRAWING RD-2
REFERENCE DRAWING RD-3
REFERENCE DRAWING RD-4
REFERENCE DRAWING RD-5
REFERENCE DRAWING RD-6
REFERENCE DRAWING RD-7
REFERENCE DRAWING RD-8
File details come from the government source that posted it. Updated .