3A_-_Architectural_Plans_(A-001)_-_100%_-_9-25-25.pdf
PDF 10 MB Posted
- Attached to
- Raw Water Booster Pump Station Improvements
- Solicitation number
- 25-8400
- Issued by
- Collier County, Florida
About this file
This is an architectural plan document (Sheet A-001) for the Raw Water Booster Pump Station Improvements project prepared by TetraTech for Collier County Public Utilities. The plan depicts the existing pump building layout and identifies three primary scope components: installation of a potable water well and reverse osmosis (RO) system in a designated corner, upgrade of the existing restroom to include a new shower and hot water heater with associated plumbing and mechanical systems, and conversion of the existing storage room into office space with air conditioning, electrical, and lighting systems. The potable water system installation requires a turnkey solution including a 4-inch well with 1 HP-20 GPM pump, 1-inch HDPE water main with valves, backflow preventer, hydro-pneumatic tank, RO treatment system, building connections, disinfection, water testing, electrical work, and a 3-year warranty on all parts and labor. The restroom upgrade encompasses demolition and installation of new plumbing per specifications, new shower and hot water heater, ventilation systems, lighting, electrical systems, and interior finishes with paint and colors to be approved by the county. The office conversion includes demolition of an existing concrete ramp, installation of air conditioning and electrical systems, interior painting, and furniture provision per specifications. The plan is dated April 11, 2025, and reflects 100% submittal status with reference to additional civil, site, and utility drawings included in the project document set.
The architectural plan provides spatial context and layout details for the project scope but does not contain pricing, bonding, scheduling, or procurement-specific information. However, the related contract opportunity indicates an estimated project budget of $1,500,000 with a $100,000 Owner's Allowance for unforeseen conditions, sealed bids due October 3, 2025, at 3:00 p.m., a non-mandatory pre-bid meeting and site visit scheduled for August 29, 2025, at 9:00 a.m. at the North County Regional Water Treatment Plant, and an anticipated project completion timeline of 365 consecutive calendar days from Notice to Proceed. Bidders must be registered on the county's procurement portal, comply with E-Verify requirements, provide a 5% bid bond, and possess appropriate Florida licensing. Successful bidders will be required to provide performance and payment bonds for 100% of the contract amount and maintain comprehensive insurance coverage, with liquidated damages set at $610 per calendar day for failure to achieve Substantial Completion within the specified timeframe.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRIC ROOM
GENERATOR ROOM
ELECTRIC ROOM
PUMP ROOM
RESTROOM
FUEL TANK
OFFICE
ELECTRIC ROOM
NOTES
CHKD:
DRWN:
PROJ:
DESN:
w w w t e t r a t e c h c o m
M A
R K
D A
T E
D E
S C
R I P
T I O
N B
Y
A
M
O
P
R O
J E
C T
S O
R L
A N
D O
I E
R
C
A D
S
H E
E T
F I L
E S
A
E
X I S
T I N
G
B
U I L
D I N
G D
W G
M
A R
Q U
E Z
G
E R
M A
I N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C o p y r i g h t
T e t r a
T e c h
200-08486-24001
R A
W
W
A T
R
B
O O
S T
R
P
U M
P
S
T A
T I O
N
I M
P R
O V
E M
E N
T S
C O
L L
I E
R
C
O U
N T
Y
P
U B
L I C
U
I L
I T
I E
S
C
H E
V R
O L
W
A Y
S
U I T
E
E S
T E
R O
F
L
P H
100% SUBMITTAL
N
G I N
E E
R I N
G
B
U S
I N
E S
S
N
O
A-001
E X
I S
T I N
G
P
U M
P
B
U I L
D I N
G
N
SCALE:
4' 8' 16'
1/8" = 1'-0''
PLAN
SCALE: 1/8"=1'-0"
PHOTO
SCALE: N.T.S.
PHOTO
SCALE: N.T.S.
PHOTO
SCALE: N.T.S.
PHOTO
SCALE: N.T.S.
PHOTO
R.O. SYSTEM TO BE
INSTALLED IN THIS
CORNER (SEE NOTE 1)
STORAGE ROOM TO BE
CONVERTED TO OFFICE
SPACE (SEE NOTE 3)
RESTROOM TO BE
UPGRADED (SEE NOTE 2)
PHOTO
PHOTO
PHOTO
1. POTABLE WATER WELL AND REVERSE OSMOSIS (RO) SYSTEM - THE
POTABLE WATER SYSTEM WILL BE USED FOR THE UPGRADE TO THE
EXISTING RESTROOM, WHICH INCLUDES AN EXISTING TOILET, EXISTING SINK,
AND A NEW SHOWER. THE CONTRACTOR, THROUGH A QUALIFIED POTABLE
WATER WELL DRILLER LICENSED IN THE STATE OF FLORIDA, SHALL PROVIDE
A TURNKEY POTABLE WATER SYSTEM, INCLUDING BUT NOT LIMITED TO:
A.THE FINAL LOCATION AND INSTALLATION OF A 4-INCH WELL WITH A 1 HP -
20 GPM PUMP.
B.1-INCH HDPE WATER MAIN AND VALVES.
C.BACK FLOW PREVENTER.
D.HYDRO-PNEUMATIC TANK.
E.REVERSE OSMOSIS (RO) WATER TREATMENT SYSTEM.
F. CONNECTION TO THE BUILDING INTERIOR POTABLE WATER SYSTEM.
G.DISINFECTION.
H. WATER TESTING.
I. ELECTRICAL FROM THE BUILDING TO THE WELL.
J. DRILLING SLURRY CLEANUP.
K. START UP AND TESTING OF THE SYSTEM
L. 3 YEAR WARRANTY ON ALL PARTS AND LABOR.
M.ALL COLLIER COUNTY AND STATE PERMITS.
2. RESTROOM UPGRADE - THE CONTRACTOR SHALL PROVIDE ALL LABOR,
EQUIPMENT, MATERIALS, AND INCIDENTALS TO UPGRADE THE RESTROOM,
WHICH INCLUDES AN EXISTING TOILET, EXISTING SINK, AND A NEW SHOWER,
INCLUDING BUT NOT LIMITED TO:
A.INSTALLATION OF A NEW SHOWER AND HOT WATER HEATER.
B.DEMOLITION OF EXISTING PLUMBING PER THE PLUMBING PLANS AND
SPECIFICATIONS.
C.INSTALLATION OF PLUMBING PER THE PLUMBING PLANS AND
SPECIFICATIONS.
D.INSTALLATION OF THE SHOWER/RESTROOM VENTILATION SYSTEMS PER
THE MECHANICAL PLANS AND SPECIFICATIONS.
E. INSTALLATION OF ALL LIGHTING AND ELECTRICAL PER THE ELECTRICAL
PLANS AND SPECIFICATIONS.
F. CLEAN THE CEILING AS REQUIRED TO PROVIDE TWO (2) COATS OF PAINT IN
COLORS TBD AND APPROVED BY THE COUNTY.
G.CLEAN THE WALLS AS REQUIRED TO PROVIDE TWO (2) COATS OF PAINT IN
COLORS TBD AND APPROVED BY THE COUNTY.
H.CLEAN THE FLOOR AS REQUIRED TO PROVIDE TWO (2) COATS OF FLOOR
PAINT IN COLORS TBD AND APPROVED BY THE COUNTY.
3. STORAGE ROOM CONVERTED TO OFFICE SPACE - THE CONTRACTOR SHALL
PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND INCIDENTALS TO
CONVERT THE EXISTING STORAGE ROOM TO OFFICE SPACE, INCLUDING BUT
NOT LIMITED TO:
A.DEMOLITION OF THE EXISTING CONCRETE RAMP.
B. INSTALLATION OF AIR CONDITIONING SYSTEM PER THE MECHANICAL
PLANS AND SPECIFICATIONS.
C.INSTALLATION OF ALL LIGHTING AND ELECTRICAL SYSTEMS PER THE
ELECTRICAL PLANS AND SPECIFICATIONS.
D.CLEAN THE CEILING AS REQUIRED TO PROVIDE TWO (2) COATS OF PAINT IN
COLORS TBD AND APPROVED BY THE COUNTY.
E. CLEAN THE WALLS AS REQUIRED TO PROVIDE TWO (2) COATS OF PAINT IN
COLORS TBD AND APPROVED BY THE COUNTY.
F. CLEAN THE FLOOR AS REQUIRED TO PROVIDE TWO (2) COATS OF FLOOR
PAINT IN COLORS TBD AND APPROVED BY THE COUNTY.
G.FURNITURE PER THE SPECIFICATIONS.
H.THE COUNTY WILL REMOVE ALL THE EXISTING EQUIPMENT IN THE STORGE
ROOM.
CONCRETE
RAMP TO BE
DEMOLISHED
CONCRETE RAMP
TO BE DEMOLISHED
MASON.LUNDQUIST
Cloud
MASON.LUNDQUIST
Highlight
MASON.LUNDQUIST
Callout
DRY SUMP
Highlight
MASON.LUNDQUIST
Highlight
Cloud
| Sheets and Views |
| G-000 COVER SHEET |
| G-001 LOCATION MAP, GENERAL NOTES, AND DRAWING INDEX |
| G-002 LEGENDS AND ABBREVIATIONS |
| C-101 GENERAL SITE PLAN |
| C-102 EXISTING YARD PIPING PLAN |
| C-103 EXISTING FLOW METER PIPING AND DEMOLITION PLAN & SECTION |
| C-104 PROPOSED FLOW METER PIPING PLAN & SECTION |
| C-501 CIVIL DETAILS |
| C-502 CIVIL DETAILS |
| A-001 EXISTING PUMP BUILDING |
File details come from the government source that posted it. Updated .