36E77619R0036-006.pdf
PDF 16 MB Posted
- Solicitation number
- 36E77619R0036
About this file
36E77619R0036 ATTACHMENT 5 - Drawings 2 of 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0059-000.docx | DOCX document | |
| 36E77619R0036-0005001.pdf | ||
| 36E77619R0036-0005000.docx | DOCX document | |
| 36E77619R0036-0004001.pdf | ||
| 36E77619R0036-0004000.docx | DOCX document | |
| 36E77619R0036-0003001.pdf | ||
| 36E77619R0036-0003003.pdf | ||
| 36E77619R0036-0003004.pdf | ||
| 36E77619R0036-0003005.pdf | ||
| 36E77619R0036-0003006.pdf | ||
| 36E77619R0036-0003002.pdf | ||
| 36E77619R0036-0003000.docx | DOCX document | |
| 36E77619R0036-0003007.pdf | ||
| 36E77619R0036-0002000.docx | DOCX document | |
| 36E77619R0036-0001000.docx | DOCX document | |
| 36E77619R0036-0001001.pdf | ||
| 36E77619R0036-004.pdf | ||
| 36E77619R0036-007.pdf | ||
| 36E77619R0036-008.pdf | ||
| 36E77619R0036-005.pdf | ||
| 36E77619R0036-002.pdf | ||
| 36E77619R0036-009.docx | DOCX document | |
| 36E77619R0036-010.pdf | ||
| 36E77619R0036-003.pdf | ||
| 36E77619R0036-001.docx | DOCX document | |
| 36E77619R0036-000.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
LOBBY
ENTRY
VESTIBULE
RECEPTION
WORK AREA
HALLWAY
CALMING RM
VESTIBULE
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PATHWAY /
PRACTICUM
DIRECTOR
VESTIBULE
PEER
SUPPORT
SERVICE LINE
DIRECTOR
HALLWAY
TEST
TEST /
OBSERV
TEST
OFFICE
RESIDENT
OFFICE
PRINT / COPY /
STORAGE
RESIDENT
RESIDENT
THERAPIST
165 THERAPIST
SUIC PREV
SHARED
SUIC PREV
SHARED
VOC SHARED
LOC
RECOVERY
TREATMENT
STAFF T.
EXAM T.
NURSE
NURSE
NURSE
NURSE
NURSE
COMM.
CENTER
OFFICE
PROG. ASS.
SECRETARY
ADMIN
OFFICER
STORAGE
GROUP
THERAPY
GROUP
THERAPY
MED ROOM
PUBLIC T.
PUBLIC T.
THERAPIST
THERAPIST
OUTPATIENT
SUPERVISOR
PSYCHOLOGY
INTERN
SHARED
CONF/
CLASSROOM
HALLWAY
STAFF T.
H.K.
HALLWAY
STAFF T.
LACTATION
MECH
PENTHOUSE
STAIR
RISER ROOM
LOUNGE/STAFF
191ELEC
VESTIBULE
HALLWAY
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PUBLIC T.
PUBLIC T.
HALLWAY
HALLWAY
HALLWAY
HALLWAY
ALCOVE
QH103
QH103
QH103
QH103
QH103
QH103
QH103
QH103
ELEC. CLOSET
H.K.
QH103
QH103
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
KEY PLAN
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/5
/2
:1
:1
P
M C
U s e rs
\p c h o i\ D o c u m e n ts
\1 O
M H
B R
V T
Y e u n y o u n g .r v t
FIRST FLOOR EQUIPMENT PLAN
PDD PYC 55
QH101
1/8" = 1'-0"
FIRST FLOOR EQUIPMENT PLAN
PLAN
NORTH
TRUENORTH
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
Revisions Date
UP
LOBBY
HALLWAY
CALMING RM
STORAGE
WORK AREA
RECEPTION
ADMIN
OFFICER
SECRETARY
PROG. ASS.
COMM.
CENTER
OFFICE
109ENTRY
VESTIBULE
PUBLIC T.
PUBLIC T.
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
PSYCHOLOGY
PROVIDER
VESTIBULE
ELEC
LOUNGE/STAFF
RISER ROOM
MECH
PENTHOUSE
STAIR
STAFF T.
LACTATION
STAFF T.
H.K.
HALLWAY
HALLWAY
CONF/
CLASSROOM
137PSYCHOLOGY
INTERN
SHARED
THERAPIST
THERAPIST
OUTPATIENT
SUPERVISOR
GROUP
THERAPY
GROUP
THERAPY
TREATMENT
EXAM T.
MED ROOM
ALCOVE
HALLWAY
PRINT / COPY /
STORAGE
PUBLIC T.
PUBLIC T.
HALLWAY
HALLWAY
NURSE
NURSE
NURSE
NURSE
NURSE
STAFF T.
HALLWAY
SERVICE LINE
DIRECTOR
PEER
SUPPORT
DIRECTOR
VESTIBULE
PATHWAY /
PRACTICUM
HALLWAY
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
VESTIBULE
RESIDENT
RESIDENT
OFFICE
RESIDENT
OFFICE
TEST
TEST /
OBSERV
TEST
THERAPIST
SUIC PREV
SHARED
SUIC PREV
SHARED
VOC SHARED
LOC
RECOVERY
ELEC. CLOSET
H.K.
THERAPIST
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
KEY PLAN
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/5
/2
:1
:2
P
M C
U s e rs
\p c h o i\ D o c u m e n ts
\1 O
M H
B R
V T
Y e u n y o u n g .r v t
FIRST FLOOR FURNITURE PLAN
PDD PYC 56
QH102
FURNITURE IS NOT IN CONTRACT,
FURNITURE SHOWN ON THIS
DRAWING IS FOR REFERENCE ONLY
1/8" = 1'-0"
FIRST FLOOR FURNITURE PLAN
PLAN
NORTH
TRUENORTH
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
PUBLIC T.
PUBLIC T.
LOBBY
PSYCHOLOGY
PROVIDER
NURSE
NURSE
NURSE
NURSE
NURSE
HALLWAY
PROG. ASS.
SECRETARY
ADMIN
OFFICER
COMM.
CENTER
OFFICE
HALLWAY
MED ROOM
PUBLIC T.
PUBLIC T.
5 1
3 GROUP
THERAPY
HALLWAY
HALLWAY
HALLWAY
STAFF T.
EXAM T.
ALCOVE
6 8
HALLWAY
RESIDENT
TREATMENT
HALLWAY
HALLWAY
H.K.
TREATMENT
23HALLWAY
RESIDENT
RESIDENT
EXAM T.
H.K.
STAFF T.
HALLWAY
STAFF T.
LACTATION
H.K.
3 4
HALLWAY
LOUNGE/STAFF
HALLWAY
4 3
42 43
ELEC
LOUNGE/STAFF
RISER ROOM
17 17
WORK AREA
ADMIN
OFFICER
SECRETARY
PROG. ASS.
COMM.
CENTER
OFFICE
HALLWAY
RECEPTION
HALLWAY
STORAGE
PRINT / COPY
/ STORAGE
OFFICE
HALLWAY
HALLWAY
RESIDENT
THERAPIST
170THERAPIST
FF & E SCHEDULE ABBREVIATIONS
CC: CONTRACTOR FURNISHED & INSTALLED
VV: VA FURNISHED & INSTALLED
VC: VA FURNISHED & CONTRACTOR INSTALLED
GROUP
THERAPY
HALLWAY
GROUP
THERAPY
PUBLIC T.
PUBLIC T.
HALLWAY
OUTPATIENT
SUPERVISOR
THERAPIST
48 48
49 49
CONF/
CLASSROOM
THERAPIST
PSYCHOLOGY
INTERN
SHARED
HALLWAY
HALLWAY
HALLWAY
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/5
/2
:1
:2
P
M C
U s e rs
\p c h o i\ D o c u m e n ts
\1 O
M H
B R
V T
Y e u n y o u n g .r v t
ENLARGED EQUIPMENT PLANS
AND SCHEDULE
PDD PYC 57
QH103
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
EQUIPMENT LEGEND
KEY DISCRIPTION ACTIVATED BY
1 GRAB BAR CC
2 GRAB BAR CC
3 TOILET TISSUE DISPENSER VC
4 FEMININE NAPKIN DISPOSAL CC
5 PAPER TOWEL DISPENSER, HANDS FREE VC
6 SOAP DISPENSER VC
7 MIRROR CC
8 WASTE BASKET VV
9 PAPER TOWEL DISPENSER VC
10 GLOVE DISPENSER VC
11 HAND SANITIZER DISPENSER VC
12 WALL MOUNTED WORK STATION AND COMPUTER VC
13 SCALE VV
14 COPY/PRINTER VV
15 PAPER SHREDDER VV
16 PRINTER VV
17 COAT HOOK CC
18 BABY CHANGING STATION CC
19 MAIL SLOTS VV
20 KIOSK VV
21 UNDER COUNTER REFRIGERATOR VV
22 EXAM TABLE VV
23 STAND VV
24 COMPUTER VV
25 STOOL VV
26 BIOHAZARD BASKET VV
27 SPECIMEN PASS THROUGH CC
28 FAX VV
29 DRUG STORAGE CABINET VV
30 RETURN BIN VV
31 MEDICATION REFRIGERATOR VV
32 12"X24" STAINLESS STEEL SHELF VC
33 REFRIGERATOR VV
34 COFFEE BREWER VV
35 MICROWAVE VV
36 WASTE BASKET VV
37 CLEANING VACCUM VV
38 TRASH CART VV
39 CLEANING CART VV
40 EXTRACTOR VV
41 BRUNISHER VV
42 SCRUBBER VV
43 FLOOR SCRUBBER VV
44 SHELF CC
45 WALL MOUNTED SPHYGMOMANOMETER VV
46 SHARP W/GLOVE DISPENSER VC
47 SMART BOARD VV
48 COAT RACK VV
49 CONTROL STATION W/ COMPUTER VV
50 5"x18" STAINLESS STEEL SHELF CC
PLAN
NORTH
TRUENORTH
0 4' 8' 12'2'1'
SCALE: 1/4" = 1'-0"
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN - 142, 143
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN - 137
*: SEE DOOR SCHEDULES FOR
ADDITIONAL LOCATIONS OF COAT HOOK .
CONTRACTOR TO PROVIDE ADDITIONAL ANGLES TO SUPPORT DECKING AT AREAS
WHERE DECK IS CUT FOR COLUMNS OR OTHER PENETRATIONS TO INSURE NO
WEAKENED AREAS IN DECKING
5.
PROVIDE CLOSURE PLATES FOR DECK AT EDGES OF ALL CONCRETE UNLESS
NOTED OTHERWISE.
4.
THE CONCRETE SLAB OVER THE FLOOR DECK SHALL BE REINFORCED AS
NOTED ON THE DRAWINGS
3.
THE FLOOR DECK SHALL BE FASTENED TO SUPPORTING STEEL IN ACCORDANCE
WITH THE PROJECT MANUAL
2.
1. THE FLOOR DECK SHALL BE AS INDICATED ON THE DRAWINGS.
CONTRACTOR TO PROVIDE ADDITIONAL ANGLES TO SUPPORT DECKING AT AREAS
WHERE DECK IS CUT FOR COLUMNS OR OTHER PENETRATIONS TO INSURE NO
WEAKENED AREAS IN DECKING
4.
PROVIDE GALVANIZED DECK OVER ALL AREAS - G60 WITH GRAY PRIMER TOP AND BOTTOM3.
THE DECK SHALL BE FASTENED TO SUPPORTING STEEL IN ACCORDANCE WITH
THE PROJECT MANUAL.
2.
1. THE ROOF DECK SHALL BE AS INDICATED ON THE DRAWINGS.
STEEL ERECTOR SHALL PROVIDE THE NECESSARY BRACING FOR STRUCTURE
STABILITY DURING ERECTION AND UNTIL ALL STEEL IS PLUMB AND SECURED.
7.
6.
COMPOSITE BEAMS NEED NOT BE SHORED DURING CONSTRUCTION.5.
COMPOSITE BEAM CONNECTIONS SHALL BE DESIGNED FOR A MINIMUM END REACTION
OF 0.80 x MAXIMUM TOTAL UNIFORM LOAD APPROPRIATE FOR BEAM SPAN.
4.
STANDARD BEAM CONNECTIONS SHALL BE DESIGNED FOR A MINIMUM END REACTION
OF 0.60 x MAXIMUM TOTAL UNIFORM LOAD APPROPRIATE FOR BEAM SPAN.
3.
UNLESS DETAILED OTHERWISE, ALL FIELD CONNECTIONS SHALL BE MADE USING 3/4" DIAMETER
ASTM F3125 GRADE A325 (N) HIGH STRENGTH BOLTS ('SC' INDICATES SLIP CRITICAL
TYPE : 'N' INDICATES BEARING TYPE WITH THREADS IN SHEAR PLANE: 'X' INDICATES
BEARING TYPE WITH THREADS EXCLUDED FROM SHEAR PLANES).
2.
UNLESS DETAILED OTHERWISE, BEAM CONNECTIONS SHALL BE SELECTED TO SUPPORT
THE END REACTION TABULATED USING THE "MAXIMUM TOTAL UNIFORM LOAD" IN PART 3
OF THE AISC STEEL CONSTRUCTION MANUAL, FOURTEENTH EDITION. FOR THE GIVEN BEAM
SIZE, SPAN AND STEEL SPECIFICATION, USING THE FACTORS BELOW OR FOR THE BEAM
REACTION SHOWN ON THE DRAWINGS, WHICHEVER IS GREATER - UNLESS DETAILED
OTHERWISE, CONNECTIONS SHALL CONFORM TO THOSE SHOWN IN PART 9 THRU PART 14
OF THE AISC STEEL CONSTRUCTION MANUAL, FOURTEENTH EDITION.
1.
SEE ARCHITECTURAL FOR LOCATION OF CONTROL JOINTS, MASONRY OPENINGS
AND EMBEDDED ANCHORS FOR DOORS, EXTEND CONTROL JOINTS FULL HEIGHT
OF CMU WALL.
10.
ALL BEARING PLATES SHALL BE CENTERED ON WALLS AND CMU COLUMNS
UNLESS NOTED OTHERWISE
9.
FILL ALL BLOCK LINTELS AND BOND BEAMS SOLID WITH CMU COREFILL8.
ALL LINTELS OR STEEL BEAMS SHALL BEAR A MINIMUM OF 8" ON SOLID MASONRY.
FILL BLOCK CORES UNDER ALL BEARINGS WITH CONCRETE CMU VERTICAL COREFILL A
MINIMUM OF 3 COURSES DOWN FOR A 24" LENGTH OF WALL UNLESS NOTED OTHERWISE.
7.
PROVIDE STANDARD HORIZONTAL JOINT REINFORCEMENT AT 16" OC FULL HEIGHT
OF WALL.
1.
PROVIDE VERTICAL REINFORCEMENT FULL HEIGHT OF WALL (FOOTING TO TOP
OF WALL OR PARAPET) - DOWEL TO FOOTING.
2.
JAMB REINFORCING UNO: REINFORCE NUMBER OF CORES SHOWN BELOW WITH 2-#5
BARS (1 EACH FACE, FULL HEIGHT) EACH SIDE OF OPENING.
3.
a. OPENINGS < = 4'-0": 1 CORE
b. 4'-0" < OPENINGS < = 8'-8": 2 CORES
c. 8'-8" < OPENINGS < = 10'-0": 3 CORES
d. 10'-0" < OPENINGS < = 11'-0": 5 CORES
BOND BEAM REINFORCEMENT SHALL BE CONTINUOUS AT CONTROL JOINTS,
CORNERS, AND STEPPED BOND BEAMS - LAP REINFORCEMENT 48 BAR DIAMETERS.
4.
LAP ALL VERTICAL AND HORIZONTAL REINFORCEMENT 48 BAR DIAMETERS.5.
FOR ALL OPENINGS, THROUGH MASONRY WALLS INCLUDING MECHANICAL AND ELECTRICAL
OPENINGS, PROVIDE ONE OF THE FOLLOWING UNLESS NOTED OTHERWISE.
6.
a. STEEL ANGLE LINTELS:
1-3 1/2x3 1/2x1/4 ANGLE FOR EACH 4" THICKNESS OF WALL FOR SPANS UP TO 4'-0" 1-5x3 1/2x5/16 ANGLE FOR EACH 4" THICKNESS OF WALL FOR SPANS UP TO 5'-0" 1-6x3 1/2x5/16 ANGLE FOR EACH 4" THICKNESS OF WALL FOR SPANS UP TO 6'-0"
b. BLOCK LINTELS: (8" HIGH UNLESS NOTED OTHERWISE)
12" BLOCK 8" BLOCK 6" BLOCK
2-#4 BOT 2-#4 BOT 1-#4 BOT NON-BEARING WALL UP TO 3'-4" SPAN
2-#5 BOT 2-#5 BOT 1-#5 BOT NON-BEARING WALL 3'-5" TO 6'-4" SPAN
ALL COLUMNS SHALL BE CENTERED ON GRID LINES UNLESS NOTED OTHERWISE.1.
ALL COLUMNS FOOTINGS SHALL BE CENTERED ON COLUMNS UNLESS NOTED OTHERWISE.2.
ALL WALL FOOTINGS SHALL BE CENTERED ON WALLS UNLESS NOTED OTHERWISE.3.
FOOTING SHALL BEAR ON UNDISTURBED, NATURAL MATERIAL OR COMPACTED FILL.1.
THE NATURAL SOIL BELOW THE ENGINEERED FILL OR FOOTINGS SHALL BE
SURFACE COMPACTED.
2.
IF THE SOIL AT THE FOOTING ELEVATIONS SHOWN IS OF QUESTIONABLE BEARING
VALUE, NOTIFY THE ARCHITECT'S OFFICE IMMEDIATELY.
3.
AFTER FOOTING EXCAVATIONS ARE COMPLETED AND BEFORE PLACING CONCRETE,
THE EXCAVATED AREAS SHALL BE REVIEWED BY THE INDEPENDENT TESTING
LABORATORY (ITL).
4.
REINFORCING STEEL SHALL BE NEW AND ALL BARS SHALL BE DEFORMED.1.
CONCRETE PROTECTIVE COVERING FOR REINFORCEMENT AT SURFACES NOT
EXPOSED DIRECTLY TO THE GROUND OR WEATHER SHALL BE 3/4" FOR SLABS,
JOISTS AND WALLS AND 1 1/2" FOR COLUMN TIES.
2.
CONCRETE PROTECTIVE COVERING FOR REINFORCEMENT AT SURFACES WHICH
WILL BE EXPOSED TO THE WEATHER OR BE IN CONTACT WITH THE GROUND
SHALL BE 2" FOR BARS LARGER THAN #5 AND 1 1/2" FOR #5 BARS OR SMALLER
PROVIDE 3" COVER BELOW FOOTING BARS.
3.
LOCATION AND SIZES OF OPENINGS, SLEEVES, ETC., REQUIRED FOR OTHER
TRADES MUST BE VERIFIED BY THESE TRADES BEFORE PLACING CONCRETE.
4.
FOR CONSTRUCTION, CONTROL AND EXPANSION JOINTS IN WALLS AND SLABS,
SEE PROJECT MANUAL AND DETAILS.
5.
1. DESIGN CODES - (ALL LATEST EDITIONS UNLESS NOTED)
- AMERICAN CONCRETE INSTITUTE (ACI) 318-14
- AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) 360-10
- AMERICAN WELDING SOCIETY (AWS)
- NATIONAL CONCRETE MASONRY ASSOCIATION (NCMA)
- STEEL JOIST INSTITUTE (SJI)
- STEEL DECK INSTITUTE (SDI)
- INTERNATIONAL BUILDING CODE (IBC) 2015
- SOUTH DAKOTA STATE BUILDING CODE 2015
- STRUCTURAL STEEL (ASTM A992)
- STRUCTURAL PLATES,
CHANNELS AND ANGLES (ASTM A36)
- STRUCTURAL TUBING (ASTM A500, GRADE B)..
- STRUCTURAL PIPE (ASTM A53, GRADE B)
- CAST-IN-PLACE CONCRETE:
(EXCEPT GROUT AND COREFILL)
- FOOTINGS
- FOUNDATION WALLS AND
GRADE BEAMS
- NON-INDUSTRIAL SLABS-ON-GRADE
- EXTERIOR SLABS-ON-GRADE
(AIR ENTRAINED)
- CONCRETE OVER METAL DECK
- TOPPING AND STAIR PAN FILL
- CMU COREFILL
(LINTELS AND BOND BEAMS)
- CMU VERTICAL COREFILL
- ALL OTHER CONCRETE
- REINFORCING STEEL:
- TYPICAL BARS (ASTM A615, GRADE 60)
- WELDABLE BARS (ASTM A706, GRADE 60)
- CONCRETE MASONRY
- ROOFS
- LOBBIES, CORRIDORS, AND STAIRS
- MECHANICAL EQUIPMENT FLOORS
2. DESIGN STRESSES
3. DESIGN LIVE LOADS
- SOIL BEARING PRESSURE
- SUBGRADE MODULUS
- FROST DEPTH FOR FOOTINGS
- LATERAL EARTH
EQUIVALENT FLUID PRESSURE:
- AT-REST
- FOUNDATION DESIGN IS BASED ON REQUIREMENTS OF
GEOTECHICAL INVESTIGATION REPORT #17-F93
DATED: 01-05-2018
PREPARED BY: GEOTEK ENGINEERING & TESTING SERVICES, INC
4. DESIGN SOIL BEARING PRESSURES
a. FABRICATORS (REQUIRED), EXCEPT WHEN FABRICATOR MAINTAINS ONGOING
INSPECTIONS BY AN APPROVED INDEPENDENT INSPECTOR OR QUALITY CONTROL
AGENCY (NOT REQUIRED) SEE SECTION 1704.2
b. STEEL CONSTRUCTION (REQUIRED AS DETAILED IN SECTION 1705.2)
c. CONCRETE CONSTRUCTION (REQUIRED AS DETAILED IN SECTION 1705.3)
d. STRUCTURAL MASONRY CONSTRUCTION (REQUIRED AS DETAILED IN SECTION 1705.4)
e. FOR ADDITIONAL INSPECTION REQUIREMENTS SEE PROJECT MANUAL SECTION 014533
1. PROVIDE SPECIAL INSPECTIONS FOR THE FOLLOWING ITEMS AS NOTED:
B. SPECIAL INSPECTIONS....................................................BASED ON IBC
2. SPECIAL INSPECTION REPORTS AND A FINAL REPORT IN ACCORDANCE WITH SECTION 1704.2.4 SHALL BE SUBMITTED TO THE BUILDING OFFICIAL PRIOR TO THE TIME THAT PHASE OF WORK IS
APPROVED FOR OCCUPANCY.
C. GENERAL INFORMATION
A. DESIGN DATA
D. FOOTINGS
E. CAST-IN-PLACE CONCRETE
F. CONCRETE MASONRY
G. STRUCTURAL STEEL
J. STEEL ROOF DECK
K. STEEL FLOOR DECK
GENERAL STRUCTURAL NOTES
SCREED THE CONCRETE TO THE DECK. DO NOT USE LASER SCREEDS UNLESS
APPROVED BY THE ARCHITECT.
6.
L. COLD FORMED METAL FRAMING
DESIGN: ALL STUDS, JOISTS AND CONNECTIONS, NOT SPECIFICALLY DETAILED ON THE DRAWINGS, SHALL BE DESIGNED FOR THE SPACINGS AND LOADS INDICATED, BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF SOUTH DAKOTA, DESIGN SHALL BE IN ACCORDANCE WITH AMERICAN IRON AND STEEL INSTITUTE (AISI) "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL
STRUCTURAL MEMBERS".
1.
FIRE RESISTANCE RATINGS: COMPLY WITH FIRE RESISTANCE RATINGS AS INDICATED AND AS
REQUIRED BY GOVERNING AUTHORITIES AND CODES. PROVIDE MATERIALS, ACCESSORIES, AND
INSTALLATION PROCEDURES WHICH HAVE BEEN LISTED BY UL OR TESTED IN ACCORDANCE
WITH ASTM E119 FOR THE TYPE OF CONSTRUCTION SHOWN.
2.
ALL METAL FRAMING COMPONENTS SHALL BE FORMED FROM STRUCTURAL STEEL SHEET
CONFORMING TO THE REQUIREMENTS OF ASTM A446, WITH A MINIMUM YIELD STRENGTH OF
33,000 PSI.
3.
ALL METAL FRAMING COMPONENTS SHALL HAVE A GALVANIZED FINISH COMPLYING WITH ASTM
A525 FOR A MINIMUM G60 COATING.
4.
ALL METAL FRAMING COMPONENTS SHALL BE CUT SQUARELY FOR ATTACHMENT TO
PERPENDICULAR MEMBERS OR, WHEN REQUIRED, FOR AN ANGULAR FIT TO ABUTTING MEMBERS.
5.
SPLICING OF AXIAL LOADED MEMBERS IS NOT PERMITTED.6.
FASTENING OF COMPONENTS SHALL BE WITH SELF-DRILLING SCREWS OR WELDING AS
STANDARD WITH MANUFACTURER. SCREWS SHALL BE OF SUFFICIENT SIZE TO INSURE
STRENGTH OF THE CONNECTION. ALL WELDS SHALL BE TOUCHED UP WITH A ZINC-RICH PAINT.
AT EXTERIOR WALLS THAT ARE PART OF THE BUILDING ENVELOPE, COAT SCREWS WITH
BITUMINOUS OR ZINC-RICH PAINT. WIRE TYING OF COMPONENTS IS NOT PERMITTED.
7.
FRAMING COMPONENTS MAY BE PREFABRICATED INTO PANELS PRIOR TO ERECTION. FABRICATE
PANELS PLUMB, SQUARE, TRUE TO LINE AND BRACED AGAINST RACKING. PERFORM LIFTING OF
PREFABRICATED PANELS IN A MANNER TO PREVENT DAMAGE OR DISTORTION.
8.
INSTALL FRAMING MEMBERS AS PER MANUFACTURER'S DESIGN AND RECOMMENDATIONS.9.
PROVIDE TEMPORARY BRACING, WHEN REQUIRED, UNTIL ERECTION IS COMPLETE.10.
f'c = 4,500 PSI @ 28 DAYS f'c = 4,500 PSI @ 28 DAYS f'c = 4,000 PSI @ 28 DAYS f'c = 4,000 PSI @ 28 DAYS f'c = 4,000 PSI @ 28 DAYS f'c = 4,000 PSI @ 28 DAYS f'c = 3,000 PSI @ 28 DAYS f'c = 3,000 PSI @ 28 DAYS f'c = 4,000 PSI @ 28 DAYS
Fy = 60,000 PSI Fy = 60,000 PSI f'm = 2,000 PSI @ 28 DAYS
Fy 50,000 PSI
Fy 36,000 PSI Fy 46,000 PSI Fy 35,000 PSI
20 PSF
100 PSF
125 PSF
2000 PSF
100 PCI
48 INCHES
50 PSF/FT
- ULTIMATE WIND DESIGN SPEED
- NOMINAL WIND DESIGN SPEED
- RISK CATEGORY
- WIND EXPOSURE
- ENCLOSURE CLASSIFICATION
- INTERNAL PRESSURE COEFFICIENT
- COMPONENT AND CLADDING LOADING
5. WIND CRITERIA
Vult = 115 MPH Vasd = 90 MPH I I C
ENCLOSED
± 0.18
SEE
PROVIDE GALVANIZED DECK OVER ALL AREAS - G60.7.
MISCELLANEOUS STEEL FRAMING (STAIRS, RAILINGS, ETC.) SHALL BE DESIGNED BY THE
FABRICATOR. THE FABRICATOR SHALL SUBMIT DOCUMENTATION THAT THE DESIGN HAS
BEEN REVIEWED AND APPROVED BY A LICENSED ENGINEER IN THE STATE OF SOUTH
DAKOTA.
a. 6" BLOCK - #4 AT 48"OC
b. 8" BLOCK - #5 AT 32"OC, UNO
c. 12" BLOCK - #5 EACH FACE AT 32"OC, UNO
M. INTERPRETATION OF CONFLICT
SHOULD CONFLICTS OCCUR IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL REQUEST
INTERPRETATION BEFORE PROCEEDING WITH THE ASSOCIATED WORK. ALL SUCH REQUESTS SHALL FIRST BE PRECEDED BY A DILIGENT INVESTIGATION INTO THE CONTRACT DOCUMENTS. EVIDENCE OF SUCH INVESTIGATION SHALL BE COMBINED IN ALL REQUESTS FOR INTERPRETATION SUBMITTED.
IF THE CONTRACTOR FAILS TO MAKE SUCH A REQUEST, NO EXCUSE WILL THEREAFTER BE
ENTERTAINED FOR FAILURE TO CARRY OUT THE WORK IN A SATISFACTORY MANNER. SHOULD
CONFLICTS OCCUR IN OR BETWEEN DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR IS DEEMED TO HAVE ESTIMATES ON THE MORE EXPENSIVE WAY OF DOING THE WORK UNLESS HAVING ASKED FOR, AND OBTAINED, WRITTEN DECISION BEFORE SUBMISSION OF PROPOSAL AS TO WHICH METHOD
OF MATERIALS WILL BE REQUIRED.
1.
2.
- GROUND SNOW LOAD
- FLAT ROOF SNOW LOAD
- SNOW EXPOSURE FACTOR
- THERMAL FACTOR
- SNOW IMPORTANCE FACTOR
6. SNOW CRITERIA
Pg = 40 PSF Pf = 30.8 PSF Ce = 1.00 Ct = 1.10 Is = 1.00
STEEL JOIST SHALL BE DESIGNED FOR ALL SPECIAL LOADING CONDITIONS
SEE FOR SPECIAL JOIST DIAGRAMS.
6.
PROVIDE CEILING EXTENSIONS IN AREAS WHERE CEILINGS OCCUR.5.
EXTEND TOP AND BOTTOM CHORDS WHERE NOTED ON THE DRAWINGS.4.
JOISTS SHALL BE WELDED TO SUPPORTING STEEL IN ACCORDANCE WITH THE
SJI SPECIFICATIONS.
3.
BRIDGING SHALL BE DETERMINED BY THE JOIST SUPPLIER. JOIST BRIDGING SHALL
BE SIZED, SPACED AND INSTALLED ACCORDING TO SJI SPECIFICATIONS UNLESS
NOTED OTHERWISE. JOIST SUPPLIER SHALL DESIGN AND PROVIDE ALL BRIDGING
TERMINATION DETAILS IN THEIR SHOP DRAWINGS PER OSHA REQUIREMENTS.
2.
STEEL JOISTS SHALL BE K OR LH SERIES, WELDED TYPE OF THE DEPTH AND
SIZE SHOWN ON THE DRAWINGS.
1.
H. STEEL JOISTS
/5 SS001
/7 SS001
T/CONC PIER
OR FOOTING
9"
1' -0
3"
4" 6"
A T
3/ 4"
Ø B
O
LT
S
A T
1" Ø
B O
LT
S
2 - #4 TIES @ 1"Ø BOLTS
THREADED
PROJECTION
1" GROUT BED AT 3/4"Ø
2" GROUT BED AT 1"Ø
PL 1/2x3 1/2x0'-3 1/2" AT
1"Ø ANCHOR BOLTS
7/
6" 2'-
/2
3/
7/
1'-
7/
6"
7/
6"
2"
1/
2"
PL 3/8x3x0'-3"
7/
6" 2'-
/2
3/
BP-1
CL COL
C L C
O L
GRID
GRID
2"
2"HSS COL
COAT COLUMN AND
ANCHOR BOLTS BELOW
SLAB WITH BITUMASTIC
3" COVER
TYPICAL
FOR FTG SIZE AND REINF
SEE FOOTING SCHEDULE
DWG SS001
FOR COL SIZE, BASE PLATE
SIZE AND ANCHOR BOLTS
SEE COL SCHED ON DWG
SS001
TFE
SEE PLAN
TSE
SEE PLAN
3"
3"
GRID
CONCRETE SLAB
CONC PIER SEE
PLAN & SCHED
3" COVER
TYPICAL
FOR FTG SIZE AND REINF
SEE FOOTING SCHEDULE
DWG SS001
FOR BASE PLATE SIZE
AND ANCHOR BOLTS
SEE COL SCHEDULE ON
DWG SS001
TFE
SEE PLAN
TPE
99'-0"
TSE
SEE PLAN
3"
3"
HK
STD
3" 3"
S P
A C
IN
G
E Q
U A
L
TI
E
GRID
2-ADD'L TIES @ 3"OC
@ TOP OF PIER
2" CLR
PROVIDE 3-#6 IN
PIER @ EA COL THUS: 1'-8"
#4 @ 12"OC TYP
UNO
T-1
1 2
AA
C
D
B
G
H
K
LL
MM
Z.8
36/7
3'-0"
@ EA SUPPORT
SEE PLAN FOR
NUMBER OF SIDE
LAP CONN'S
STEEL DECK DIAPHRAGM NOTES:
1. ALL CONNECTORS TO SUPPORT MEMBERS SHALL BE #12, SELF-DRILLING SCREWS UNLESS NOTED OTHERWISE.
2. ALL CONNECTORS TO SIDELAPS SHALL BE #10 SELF DRILLING SCREWS.
3. PROVIDE CONNECTORS @ 6"OC AT ALL PERIMETER EDGES AND AROUND ALL ROOF OPENINGS.
4. DIAPHRAGM DESIGNS AND CAPACITIES BASED ON DECK ROFILE AND FASTENING SHOWN. SEE PROJECT MANUAL FOR
PROCEDURES FOR PROPOSING ALTERNATE DECK FASTENING METHODS.
5. AT PERIMETER WALLS PROVIDE 2 SELF DRILLING SCREWS EACH DECK FLUTE TO PERIMETER ANGLE
THUS:
X
NOTES:
1. THE WIND PRESSURE DIAGRAM ABOVE REPRESENTS
NET UPLIFT LOADS TO JOISTS IN SERVICE LEVEL LOADS.
2. ADDITIONAL BRIDGING SHALL BE FURNISHED BY THE
ROOF JOIST SUPPLIER TO RESIST THE WIND UPLIFT
PRESSURES SHOWN AND AS REQUIRED FOR LATERAL
JOIST BRACING.
15 PSF
25 PSF1
1 2
AA
C
D
B
G
H
K
LL
MM
Z.8
8'-0"
8' -0
8' -0
8' -0
8'
-0
8'-0"
8'-0"
8'-0"
8' -0
8'-0"
8' -0
8'
-0
8'-0" 8'-0"
8'-0"
8' -0
8'
-0
8'-0" 8'-0"
K
W1
M
18KSP1 DL
W1
160 PLF
LL
485 PLF
DL
W2
160 PLF
LL
180 PLF
DL
W3
160 PLF
LL
180 PLF
DL
W4
160 PLF
LL
300 PLF
W2 W3
W4
26'-6 3 1/ 128" 2'-5 15 5/ 256" 11'-6 3 9/ 256"
1'-0" 4'-8"10'-9"
A
W1
D
18KSP2 DL
W1
160 PLF
LL
300 PLF
DL
W2
160 PLF
LL
180 PLF
DL
W3
160 PLF
LL
180 PLF
DL
W4
160 PLF
LL
485 PLF
W2 W3
W4
7'-9 21 7/ 256" 14'-7 247/ 256" 18'-0 3/ 16"
4'-8" 10'-9"8'-9"
FACTORED (ULTIMATE)
DESIGN WIND PRESSURE (PSF)
TRIBUTARY AREA (SQ FT)
ZONE 10 100 500
NOTES:
1. IT IS PERMITTED TO INTERPOLATE BETWEEN VALUES OF
TRIBUTARY AREA
2. SEE ASCE 7 FOR ADDITIONAL INFORMATION
3. VALUES SHOWN CAN ACT POSTIVELY OR NEGATIVELY
NORMAL TO THE SURFACE
31.9 29.2 29.2
53.6 40.3 34.6
80.6 48.5 34.6
31.6 27.4 24.3
39.0 30.4 24.3
8'-0" TYP
8'-0" T
YP
16'-0" TYP
8'-0" TYP
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
NOT FOR CONSTRUCTION
U.S. Department of Veterans Affairs
/8
/2
:1 :1
P
M C
U s e rs
\D J F o rs c h e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -S
T R
U C
T D
J F o rs c h e n .r v t
GENERAL STRUCTURAL NOTES,
SCHEDULES AND DETAILS
KDC DJF 58
SS001
COLUMN SCHEDULE
MARK COLUMN SIZE
BASE PLATES
ANCHOR BOLTS REMARKSSIZE (TxWxL) TYPE
C-1 HSS5X5X3/8 3/4x13x1'-1" BP-1 4-3/4"Ø
C-2 HSS6X6X3/8 1x14x1'-2" BP-1 4-3/4"Ø
C-3 HSS7X7X3/8 1 1/4x15x1'-3" BP-1 4-1"Ø
CONCRETE PIER SCHEDULE
MARK PIER SIZE
VERTICAL
REINFORCING TIES REMARKS
P-1 2'-0" x 2'-0" 8-#7 T-1
P-2 2'-4" x 2'-4" 8-#7 T-1
SPREAD FOOTING SCHEDULE
MARK SIZE REINF BOT REINF TOP REMARKS
F-3 3'-0" x 3'-0" x 1'-2" 3-#5
F-4 4'-0" x 4'-0" x 1'-2" 4-#5
F-5 5'-0" x 5'-0" x 1'-2" 5-#5
F-6 6'-0" x 6'-0" x 1'-4" 6-#5
F-7 7'-0" x 7'-0" x 1'-4" 7-#6
F-9 9'-0" x 9'-0" x 1'-6" 9-#6
F-10 10'-0" x 10'-0" x 1'-8" 10-#7
F-28 18'-0" x 8'-0" x 2'-0" #7 @ 11"OC #7 @ 11"OC
F-29 9'-0" x 5'-0" x 1'-6" #6 @ 10"OC
F-30 13'-6" x 13'-0" x 2'-0" 13-#7 13-#7
WALL FOOTING SCHEDULE
MARK SIZE (WxT)
REINF
LONGIT
REINF
TRANSV REMARKS
WF-1 2'-6" x 1'-2" 3-#5 #4 @ 16"OC
NOTES:
1. FOR ANCHOR BOLT DETAIL SEE 3/SS001
2. FOR BASE PLATE DETAILS SEE 4/SS001
NOTES:
1. FOOTING REINFORCING IS EACH WAY UNLESS NOTED OTHERWISE.
2. FOR TYPICAL INTERIOR COLUMN FOOTING SEE 2/SS001NOTES:
1. FOR DIAGRAMMATIC PIER PLAN 1/SS001
2. TPE (TOP OF PIER ELEVATION) = 99'-0" AT PERIMETER, UNO
3. TPE (TOP OF PIER ELEVATION) = 99'-0" AT INTERIOR, UNO
SCALE: NTS3 ANCHOR BOLT DETAIL
SCALE: NTS4 BASE PLATE DETAIL
SCALE: NTS2 TYPICAL COLUMN FOOTING DETAIL
SCALE: NTS1 DIAGRAMMATIC PIER DETAIL
SCALE: NTS6 DECK FASTENING DETAIL
SCALE: NTS8 NET WIND UPLIFT PRESSURES ON ROOF
SCALE: NTS5 SPECIAL JOIST DIAGRAMS
SCALE: NTS7 WIND-COMPONENTS AND CLADDING (ULTIMATE PRESSURES)
Revisions Date
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:_____________________________________ Typed or Printed Name:__________________________ Date:______________ License Number:_____________
David J. Stark 10/01/2018 52632
1 2
7 8 9
10 11
12 13
AA
C
D
B
E
G
H
K
LL
MM
J
4'-1" 3'-2" 14'-9" 25'-6" 17'-1" 7'-10" 20'-10" 24'-10" 37'-3" 22'-9" 16'-6" 4'-9"
7'-3" 14'-9" 25'-6" 17'-1" 7'-10" 1'-9" 24'-10" 24'-10" 24'-3" 30'-0" 1'-2" 5'-9" 9'-7" 1'-8"
1' -8
'-4
1' -8
'-2
'-0
'-8
9'
-1
7' -0
9'
-5
4' -9
9'
-5
5' -4
'-1 1"
6' -0
'-4
'-1
1" 9'
-5
1' -8
9' -2
1'
-1 1"
1' -8
1'-8"
6"6" 1'
-2
194'-7"
1'-8" 1'-11"1'-8"
1' -2
6"
4'-0"
1'-0"
8"
1'-2"
6"
6'-0"
B.2
5" CONCRETE SLAB ON GRADE
REINF W/ #4 @ 12"OC EA WAY
TSE = 100'-0"
PROVIDE VAPOR BARRIER
BELOW FLOOR SLAB SEE
DETAIL
7.1 8.3 9.3
10.3
SS001
SS001
1' -2
TYPICAL
INTERIOR
FOOTING
F-5 F-6
F-28
P-2
P-2 P-2
F-4 P-1
TFE = 99'-0"
TYP AT INTERIOR
COLUMN FTGS
UNO
TFE =
97'-0"
F-5
F-5F-5F-5F-5 F-4
F-5 F-7
F-4
F-4
F-7
F-5
F-4 F-5 F-5
F-9
P-1 F-3
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
F-4 P-1
TFE = 97'-0"
TYP AT EXTERIOR
COLUMN & WALL
FTGS, UNO
F-3
P-1
F-4 P-1
F-4 P-1
F-4
P-1
F-4 P-1
P-1 P-1
P-1
F-4 P-1
P-1
F-4 P-1
3' -5
3'
-1 1"
18'-6" 3'-10"
9'-5"
'-4
5"
P-2
P-2
.0
0°
15.00°
2'-6" THICK MAT FOUNDATION FOR
PRE-FABRICATED ENTRY CANOPY
REINF W/ #7 @ 12"OC EACH WAY
REFER TO ARCH - SIZE & REINF TO
BE CONFIRMED ONCE FINAL
PRE-FABRICATED ENTRY CANOPY
IS SELECTED
TFE = 97'-0"
TPE=
100'-6"
TPE=
100'-6"
WF-1
WF-1
W F
-1
WF-1
W F
-1
W F
-1
W F
-1
W F
-1
WF-1
W F
-1
W F
-1
Z.8
1' -8
6"
1' -2
1' -2
1' -0
9'
-6
6"
1'-8"
6" 6'
-0
6"
1' -2
SB501
SB501
SB501
SB501
8" 6"6"
1'-2" 6"
1'-4"
2"
1'-4" 4"
1' -4
4"
4' -3
4" 1'-4"
6' -4
2'
-5
7"
1' -4
7" 1'-4"
1' -4
4"
4" 1'-4"
4'-3"
6' -0
4" 1'
-4
1'-2" 6"
SB501
SB501
SB501
SB501
GRID
H TO K
GRID
B TO E
SIM, GRID
11 TO 13
SB501
TYP
UNO
SB501
TYP
UNO
SB501
TYP
UNO
SB501
TYP
UNO
SB501
SB501
1' -2
3'
-1
SB501
MECH LINE INVERT
EL = 98'-5"
VFY W/ MECH
MECH LINE INVERT
EL = 93'-3"
VFY W/ MECH
MECH LINE INVERT
EL = 98'-0" VFY W/
CIVIL & MECH
MECH LINE INVERT
EL = 98'-0"
VFY W/ MECH
MECH LINE INVERT
EL = 96'-0"
VFY W/ MECH
MECH LINE INVERT
EL = 95'-0" VFY W/
MECH & CIVIL
S 97'-0"
S 95'-6"
96'-6"
S 95'-6"
S 97'-0"
96'-6"
SB501
TYP
SB501
TYP
6'-6" 2'-6"
2' -6
2'
-6
F-29
F-29
2' -6
2'
-6
6'-6" 2'-6"
C J, T Y
P
CJ, TYP
/4 SB501
8'-6" 6'-11" 2'-7"
4' -0
4'
-0
F-30
5' -0
5'
-4
2' -8
4'-1" 6'-11" 2'-6"
3'-6"
4'-0"
4' -0
TYP AT
STOOP
TPE=
100'-0"
1'-8"
TPE=100'-0"
3'-1" 1'-2"
TPE=
100'-0"
1'-4" 4"
MECH LINE INVERT
EL = 97'-6" VFY W/
MECH
TFE = 98'-6"
F-10
TFE = 97'-6"
P-2 P-2
TFE = 97'-6"
P-2
TYPICAL
INTERIOR
FOOTING
& PIER
1. FOR GENERAL STRUCTURAL NOTES SEE DRAWING SS001
2. P-1 INDICATES COLUMN PIER DESIGNATION. FOR PIER SCHEDULE
SEE DRAWING SS001
3. F-1 INDICATES COLUMN FOOTING DESIGNATION. FOR FOOTING SCHEDULE
SEE DRAWING SS001
4. W-1 INDICATES WALL FOOTING DESIGNATION. FOR WALL FOOTING SCHEDULE
SEE DRAWING SS001
5. FOR BASE PLATE AND ANCHOR BOLT DETAILS SEE
6. FOR SLAB CONSTRUCTION (CJ) & CONTROL (CJT) JOINTS SEE
CJ SPACING: 15'-0"OC, MAX
7. FOR COLUMN/SLAB ISOLATION JOINT DETAIL SEE
8. FOR BELOW GRADE UTILITY LINES AT BUILDING PERIMETER PROVIDE THICKENED
CONTINUOUS FOOTING PER DETAIL IF CONDITIONS AT UTILITY LINES
REQUIRE ALTERNATE METHODS NOTIFY ARCHITECT/ENGINEER
9. RECESS CONC SLAB AS REQUIRED AT FLOOR DRAINS. SEE ARCHITECTURAL
FLOOR PLANS AND FINISH SCHEDULE FOR LOCATIONS.
10. FOR EQUIPMENT PADS ON SLAB ON GRADE - SEE
11. INDICATES FOOTING STEP. FOR STEPPED FOOTING DETAIL
SEE
FOUNDATION PLAN NOTES:
/9 SB501
/8 SB501
/3 SS001 /4 SS001
&/1 SB501 /2 SB501
&/3 SB501 /4 SB501
S 97'-0"
96'-6"
12. FOR WALL CONSTRUCTION JOINT DETAIL - SEE
13. FOR CORNER BAR DETAIL - SEE
/6 SB501
/7 SB501
/5 SB501
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
NOT FOR CONSTRUCTION
KEY PLAN
U.S. Department of Veterans Affairs
/8
/2
:1 :5
P
M C
U s e rs
\D J F o rs c h e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -S
T R
U C
T D
J F o rs c h e n .r v t
FOUNDATION PLAN
KDC DJF 59
SB101
SCALE: 1/8" = 1'-0"1 FOUNDATION PLAN
PLAN
NORTH
TRUENORTH
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
"AN ALTERNATE APPLIES TO THE
PRE-FABRICATED ENTRY CANOPY.
SEE SPEC SECTION 01 23 00
ALTERNATES FOR ADDITIONAL
INFORMATION REGARDING
ALTERNATE."
Revisions Date
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:_____________________________________ Typed or Printed Name:__________________________ Date:______________ License Number:_____________
SEE FOUNDATION PLANS FOR JOINT
LOCATIONS, SLAB THICKNESSES
AND REINFORCEMENT
FOR EXTENT OF EXPOSED CONCRETE
FLOORS SEE ARCHITECTURAL ROOM FINISH
SCHEDULE
AT CONSTRUCTION JOINT:
AT EXPOSED CONCRETE
PROVIDE SAWCUT AND JOINT
SEALER
AT CONTROL JOINT:
ALWAYS PROVIDE SAWCUT AND AT EXPOSED
CONCRETE PROVIDE JOINT SEALER
2" CLEAR (TYP)
2x2 KEYWAY AT
CONST
JT ONLY
INTERRUPT REINF AT
CONSTRUCTION AND
CONTROL JOINT
FOR SLAB SAWCUT
DETAIL SEE
NOTES:
2.
1.
TSE
SEE PLAN
CL JOINT
/2
/2 SB501
1" D /4
1/4"
1/ 4"
A T
C O
N
TR
O L
JO
IN
T
A T
C O
N S
T
JO
IN
T
JOINT SEALER SEE PROJECT
MANUAL SECTION 03300
INSTALL IN ACCORDANCE
WITH MFG INSTRUCTIONS
CLOSED CELL POLYETHYLENE
JOINT BACKER
TOP OF FINISH SLAB
1'-1 19 / 128"
1'-
5/
6"
3'-
9/
3'-
9/
CL JOINT
C J
O R
C
JT
CJ OR CJT
COAT COLUMN, BASE PLATE
AND TOPS OF ANCHOR BOLTS,
BELOW TOP OF SLAB TO TOP
OF PIER OR FOOTING, WITH
BITUMASTIC
AT HSS COL PROVIDE:
2" HIGH SLOPED CONCRETE
WASH WHERE THERE ARE
NOT CURBS
WRAP COLUMN WITH
EXPANSION JOINT MATERIAL
BEND BAR WHERE REQ'D
#4 DIAGONAL BAR x 4'-0"
LONG EACH CORNERHSS COLUMN
1'-0" TYP
2" T
YP
3/ 4"
1/2"
CONSTRUCTION JOINT
2 x 4 CONT KEYWAY
NOTE:
1. PROVIDE RECESS IN EXPOSED FACES ABOVE GRADE ONLY.
2. 90 FT MAX SPACING OF CONSTRUCTION JOINTS.
SEALANT
2" C
O R
N E
R T
Y P
CL CONST JOINT
LAP
36 DIA
1 61/ 256"
/1
1"
MATCH FOOTING REINF
OR 2-#4 MIN @ STEP
3" CLR COVER (TYP)
12" MIN THICKNESS
36 BAR DIA TYP
2D MIN
D
FDN WALL
TFE
SEE PLAN
TFE
SEE PLAN
TYP INTERSECTION
3'-0"
SPLICE BAR
THUS:
3' -0
TYP CORNER
NOTE:
ALL SPLICE BARS TO
BE SAME SIZE AND SPACING
AS WALL REINF
3' -0
1'-0"
SPLICE BAR
THUS:
3"
1'-0"
2"
3/4" CHAMFER
ALL SIDES
NOTE:
COORDINATE SIZE AND LOCATION OF PADS WITH MECH
AND ELEC CONTRACTORS. PAD CONFIGURATION, AND
SIZE AND LOCATION OF ANCHOR BOLTS AND SLEEVES
SHALL CONFORM TO MFR'S REQUIREMENTS
#4 @ 12"OC EACH WAY
SLAB ON GRADE
OR STRUCTURAL
SLAB REINF NOT
SHOWN
1/2"Ø BOLTS IN 1/2"Ø
DROP-IN EXPANSION
BOLTS (4 PLACES)
4" MIN
1'-8 4 3/ 64"
SEE NOTE BELOW
2" MIN CLR
1/
2" C
LR
/6 4"
/6 4"
N O
TE
D
4" O
R A
S
TSE
SEE PLANLOOSELY PACKED
FILL
PIPE INVERT
EL SEE MECH
FDN WALL
TYP FTG REINF TO
BE CONT OVER
UTILITY PIPE
MIN
1'-0"A S
R E
Q 'D
TH
IC
K E
N F
TG
UTILITY PIPE
1 M
IN6"
4" MIN
1" M
IN
WALL FOOTING
TFE
SEE PLAN
1" M
IN
UTILITY PIPE
ABOVE WALL
FOOTING
PIPE SLEEVE
THROUGH
FDN WALL
VAPOR RETARDER DETAIL
CONC SLAB - SEE
PLAN FOR THICKNESS
NOTES:
TSE
SEE PLAN
VAPOR RETARDER
PLACED DIRECTLY
BELOW FLOOR SLAB
1. PROVIDE VAPOR RETARDER WHERE INDICATED ON DRAWINGS.
2. PRIOR TO SLAB PLACEMENT, CONTRACTOR MUST REVIEW ARCH FINISH SCHEDULE TO IDENTIFY LOCATIONS OF MOISTURE SENSITIVE FLOOR FINISHES, (VCT, CARPET, RUBBER FLOORING, EPOXY, CERAMIC / PORCELAIN TILE, ETC). - NOTIFY ARCHITECT IF MOISTURE-SENSITIVE FLOOR FINISHES ARE
NOT UNDERLAIN BY VAPOR RETARDER.
/2
4"
12" MIN COMPACTED SUBGRADE
4" CRUSHED AGGREGATE BASE
1" MAX AGGREGATE SIZE
5" CONC SLAB
W/ #4 @ 16" OC
EA WAY
SLAB ON GRADE
16" CONCRETE WALL W/
#5 @ 12"OC HORIZ, EA FACE
& #5 @ 12" VERT, EA FACE
W/ STD HK INTO FTG
DOOR SEE ARCH
EXT GRADE
OR PAVING
8"
8" 8"
#4 DWLS @ 16" OC
THUS:
24"
24"
SLOPE DOWN 1"
SEE PLAN
LENGTH x WIDTH
8" CONC FDN WALL
W/ #4 @ 16"OC HORIZ
& #4 @ 12"OC VERT
W/ STD HK INTO FTG
2-#5 CONT
1' -0
2'-0"
#4 DWLS x 2'-0" @ 16"OC
CENTER ON JOINT
2" C
LR
LOOSELY COMPACTED
GRANULAR FILL
TSE
SEE PLAN
TFE
SEE PLAN
CONC WALL FTG
CENTER ON WALL
SEE PLAN & SCHED
5" CONC SLAB
W/ #4 @ 16" OC
EA WAY
SLAB ON GRADE
8" CONC FDN WALL
W/ #5 @ 12"OC HORIZ
& #5 @ 12" VERT
W/ STD HK INTO FTG
DOOR SEE ARCH
EXT GRADE
OR PAVING
8"
4"
#4 DWLS @ 16" OC
THUS:
24"
24"
SLOPE DOWN 1"
SEE PLAN
LENGTH x WIDTH
8" CONC FDN WALL
W/ #4 @ 16"OC HORIZ
& #4 @ 12"OC VERT
W/ STD HK INTO FTG
2-#5 CONT
AT SIDE WALLS
S
ID
E W
A
LL
S 1'
-0
A T
AT SIDE WALLS
2'-0"
#4 DWLS x 2'-0" @ 16"OC
CENTER ON JOINT
2" C
LR
LOOSELY
COMPACTED
GRANULAR FILL
TSE
SEE PLAN
TFE
SEE PLAN
CONC MAT SLAB
SEE PLAN
CONC WALL FTG
CENTER ON WALL
SEE PLAN & SCHED
CURTAIN WALL
SEE ARCH
CONC SLAB, SEE PLAN
12" CONC FDN WALL W/
#5 @ 12"OC HORIZ, EA FACE
& #5 @ 12" VERT, EA FACE
W/ STD HK INTO FTG
TSE & TWE
SEE PLAN
TFE
SEE PLAN
1'-0" SEE PLAN
RIGID INSULATION
SEE ARCH
1/2" EXP JT MAT'L
8"
BLOCK-OUT W/ CURTAIN WALL
7" VFY - ALIGN WALL
EXT GRADE
OR PAVING,
SEE CIVIL
3/4" CHAMFER
CONC WALL FTG
CENTER ON WALL
SEE PLAN & SCHED
EXTERIOR WALL FINISH
SEE ARCH
CONC SLAB, SEE PLAN
CONCRETE FOUNDATION WALL
SEE PLAN FOR THICKNESS
W/ #5 @ 12"OC HORIZ, EA FACE
& #5 @ 12" VERT, EA FACE
W/ STD HK INTO FTG
TSE & TWE
SEE PLAN
TFE
SEE PLAN
GRID
SEE PLAN SEE PLAN
RIGID INSULATION
SEE ARCH
1/2" EXP JT MAT'L
EXT GRADE OR
PAVING, SEE CIVIL
CONC WALL FTG
CENTER ON WALL
SEE PLAN & SCHED
8" DEEP COLD FORMED
METAL WALL MEMBER
DESIGN & ANCHORAGE
BY SUPPLIER
W / A
R C
H
8" V
FY
8 1/2"
EXTERIOR WALL FINISH
SEE ARCH
CONC SLAB, SEE PLAN
16" CONC FOUNDATION WALL
W/ #5 @ 12"OC HORIZ, EA FACE
& #5 @ 12" VERT, EA FACE
W/ STD HK INTO FTG
TSE & TWE
SEE PLAN
TFE
SEE PLAN
1'-4" SEE PLAN
RIGID INSULATION
SEE ARCH
1/2" EXP JT MAT'L
EXT GRADE OR
PAVING, SEE CIVIL
10" DEEP COLD FORMED
METAL WALL MEMBER
DESIGN & ANCHORAGE
BY SUPPLIER
W / A
R C
H
8" V
FY
11"
13B
CONC WALL FTG
CENTER ON WALL
SEE PLAN & SCHED
EXTERIOR WALL FINISH
SEE ARCH
20" CONC FOUNDATION WALL
W/ #5 @ 12"OC HORIZ, EA FACE
& #5 @ 12" VERT, EA FACE
W/ STD HK INTO FTG
TWE & TPE
100'-0"
EXT GRADE OR
PAVING, SEE CIVIL
4" DEEP COLD FORMED
METAL WALL MEMBER
DESIGN & ANCHORAGE
BY SUPPLIER
CONCRETE FTG
SEE PLAN & SCHED
GRID
TFE
SEE PLAN
CONCRETE STOOP
SLAB & FOUNDATION
WALL, SEE /10 SB501
TSE
VARIES
6" 1'-2"
EXTERIOR WALL FINISH
SEE ARCH
8" DEEP COLD FORMED
METAL WALL MEMBER
DESIGN & ANCHORAGE
BY SUPPLIER
EXTERIOR WALL FINISH
SEE ARCH
CONC SLAB, SEE PLAN
CONCRETE FOUNDATION WALL
BEYOND, SEE PLAN FOR THICKNESS
FOR REINF SEE
CONTINUE REINF THROUGH
CONCRETE PIER
TSE & TWE
SEE PLAN
TFE
SEE PLAN
GRID
SEE PLAN SEE PLAN
EXT GRADE OR
PAVING, SEE CIVIL
CONC WALL FTG BEYOND
SEE PLAN & SCHEDULE,
CONTINUE REINF THROUGH
COLUMN FOOTING
W / A
R C
H
8" V
FY
TPE
99'-0"
2'-6"
1'-4"
/14 SB501
CONC PIER SEE
PLAN & SCHED
CONC FOOTING
SEE PLAN & SCHED
HSS COLUMN, SEE
PLAN & SCHEDULE
BLOCK-OUT FDN WALL
AT COLUMN BASE PL
RIGID INSULATION
SEE ARCH
PRECAST PANEL
SEE ARCH
CONC SLAB, SEE PLAN
16" CONC FOUNDATION WALL
W/ #5 @ 12"OC HORIZ, EA FACE
& #5 @ 12" VERT, EA FACE
W/ STD HK INTO FTG
TSE
SEE PLAN
TFE
SEE PLAN
10" VFY W/ ARCH
6" SEE PLAN
1/2" EXP JT MAT'L
EXT GRADE OR PAVING,
SEE CIVIL
CONC WALL FTG
CENTER ON WALL
SEE PLAN & SCHED
TWE = 99'-4"
VFY W/ ARCH
CONNECTION BY
PRECAST SUPPLIER
RIGID INSULATION
SEE ARCH
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
NOT FOR CONSTRUCTION
U.S. Department of Veterans Affairs
/8
/2
:1 :5
P
M C
U s e rs
\D J F o rs c h e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -S
T R
U C
T D
J F o rs c h e n .r v t
FOUNDATION DETAILS
KDC DJF 60
SB501
SCALE: NTS1 SLAB CONSTRUCTION/CONTROL JOINT
SCALE: NTS2 SAW CUT DETAIL
SCALE: NTS3 TYPICAL ISOLATION JOINT AT COLUMNS
SCALE: NTS5 WALL CONSTRUCTION/CONTROL JOINT
SCALE: NTS6 STEPPED FOOTING DETAIL
SCALE: NTS7 CORNER BAR DETAIL
SCALE: NTS9 HOUSEKEEPING EQUIPMENT PAD DETAIL
SCALE: NTS8 SECTION
SCALE: NTS4 VAPOR RETARDER & STONE BASE DETAIL
SCALE: 1/2" = 1'-0"10 STOOP SECTION
SCALE: 1/2" = 1'-0"11 STOOP SECTION
SCALE: 1/2" = 1'-0"13 SECTION
SCALE: 1/2" = 1'-0"14 SECTION
SCALE: 1/2" = 1'-0"15 SECTION
SCALE: 1/2" = 1'-0"12 STOOP SECTION
SCALE: 1/2" = 1'-0"16 SECTION
SCALE: 1/2" = 1'-0"17 SECTION
Revisions Date
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:_____________________________________ Typed or Printed Name:__________________________ Date:______________ License Number:_____________
1 2
7 8 9
10 11
12 13
AA
C
D
B
E
G
H
K
LL
MM
J
W16X26W16X26W16X26W16X26W16X26W12X26 W16X26 W12X26
W
X
W
X
W
X
W
X
W
X
W
X
W
X
W
X
W
X
W12X26
W16X26W16X26W16X26 W16X26
W16X26W16X26W16X26
W16X26W16X26W16X26 W16X36
W
X
W
X
W
X
W
X
W
X
W12X26
W
X
W
X
W
X 40 W12X26
W16X26W16X26W16X26
W
X
W
X
W16X26W16X26W12X26
W
X
W
X
W16X26W16X26W16X26
14K1
W16X26
14K1
14K1
14K1
14K1
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
K
S P
K
S P
W
X
W
X
K
S P
K
S P
W
X
20K312K1
20K312K1
20K312K1
20K412K1
22K616K2
22K416K2
22K416K2
22K416K2
4'-1" 3'-2" 14'-9" 25'-6" 17'-1" 7'-10" 20'-10" 24'-10" 37'-3" 22'-9" 16'-6"
4' -9
9'
-5
5' -4
'-1 1"
6' -0
'-4
'-1
1" 9'
-5
'-2
'-0
'-8
9'
-1
'-5
7'-3" 14'-9" 25'-6" 17'-1" 7'-10" 1'-9" 24'-10" 24'-10" 24'-3" 30'-0" 1'-2" 5'-9" 9'-7"
B.2
W
X
W
X
W16X26
W16X26
W
X
W16X26
W
X
W
X
W
X
W18X35
4' -9
'-4
8' -5
6'
-6
4'-9"
DECK SPAN
SLOPE DOWN
SLOPE DOWN
D E
C K
S P
A N
D E
C K
S P
A N
D E
C K
S P
A N
DECK SPAN
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE = 112'-2 1/2"
7.1 8.3 9.3
10.3
K
K
K
K
K
W16X26
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE = 112'-2 1/2"
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE = 112'-2 1/2"
C-1
C-1 C-1
C-3
C-1C-1 C-1
C-1C-1
C-1C-1
C-1
C-2 C-1
C-2 C-1
C-1
C-1 C-1C-1C-1 C-1C-1C-2
C-1 C-1C-1C-1C-1C-2
C-1
C-2 C-2
C-2
C-2
C-3
C-1
C-1
C-2
OPEN
OPEN
D B
E
'-2
/2
T Y
P G
R
ID
D B
E
'-2
/2
T Y
P G
R
ID
D B
E
'-5
/2
T Y
P G
R
ID
D B
E
'-5
/2
T Y
P G
R
ID
D B
E
'-1 1"
T Y
P G
R
ID
D B
E
'-1 1"
T Y
P G
R
ID
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE VARIES
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE VARIES
4'-1" 1'-8" 1'-6"
TSE = 119'-5 1/4"
D B
E
'-8
/2
DBE = 119'-8 1/2"
TYP GRID 2
FROM C TO H
W12X26
TSE=118'-11"
T Y
P G
R
ID
F
R O
M C
T O
H
W12X26
TSE =
119'-8 1/2"
3'-11" 3'-11" 4 EQ SPA @ 5'-2 1/2"OC = 20'-10" 5 EQ SPA @ 4'-11 5/8"OC (±) = 24'-10" 7 EQ SPA @ 5'-3 7/8"OC (±) = 37'-3" 4 EQ SPA @ 5'-8 1/4"OC = 22'-9"
E
Q S
P A
'-1
/8 "O
C
3 EQ SPA @ 5'-8 3/8"OC (±) = 17'-1"
5 EQ SPA @ 5'-3 7/8"OC (±) = 26'-7" 5 EQ SPA @ 4'-11 5/8"OC (±) = 24'-10" 5 EQ SPA @ 4'-10 1/4"OC (±) = 24'-3"
6 EQ SPA @ 5'-2 3/8"OC (±) = 31'-2"
6 EQ SPA @ 5'-2 3/8"OC (±) = 31'-2"
E
Q S
P A
'-1 0"
O C
4' -2
3'
-3
E
Q S
P A
'-3
/2 "O
C
3'
-2
E
Q S
P A
'-8 "O
C
194'-7"
3"
DECK SPAN
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE = 119'-8 1/2"
D E
C K
3"
3"
4 5/8"4 5/
8"
W
X
5/
8"
DECK SPAN
5/
8"
4 5/8"
3"
3"
4 5/8"
4 5/8" GRID A TO C
DECK
4'-1"9"
3"
3/ 8"
7 3/8"
3/
8"
5 3/8"
TSE = 119'-5 1/4"
Z.8
W12X26
K
W16X26
7' -0
9'
-5
6' -0
'-6
'-3
2'
-0
W12X26
K
W
X
W
X
SF501
C-3
C-3
C-3
C-3 C-3
SF501
SF501
SF501
SF501
W
X
SF501
SF501
SF501
SF501
SF501
3"
SF501
SF501
SF501
SF501
SF501
SF501
SF501
SF502
SF502
SF501
W12X26
SF501
SIM
SF501
SF501
SF501
T/STL =
112'-2 1/2"
SF501
SIM
SF501
SF501
SF501
SF501
SF501
SF501
SF501
MOMENT
CONNECTION
SEE
TYP GRID A
/5 SF502
MOMENT
CONNECTION
SEE
TYP GRID M
/5 SF502
4' -2
/2
4'
-2
/2
3' -3
3'
-3
4' -8
/2
4'
-8
/2
W12X26
14K1
W 8X
MOMENT
CONNECTION
SEE /7 SF502
SF502
9 3/4"
SF502
9 5/8"
3" GRID C TO D
SF501
SF501
SF501
SF502
2-L3X3X1/4 HANGER
SF502
SPAN
2-L3X3X1/4
HANGER
H
IG
H
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE = 109'-11"
HSS8X6X3/8
(LSV) LOW
E
Q S
P A
'-8 "O
C
HSS8X6X3/8
(LSV) LOW
4'-10"
DECK
SPAN
S P
A N
HSS8X4X1/4
(LSV) LOW
O"
SF502
W12X26
W12X26
W8X18
W8X18
W8X18
SF501
SF502
SF502
SF502W
X
T S
E =1
'-8
/2
O
SF502W
X
PRECAST PANEL CONNECTION POINTS
TYPICAL AT COLUMNS ALONG GRID K AND D
FROM GRIDS 2 TO 6 AND AT COLUMN H-2
SEE /18 SF502
1. FOR GENERAL STRUCTURAL NOTES SEE DRAWING SS001
2. C-1 INDICATES COLUMN DESIGNATION. FOR COLUMN SCHEDULE
SEE DRAWING SS001
3. FOR OPENINGS THROUGH ROOF SEE MECHANICAL DRAWINGS.
PROVIDE ROOF FRAME AT EACH OPENING SEE
4. FOR TYPICAL ROOF DECK FASTENING SEE DETAIL
5. JOISTS TO BE DESIGNED FOR WIND UPLIFT SEE DETAIL
6. FOR SPECIAL JOIST LOADING DIAGRAMS SEE DETAIL
7. (c=3/4") INDICATES AN UPWARD CAMBER AT MIDSPAN OF STEEL BEAM.
8. DBE INDICATES DECK BEARING ELEVATION.
9. COORDINATE LOCATIONS OF ROOF JOIST WEBS, CHORDS &
BRIDGING WITH PIPING LAYOUT OF SPRINKLER PIPING. LAYOUT
SHALL BE SHOWN ON JOIST ERECTION DRAWINGS WITH
CLEARANCE TO PIPING NOTED.
10. INDICATES L2 1/2 x2 1/2 BRACING LOCATIONS SEE
11. WHERE JOIST CHORD CONCENTRATED LOADS DO NOT OCCUR WITHIN
0'-6" OF PANEL POINT, REINFORCE JOIST PER
12. FOR K JOISTS AND JOIST SUBSTITUTES PROVIDE 2 1/2" SEATS AT
BEAM SUPPORTS, UNO.
13. FOR LATERAL LOADS TO JOIST SEATS SEE
14. INDICATES MOMENT CONNECTION SEE PLAN FOR DETAIL INFORMATION
15. JOIST BRIDGING BY JOIST SUPPLIER IN ACCORDANCE WITH SJI, NOT SHOWN
FOR CLARITY.
ROOF FRAMING PLAN NOTES:
/1 SF501
/2 SF501
/3 SF501
/8 SS001
/6 SS001
/6 SF501
/5 SS001
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
NOT FOR CONSTRUCTION
KEY PLAN
U.S. Department of Veterans Affairs
/8
/2
:1 :5
P
M C
U s e rs
\D J F o rs c h e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -S
T R
U C
T D
J F o rs c h e n .r v t
LOWER ROOF FRAMING PLAN
KDC DJF 61
SF101
SCALE: 1/8" = 1'-0"1 LOWER ROOF FRAMING PLAN
PLAN
NORTH
TRUENORTH
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
Revisions Date
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:_____________________________________ Typed or Printed Name:__________________________ Date:______________ License Number:_____________
2 4 5
7 8 9
D
B
G
H
K
LL
W18X35 W18X35 W24X62 W18X35
W18X35 W18X35 W21X48
W18X35 W18X35 W18X35
W
X
W
X
W
X
W
X
W
X
W
X
W
X
W
X
K
K
K
K
K
K
K
K
W
X
W
X
K
K
K
K
K
K
W
X
W
X
K
K
K
K
K
K
B.2
'-3
'-3
17'-11" 25'-6" 17'-1" 7'-10" 20'-10" 24'-10" 30'-0" 7'-3" 22'-9" 6'-11"
DECK SPAN
8.3 9.3
10.3
K
K
C-1
C-1 C-1
C-1C-1 C-1
C-1C-1
C-1C-1
C-1
26'-7" 24'-10" 24'-3" 30'-0" 6'-11"
1 1/2" 22GA TYPE B
METAL ROOF DECK
DBE = 115'-6 1/2", UNO
5 EQ SPA @ 4'-2"OC = 20'-10" 5'-9" 4 EQ SPA @ 4'-9 1/4"OC = 19'-1" 5'-9" 5 EQ SPA @ 4'-10 1/4"OC (±) = 24'-3"
EF-1
150 LBS
ACCU-1
3000 LBS
SF501
SF501
W16X26
W16X31
W16X31
W16X31
W16X26
E
Q S
P A
'-6
/2 "O
C
7'
-3
D E
C K
S P
A N
8 3/8"
3/
8"
3/
8"
3/ 8"
8 3/8"
SF501
SF501
SF501
SF501
SF501
SF501
SF501
SF501
O
HSS5X2 1/2X1/4
LSH
'-8
9'
-1
7' -0
DECK SPAN
4 1/2" CONCRETE SLAB
REINF W/ #4 @ 16"OC EA WAY
ON 3" TYPE VLI 20 GA
COMPOSITE METAL DECK
(7 1/2" TOTAL THICKNESS)
TSE = 116'-0" - SLOPE 1/4"
PER FOOT TO DRAINS
OPEN
OPEN
ADD'L 6" THICK
SLAB (SEE ARCH FOR
DIMENSIONS AND
EXTENTS)
ADD'L 6" THICK
EQUIPMENT PAD
(SEE ARCH FOR
DIMENSIONS AND
EXTENTS)
8 3/8"
C-3
6'-11"5'-0" 5'-0" 5'-2" 6'-5" 8'-5"
6" CONC CURB
6" C
O N
C C
U R
B
2' -9
3'
-1
'-1
0" 3'
-2
3' -5
6" CONC CURB
WH-1
WS-1 BT-2
ET-1
W27X84 (28)
W27X94 (20)
W
X
(3 2)
W
X
(2 6)
W
X
(1 6)
W12X26 (4)
W
X
(3 2)
W
X
(3 2)
W
X
(3 2)
W12X26 (6)
W12X26 (6) 3"
5 1/2"
9"
3/
8"
C-3
C-3
C-3 C-3
6"
AHU-1
8,500 LBS
OPEN
OPEN
W
X
(2 0)
W
X
(2
W
X
(2
W16X26 (8)
W18X35 (8)
W18X35 (8)
W16X26 (8)
W8X10 (2)
W8X10 (2)
1'-0"
1'-0"
4 SIDES
6" TYP
4 SIDES
6" TYP
6" C
O N
C C
U R
B
'-6
'-5
8 3/8"
SF501
6'-8" 6'-0"
SF501
SF501
SF501
SF501
W12X26
SIM
SF501
SF502
C-1
'-7
/2
'-7
/2
ABOVE
ALONG GRID 11
FROM GRID G TO L
L4x4x5/8 DOUBLE
ANGLE CONNECTION
MOMENT
CONNECTION
SEE
TYP
/6 SF502
K
1'-0"
INSTALL STUDS AT
CONC SLAB ONLY
INSTALL STUDS AT
CONC SLAB ONLY
L4X4X1/4
SEE /30 SF501
W16X26 1' -2
1. FOR ROOF FRAMING PLAN NOTES SEE DRAWING SF101
ROOF FRAMING PLAN NOTES:
1. FOR GENERAL STRUCTURAL NOTES SEE DRAWING SS001
2. C-1 INDICATES COLUMN DESIGNATION. FOR COLUMN SCHEDULE
SEE DRAWING SS001
3. (12 ) INDICATES THE NUMBER OF 3/4" DIA x 6" HEADED STUDS TO BE
CENTERED U.N.O. AND EQUALLY SPACED ALONG THE BEAM. STEEL
DECK SUPPLIER TO LAYOUT STUDS IN DECK FLUTES.
4. DESIGN LL = 125 PSF
FLOOR FRAMING PLAN NOTES:
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
NOT FOR CONSTRUCTION
KEY PLAN
U.S. Department of Veterans Affairs
/8
/2
:1 :0
P
M C
U s e rs
\D J F o rs c h e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -S
T R
U C
T D
J F o rs c h e n .r v t
UPPER ROOF AND FLOOR
FRAMING PLAN
KDC DJF 62
SF102
SCALE: 1/8" = 1'-0"1 UPPER ROOF AND FLOOR FRAMING PLAN
PLAN
NORTH
TRUENORTH
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
Revisions Date
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:_____________________________________ Typed or Printed Name:__________________________ Date:______________ License Number:_____________
2 4 5 7 8 9 10 116 13
D
B
G
H
K
LL
'-3
'-3
W
X 55 W
X
W
X
W
X
W16X26 W16X26 W16X26
W16X26 W16X26 W16X26
28LH08
28LH08
28LH08
28LH08
28LH08
28LH08
28LH08
17'-11" 25'-6" 17'-1" 7'-10" 20'-10" 24'-10" 30'-0" 30'-0" 6'-11"
'-8
9'
-1
7' -0
D E
C K
S P
A N
1 1/2" 20GA TYPE B
METAL ROOF DECK
DBE VARIES
SLOPE DOWNSLOPE DOWN
C-2C-2
C-2 C-2
C-3
C-3
C-2
C-2
C-2
D B
E
'-0
T Y
P G
R
ID
D B
E
'-3
T Y
P G
R
ID
D B
E
'-2
/4
T Y
P G
R
ID
D B
E
'-1
1/ 4"
T Y
P G
R
ID
E
Q S
P A
'-1
5/ 8"
O C
9' -9
VFY W/ ARCH
10" PANEL
8" 5 3/8"
V
FY
W / A
R C
H
P
A N
E L
8"
V
FY
W / A
R C
H
P
A N
E L
8"
SF502
SF502
W
X
W
X
W
X
W16X26 W12X26
W16X26 W12X26
28K7 10K1
28K7 10K1
28K7 10K1
28K7 10K1
28K7 10K1
28K7 10K1
C-3
C-3
C-3 C-3
C-3C-3
SF501
SF501
D B
E
'-6
T Y
P G
R
ID
D B
E
'-4
T Y
P G
R
ID
D B
E
'-4
T Y
P G
R
ID
D E
C K
S P
A N
SLOPE DOWN SLOPE
DOWN
1 1/2" 20GA TYPE B
METAL ROOF DECK
DBE VARIES
E
Q S
P A
'-1
3/ 4"
O C
4'
-3
SF501
8 3/8"
3/
8"
3/
8"
8 3/8"
SF502
SF501
SF501
SF501
SF501
2'-3" 2'-3"
2'-3" 2'-3"
18LH03
18LH03
18LH03
18LH03
18LH03
18LH03
18LH03
ADDITIONAL 1 1/2" 20GA TYPE B
METAL ROOF DECK AT VALLEY
DBE = 124'-6"±
ALTERNATE - DBE = 122'-0"±
ADDITIONAL 1 1/2" 20GA TYPE B
METAL ROOF DECK AT VALLEY
DBE = 126'-10"±
ALTERNATE - DBE = 125'-10"±
SF502
C-1
C-1
ALONG GRID 11
FROM GRID G TO L
'-7
/2
'-7
/2
H S
S 5X
4X 5/
T /S
T L
4' -0
V
F Y
W / A
R C
HLS
H
HSS3X3X1/4 KICKER
MOMENT
CONNECTION
SEE
TYP
/6 SF502
L4X4X1/4
SEE /30 SF501
L4X4X1/4
SEE /30 SF501
8" VFY W/ ARCH
10" PANEL
8" VFY W/ ARCH
10" PANEL
A
LT
E R
N A
T E
D B
E
'-6
T Y
P G
R
ID
A
LT
E R
N A
T E
D B
E
'-9
T Y
P G
R
ID
A
LT
E R
N A
T E
D B
E
'-8
/4
T Y
P G
R
ID
A
LT
E R
N A
T E
D B
E
'-4
/4
T Y
P G
R
ID
ALTERNATE
TYP
TYP
TYP
ALTERNATE
ALTERNATE
A
LT
E R
N A
T E
D B
E
'-6
T Y
P G
R
ID
A
LT
E R
N A
T E
D B
E
'-4
T Y
P G
R
ID
A
LT
E R
N A
T E
D B
E
'-4
T Y
P G
R
ID
ALTERNATE
1. FOR ROOF FRAMING PLAN NOTES SEE DRAWING SF101
ROOF FRAMING PLAN NOTES:
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
NOT FOR CONSTRUCTION
KEY PLAN
U.S. Department of Veterans Affairs
/8
/2
:1 :0
P
M C
U s e rs
\D J F o rs c h e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -S
T R
U C
T D
J F o rs c h e n .r v t
ROOF FRAMING PLAN - LOBBY
AND PENTHOUSE
KDC DJF 63
SF103
SCALE: 1/8" = 1'-0"1 ROOF FRAMING PLAN - LOBBY AND PENTHOUSE
PLAN
NORTH
TRUENORTH
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
"AN ALTERNATE APPLIES TO
THE HEIGHT OF VARIOUS
PORTIONS OF THE BUILDING.
SEE SPEC SECTION 01 23 00
ALTERNATES FOR
ADDITIONAL INFORMATION
REGARDING ALTERNATE."
Revisions Date
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:_____________________________________ Typed or Printed Name:__________________________ Date:______________ License Number:_____________
4-CLIP L5x5x5/16x0'-5"
(5/16" ABOVE FRAMING ANGLES)
WHERE DIMENSION "X" IS 6"
OR LESS, THIS L MAY BE OMITTED
NOTES:
1. PROVIDE FRAMES FOR ALL
OPNGS GREATER THAN 12"x12".
2. FRAMES SHALL BE SHOP
WELDED AS ONE UNIT WITH
3/16" FILLET WELD AROUND ALL
CONTACTS & FIELD WELDED TO
SUPPORT MEMBERS W/ 3/16"
FILLET WELD ALL AROUND.
3. VERIFY SIZE AND LOCATION OF
ALL OPENINGS W/ MECH
CONTRACTOR PRIOR TO
FABRICATION OF ALL FRAMES.
4-FRAMING L4x4x1/4 ELEVATION
TOP OF FRAMING ANGLES IS THE
SAME AS ELEVATION TOP OF
SUPPORTS WHERE L4x4 DOES
NOT OCCUR WITHIN 6" OF JOIST
TOP CHORD PANEL POINT,
PROVIDE ADD'L WEB MEMBER SEE
SEE PLAN
FOR SUPPORT SPACING
"X"
/2 SF501
WHERE CHORD LOADING IS
NOT WITHIN 6" OF JOIST PANEL
POINTS ADD L1 1/2x1 1/2x3/16
EACH SIDE OF JOIST CENTERLINE
FIELD WELD WITH 1/8" FILLET
TOP CHORD LOAD
BOTTOM CHORD LOAD
JOIST PANEL POINTS
BEAM AT PERIMETER
JOIST BRG SEAT
NOTE:
DESIGN JOIST BRG SEAT
FOR LATERAL LOAD APPLIED
TO TOP OF JOIST
2.0K
3/16 2
TYP
GRID
GRID
C6x8.2 TYPICAL MC6x12 @ SIM
EXTEND MECH UNIT SUPPORT
CURB TO NEXT ADJACENT BEAM
E X
TE
N
T O
F M
E C
H U
N
IT
CL BM CL BM CL BM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.