This document is a set of construction plans for the Giese Road and Kautz Road Reconstruction Project (Project Number 3-2-223) at Fermi National Accelerator Laboratory in Batavia, Illinois, prepared by Consulting Engineers at 1431 Opus Place, Downers Grove, Illinois. The project involves the reconstruction of Giese Road from the Schwahn Road intersection to Kautz Road, and Kautz Road from the Giese Road intersection to Indian Creek Road, along with the replacement of existing culverts beneath Giese Road for drainage improvement.
The construction plans include detailed site information, roadway alignment tables with directional bearings, existing conditions and alignment plans, site access and traffic control details, demolition plans for both roadways, drainage and grading specifications, erosion control plans, cross-sectional details, and construction details sheets. Key project elements include three culvert installations with flared end sections and riprap protection, pavement reconstruction with asphalt and aggregate shoulders, guardrail installations, sign panel assemblies, and comprehensive erosion control measures including silt fencing and temporary seeding. The project requires coordination with Fermilab personnel to maintain access to the MINOS facility and adherence to on-site construction routing and traffic management protocols. Plans were issued for bid on May 30, 2025, with Addendum 1 issued on April 7, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Consulting Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
Fermi National Accelerator Laboratory
2026-04-07
ADDENDUM 1
GIESE ROAD RECONSTRUCTION - PROJECT NUMBER 3-2-223
Giese Road and Kautz Road Batavia, Illinois 60510-5011
FERMILAB CAMPUS LOCATION AND VICINITY MAP
PROJECT
DESCRIPTION
60510
BATAVIA, ILLINOIS
DUPAGE COUNTY
FERMI NATIONAL ACCELERATOR LABORATORY
BUILDING
ADDRESS
PROJECT INFORMATION
THE PROJECT INVOLVES THE RECONSTRUCTION OF GIESE ROAD FROM THE SCHWAHN
INTERSECTION TO KAUTZ ROAD, AND OF KAUTZ ROAD FROM THE GIESE ROAD
INTERSECTION TO INDIAN CREEK ROAD, ALONG WITH THE REPLACEMENT OF EXISTING
CULVERTS BENEATH GIESE ROAD FOR DRAINAGE IMPROVEMENT.
PROJECT LOCATION
ALIGNMENT TABLE
LINE # LENGTH
530.83
259.19
26.57
146.69
38.17
333.42
DIRECTION
N53° 38' 44.25"E
N54° 12' 34.44"E
N40° 56' 40.68"E
S38° 32' 02.08"E
S56° 58' 26.22"E
N89° 57' 01.16"E
START STATION/
PI STATION
0+00.00
5+30.83
9+17.36
100+00.00
102+75.42
104+72.34
START N/E
N: 97972.86 E: 98637.23
N: 98287.52 E: 99064.74
N: 98524.81 E: 99368.78
N: 98441.73 E: 99278.60
N: 98240.80 E: 99464.87
N: 98175.57 E: 99646.99
END STATION/
CURVE RADIUS
5+30.83
7+90.02
9+43.93
101+46.69
103+13.59
108+05.77
END N/E
N: 98287.52 E: 99064.74
N: 98439.10 E: 99274.99
N: 98544.88 E: 99386.19
N: 98326.98 E: 99369.98
N: 98220.00 E: 99496.87
N: 98175.86 E: 99980.42
127.33
128.74
158.75
CENTER
STA. 8+53.98
CENTER
STA. 102+11.62
CENTER
STA. 103+95.25
N: 98439.10 E: 99274.99
N: 98326.98 E: 99369.98
N: 98220.00 E: 99496.87
R = 550.00
R = 400.00
R = 275.00
CENTER
N: 98524.81 E: 99368.78
CENTER
N: 98240.80 E: 99464.87
CENTER
N: 98175.57 E: 99646.99
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/6 /20
:02 A
M
EXISTING CONDITIONS
ALIGNMENT PLAN
C-3 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SCALE IN FEET
50' 100'
SC
H
W
AH
N R
D
KA
U
TZ
R
O
AD
GIESE ROAD
KAUTZ ROAD
GIESE ROAD
EXISTING WETLAND EXISTING WETLAND
EPHEMERAL NON-JURISDICTIONAL STREAM
FEDERALLY JURISDICTIONAL STREAM
FEDERALLY JURISDICTIONAL STREAM
BENCHMARKS
SOURCE BENCHMARK: (FERMILAB MONUMENT BM407)
MAG NAIL IN PAVEMENT OF IERC PARKING LOT.
NORTHING: 100,896.97
EASTING: 99,968.03
ELEVATION = 747.38 (NAVD88)
SITE BENCHMARK #1:
FERMILAB MONUMENT 190910 ON BOOSTER ROAD
APPROXIMATELY 800 FEET NORTHEASTERLY OF SITE.
NORTHING: 99090.23
EASTING: 99766.97
ELEVATION = 745.77 (NAVD88)
NOTES:
1. SURVEY COMPLETED BY MACKIE CONSULTANTS, LLC IS
BASED ON FIELD WORK COMPLETED ON 03-20-25.
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/6 /20
:02 A
M
SITE
ACCESS
PLAN
C-4 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
AREA
ROAD
C
HWY. 56 BUTTERFIELD RD.
INDUSTRIAL
MAIN
TO
IN
TE
R
ST
AT
E I-8
FA
R N
SW
O
R
TH
KAUTZ RD.
CONSTRUCTION ENTRANCE
INJECTOR
MAIN
SUBSTATION
KA
U
TZ
R
D
KAUTZ RD.
RING RD.
IS REQUIRED TO ENTER
NOTE: APPROPRIATE I.D.
WILSON ST. ENTRANCE
THIS GATE
PINE ST. ENTRANCE
(NO TRUCKS)
PROJECT AREA
PINE ST. (OUT)
PINE ST. (IN)
ROAD
A
-2
ROAD
A -1
HOLTER RD
CDF
FE
LD
O
TT
R D
BATAVIA RD.
RECEIVING
SITE
TO ENTER THIS GATE
FA
RM R
D
CLOSED
6 AM TO 6 PM
6 AM TO 6 PM
6 AM TO 5 PM
LEGEND
SITE BOUNDARY LINES
ON SITE CONSTRUCTION ROUTES
SW
ENSON
BATAVIA RD
KAUTZ RD
WILSON ST
PINE ST
HOURS
(NO ACCESS)
EOLA RD.
ENTRANCE
TO RT. 59
BATAVIA RD.
EO
LA
R D
GCC
ROAD D
FERMILAB
VILLAGE
(LOAD LIMIT-6 TONS)
BATAVIA RD.
ENTRANCE
ROAD E
0 500'
SCALE IN FEET
1000'
NOTE: APPROPRIATE
I.D. IS REQUIRED
CONTRACTOR STAGING AREA
CONSTRUCTION TRAFFIC
EXCESS MATERIAL STOCKPILE
EXCESS MATERIAL STOCKPILE
NOTES
1. CONTACT THE FERMI CONSTRUCTION COORDINATOR (FCC) FOR
LOCATION OF BORROW PIT.
2. ACCESS TO THE MINOS FACILITIES AT THE INTERSECTION OF
SCHWAHN AND GIESE ROAD MUST ALWAYS BE MAINTAINED FOR
REGULAR ACTIVITIES AND EMERGENCIES.
ONLY
ONLY
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/6 /20
:03 A
M
MAINTENANCE OF TRAFFIC
STAGE 1
C-5 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SC
H
W
AH
N R
D
KA
U
TZ
R
O
AD
GIESE ROAD
KAUTZ ROAD
GIESE ROAD
LEGEND
DIRECTION OF TRAFFIC
WORK ZONE
TYPE III BARRICADE
DRUMS
TEMPORARY INFORMATION SIGNING
KEY NOTES
TYPE III BARRICADE WITH R11-2 SIGN
TYPE III BARRICADE WITH R11-4 SIGN
TYPE III BARRICADE
DRUMS @ 25' SPACING
NOTES
1. SEE SHEET C-20 FOR TRAFFIC CONTROL STANDARD DETAILS.
2. BARRICADE TO BE PLACED AT UPSTREAM INTERSECTION.
3. THE INTERSECTION OF GIESE ROAD AND SCHWAHN ROAD SHALL
BE COMPLETED IN SUB-STAGES TO PROVIDE ACCESS TO THE
MINOS FACILITY AT ALL TIMES.
NOT USED ON THIS SHEET
2 1
SEE NOTE 2
SEE NOTE 2
R3-5L 30" X 36"
STA 7+85.75'
OFFSET: -16.48'
R3-5R 30" X 36"
STA 100+10.48'
OFFSET: -23.76
SCALE IN FEET
50' 100'
SEE NOTE 3
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/6 /20
3:
P
M
DEMOLITION
PLAN - GIESE ROAD
C-8 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SCALE IN FEET
30' 60'
SEE SHEET C-9
GENERAL DEMOLITION NOTES:
1. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS
SHALL BE DISPOSED OF, UNLESS OTHERWISE NOTED BY FERMI
CONSTRUCTION MANAGER.
2. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE
REPAIRED OR REMOVED AND REPLACED AT NO ADDITIONAL COST TO
OWNER.
3. SUBCONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND PAVEMENT
REMOVAL WITH PROPOSED PAVEMENT AND UTILITY LAYOUTS AND
JOINTING PLANS.
4. EXISTING PAVEMENT EDGES SHALL BE SAWCUT FULL DEPTH AROUND
PERIMETER OF PAVEMENT TO BE REMOVED TO PROVIDE CLEAN EDGE FOR
CONSTRUCTION OF PROPOSED PAVEMENT
5. SUBCONTRACTOR SHALL PRESERVE EXISTING TREES AND VEGETATION
WHENEVER PRACTICABLE. SUBCONTRACTOR SHALL TAKE NECESSARY
PRECAUTIONS TO PROTECT ROOT SYSTEMS OF SHRUBS, PLANTS AND
TREES ALONG THE AREA OF EXCAVATION.
6. EXISTING VEGETATION AND FACILITIES WHICH ARE NOT INDICATED TO BE
REMOVED SHALL BE PROTECTED FROM DEMOLITION OR OTHER
CONSTRUCTION ACTIVITIES.
7. STOCKPILE AND REUSE EXISTING AGGREGATE REMOVAL FOR USE EITHER
AS CA-6 FOR PAVEMENT BASE OR AGGREGATE SHOULDER CONSTRUCTION
AS LONG AS MEETS GRADATION AND COMPACTION.
8. SEE EROSION CONTROL PLAN FOR PROTECTION OF THE EXISTING
WETLAND AND STREAM.
9. THE WORK ASSOCIATED WITH PIPE CULVERTS TO BE CLEANED SHALL BE
PERFORMED IN A NON-DESTRUCTIVE MANNER, THE AREA ADJACENT TO
THE EXISTING CULVERT AND END SECTIONS SHALL NOT BE DISTURBED
DURING THE CLEANING OPERATION.
LEGEND
LINEAR REMOVAL
PAVEMENT REMOVAL
REMOVE ITEM
KEY NOTES
GUARDRAIL REMOVAL
STORM SEWER REMOVAL, 36"
STORM SEWER REMOVAL, 12"
FLARED END SECTION REMOVAL
SC
H
W
AH
N R
D
KA
U
TZ
R
O
AD
GIESE ROAD
GIESE ROAD
REMOVE SIGN PANEL ASSEMBLY
TREE PROTECTION
PROTECT EXISTING SIGN
NOT USED ON THIS SHEET
ENVIRONMENTAL IMPACTS
PROTECT EXISTING WETLAND
SEE NOTE 8
PROTECT EXISTING STREAM
STREAM IMPACT = 0.0130 AC
PROTECT EXISTING STREAM
LIMITS OF DISTURBANCE
PIPE CULVERTS TO BE CLEANED
MASONRY REMOVAL9
PIPE CULVERTS TO BE CLEANED8
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/6 /20
9:
A
M
DEMOLITION
PLAN - KAUTZ ROAD
C-9 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SCALE IN FEET
30' 60'
SEE SHEET C-8
GENERAL DEMOLITION NOTES:
1. SEE SHEET C-8 FOR NOTES.
LEGEND
KEY NOTES
GUARDRAIL REMOVAL
STORM SEWER REMOVAL, 36"
STORM SEWER REMOVAL, 12"
FLARED END SECTION REMOVAL
GIESE ROAD BASELINE
KAUTZ ROAD
REMOVE SIGN PANEL ASSEMBLY
TREE PROTECTION
PROTECT EXISTING SIGN
LINEAR REMOVAL
PAVEMENT REMOVAL
REMOVE ITEM
ENVIRONMENTAL IMPACTS
LIMITS OF DISTURBANCE
PIPE CULVERTS TO BE CLEANED
NOT USED ON THIS SHEET
MASONRY REMOVAL9
PIPE CULVERTS TO BE CLEANED8
4 5
2'
2'
12' 12' 2' 2'
POINT TABLE
POINT
ALIGNMENT
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
KAUTZ ROAD
GIESE ROAD
STATION
0+09.66
0+14.19
0+33.22
0+30.68
0+52.23
1+12.08
6+35.41
5+93.49
6+03.49
6+03.56
6+27.72
6+27.69
6+37.68
6+53.03
8+48.21
8+64.39
8+64.39
8+52.63
100+58.11
7+28.03
OFFSET
-7.13
-7.34
-28.70
-65.21
-66.78
-11.00
-13.33
-11.00
-20.69
-23.06
-22.31
-21.31
-11.00
-15.00
-11.00
-8.85
8.92
9.00
-12.00
-15.00
POINT TABLE
POINT
ALIGNMENT
GIESE ROAD
KAUTZ ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
GIESE ROAD
STATION
7+48.03
100+54.30
7+39.15
5+98.55
2+05.50
1+66.54
1+67.45
1+42.64
1+38.12
0+75.99
0+30.34
0+09.66
6+18.55
6+93.55
7+13.55
OFFSET
-13.00
12.00
11.00
13.00
11.00
60.09
63.98
71.60
56.91
11.00
11.00
7.38
15.00
15.00
13.00
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/5 /20
8:
P
M
ROADWAY
PLAN - GIESE ROAD
C-11 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SCALE IN FEET
30' 60'
SEE SHEET C-12
LEGEND
SIGN PANEL WITH METAL POSTS - TYPE A
KEY NOTES
ASPHALT PAVEMENT
AGGREGATE SHOULDER
GUARDRAIL
NOT USED ON THIS SHEET
SC
H
W
AH
N R
D
KA
U
TZ
R
O
AD
GIESE ROAD
GIESE ROAD
KA
U
TZ
R
O
AD
1 2
R60'
R20'
R65' R40'
R46' R50'
R10'
R10'
W1-7 48" X 24"
STA 8+09.98
OFFSET: -18.81
TOPSOIL FURNISH AND PLACE, 6''
SEEDING, CLASS 2A
NITROGEN FERTILIZER NUTRIENT
POTASSIUM FERTILIZER NUTRIENT
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/5 /20
8:
P
M
DRAINAGE & GRADING
PLAN - GIESE ROAD
C-14 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SCALE IN FEET
30' 60'
SEE SHEET C-15
KEY NOTES
PRECAST REINFORCED CONCRETE FLARED END SECTIONS,
EQUIVALENT ROUND-SIZE 48"
PIPE CULVERTS, CLASS A, TYPE 1
EQUIVALENT ROUND-SIZE 48"
RIPRAP WITH FILTER FABRIC
NOT USED ON THIS SHEET
LEGEND
RIPRAP WITH FILTER FABRIC
FES INV: 736.31
STA 6+61.66
OFFSET: -16.59'
FES INV: 736.31
STA 6+69.55
OFFSET: -17.17'
FES INV: 736.31
STA 6+77.45
OFFSET: -17.75'
FES INV: 736.04
STA 6+64.52
OFFSET: 22.43'
FES INV: 736.04
STA 6+72.42
OFFSET: 21.86'
FES INV: 736.04
STA 6+80.31
OFFSET: 21.28'
1RIPRAP AT FLARED END SECTION
NOTES:
1. STONE RIPRAP, CLASS A4 SHALL BE USED.
2. MINIMUM BEDDING THICKNESS SHALL BE 6 INCHES.
3. MINIMUM STONE THICKNESS SHALL BE 16 INCHES.
4. FILTER FABRIC SHALL BE INSTALLED BETWEEN SUBGRADE AND RIPRAP
5. LA = APRON LENGTH
STA 7+00
OFFSET: 14.38'
STA 6+50
OFFSET: 15'
NOTES
1. FLARED END STRUCTURE CALLOUTS AND INVERT
ELEVATIONS ARE TAKEN AT THE INTERFACE BETWEEN THE
PIPE AND THE FLARED END STRUCTURE.
A
STA 7+00
OFFSET: 15'
STA 6+50
OFFSET: 14.72'
STA: 6+63.68
OFF: 60.48
STA: 6+98.99
OFF: 58.06
1 1
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/5 /20
8:
P
M
EROSION CONTROL
PLAN - GIESE ROAD
C-16 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SCALE IN FEET
30' 60'
SEE SHEET C-17
LEGEND
INLET AND PIPE PROTECTION
PERIMETER EROSION BARRIER
SEDIMENT CONTROL, SILT CURTAIN
TEMPORARY EROSION CONTROL SEEDING
KEY NOTES
PERIMETER EROSION BARRIER
INLET AND PIPE PROTECTION
SEDIMENT CONTROL, SILT CURTAIN
SUPER FILT FENCE
NOTES:
1. EROSION CONTROL MEASURES SHOWN ON THIS SHEET ARE INTENDED
TO BE A GUIDELINE. MORE EROSION CONTROL MEASURES MAY BE
NEEDED DURING CONSTRUCTION.
2. COMPLIANCE WITH EROSION CONTROL REQUIREMENTS SHALL NOT
INTERFERE WITH FERMILAB OPERATIONS.
3. PROTECT ALL TREES WHERE POSSIBLE.
4. RESTORE ALL DISTURBED AREAS INSIDE EXISTING SILT FENCE AREAS
WITH TEMPORARY SEEDING IN ACCORDANCE WITH THE
SPECIFICATIONS.
5. INSTALL TEMPORARY SEEDING IN ALL DISTURBED TURF AREAS
OUTSIDE OF EXISTING SILT FENCE THAT WILL NOT BE PERMANENTLY
RESTORED WITHIN 14 DAYS OF DISTURBANCE.
6. SUBCONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO
PREVENT TRACKOUT AND IMMEDIATELY REMOVE ANY MUD OR DEBRIS
FROM ROAD SURFACES.
7. THE SUBCONTRACTOR SHALL NOTE THAT THE PROJECT AREA IS
SUBJECT TO PONDING OF WATER. DEWATERING MAY BE REQUIRED TO
CONSTRUCT THE IMPROVEMENTS.
8. SUBCONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF
EXISTING EROSION CONTROL MEASURES.
9. INSTALL EROSION CONTROL BEST PRACTICES FOR ALL NEW UTILITIES
NOT SHOWN ON THIS SHEET. RESTORE ALL AREAS DISTURBED AS A
RESULT OF CONSTRUCTION NOT SHOWN ON THIS SHEET IN
ACCORDANCE WITH THE SPECIFICATIONS.
10. THE SUBCONTRACTOR SHALL PROTECT ALL TREES, SHRUBS, AND
LANDSCAPING AGAINST ANY DAMAGES, AND REPAIR/REPLACE ANY
DAMAGED MATERIALS/AREAS AT HIS OWN EXPENSE. ANY TREES OR
SHRUBS REQUIRING RELOCATION WILL BE NOTED PRIOR TO
EXCAVATION AND SHALL BE REMOVED BY FERMILAB UNLESS
OTHERWISE NOTED ON THE DRAWINGS.
11. ALL GRASS AREAS DISTURBED BY CONSTRUCTION ACTIVITIES, NOT IN
THE AREA DESIGNATED FOR CLEARING, SHALL BE RESTORED WITH
SEEDING AND FERTILIZING PER THE SPECIFICATIONS. DISTURBED
AGRICULTURAL FIELDS WILL NOT REQUIRE SEEDING BUT SHOULD BE
FINISHED GRADED WITH TOPSOIL AND 50 LBS PER ACRE OF ANNUAL
RYE. TOPSOIL SHALL BE REMOVED IN THE CLEARING AREA AND
STOCKPILED AT THE LOCATION SHOWN ON THE DRAWINGS. THOSE
AREAS DISTURBED, NOT IN THE AREA DESIGNATED FOR CLEARING,
THAT ARE 15 FEET BEYOND THE CENTERLINE OF THE UTILITY SHALL
BE REPAIRED AT THE SUBCONTRACTOR'S EXPENSE.
12. IT IS THE RESPONSIBILITY OF THE SUBCONTRACTOR TO USE
APPROPRIATE SOIL EROSION CONTROL DEVICES AS SHOWN ON THE
PROJECT DRAWING AND EXPLAINED IN THE DETAILS TO PREVENT
SEDIMENT FROM ENTERING THE EXISTING STORM SEWER SYSTEM OR
SURFACE WATER
13. ANY DEWATERING REQUIRED DURING THE COURSE OF THE PROJECT
SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR. WATER
PUMPED FROM EXCAVATIONS SHALL BE DISCHARGED INTO
SEDIMENTATION PITS. WATER SHALL NOT BE DISCHARGED DIRECTLY
INTO THE FLOW LINE OF DITCHES, GUTTERS, OR DRAINAGE
STRUCTURES UNDER ANY CIRCUMSTANCES.
14. AT THE CLOSE OF EACH WORK DAY, OR AS NEEDED, ANY LOOSE
MATERIAL DEPOSITED ON ROADWAYS OR IN THE FLOW LINE OF
GUTTERS, DRAINAGE STRUCTURES, DITCHES, ETC. SUCH THAT THE
NATURAL FLOW LINE OF WATER IS OBSTRUCTED, SHALL BE REMOVED
BY THE SUBCONTRACTOR. AT THE CONCLUSION OF CONSTRUCTION
OPERATIONS, ALL DRAINAGE STRUCTURES AND FLOW LINES SHALL BE
FREE FROM DIRT AND DEBRIS.
15. EROSION CONTROL MEASURES NOT SHOWN AS EXISTING SHALL BE
REMOVED BY THE SUBCONTRACTOR UPON COMPLETION OF THE
PROJECT.
16. THE SUBCONTRACTOR WILL BECOME SIGNATORY TO THE STORM
WATER POLLUTION PREVENTION PLAN (SWPPP) AND WILL COMPLY
WITH INSTALLATION AND MAINTENANCE REQUIREMENTS
THROUGHOUT THE PROJECT.
TEMPORARY EROSION CONTROL SEEDING4
NOT USED ON THIS SHEET
SUPER SILT FENCE
SUPER SILT FENCE LAYOUT TABLE
A D
B
C
E
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/5 /20
:39 P
M
EROSION CONTROL
PLAN - KAUTZ ROAD
C-17 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
SCALE IN FEET
30' 60'
SEE SHEET C-16
LEGENDLEGEND
INLET AND PIPE PROTECTION
PERIMETER EROSION BARRIER
KEY NOTES
PERIMETER EROSION BARRIER
INLET AND PIPE PROTECTION
SEDIMENT CONTROL, SILT CURTAIN
NOTES
1. SEE SHEET C-16 FOR EROSION CONTROL DETAILS
TEMPORARY EROSION CONTROL SEEDING
TEMPORARY EROSION CONTROL SEEDING4
SUPER FILT FENCE
NOT USED ON THIS SHEET
5 1
SUPER SILT FENCE
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/6 /20
:09 P
M
DETAILS
C-20 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
4/6 /20
:09 P
M
DETAILS
C-22 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
1SUPER SILT FENCE
NOTES:
1. FENCING SHALL BE 36" IN HEIGHT AND CONSTRUCTED IN ACCORDANCE WITH SECTION 664 OF THE ILLINOIS STANDARD SPECIFICATIONS. THE SPECIFICATION FOR A 6' FENCE SHALL BE USED, SUBSTITUTING 36" AND 6' LENGTH POSTS.
2. CHAIN LINK FENCE SHALL BE FASTENED SECURELY TO THE FENCE POSTS WITH WIRE TIES. THE LOWER TENSION WIRE, BRACE AND TRUSS RODS, DRIVER ANCH0RS AND POST CAPS ARE NOT REQUIRED. PULL POSTS, CORNER POSTS, HORIZONTAL BRACING AND TIE RODS ARE NOT REQUIRED.
3. SILT FENCE FABRIC SHALL BE FASTENED SECURELY TO THE CHAIN LINK FENCE WITH TIES SPACED EVERY 24" AT THE TOP AND MID SECTION.
4. WHEN TWO SECTIONS OF SILT FENCE FABRIC ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED 2' HORIZONTALLY.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED. SILT BUILD-UP AGAINST FENCE SHALL BE REMOVED WHEN SILT REACHES 50% OF FENCE HEIGHT.
6. SUPER SILT FENCE IS TO BE USED TO PROTECT ENVIRONMENTALLY SENSITIVE AREAS AND CONTROL SEDIMENT RUNOFF FROM CONSTRUCTION STONE
SITES WHEN ADDITIONAL REINFORCEMENT IS REQUIRED DUE TO SLOPE OF SITE OS VOLUME OF STORM WATER RUNOFF.
6+50.00
0 20 40 600-20-40-60
O
FF
:0 .0
E
L:
1.
O
FF
:0 .0
E
L:
1.
7+00.00
0 20 40 600-20-40-60
O
FF
:0 .0
E
L:
1.
O
FF
:0 .0
E
L:
1.
7+50.00
0 20 40 600-20-40-60
O
FF
:0 .0
E
L:
1.
O
FF
:1 2.
E
L:
1.
8+00.00
0 20 40 600-20-40-60
O
FF
:0 .0
E
L:
1.
8+50.00
0 20 40 600-20-40-60
O
FF
:9 .0
E
L:
1.
O
FF
:0 .0
E
L:
1.
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.
DESCRIPTIONS
REVISIONS
REV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE: FERMI NATIONAL ACCELERATOR LABORATORY
GIESE ROAD RECONSTRUCTION
Civil Engineers 1431 Opus Pl.
Suite 400 Downers Grove, IL 60515
Tel : 630.724.3200 Fax: 630.724.3201
PROJECT
NORTH
E
S
W
3-2-223
5/3 0/2
5 1
1:1 7 P
M
CROSS SECTIONS
GIESE ROAD
C-24 1
R. GOVEIA 5/30/2025
M. CHUNG 5/30/2025
S. MCLAUGHLIN 5/30/2025
S. MCLAUGHLIN 5/30/2025
5/30/2025
/3
/2
0 5/30/2025 ISSUED FOR BID
1 4/7/2026 ADDENDUM 1
2.0%2.0%
2.0%2.0% 2.0% 2.0%
2.0%2.0% 2.0% 2.0%
2.0%2.0% 2.0%
2.0%2.0% 2.0% 2.0%
| C-1-Layout1 |
| C-3-Layout1 |
| C-4-Layout1 |
| C-5-Layout1 |
| C-8-Layout1 |
| C-9-Layout1 |
| C-11-Layout1 |
| C-14-Layout1 |
| C-16-Layout1 |
| C-17-Layout1 |
| C-20-Layout1 |
| C-22-Layout1 |
| C-24-Layout1 |
| C-1-Layout1 |
File details come from the government source that posted it. Updated .