5_-_Mechanical_-_100%_-_4-9-25_.pdf
PDF 42 MB Posted
- Attached to
- Raw Water Booster Pump Station Improvements
- Solicitation number
- 25-8400
- Issued by
- Collier County, Florida
About this file
The file is a comprehensive mechanical engineering set of design and specification documents for the Collier County Public Utilities Raw Water Booster Pump Station Improvements project in Florida. The project involves mechanical system modifications for an existing pump building and a new parking canopy, with detailed plans for demolition, equipment replacement, and installation of new mechanical systems including split system heat pumps, exhaust fans, high-volume low-speed (HVLS) fans, louvers, and gas leak detection systems. The project is advertised as Bid No. 25-8400, with sealed bids to be received by October 3, 2025, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for August 29, 2025, at 9:00 a.m. at the North County Regional Water Treatment Plant, followed by a site visit.
The mechanical documents include detailed schedules, control sequences, and technical specifications for various equipment, with a focus on replacing existing systems and improving ventilation and environmental controls. The project specifies use of specific equipment manufacturers like Mitsubishi and Greenheck, with requirements for next-generation refrigerants, high wind ratings, and compliance with Florida Building Codes. The documents outline precise installation requirements, including mounting details, electrical connections, and control system specifications. While specific budget details are not provided in the mechanical documents, the project appears to be funded through Collier County's public utilities infrastructure improvement budget, with a comprehensive approach to upgrading mechanical systems at the Raw Water Booster Pump Station.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U
M
CO
DP
SD
A
T
S
M
H
CO
EQUIPMENT TAG
MECHANICAL LEGEND MECHANICAL ABBREVIATIONS
NOTES:
1. THIS LEGEND IS FOR REFERENCE ONLY.
2. ALL SYMBOLS WITHIN THIS LEGEND MAY NOT APPLY TO THIS PROJECT.
DUCT SECTION, POSITIVE PRESSURE
DUCT SECTION, NEGATIVE PRESSURE
NEW DUCTWORK
FIRE DAMPER, PROVIDE ACCESS DOOR
VOLUME DAMPER
SUPPLY/INTAKE AIRFLOW DIRECTION
GRILLE OR REGISTER, SIDEWALL
LOUVER AND SCREEN
ANCHOR, INTERMEDIATE
BUTTERFLY VALVE
PRESSURE GAUGE
MANUAL AIR VENT
AUTOMATIC AIR VENT
MOTORIZED DAMPER
EMERGENCY SHUTDOWN SWITCH
HVAC - #
DUCT SIZE & SYSTEM ABBREVIATION
FIRST FIGURE IS DIMENSION SHOWN ON PLAN
FLEXIBLE DUCTWORK
DUCT TRANSITION
TURNING VANES
CEILING DIFFUSER - SUPPLY
CEILING DIFFUSER - RETURN
CEILING DIFFUSER - EXHAUST
PIPE CAP
PIPE CONNECTION, BOTTOM
PIPE CONNECTION, TOP
PIPE ELBOW, TURNED UP
PIPE ELBOW, TURNED DOWN
PIPE TEE
STRAINER VALVE
THREE-WAY CONTROL VALVE
TWO-WAY CONTROL VALVE
PUMP (SCHEMATIC)
THERMOSTAT
CARBON DIOXIDE SENSOR
20x12
SA
POINT OF DISCONNECTION
POINT OF CONNECTION
KEYED NOTE
AIR TERMINAL AND AIRFLOW TAG
DIFFERENTIAL PRESSURE SENSOR
DUCT SMOKE DETECTOR
GATE VALVE
CHECK VALVE
CD-A W X H ###
AIR QUANTITY DELIVERED
BY DEVICE IN CFM
AIR TERMINAL MARK AS
INDICATED IN SCHEDULE
MASTER EMERGENCY SHUTDOWN SWITCH
GATE VALVE
CEILING DIFFUSER - ROUND
BALL VALVE
BUTTERFLY VALVE
BRANCH DUCTWORK
RECT. TO ROUND TRANSITION
PNEUMATIC DAMPER
EXHAUST AIRFLOW DIRECTION
LINEAR SLOT DIFFUSER (DOUBLE SLOT)
BOTTOM OF DUCT ELEVATION TAGBOD: 4' - 7"
BACKDRAFT DAMPER
BD
HUMIDISTAT
CARBON MONOXIDE SENSOR
DOOR UNDERCUT
AREA OUT OF SCOPE
AREA OF DEMOLITION
Ø DIAMETER
AIR TERMINAL NECK SIZE (IN.)
SAD-#
### CFM
OR
AIR TERMINAL MARK AS INDICATED
IN SCHEDULE
AIR QUANTITY DELIVERED BY
DEVICE
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-001
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
M E
C H
A N
IC
A
L A
B B
R E
V
IA
T
IO
N S
L
E G
E N
D S
A
N D
N O
T E
S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
DESIGN CONDITIONS FOR LOAD CALCULATIONS
SEASON
OUTDOOR
DESIGN
CONDITIONS
AIR-COOLED
CONDENSER
HEAT
ELEV. (FT)
INDOOR CONDITIONS / ROOM TYPE
OFFICES
SUMMER (1.) 92.0 / 76.0 °F 95 °F 16.0 75 °F
WINTER (2.) 42.0 / 35.3 °F 95 °F 16.0 70 °F
(D) DEMOLITION
(E) EXISTING
(R) RELOCATED
AAV AUTOMATIC AIR VENT
ABS ABSOLUTE
AD ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATE
BFF BELOW FINISHED FLOOR
BHP BRAKE HORSEPOWER
CAP CAPACITY
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION
CP-1 CONTROL PANEL WITH DESIGNATION
CU CONDENSING UNIT
CW CHILLED WATER
DB DRY BULB
DEG DEGREES
DEMO DEMOLITION
DIA DIAMETER
DN DOWN
DWG DRAWING
EA EXHAUST AIR
EAG EXHAUST AIR GRILLE
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EMCS EMERGENCY MANAGEMENT AND CONTROL
SYSTEM
ENT ENTERING
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWT ENETERING WATER TEMPERATURE
EXH EXHAUST
F FAHRENHEIT
FCU FAN COIL UNIT
FD FIRE DAMPER
FH FIRE HYDRANT
FLEX FLEXIBLE
FM FLOW METER
FPM FEET PER MINUTE
GAL GALLONS
GH GRAVITY HOOD
GM GAS METER
GPM GALLONS PER MINUTE
GUH GAS UNIT HEATER
HP HORSEPOWER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER/DIMENSION
IE INVERT ELEVATION
IN INCH
L LOUVER
LAT LEAVING AIR TEMPERATURE
LP LOUVERED PENTHOUSE
LVL LEVEL
LWT LEAVING WATER TEMPERATURE
M METER
MAX MAXIMUM
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
N/A NOT APPLICABLE
NG NATURAL GAS
NTS NOT TO SCALE
OA OUTDOOR AIR
OD OUTSIDE DIAMETER
OED OPEN ENDED DUCT
PD PRESSURE DROP
PSI POUNDS PER SQUARE INCH
R RADIUS
RA RETURN AIR
RAG RETURN AIR GRILLE
REFRIG REFRIGERANT
RH RADIANT HEATER
RL REFRIGERANT LIQUID LINE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION LINE
SA SUPPLY AIR
SAG SUPPLY AIR GRILLE
SB SECURITY BARS
SF SUPPLY FAN
SPEC SPECIFICATION
STD STANDARD
T THERMOMETER
TA TRANSFER AIR
TBD TO BE DETERMINED
TEMP TEMPERATURE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VIF VERIFY IN FIELD
VRF VARIABLE REFRIGERANT FLOW
W WATT
WB WET BULB
WMS WIRE MESH SCREEN
WS WASTE STACK
NOTE: ALL APPLICABLE BUILDING CODES AND STANDARDS NOT SPECIFIED HEREIN.
APPLICABLE CODES AND STANDARDS
FLORIDA BUILDING CODE, 8TH EDITION
FLORIDA BUILDING CODE, EXISTING BLDG, 8TH EDITION
FLORIDA BUILDING CODE, PLUMBING, 8TH EDITION
FLORIDA BUILDING CODE, HURRICANE TESTING, 8TH EDITION
FLORIDA BUILDING CODE, ENERGY CONSERVATION, 8TH EDITION
FBC 2023
FLORIDA BUILDING CODE, MECHANICAL, 8TH EDITION
FBC-EB 2023
FBC-M 2023
FBC-P 2023
FBC-HT 2023
FBC-EC 2023
FLORIDA FIRE PREVENTION CODE, 8TH EDITION FFPC 2023
NATIONAL ELECTRIC CODE NEC 2023
OCCUPATIONAL SAFETY AND HEALTH ACT OSHA
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
NOTES:
1. BASED UPON ASHRAE 1% DB COOLING TEMPS.
2. BASED UPON ASHRAE 99% DB HEATING TEMPS.
FAISAL.ALTWAL
G:\PE Stamps\Orders\2023\104089 Twal FL-Eng\104089 Twal FL-Eng FINAL Model (1)
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-002
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
M E
C H
A N
IC
A
L G
E N
E R
A L
N O
T E
S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
1. THESE GENERAL NOTES APPLY TO ALL SHEETS. REFER TO INDIVIDUAL SHEETS FOR SHEET SPECIFIC NOTES.
2. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. DO NOT SCALE FOR MATERIAL QUANTITIES. ALL SCALING SHOULD BE REFERENCED TO
ARCHITECTURAL PLANS ONLY.
3. ALL MECHANICAL WORK SHALL BE IN COMPLIANCE WITH THE CODES LISTED IN THE TABLE ON M-001.
4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ALL OTHER DISCIPLINES AND AS SHOWN ON
OTHER CONTRACT DRAWINGS.
5. CONTRACTOR SHALL VISIT SITE AND VERIFY ALL EXISTING CONDITIONS AND CONNECTIONS TO EXISTING
WORK PRIOR TO BIDDING AND CONSTRUCTION.
6. COORDINATE ALL CUTTING AND PATCHING WITH GENERAL CONTRACTOR AND OTHER DISCIPLINES.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING RELATED TO THEIR WORK.
7. ALL ATTACHMENTS TO THE BUILDING STRUCTURE SHALL BE COORDINATED WITH THE STRUCTURAL DESIGN.
ALL BRACING AND MOUNTING OF PIPES AND DUCTS SHALL MEET THE MINIMUM REQUIREMENTS OF THE MOST RECENT SMACNA HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE. CONTRACTOR SHALL
MAINTAIN ONE COPY OF THIS MANUAL ON SITE AT ALL TIMES.
8. PROVIDE FLASHING AND COUNTERFLASHING FOR ALL PENETRATIONS THROUGH WALLS OR ROOF TO MAKE
WATERPROOF INSTALLATION.
9. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED
EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
10. CONCRETE HOUSEKEEPING PADS FOR MECHANICAL EQUIPMENT SHALL HAVE A MINIMUM PAD THICKNESS OF 6 INCHES. PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 6 INCHES ON EACH SIDE. CONCRETE
HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR.
11. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN THE DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED
BY THE MECHANICAL CONTRACTOR.
12. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
13. BALANCE AIR FLOW AT ALL AIR INLETS AND OUTLETS TO AIR QUANTITIES SHOWN. BALANCE ALL WATER FLOWS TO COILS AND MECHANICAL EQUIPMENT TO VALUES SHOWN. INSTALL TEST PLUGS WHERE NECESSARY.
BALANCING CONTRACTOR SHALL BE INDEPENDENT OF THE INSTALLING CONTRACTORS AND CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) OR ASSOCIATED AIR BALANCE COUNCIL (AABC).
14. ALL EXPOSED PIPE, PIPE SUPPORTS, DUCTWORK, UNFINISHED EQUIPMENT AND DUCT SUPPORTS SHALL MATCH ADJACENT FINISHES AS REQUIRED BY PAINTING SPECIFICATION AND ARCHITECTURAL DRAWINGS.
15. AT COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL PROVIDE COPIES OF BOUND OPERATIONS AND
MAINTENANCE MANUALS.
16. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE CONSTRUCTION SITE UNTIL FINAL STARTUP OF THE HEATING, COOLING AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEETMETAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS
WHICH MAY ENTER THE SYSTEM.
MECHANICAL GENERAL NOTES
GENERAL NOTES
1. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
2. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE
MANUFACTURER SHALL BE USED.
3. IDENTIFY ALL NEW MECHANICAL EQUIPMENT WITH NAMEPLATES PERMANENTLY ENGRAVED PER
SPECIFICATIONS.
4. MOTOR STARTERS AND VARIABLE FREQUENCY DRIVES, WHERE REQUIRED, SHALL BE PROVIDED AND MOUNTED BY THE MECHANICAL INSTALLER. CONDUIT AND WIRING SHALL BE PROVIDED BY ELECTRICAL
INSTALLER.
5. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL CONTRACTOR
SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE GENERAL
CONTRACTOR.
6. EQUIPMENT AND APPLIANCES SHALL BE ACCESSIBLE FOR SERVICE, INSPECTION, REPAIR AND REPLACEMENT WITHOUT REMOVING PERMANENT CONSTRUCTION. SUFFICIENT CLEARANCE SHALL BE MAINTAINED TO PERMIT CLEANING, REPLACEMENT OF FILTERS, BLOWERS, MOTORS, CONTROLS AND
LUBRICATION OF MOVING PARTS.
EQUIPMENT NOTES
1. OUTSIDE AIR FOR A HEATING OR COOLING SYSTEM SHALL NOT BE TAKEN FROM CLOSER THAN TEN (10) FEET FROM AN APPLIANCE VENT OUTLET, VENT OPENING OF A PLUMBING SYSTEM, OR THE DISCHARGE OUTLET OF
EXHAUST FAN, UNLESS THE OUTLET IS THREE (3) FEET ABOVE THE OUTSIDE AIR INLET.
2. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. DETAILED DESCRIPTIONS ARE PROVIDED IN THE
ARCHITECTURAL DOCUMENTS AND SHALL BE COORDINATED WITH GENERAL CONTRACTOR.
3. ALL PENETRATIONS THROUGH FIRE AND SMOKE RATED WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE AND SMOKE STOPPED WITH A UL APPROVED SEALANT SYSTEM.
DUCTWORK NOTES
1. CONDENSATE AND PRESSURE RELIEF PIPING SHALL BE TYPE L OR M TUBING WITH WROUGHT COPPER FITTINGS. A PRIMARY DRAIN PAN SHALL BE PROVIDED WITH COOLING COIL AND EXTEND BEYOND THE LEAVING SIDE OF THE COIL AND UNDERNEATH THE COOLING COIL CONNECTIONS. PROVIDE SECONDARY
DRAIN PIPE FOR EQUIPMENT ABOVE CEILINGS AND ROUTE TO A READILY VISIBLE LOCATION.
2. SUPPORT ALL PIPING SO THAT IT IS FIRMLY HELD IN PLACE BY APPROVED HANGERS AND SUPPORTS.
PIPING NOTES
CONTROL NOTES
1. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM AS RECOMMENDED BY THE
MANUFACTURER FOR RATED ACCURACY.
2. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM SENSORS AND THERMOSTATS SUCH THAT
OPERABLE PARTS ARE NO HIGHER THAN 48" ABOVE FINISHED FLOOR.
3. COORDINATE ALL CONTROLS AND SEQUENCES OF OPERATION WITH THE BUILDING AUTOMATION SYSTEM (BAS). PROVIDE ALL DEVICES, CONTROLLERS, SENSORS, CONDUIT, WIRING AND LABOR TO PROVIDE A COMPLETE AND OPERATIONAL SYSTEM TO MEET THE OWNER’S PROJECT REQUIREMENTS
AND THE DESIGN INDICATED ON THESE DRAWINGS AND SPECIFICATIONS.
4. ALL CONTROL CONDUIT AND WIRING SHALL COMPLY WITH THE ELECTRICAL CODE AND THE
SPECIFICATIONS.
5. THE CONTROLS CONTRACTOR IS RESPONSIBLE FOR POWER CIRCUITS AND WIRING TO ALL CONTROL
PANELS.
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
N
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
0' 8' 16'8'
SCALE: 1/8" = 1'-0"
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-101
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
E X
IS
T
IN
G
P U
M P
B U
IL
D
IN
G
M E
C H
A N
IC
A
L D
E M
O L
IT
IO
N P
L A
N
S E
C T
IO
N
S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
SCALE: 1/8" = 1'-0"M-101
1 MECHANICAL DEMOLITION PLAN
KEYED NOTES:
1. REMOVE AND DISPOSE OF EXISTING WALL MOUNTED
EXHAUST FAN INCLUDING ALL ASSOCIATED SUPPORTS,
HANGARS, THERMOSTATS, DISCONNECTS, MOTOR
STARTER, AND CONTROL WIRING AS SHOWN. THE
CONTRACTOR SHALL TEMPORARILY CAP AND SEAL THE
REMAINING WALL OPENING IN PREPARATION FOR THE
NEW INTAKE LOUVER INSTALLATION. THE SEALING
PROCESS SHALL INCLUDE THE USE OF INSULATION
MATERIALS SUCH AS RIGID FOAM, FIBER GLASS OR
APPROVED EQUAL TO ENSURE THERMAL EFFICIENCY
AND PREVENT AIR LEAKAGE. THE INSULATION SHOULD
BE INSTALLED SECURELY AROUND THE PERIMETER OF
THE OPENING, AND THE CAP MUST BE CONSTRUCTED OF
WEATHER-RESISTANT MATERIALS TO PROTECT AGAINST
MOISTURE INTRUSION AND ENSURE STRUCTURAL
INTEGRITY UNTIL THE NEW LOUVER IS INSTALLED.
2. REMOVE AND DISPOSE OF EXISTING LOUVER WITH
ASSOCIATED MOTORIZED DAMPER AND CONTROL
WIRING. THE REMAINING WALL OPENING SHALL BE
PERMANENTLY SEALED TO ENSURE STRUCTURAL
INTEGRITY AND PREVENT AIR AND MOISTURE
INFILTRATION. THE SEALING PROCESS WILL INVOLVE THE
INSTALLATION OF A WEATHER-RESISTANT CAP THAT IS
FASTENED TO THE WALL. ADDITIONALLY, INSULATION
MATERIALS, SUCH AS RIGID FOAM, FIBERGLASS OR
APPROVED EQUAL SHALL BE APPLIED AROUND THE
PERIMETER OF THE OPENING TO ENSURE THERMAL
EFFICIENCY AND PREVENT AIR LEAKAGE.
3. REMOVE AND DISPOSE OF EXISTING ROOF MOUNTED
EXHAUST FAN INCLUDING ALL ASSOCIATED SUPPORTS,
HANGARS, THERMOSTATS, DISCONNECTS, MOTOR
STARTER, AND CONTROL WIRING AS SHOWN. THE
EXISTING CURB SHALL REMAIN IN PLACE AND MUST BE
TIGHTLY SEALED TO PREVENT WATER INFILTRATION AND
ENSURE STRUCTURAL INTEGRITY. THE SEALING
PROCESS SHALL INVOLVE APPLYING POLYURETHANE
WEATHER-RESISTANT SEALANT AROUND THE
PERIMETER OF THE CURB TO CREATE A WATERTIGHT
BARRIER. ADDITIONALLY, INSULATION MATERIALS, SUCH
AS RIGID FOAM, FIBERGLASS OR APPROVED EQUAL
SHALL BE APPLIED TO ENSURE THERMAL PERFORMANCE
AND PREVENT CONDENSATION WITHIN THE CURB AREA.
GENERAL NOTES:
1. EXISTING SYSTEMS AND INFORMATION SHOWN ON
THESE PLANS WERE DEVELOPED USING EXISTING
BUILDING DRAWINGS. CONTRACTOR SHALL VERIFY AT
SITE ALL EXISTING SYSTEMS. REMOVE ALL PORTIONS OF
PIPING SYSTEMS BEING DEMOLISHED. TERMINATE
EXISTING SYSTEMS IN A MANNER THAT WILL NOT
CONFLICT WITH NEW WORK. CLOSELY COORDINATE NEW
WORK WITH EXISTING SYSTEMS. PROVIDE OFFSETS IN
EXISTING AND NEW SYSTEMS AS REQUIRED TO AVOID
CONFLICTS.
2. COORDINATE DEMOLITION AND DISPOSAL WITH THE
OWNER.
3. CONTRACTOR IS RESPONSIBLE TO REMOVE AND DELIVER
EXISTING EQUIPMENT, MATERIALS, ETC., BEING
DEMOLISHED TO THE OWNER WHERE SO DIRECTED.
SHOULD THE OWNER DECIDE NOT TO KEEP THE
EXISTING EQUIPMENT, MATERIALS ETC., BEING
DEMOLISHED, IT BECOMES THE PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM THE SITE
AND BE DISPOSED OF IN A LEGAL MANNER.
4. EXISTING MECHANICAL EQUIPMENT, ACCESSORIES,
SUPPORTS, CONTROLS, AND OTHER COMPONENTS
SHALL BE DEMOLISHED AND REMOVED FROM SITE AS
SHOWN.
5. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY
LOCATIONS, DIMENSIONS, AND CONFIGURATION OF ALL
EXISTING EQUIPMENT, HANGERS, SUPPORTS, ANCHORS,
CONTROLS, ETC.
6. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
PENETRATIONS CREATED BY REMOVAL OF EQUIPMENT,
PIPING, ETC. TO MATCH EXISTING. REPAIR ADJACENT
CONSTRUCTION AND FINISHES DAMAGED DURING
DEMOLITION AND EXTENSION WORK. PATCH TO MATCH
ORIGINAL CONSTRUCTION. VERIFY ALTERNATIVE OR
SPECIAL REPAIR METHODS WITH ARCHITECT/ENGINEER
BEFORE PROCEEDING WITH DEMOLITION.
SCALE: 3" = 1'-0"M-101
2 DEMO PHOTO
SCALE: 3" = 1'-0"M-101
3 DEMO PHOTO
SCALE: 3" = 1'-0"M-101
4 DEMO PHOTO
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
LEGEND:
DAHU/HP-1, L-1
EF-1
NOT IN PROJECT SCOPE
PUMP ROOM
OFFICE
BATHROOM
GENERATOR ROOM
ELECTRICAL
ROOM
A B
N
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
0' 8' 16'8'
SCALE: 1/8" = 1'-0"
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-201
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
E X
IS
T
IN
G
P U
M P
B U
IL
D
IN
G
M E
C H
A N
IC
A
L Z
O N
IN
G
P L
A N
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
GENERAL NOTES:
1. DAHU-1 = THERMOSTAT.
2. PROVIDE ALL THERMOSTATS WITH LOCKBOX COVER.
SCALE: 1/8" = 1'-0"M-201
1 MECHANICAL ZONING PLAN
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
LEGEND:
NOT IN PROJECT SCOPE
M-202
M-202
OFFICE
REST ROOM
PUMP ROOM
GENERATOR ROOM
ELECTRICAL
ROOM
A B
EB-EF-1
B
OS 7
EB-L-1
EB-HP-1
EB-DAHU-1
5"ø
"ø
C O
N D
B
1 2
DRYWELL
T 4
N
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
0' 8' 16'8'
SCALE: 1/8" = 1'-0"
0' 4' 8'4'
SCALE: 1/4" = 1'-0"
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-202
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
E X
IS
T
IN
G
P U
M P
B U
IL
D
IN
G
M E
C H
A N
IC
A
L M
O D
IF
IC
A T
IO
N
P L
A N
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
KEYED NOTES:
1. POSITION UNIT AT MANUFACTURE'S RECOMMENDED
CLEARANCE.
2. REFRIGERANT LINES SHALL BE ROUTED FROM
CONDENSING UNIT, SLEEVE THROUGH WALL AND TO AIR
HANDLING UNIT. SIZE LINES PER MANUFACTURER'S
RECOMMENDATIONS.
3. ROUTE NEW CONDENSATE TUBING DISCHARGE FROM
CONDENSATE PUMP FROM AIR HANDLING UNIT THROUGH
WALL AND TO CONDENSATE DRYWELL.
4. PROVIDE PROGRAMMABLE THERMOSTAT AND WIRE TO
AIR HANDLING UNIT.
5. MOUNT LOUVER IN EXISTING OPENING.
6. MOUNT CENTERLINE OF EF-1 AT 8' 1" AFF. SEE
ARCHITECTURAL ELEVATIONS.
7. PROVIDE AN OCCUPANCY SENSOR.
GENERAL NOTES:
1. ALL REFRIGERANT PIPING SHOWN ON PLAN SHALL BE
SIZED PER MANUFACTURER'S RECOMMENDATIONS.
2. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH
MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS
TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED
FOR EQUIPMENT FURNISHED.
3. DIMENSIONS SHALL BE FIELD VERIFIED AND
COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER
DISCIPLINES INVOLVED. FIELD MODIFICATIONS SUCH AS
OFFSETS IN PIPING OR DUCTWORK DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE
PROVIDED AT NO ADDITIONAL COST.
4. CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF
WALL, SLAB AND PATCHING OF ALL PENETRATIONS
CREATED DURING MECHANICAL INSTALLATION. REPAIR
ADJACENT CONSTRUCTION AND FINISHES DURING
INSTALLATION. PATCH TO MATCH ORIGINAL
CONSTRUCTION.
SCALE: 1/8" = 1'-0"M-202
1 MECHANICAL MODIFICATION PLAN
SCALE: 1/4" = 1'-0"M-202
2 BATHROOM ENLARGED PLAN
SCALE: 1/4" = 1'-0"M-202
3 OFFICE ENLARGED PLAN
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
PC-EF-1
PC-L-1
PC-L-2
PC-L-3
1 3
TEF-1
920 CFM
920 CFM
920 CFM
BAY 2 OPENBAY 1 ENCLOSED
PC-HVLS-1
PC-GLD-1
PC-GLD-2
PC-GLD-1
PC-GLD-2
BAY 3 OPEN
PC-GLD-C-1
HORN/STROBE
PC-HVLS-2
N
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
0' 4' 8'4'
SCALE: 1/4" = 1'-0"
/9
/2
:3
:3
A
M A u to d e s k D o c s /2
-0
-2
C o lli e r
C o B ri d g e C ra n e A d d
/M
-2
C
C B
C A
E n c lo s e d G a ra g e .r v t
200-08486-24001
FFA
RZN
KPK
M-203
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
P A
R K
IN
G
C A
N O
P Y
M E
C H
A N
IC
A
L P
L A
N
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
SCALE: 1/4" = 1'-0"M-203
1 MECHANICAL PLAN
KEYED NOTES:
1. POSITION UNIT AT MANUFACTURE'S RECOMMENDED
CLEARANCE.
2. MOUNT BOTTOM OF LOUVERS L-1, L-2, AND L-3 AT 5' 0"
AFF. SEE ARCHITECTURAL ELEVATIONS.
3. MOUNT CENTERLINE OF EF-1 AT 11' 8" AFF. SEE
ARCHITECTURAL ELEVATIONS.
4. PROVIDE LINE VOLTAGE WIRED THERMOSTAT.
5. MOUNT 2' FROM CEILING USING Z-PURLIN MOUNTING
SYSTEM.
6. PROVIDE CO SENSOR CARTRIDGE AT 3' 6" ABOVE
FINISHED FLOOR.
7. PROVIDE NO2 SENSOR CARTRIDGE AT 1' 0" BELOW
FINISHED CEILING.
8. WALL MOUNTED GAS LEAK DETECTION CONTROLLER.
GENERAL NOTES:
1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH
MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS
TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED
FOR EQUIPMENT FURNISHED.
2. DIMENSIONS SHALL BE FIELD VERIFIED AND
COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER
DISCIPLINES INVOLVED. FIELD MODIFICATIONS SUCH AS
OFFSETS IN PIPING OR DUCTWORK DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE
PROVIDED AT NO ADDITIONAL COST.
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
3" MIN CLEARANCE EACH END
(TYP)
3" MIN WALL TO WALL SEPARATION
FOR PIPE < 4"
6" MIN WALL TO WALL
SEPARATION FOR PIPE 5" THRU 8"
LOAD BEARING PIPE CLAMP
(TYP)
STOP LOCK
ASSEMBLY IF REQUIRED BASED
ON MFR RECOMMENDATIONS (TYP)
CHANNEL FRAMING
NOTES:
1. SEE DRAWINGS FOR TYPE, SIZE, AND QUANTITY OF SUPPORTED PIPES.
2. ALL FRAMING AND PIPE SUPPORT MATERIALS SHALL 316 SST (UNISTRUT
OR EQUAL FOR EXTERIOR).
CONCRETE
WALL, THRENCH
OR SLAB
5/8" 316 SST
EXPANSION
ANCHOR,
COUNTERSUNK,
FLATHEAD (TYP)
INSULATION
(WHERE REQUIRED)
BACKUP MATERIAL
SEALANT
ALUMINUM JACKET WITH
FACTORY APPLIED MOISTURE
BARRIER. EXTEND 2" BOTH
SIDES & SECURE BOTH ENDS
WITH A BAND
SCHEDULE 40 STEEL OR
CAST-IRON PIPE SLEEVE
CUT FLUSH WITH WALL
MINIMUM 1/4" GAP
ALL AROUND PIPE
PROVIDE ESCUTCHEON
FOR EXPOSED PIPING.
OMIT INSIDE MECH RMS.
FOR GYP. BOARD WALLS
PROVIDE MIN. 16 GAUGE
GALV. STEEL SLEEVE W/
LOCK-TYPE LONGITUDINAL
SEAM
OMIT ALUMINUM JACKET IF
PIPING IS UNINSULATED
MASONRY WALL
AIRFLOW
AIRFLOW
INSULATED REFRIGERANT
SUCTION & LIQUID LINES.
OBSERVE
MANUFACTURER'S.
RECOMMENDED SIZE AND
LENGTH
CONCRETE
EQUIPMENT PAD.
EXTEND 6" BEYOND
THE DIMENSIONS OF
CONDENSING UNIT.
SECURE CONDENSING
UNIT USING HURRICANE
TIE DOWN STRAP.
24"
6"
6"
24"
PROVIDE TOPSOIL
ABOVE STONE WITH
FILTER FABRIC.
CONDENSATE
DRAIN
PROVIDE 30 MIL HDPE
GEOMEMBRANE
BETWEEN TOPSOIL
AND GROUNDCOVER
EXTENDING OUT 4"
PAST STONE.
WRAP STONE WITH
FILTER FABRIC ON ALL
SIDES.
FINE SAND
LIQUID
SUCTION
CONDENSATE
DRAIN
5-1/4" BRANCH
DUCT KNOCKOUT
(3 SIDES)
ELECTRICAL
KNOCKOUTS
O.A KNOCKOUTS
AT REAR OF UNIT
(2 PLACES)
THREADED STEEL HANGAR
RODS & VIBRATION HANGERS;
SUPPORT FROM BUILDING
STRUCTURE - TYP.
A*
B**
THREADED PLUG (TYP.)
UNION
FULL SIZE OF
DRAIN CONNECTION.
SLOPE TO FLOOR
DRAIN AT 1/4" PER
FOOT MINIMUM.
AIR HANDLING
UNIT DRAIN PAN
** - 1/2 OF UNIT TOTAL
STATIC PRESSURE
* - UNIT TOTAL
STATIC PRESSURE
THREADED SUPPORT
RODS
NOTES:
1. SUBMIT ANCHORING METHOD TO STRUCTURAL ENGINEER
FOR APPROVAL.
2. SEE SPECIFICATION FOR PAINT REQUIREMENTS ON
SUPPORTS.
INSULATION AS
SPECIFIED, TYPICAL
360° INSULATION SHIELD
SCHEDULE 40 PVC 12" LG MIN.
(1)360°
SCHEDULE 40 PVC
INSULATION SHIELDS
12' LONG
FIELD OR FACTORY
APPLIED PAINT REQUIRED
NUT & WASHER
TOP & BOTTOM,TYPICAL
TO STRUCTURE
*NOTE 1
TO STRUCTURE
(TYPICAL ALL HGRS)
*NOTE 1
TYPICAL
HANGER RODS
3/8" MININUM
CLEVIS TYPE HANGER
AS SPECIFIED
FACTORY PAINTED
GALVANIZED
U-BOLT OR CLAMP
ACCORDING TO
SPECIFICATION
NOTE:
MOUNT AND SECURE TO WALL
IN ACCORDANCE WITH MANUFACTURERS
INSTALLATION PROCEDURES. FAN SHALL BE
MOUNTED TO BE HIGH WIND RESISTANT.
DAMPER
REFER TO
SCHEDULE
FOR TYPE
EXTERIOR WALL
FASTENERS
MOUNTING PLATE
SEALANT OR CAULKING
SHOULD BE APPLIED IN THE
GROOVE FORMED BY THE
MOUNTING PLATE AND THE
WALL TO PREVENT MOISTURE
LEAKAGE INTO THE BUILDING.
WALL
OPENING
THE UNIT SHOULD BE
ALIGNED WITH THE
BREATHER TUBE
POINTING DOWN.
EXTERNAL
WIRING BY
OTHERS
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-501
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
M E
C H
A N
IC
A
L D
E T
A
IL
S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
SCALE: NTS
6 PIPE SUPPORT DETAIL
SCALE: NTS
5 WALL PIPE PENETRATION DETAIL
SCALE: NTS
2 CONDENSING UNIT DETAIL
SCALE: NTS
7 CONDENSATE DRYWELL DETAIL
SCALE: NTS
1 CEILING CASSETTE SYSTEM DETAIL
SCALE: NTS
3 AHU CONDENSATE DRAIN DETAIL
SCALE: NTS
4 MECHANICAL PIPE HANGER DETAIL
SCALE: NTS
8 WALL EXHAUST FAN DETAIL
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
COLLAR
CAULK ALL AROUND
NOTES:
1. FOR LOCATION AND SIZE OF THE
WALL OPENINGS, SEE PLANS.
2. LOUVER/DAMPER ASSEMBLIES TO
BE ASSEMBLED AT LOUVER
MANUFACTURER FACTORY.
3. EXTENDED SILL TO BE PROVIDED
BY LOUVER MANUFACTURER.
4. MOTOR ACTUATORS TO BE SIZED
AND INSTALLED BY LOUVER
MANUFACTURER.
5. INSTALLATION OF LOUVER TO BE
IN ACCORDANCE WITH LOUVER
MANUFACTURER'S
RECOMMENDATIONS.
1 1/2" THICK RIGID BOARD
INSULATION WITH VAPOR
BARRIER ALL AROUND
OUTSIDE WALL
MOTORIZED DAMPER
120V,1 PH, 60 HZ.
INTERLOCKED WITH
EXHAUST FAN
18 GA. GALVANIZED
STEEL COLLAR ON
FOUR SIDES. SECURED
TO WALL OPENING ON
ALL SIDES WITH
ANCHOR BOLTS.
LOUVER WITH BIRD SCREEN.
REFER TO ARCH. DRAWINGS
AND SPECIFICATION.
1/4" GALV. STEEL ANCHOR
BOLTS TWO ON EACH OF
THE FOUR SIDES.
24 GA. STAINLESS STEEL
EXTENDED SILL
OUTSIDEINSIDE
24 GA. STAINLESS STEEL
EXTENDED SILL
LOUVER WITH BIRD SCREEN.
REFER TO MECHANICAL
SCHEDULE.
CAULK ALL AROUND
OUTSIDE WALL
NOTES:
1. FOR LOCATION AND SIZE OF THE
WALL OPENINGS, SEE PLANS.
2. EXTENDED SILL TO BE PROVIDED
3. INSTALLATION OF LOUVER TO BE
IN ACCORDANCE WITH LOUVER
MANUFACTURER'S
4. LOUVER SHALL BE FLORIDA
PRODUCT APPROVED
OUTSIDE
INSIDE
STEEL ANGLE BY CONTRACTOR
BOTTOM VIEW
SIDE VIEW
DIAMETER
3.0
NOTES:
1. VERIFY ALL DIMENSIONS AND INSTALLATION REQUIREMENTS WITH
FAN SUPPLIER.
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-502
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
M E
C H
A N
IC
A
L D
E T
A
IL
S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
SCALE: NTS
1 LOUVER/DAMPER DETAIL
SCALE: NTS
2 LOUVER DETAIL
SCALE: NTS
3 HVLS FAN DETAIL
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-601
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
E X
IS
T
IN
G
P U
M P
B U
IL
D
IN
G
M E
C H
A N
IC
A
L S
C H
E D
U L
E S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
EXISTING PUMP BUILDING FAN SCHEDULE
MARK AREA SERVED LOCATION
FAN ELECTRICAL
MOUNTING TYPE
WEIGHT
(LBS)
MANUFACTURER MODEL NOTESAIRFLOW
(CFM)
ESP (IN-WC) FAN RPM WHEEL TYPE DRIVE TYPE
MOTOR
ENCLOSURE
HP MOTOR RPM VOLTS PHASE HZ MCA
MOCP
EB-EF-1 REST ROOM OUTDOOR 120 0.05 578 CENTRIFUGAL DIRECT TENV 1/10 1725 115 1 60 2 15 SIDEWALL MOUNTED 51 GREENHECK CUE-080-VG 1,2,3,4,5,6
EXISTING PUMP BUILDING LOUVER SCHEDULE
MARK AREA SERVED LOCATION
ASSOCIATED
EQUIPMENT
TYPE SERVICE
SIZE (IN) PERFORMANCE CRITERIA
MATERIAL MANUFACTURER MODEL NOTES
HEIGHT WIDTH DEPTH
AIRFLOW
(CFM)
VELOCITY
(FPM)
FREE AREA
(FT²)
PRESSURE DROP
(IN WG)
EB-L-1 OFFICE WALL MOUNTED DAHU-1 DRAINABLE INTAKE 16 16 6 80 140 0.57 0.003 ALUMINUM GREENHECK ESD-635X 1,2,3,4,5,6
NOTES:
1. ALL UNITS CURRENTLY LISTED WITH R-410A REFRIGERANT WILL BE SELECTED WITH NEXT GENERATION REFRIGERANT (R-454B OR EQUIVALENT) AT TIME OF BIDDING/CONSTRUCTION. THESE UNITS UTILIZING NEXT GENERATION REFRIGERANT WILL BE REQUIRED TO MEET THE PERFORMANCE AND CAPACITY AS INDICATED ON SCHEDULES. ADDITIONAL ACCESSORIES SUCH AS LEAK DETECTION SENSORS WILL ALSO BE PROVIDED TO MEET UPDATED SAFETY REQUIREMENTS.
2. PROVIDE SINGLE POINT POWER CONNECTION, GROUND FAULT PROTECTION, AND DISCONNECTS.
3. PROVIDE MOTOR WITH OVERLOAD PROTECTION AND DRIVE KITS.
4. PROVIDE COATING PER SECTION 230546 ON EXTERIOR CABINET AS WELL AS ALL INTERNAL COMPONENTS INCLUDING COILS, FINS, EQUIPMENT ETC.
5. PROVIDE WITH 7 DAY 2-STAGE COOLING PROGRAMMABLE THERMOSTAT
6. REFER TO CONTROL DRAWINGS FOR ADDITIONAL INFORMATION. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONTROL COMPONENTS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM.
7. BASIS OF DESIGN IS MITSUBISHI OR APPROVED EQUAL.
NOTES:
1. COORDINATE LOCATION AND FINISH WITH ARCHITECTURAL.
2. PROVIDE INTAKE LOUVERS WITH BIRD/INSECT SCREENS AND EXHAUST LOUVER WITH INSECT SCREEN.
3. PROVIDE 2 COATS OF 70% PVDF.
4. LOUVERS SHALL BE FLORIDA PRODUCT APPROVED.
5. LOUVERS SHALL BE ENHANCED AMCA 540 RATED.
6. BASIS OF DESIGN IS GREENHECK OR APPROVED EQUAL.
NOTES:
1. INCLUDE SOLID STATE SPEED CONTROL.
2. PROVIDE NEW FAN WITH HIGH WIND RATING PER MANUFACTURER AND VALID NOA'S.
3. PROVIDE SINGLE POINT POWER CONNECTION, MOTOR WITH OVERLOAD PROTECTION, GROUND FAULT PROTECTION, EXTERNAL WIRING PIGTAIL AND NEMA-4X DISCONNECT SWITCH.
4. PROVIDE FAN WITH ALUMINUM CONSTRUCTION, WALL GRILLE, GRAVITY BACKDRAFT DAMPER, STAINLESS STEEL FASTENERS, AND ALUMINUM BIRD SCREEN.
5. PROVIDE HI-PRO POLYESTER COATING ON EXTERIOR CABINET AS WELL AS ALL INTERNAL COMPONENTS.
6. BASIS OF DESIGN IS GREENHECK OR APPROVED EQUAL.
EXISTING PUMP BUILDING DUCTLESS SPLIT SYSTEM (HP) SCHEDULE
MARK AREA SERVED LOCATION TYPE
AIR HANDLING UNIT CONDENSING UNIT CONDENSING UNIT
MANUFACTURER INDOOR MODEL OUTDOOR MODEL NOTES
AIR FLOW COOLING HEAT PUMP HEATING
MARK LOCATION
COMPRESSOR
AMBIENT TEMP.
(°F)
SEER2
ELECTRICAL
SUPPLY AIR
(CFM)
OUTSIDE AIR
(CFM)
TYPE
E.A.T. (°F) CAPACITY (MBH) OUTPUT
(MBH)
DESIGN AMBIENT
(°F)
QTY STAGE REFRIG. VOLTS / PH / HZ MCA MOCP
DB WB TOTAL SENS.
EB-DAHU-1 OFFICE INDOOR CEILING CASSETTE 1200 80 DX 80 67 36.0 31.0 42.0 47 EB-HP-1 OUTDOOR 1 SINGLE R-410A 95 22 208-230 / 1 / 60 25 31 MITSUBISHI PLA-A36EA8 PUZ-A36NKA7 1,2,3,4,5,6,7
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:3
:3
A
M A u to d e s k D o c s /2
-0
-2
C o lli e r
C o B ri d g e C ra n e A d d
/M
-2
C
C B
C A
E n c lo s e d G a ra g e .r v t
200-08486-24001
FFA
RZN
KPK
M-602
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
P A
R K
IN
G
C A
N O
P Y
M E
C H
A N
IC
A
L S
C H
E D
U L
E S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
PARKING CANOPY (PC) LOUVER SCHEDULE
MARK AREA SERVED LOCATION
ASSOCIATED
EQUIPMENT
TYPE SERVICE
SIZE (IN) PERFORMANCE CRITERIA
MATERIAL MANUFACTURER MODEL NOTES
HEIGHT WIDTH DEPTH
AIRFLOW
(CFM)
VELOCITY
(FPM)
FREE AREA
(FT²)
PRESSURE DROP
(IN WG)
PC-L-1 BAY 1 ENCLOSED WALL MOUNTED EF-1 DRAINABLE INTAKE 24 26 6 920 462 1.99 0.032 ALUMINUM GREENHECK ESD-635X 1,2,3,4,5,6
PC-L-2 BAY 1 ENCLOSED WALL MOUNTED EF-1 DRAINABLE INTAKE 24 26 6 920 462 1.99 0.032 ALUMINUM GREENHECK ESD-635X 1,2,3,4,5,6
PC-L-3 BAY 1 ENCLOSED WALL MOUNTED EF-1 DRAINABLE INTAKE 24 26 6 920 462 1.99 0.032 ALUMINUM GREENHECK ESD-635X 1,2,3,4,5,6
PARKING CANOPY (PC) FAN SCHEDULE
MARK AREA SERVED LOCATION
FAN ELECTRICAL
MOUNTING TYPE
WEIGHT
(LBS)
MANUFACTURER MODEL NOTESAIRFLOW
(CFM)
ESP (IN-WC) FAN RPM WHEEL TYPE DRIVE TYPE
MOTOR
ENCLOSURE
HP MOTOR RPM VOLTS PHASE HZ MCA
MOCP
CONTROL
PC-EF-1 BAY 1 ENCLOSED OUTDOOR 2760 0.5 916 CENTRIFUGAL DIRECT TENV 1 1000 208 1 60 9 20 - WALL MOUNTED 115 GREENHECK CUE-180-VG 1,2,3,4,5,6
PARKING CANOPY (PC) HIGH VOLUME LOW SPEED FAN SCHEDULE
MARK AREA SERVED LOCATION
FAN ELECTRICAL
MOUNTING TYPE
WEIGHT
(LBS.)
MANUFACTURER MODEL NOTES
CFM FAN RPM DRIVE TYPE MOTOR ENCLOSURE MOTOR HP VOLTS / PH / HZ FLA
PC-HVLS-1 BAY 1 ENCLOSED CEILING 14,517 32 DIRECT IP54 0.67 208 / 3 / 60 7.0 CEILING 178 GREENHECK DC-6-12 1,2,3,4,5,6
PC-HVLS-2 BAY 1 ENCLOSED CEILING 14,517 32 DIRECT IP54 0.67 208 / 3 / 60 7.0 CEILING 178 GREENHECK DC-6-12 1,2,3,4,5,6
NOTES:
1. COORDINATE LOCATION AND FINISH WITH ARCHITECTURAL.
2. PROVIDE INTAKE LOUVERS WITH BIRD/INSECT SCREENS AND EXHAUST LOUVER WITH INSECT SCREEN.
3. PROVIDE 2 COATS OF 70% PVDF.
4. BASIS OF DESIGN IS GREENHECK OR APPROVED EQUAL.
5. LOUVERS SHALL BE FLORIDA PRODUCT APPROVED.
6. LOUVERS SHALL BE ENHANCED AMCA 540 RATED.
NOTES:
1. INCLUDE VARI GREEN 2-SPEED WITH INTEGRAL 85-277V TO 24VDC TRANFORMER CONTROL.
2. PROVIDE NEW FAN WITH HIGH WIND RATING PER MANUFACTURER AND VALID NOA'S.
3. PROVIDE SINGLE POINT POWER CONNECTION, MOTOR WITH OVERLOAD PROTECTION, GROUND FAULT PROTECTION, EXTERNAL WIRING PIGTAIL AND NEMA-4X DISCONNECT SWITCH.
4. PROVIDE FAN WITH ALUMINUM CONSTRUCTION, WALL GRILLE, GRAVITY BACKDRAFT DAMPER, STAINLESS STEEL FASTENERS, AND ALUMINUM BIRD SCREEN.
5. PROVIDE HI-PRO POLYESTER COATING ON EXTERIOR CABINET AS WELL AS ALL INTERNAL COMPONENTS.
6. BASIS OF DESIGN IS GREENHECK OR APPROVED EQUAL.
NOTES:
1. PROVIDE WITH EXRTUDED ALUMINUM AIRFOIL KIT.
2. PROVIDE WITH Z-PURLIN MOUNTING KIT.
3. PROVIDE SINGLE POINT POWER CONNECTION, MOTOR WITH OVERLOAD PROTECTION, GROUND FAULT PROTECTION, EXTERNAL WIRING PIGTAIL AND NEMA-4X DISCONNECT SWITCH.
4. PROVIDE FAN WITH ALUMINUM CONSTRUCTION.
5. PROVIDE HI-PRO POLYESTER COATING ON EXTERIOR CABINET AS WELL AS ALL INTERNAL COMPONENTS.
6. BASIS OF DESIGN IS GREENHECK OR APPROVED EQUAL.
PARKING CANOPY (PC) GAS LEAK DETECTION SYSTEM SCHEDULE
MARK DESCRIPTION LOCATION POWER REQUIRED OUTPUT RATING MANUFACTURER MODEL NOTES
PC-GLD-1 CO SENSOR BAY 1 ENCLOSED 24 VAC/VDC 5A @ 250 VAC / 30 VDC HONEYWELL E3SM-E3SCO 1
PC-GLD-2 NO2 SENSOR BAY 1 ENCLOSED 24 VAC/VDC 5A @ 250 VAC / 30 VDC HONEYWELL E3SM-E3NO2 1
PC-GLD-C-1 CONTROLLER BAY 1 ENCLOSED 24-38 VDC / 17-27 VAC 5A @ 250 VAC / 30 VDC HONEYWELL 301-C-DLC 1,2
NOTES:
1. BASIS OF DESIGN IS HONEYWELL OR APPROVED EQUAL.
2. PROVIDE 24 VOLT HORNS AND STROBES. CONTROLLER RELAY TO ACTIVATE HORN/STROBE.
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y ariable
SEQUENCE OF OPERATION: SPLIT SYSTEM WITH OUTSIDE AIR DAMPER
THIS SEQUENCE OF OPERATIONS DESCRIBES THE “SYSTEM-LEVEL” CONTROL FUNCTIONS OF A SPLIT SYSTEM, WHICH INCLUDES COORDINATING THE OPERATION OF THE OUTDOOR UNIT WITH TERMINAL UNITS DURING THE VARIOUS OPERATING MODES. THE “EQUIPMENT-LEVEL” CONTROL FUNCTIONS OF THE OUTDOOR UNIT AND THE TERMINAL UNITS ARE CONTAINED IN THEIR RESPECTIVE SEQUENCE OF
OPERATIONS DOCUMENTS.
SPLIT SYSTEM HEAT PUMP:
THE SYSTEM SHALL PROVIDE ASYNCHRONOUS HEATING OR COOLING TO THE ZONE SERVED BY THE SPLIT SYSTEM. THE SYSTEM IS OFF WHEN THE OUTDOOR UNIT IS OFF AND ALL TERMINAL UNITS ARE OFF. WHEN ANY TERMINAL UNIT TRANSITIONS TO THE ON STATE, THE SYSTEM SHALL TRANSITION TO THE ON STATE AND THE OUTDOOR UNIT SHALL TRANSITION TO EITHER THE COOL STATE OR HEAT STATE, DEPENDING ON
THE CALL TO HEAT OR COOL FROM THE TERMINAL UNITS.
WHEN THE OUTDOOR UNIT IS IN COOL STATE, IT SUPPLIES SUB-COOLED LIQUID REFRIGERANT TO THE TERMINAL UNIT. WHEN THE OUTDOOR UNIT IS IN HEAT STATE, IT SUPPLIES SUPERHEATED GAS
REFRIGERANT TO THE TERMINAL UNIT.
THE TERMINAL UNIT SHALL COMMUNICATE TO THE OUTDOOR UNIT THE NEED FOR COOLING OR HEATING.
WHEN THE STATE OF THE SPLIT SYSTEM IS ON AND THE INDOOR UNIT TRANSITION TO THE OFF STATE, THE OUTDOOR UNIT SHALL TRANSITION TO THE SHUTDOWN STATE. ENTERING THIS STATE SHALL CAUSE THE OUTDOOR UNIT TO PERFORM THE NECESSARY FUNCTIONS REQUIRED TO PREPARE THE REFRIGERANT
SYSTEM TO STOP OPERATION. ONCE THE REFRIGERANT SYSTEM HAS STOPPED OPERATION, THE
OUTDOOR UNIT SHALL TRANSITION TO THE OFF STATE AND THE SYSTEM STATE SHALL TRANSITION TO THE
OFF STATE.
SPLIT SYSTEM CONTROL (NO BAS):
THE SYSTEM CONTROL DEVICE IS A COMPUTER BASED APPLICATION THAT PROVIDES A METHOD FOR A BUILDING OPERATOR TO MONITOR AND CONTROL THE OPERATION OF ONE OR MORE SYSTEMS THAT
SERVE A BUILDING.
THE SYSTEM CONTROL DEVICE SHALL HAVE THE ABILITY TO MONITOR AND CONTROL SPLIT SYSTEM FUNCTIONS SUCH AS, BUT NOT LIMITED TO, TIME SCHEDULE BASED OPERATION, RECORDING OF OPERATING PARAMETER DATA VALUES AS A TIME OR SAMPLE SERIES, AND CONTROL INDIVIDUAL SPLIT
TERMINAL UNIT.
OUTSIDE AIR DAMPER:
THE OUTSIDE AIR DAMPER SHALL OPEN ANYTIME THE UNITS CALLED TO RUN AND THE CURRENT SENSOR
RELAY INDICATES THE COMPRESSOR IS OPERATING.
SPLIT SYSTEM CONTROLLER
SPLIT SYSTEM - CENTRAL CONTROLLER SYSTEM
THE CONTROL OF THE SYSTEM OF THIS TYPE SHALL CONSIST OF CENTRAL CONTROL
DEVICE DESIGNED WITH THE INTENT TO PROVIDE A SINGLE LOCATION FOR AN OPERATOR
TO MONITOR AND CONTROL THE INDOOR UNIT AND AUXILIARY SPLIT SYSTEM
COMPONENTS.
THE CENTRAL CONTROLLER SHALL BE ABLE TO CONTROL THE FOLLOWING INDOOR UNIT
FUNCTIONS:
ON/OFF OF THE UNIT
SPACE TEMPERATURE SETPOINT
HEAT/COOL/AUTO/DRY OPERATION MODE
FAN SPEED SETTING
AIRFLOW DIRECTION
THE CENTRAL CONTROLLER SHALL DISPLAY THE INDOOR UNIT STATUS INFORMATION:
ROOM TEMPERATURE (DEG-F OR DEG-C)
SPACE TEMPERATURE SETPOINT
ON/OFF STATUS OF THE UNIT
HEAT/COOL/AUTO/DRY OPERATION MODE
ERROR CODE
THE CENTRAL CONTROLLER SHALL BE ABLE TO SCHEDULE ON/OFF INDOOR UNIT
OPERATION:
DAILY
WEEKLY
ANNUALLY
THE CENTRAL CONTROLLER SHALL COLLECT, STORE, AND DISPLAY HISTORICAL DATA IN A
GRAPHICAL MANNER FOR THE FOLLOWING DATA:
FAN OPERATION TIME
SET TEMPERATURE
ROOM TEMPERATURE
CONTROL SYSTEM START-UP SHALL BE PERFORMED BY THE MANUFACTURER OR BY A
FACTORY CERTIFIED REPRESENTATIVE. REPRESENTATIVE SHALL HAVE A THOROUGH
UNDERSTANDING OF SYSTEM CONFIGURATION AND OPERATION. THE REPRESENTATIVE
SHALL PROVIDE PROOF OF CERTIFICATION.
CMP1 (BO)
REVERSING VALVE (BO)
SA
RS & RL
HP-1
RA
CURRENT SENSOR RELAY (BO)
ZONE TEMP (AI)
ZONE SETPOINT ADJUST (AI)
OSA
OAD-S (BO)
OAD-P (BI)
SAF (BO)
FLOW DIAGRAM: DAHU/HP-1
RUN CONDITIONS:
FAN WILL OPERATE WHEN LIGHTS ARE ON. WHEN LIGHTS ARE OFF, FAN SHALL BE OFF. SEE
OCCUPANCY SENSOR ON PLANS.
CONTRACTOR SHALL PROVIDE ALL NECESSARY WIRING AND CONDUIT, DEVICES,
CONTROLLERS, INTERLOCKS, AND SWITCHES TO MEET THE INTENT OF THESE SEQUENCES
AND THE CONTROL DIAGRAM(S) SHOWN. CONTRACTOR SHALL COORDINATE FOR A FULLY
FUNCTIONAL SYSTEM.
RESTROOM EXHAUST FAN SEQUENCE OF OPERATIONS
STR
E X
H A
U S
T A
IR
E X
H A
U S
T A
IR
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:4
:3
P M
A u to d e s k D o c s /2
-0
-2
C o lli e r
C o
B ri d g e C ra n e A d d /M
-2
C
C B
C A
R
W B
.r v t
200-08486-24001
FFA
RZN
KPK
M-901
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
E X
IS
T
IN
G
P U
M P
B U
IL
D
IN
G
M E
C H
A N
IC
A
L C
O N
T R
O L
S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E
S T
E R
O
F L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
SCALE: NTS
1 EXISTING PUMP BUILDING OFFICE MINISPLIT CONTROLS
SCALE: NTS
2 EXISTING PUMP BUILDING EXHAUST FAN CONTROLS
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
EF
EF-1
M
BI - EXHAUST FAN STATUS
T
OSA
INTAKE
LOUVER
T
AI - ZONE TEMP AI - ZONE SETPOINT ADJUST
THERMOSTAT
SEQUENCE SUMMARY:
THE STORAGE WAREHOUSE WILL RECEIVE SUMMER VENTILATION FROM EXHAUST FAN EF-1. THE EXHAUST FANS SHALL BE CONTROLLED BY SPACE THERMOSTATS. INITIAL SETTINGS SHALL
BE 85 DEG F (ADJ.)
CARBON MONOXIDE FIRST ALARM TO BE SET AT 25 PPM THAT SHALL ACTIVATE EXHAUST FANS TO HIGH SPEED. FANS SHALL CONTINUE TO RUN UNTIL LEVELS DROP BELOW 25 PPM.
NITROGEN DIOXIDE FIRST ALARM TO BE SET AT 0.7 PPM THAT SHALL ACTIVATE EXHAUST FANS TO HIGH SPEED. FANS SHALL CONTINUE TO RUN UNTIL LEVELS DROP BELOW 0.7 PPM.
STAND ALONE EXHAUST FAN WITH HARDWIRED CONTROL: THE FAN AND ITS ASSOCIATED EQUIPMENT WILL OPERATE IN STAND-ALONE MODE. ALL CONTROL FUNCTIONS FOR THE FAN AND
ITS ASSOCIATED EQUIPMENT WILL BE PERFORMED THROUGH INTERLOCK
WIRING
CONTRACTOR SHALL PROVIDE ALL NECESSARY WIRING AND CONDUIT, DEVICES, CONTROLLERS, INTERLOCKS, AND SWITCHES AS NECESSARY TO MEET THE INTENT OF THESE SEQUENCES AND THE CONTROL DIAGRAMS SHOWN. CONTRACTOR SHALL COORDINATE FOR A FULLY FUNCTIONAL SYSTEM.
BDD
CO
NO2
24 VDC HORN/STROBE
NITROGEN DIXIODE
SENSOR
CARBON MONOXIDE
SENSOR
CONTROLLER
INPUT POWERTO FAN RELAY
TO FIRE ALARM
AI - LVL AI - LVL
BUILDING AUTOMATION SYSTEM INTERFACE:
HVLS FANS WILL OPERATED IN STAND-ALONE MODE. THE FANS WILL NOT BE CONTROLLED
OR MONITORED BY A BUILDING AUTOMATION SYSTEM (BAS).
RUN CONDITIONS:
FANS WILL OPERATE TOGETHER ON INPUT FROM LOCAL CONTROL PANEL. CONTROLLER
SHALL ALLOW FOR THE FOLLOWING OPERATIONS:
A. POWER ON / OFF
B. ROTATION DIRECTION
C. SPEED
SMOKE DETECTOR SHUTDOWN:
THE UNIT SHALL SHUT DOWN IN RESPONSE TO A SIGNAL FROM THE SMOKE DETECTOR
INDICATING THE PRESENCE OF SMOKE. SMOKE DETECTORS SHALL BE INTERLOCKED TO
THE UNIT THROUGH THE DRY CONTACTS OF THE SMOKE DETECTORS. MANUAL RESET OF
THE SMOKE DETECTORS SHALL BE REQUIRED TO RESTART THE UNIT.
CONTRACTOR SHALL PROVIDE ALL NECESSARY WIRING AND CONDUIT, DEVICES,
CONTROLLERS, INTERLOCKS, AND SWITCHES TO MEET THE INTENT OF THESE SEQUENCES
AND THE CONTROL DIAGRAM(S) SHOWN. CONTRACTOR SHALL COORDINATE FOR A FULLY
FUNCTIONAL SYSTEM.
HIGH VOLUME LOW SPEED FAN
SEQUENCE OF OPERATIONS (HVLS-1, 2, 3)
CP
VFD VFD
HVLS-2 HVLS-3
CP
VFD
HVLS-1
CHKD:
DRWN:
PROJ:
DESN:
w w w .t e tr a te c h
.c o m
A
B
C
D
E
F
2 3 4 5 6 7
Bar measures 1 inch, otherwise drawing is not to scale
C o p y ri g h t:
T e tr a T e c h
/9
/2
:3
:3
A
M A u to d e s k D o c s /2
-0
-2
C o lli e r
C o B ri d g e C ra n e A d d
/M
-2
C
C B
C A
E n c lo s e d G a ra g e .r v t
200-08486-24001
FFA
RZN
KPK
M-902
C O
L L
IE
R C
O U
N T
Y P
U B
L
IC
U T
IL
IT
IE
S
R A
W W
A T
E R
B O
O S
T E
R P
U M
P S
T A
T
IO
N
IM
P R
O V
E M
E N
T S
P A
R K
IN
G
C A
N O
P Y
M E
C H
A N
IC
A
L C
O N
T R
O L
S
E N
G
IN
E E
R
IN
G B
U S
IN
E
S S
N O
C
H E
V R
O L E
T W
A Y
S T
E
E S
T E
R O
F
L O
R
ID
A
100% SUBMITTAL
P H
(2
-1
SCALE: NTS
1 PARKING CANOPY EXHAUST FAN CONTROLS
SCALE: NONE
2 PARKING CANOPY HVLS FAN CONTROLS
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N B
Y
| Sheets |
| M-001 - MECHANICAL ABBREVIATIONS, LEGENDS, AND NOTES |
| M-002 - MECHANICAL GENERAL NOTES |
| M-101 - EXISTING PUMP BUILDING MECHANICAL DEMOLITION PLAN & SECTIONS |
| M-201 - EXISTING PUMP BUILDING MECHANICAL ZONING PLAN |
| M-202 - EXISTING PUMP BUILDING MECHANICAL MODIFICATION PLAN |
| M-203 - PARKING CANOPY MECHANICAL PLAN |
| M-501 - MECHANICAL DETAILS |
| M-502 - MECHANICAL DETAILS |
| M-601 - EXISTING PUMP BUILDING MECHANICAL SCHEDULES |
| M-602 - PARKING CANOPY MECHANICAL SCHEDULES |
| M-901 - EXISTING PUMP BUILDING MECHANICAL CONTROLS |
| M-902 - PARKING CANOPY MECHANICAL CONTROLS |
| 2025-04-09T16:00:35-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:00:37-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:00:42-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:00:49-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:01:00-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:01:12-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:01:27-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:01:45-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:02:06-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:02:28-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:02:53-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
| 2025-04-09T16:03:22-0400 | |
| Faisal Al Twal | |
| I am the author of this document. |
File details come from the government source that posted it. Updated .