36E77619R0036-0003002.pdf

PDF 3 MB Posted

Attached to
Construct Outpatient Mental Health Building Sioux Falls
Solicitation number
36E77619R0036
Issued by

About this file

36E77619R0036 0003 Amendment to Utilities Routing.pdf

View the file

Other files

File Type Posted
36E77619C0059-000.docx DOCX document
36E77619R0036-0005001.pdf PDF
36E77619R0036-0005000.docx DOCX document
36E77619R0036-0004001.pdf PDF
36E77619R0036-0004000.docx DOCX document
36E77619R0036-0003001.pdf PDF
36E77619R0036-0003003.pdf PDF
36E77619R0036-0003004.pdf PDF
36E77619R0036-0003005.pdf PDF
36E77619R0036-0003006.pdf PDF
36E77619R0036-0003000.docx DOCX document
36E77619R0036-0003007.pdf PDF
36E77619R0036-0002000.docx DOCX document
36E77619R0036-0001000.docx DOCX document
36E77619R0036-0001001.pdf PDF
36E77619R0036-004.pdf PDF
36E77619R0036-007.pdf PDF
36E77619R0036-008.pdf PDF
36E77619R0036-005.pdf PDF
36E77619R0036-002.pdf PDF
36E77619R0036-009.docx DOCX document
36E77619R0036-006.pdf PDF
36E77619R0036-010.pdf PDF
36E77619R0036-003.pdf PDF
36E77619R0036-001.docx DOCX document
36E77619R0036-000.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CCiivviill

1. Sheet CU101 (Reissued July 3, 2019)

a. Revise routing of steam trench as shown in clouded areas of the Plan AArrcchhiitteeccttuurraall

1. Sheet AD101 (Reissued July 3, 2019)

a. Revised extent of demolition and reconstruction of wall and ceiling elements in

Building 1 to accommodate revised steam pipe route.

MMeecchhaanniiccaall

11.. SShheeeett MMPP110000 ((RReeiissssuueedd JJuullyy 33,, 22001199))

a. RReevviissee rroouuttiinngg ooff sstteeaamm aanndd wwaatteerr ppiippiinngg aass sshhoowwnn iinn cclloouuddeedd aarreeaa ooff ppllaann..

2. Sheet MP100A (sheet added July 3, 2019)

a. Added large scale plans and details.

EElleeccttrriiccaall

1. Sheet ES01 (Reissued July 3, 2019)

a. Revised routing of telecom conduits through Building 1 and on site as shown on clouded area of plan.as shown in clouded area of plan 1/ES001

b. RReevviisseedd KKeeyynnoottee LLeeggeenndd aass iinnddiiccaatteedd..

2. Sheet ET131(Reissued July 3, 2019)

a. CChhaannggeedd 33”” tteelleeccoomm ccoonndduuiittss ttoo 22”” ccoonndduuiittss

3. Sheet EE401(Reissued July 3, 2019)

a. Changed 3” telecom conduits to 2” conduits at enlarged plan 2/EE401

040025

025A

EMS

EMS

ENG

001A

ENG

EMS

001B

ENG

001C

ENG

052A

ELEV. C

052B

ELEV. B

ELEVATOR

LOBBY

UNASSIGNED

ROOM

CORRIDOR

042A

CORRIDOR

REMOVE THIS SECTION OF CEILING

REMOVE SECTION OF CEILING

025A

EMS

EMS

ENG

001A

ENG

EMS

001B

ENG

001C

ENG

052A

ELEV. C

052B

ELEV. B

ELEVATOR

LOBBY

UNASSIGNED

ROOM

CORRIDOR 042A

CORRIDOR

NEW 2'-0"X2'-0" AT-1 CEILING

CORE DRILL

THROUGH WALL,

COORDINATE

SIZE OF HOLE

W/ MECH

AND FIRE SEAL

NEW HVAC PIPING-

SEE MECH

CORE DRILL THROUGH

WALL, COORDINATE

SIZE OF HOLE W/ MECH

AND SEAL PENETRATION

WATER TIGHT

ALIGN CEILING GRID

TO MATCH EXIST

MODIFY SPRINKLER

HEADS FOR NEW

CEILING HEIGHT

AD101

AD101

AD101

AD101

CONSTRUCT SHAFT OF 3 5/8"

METAL STUD WITH 5/8" GYP

BOARD TO ENCLOSE PIPES

RUNNING VERTICALLY ON WALL

AD101

AD101

DEMOLITION REFELECTED CEILING PLAN

REFELECTED CEILING PLAN

052A

ELEV. C

052B

ELEV. B

ELEVATOR

LOBBY

UNASSIGNED

ROOM

CORRIDOR

042A

CORRIDOR

MECH

032B032

032C

032A

041C

FITNESS

041B

041A

029B

029A

027A 034

FITNESS

MECH

STAIR E

STAIR D

034A

034B

026A

040025

025A

EMS

EMS

ENG

001A

ENG

EMS

001B

ENG

IT

021020001

ENG

STAIR C

001C

ENG

IT

BREAK

ROOM

IT

STAIR B

STORAGE

STORAGE

008 008A

OFFICE

STAIR A

NEW CEILING TILE

MATCH TO EXISTING

METAL TRIM

SEE RCP

E X

IS

T

IN

G

V E

R

IF

Y W

IT

H

M E

C H

A N

IC

A

L

EXISTING

CEILING TILE

OMAHA | LINCOLN | COLORADO SPRINGS

FARRIS ENGINEERING

farris-usa.com

FE#:172074

CONSULTANT

Drawing Title

Approved: Project Director

Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Phase

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

AE PROJECT NO.: 14541

Stamp

730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840

EST. 1915

100% BID DOCUMENTS

10/01/2018

Outpatient Mental Health Building

VA #438-450

2501 W 22nd St, Sioux Falls, SD, 57105

U.S. Department of Veterans Affairs

NOT FOR CONSTRUCTION

/8

/2

:0 :3

A

M C

U s e rs

\p c h o i\ D o c u m e n ts

\1 O

M H

B R

V T

Y e u n y o u n g .r v t

DEMOLITION PLAN S - BUILDING 1

PDD PYC 22

AD101

1/8" = 1'-0"

ENLARGED BASEMENT DEMOLITION REFLECTED CEILING PLAN - BLDG 1

1/8" = 1'-0"

ENLARGED BASEMENT REFLECTED CEILING PLAN - BLDG 1

PLAN

NORTH

TRUENORTH

0 8' 16' 24'2' 4'

SCALE: 1/8" = 1'-0"

1/16" = 1'-0"

BUILDING 1 - OVERALL FLOOR PLAN

0 4' 8' 16' 32' 48'

SCALE: 1/16" = 1'-0"

1 1/2" = 1'-0"

SOFFIT DETAIL

0 1' 2'

SCALE: 1 1/2" = 1'-0"

Revisions Date

Reissued with Amendment #1 July, 3, 2019

STRUCTURE

SCHEDULE

NAME

STMH 14

STMH 2

STMH 4

STMH 1

STMH 8

STMH 11

STMH 13

CB 12

CB 7

CBMH 6

CBMH 5

CB10

CBMH 9

CBMH 3

CASTING

R-1642

R-1642

R-1642

R-1642

R-1642

R-1642

R-1642

R-3067

R-3067

R-3067

R-3067

R-4342

R-4342

R-4342

RIM

1498.08

1492.50

1494.17

1495.29

1494.92

1495.55

1499.14

1493.24

1493.19

1493.19

1493.55

1494.72

1494.50

1494.79

INV

1488.30

1485.70

1486.00

1484.60

1487.80

1489.90

1488.10

1490.00

1489.90

1489.80

1489.70

1490.70

1490.20

1486.10

SIZE

48"

48"

48"

48"

48"

48"

48"

2'x3'

2'x3'

48"

48"

48"

48"

60"

UTILITY PLAN

SCALE:

BUILDING 1 - ROOF DRAIN CONNECTION

1"=10'

LEGEND:

1. UTILITY INFORMATION SUPPLIED BY VA. CONTRACTOR TO VERIFY ALL UNDERGROUND UTILITIES AS NECESSARY

TO COMPLETE WORK. THIS MAY REQUIRE A PRIVATE LOCATOR. UTILITIES ON PLANS MAY VARY FROM EXISTING

CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO UTILITIES WHETHER SHOWN, NOT

SHOWN, OR SHOWN INCORRECTLY. NOTIFY COR IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND.

2. COORDINATE ALL UTILITY RELOCATIONS WITH ALL DISCIPLINES TO MINIMIZE DISRUPTIONS. COORDINATE WITH

COR ON ALL DISRUPTIONS.

3. WATERMAIN TO BE LOCATED 10' MINIMUM HORIZONTAL SEPARATION FROM SANITARY SEWER.

4. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF THE LOCAL GOVERNING AUTHORITIES FOR CONNECTION

TO PUBLIC WATER, SANITARY SEWER, AND STORM SEWER UTILITIES AND WORK WITHIN THE PUBLIC RIGHT OF

WAY.

5. ALL WATER SERVICE THRUST FORCE POINTS (INCLUDES VALVES, TEES, WYES, HYDRANTS, DEAD ENDS, AND

BENDS ARE TO HAVE MECHANICAL JOINT CONNECTIONS. THRUST BLOCKS ARE TO BE USED AS DETAILED.

6. THE CONTRACTOR SHALL CLEAN ALL SURFACE FLOW CHANNELS, PIPES, AND STRUCTURES AFTER FINAL

SURFACES ARE ESTABLISHED AND PRIOR TO PROJECT CLOSEOUT.

7. VERIFY ALL UTILITY CONNECTIONS AND CONTINUATION NEAR BUILDING PERIMETER WITH MECHANICAL PLANS

PRIOR TO INSTALLATION.

8. CONTRACTOR SHALL PERFORM A RECORD SURVEY FOR ALL CONSTRUCTED ITEMS TO VERITY CONSTRUCTION

CONFORMS TO CONSTRUCTION DOCUMENTS. ITEMS INCLUDED, BUT NOT LIMITED TO; CONNECTIONS TO EXISTING

UTILITIES (LOCATION AND ELEVATION), NEW UTILITY LINE ROUTING, NEW STRUCTURE LOCATIONS, INVERT

ELEVATIONS, PAVEMENT/CURB AND GUTTER/SIDWALK/RETAINING WALL/ ETC. LOCATIONS AND ELEVATIONS.

9. SEE ELECTRICAL FOR NEW TELEPHONE/COMMUNICATION LINE INSTALLATION AND ROUTING.

GENERAL NOTES:

INSTALL NEW HYDRANT, GATE VALVE, AND 6" HYDRANT LEAD.

COORDINATE UTILITY CONNECTION WITH BUILDING MECHANICAL, ELECTRICAL, FIRE PROTECTION, AND PLUMBING

PLANS.

CONNECT TO EXISTING WATER LINE. CONTRACTOR TO VERIFY DEPTH, SIZE, MATERIAL, AND LOCATION OF EXISTING

UTILITY PRIOR TO CONSTRUCTION. COORDINATE WITH VA ON SERVICE DISRUPTIONS.

INSTALL TWO 45° BENDS (TYP.)

INSTALL 8" 45° BEND

INSTALL 8"x6" TEE AND 6" GATE VALVE

INSTALL 8" GATE VALVE

INSTALL NEW TRANSFORMER PER ELECTRICAL PLANS.

INSTALL NEW UNDERGROUND ELECTRIC SERVICE FROM TRANSFORMER TO BUILIDNG (SEE ELECTRICAL PLANS).

INSTALL NEW TELEPHONE SERVICE. SEE ELECTRICAL PLANS FOR LOCATION.

SEE MECHANICAL FOR STEAM TRENCH CONNECTION TO BUILDING.

INSTALL SANITARY CLEANOUT.

CONNECT TO EXISTING SANITARY SEWER MANHOLE. INV. 1485.2±

LOWER WATER LINE TO MAINTAIN 7.5' MIN BURY DEPTH. INSULATE AS NECESSARY IF DEPTH IS LESS THAN 7.5'. ADD

45° ELBOW TO DROP PIPE DOWN (TO MAINTAIN PROPER BURY DEPTH) ADD SECOND 45° ELBOW TO LEVEL PIPE. SEE

DETAIL 1/CJ104

75 LF OF NEW 8" DIP WATERMAIN

6" DIP HARD WATER FIRE SERVICE LINE.

2" TYPE K COPPER SOFT WATER LINE W/ CURB STOP.

CONCRETE STEAM TRENCH. CONNECT AT BUILDING 1. SEE MECH. PLANS FOR DETAILS.

DROP MANHOLE FOR STEAM AND SOFT WATER. SEE MECH. PLANS FOR DETAILS.

(DEDUCT ALT.) NEW GAS LINE CONNECTED TO CITY HIGH PRESSURE STEEL LINE. COORDINATE WITH LOCAL UTILITY.

ELECTRICAL CONCRETE TRENCH. SEE ELEC. PLANS FOR DETAILS. RESTORE IN-KIND ALL DISTURBED.

NEW ELECTRICAL MANHOLE. SEE ELEC. PLANS FOR DETAILS.

SEE SHEET CJ106 FOR OUTLET CONTROL AND INLET STRUCTURE DETAILS.

(DEDUCT ALT.) 2" TYPE K COPPER HARD WATER SERVICE.

2" TYPE K COPPER HARD WATER IRRIGATION SERVICE. LINE TO ENTER BUILDING, PASS THROUGH WATER METER, AND EXIT BUILDING. EXTEND IRRIGATION SERVICE LINE 20' FROM BUILDING AND INSTALL CORP STOP, PLUG, AND

PROVIDE SURFACE MARKER.

PIV - SEE FIRE PROTECTION PLANS FOR DETAILS.

WATER SERVICE CONNECTION WITH CURB STOP. SEE DETAIL 5/CJ101

REROUTE EXISTING ROOF DRAIN. ELEVATION OF THE EXISTING DRAIN IS

UNKNOWN. NOTIFY COR IF EXISTING DRAIN ELEVATIONS WILL NOT DRAIN

WITH PROPOSED ELEVATIONS.

INSPECTION PORTS FOR NEW STORMWATER CHAMBERS (TYP).

SEE SHEETS CJ106 - CJ109.

LOW VOLTAGE SYSTEM (TWO 3" CONDUITS) INSTALLED ADJACENT

TO STEAM TRENCH. SEE ES001

KEYNOTES:

NEW STORM SEWER

NEW STORM SEWER STRUCTURES

NEW SANITARY SEWER

NEW WATERMAIN

NEW STEAM TRENCH

NEW GAS SERVICE

NEW GATE VALVE

NEW SANITARY SEWER MANHOLE

CONSTRUCTION LIMITS

N

0 20' 40'

UNDERGROUND STORMWATER CHAMBER

A

M

Revisions Date

EMS

Checked Drawn

IJW

CONSULTANT Drawing Title

Approved: Project Director

Project Title

Location

Issue Date

Drawing Number

Dwg. of

Project Number

Building Number

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

Y v a s i o u x f a l l s m e n t a l h e a l t h b u i l d i n g D w g

C d

C i v i l S h e e t s

C

U

T I L d w g

A

B

C

D

E

F

PhaseARCHITECT/ENGINEER OF RECORD

AE PROJECT NO.: 14541

Stamp

EST. 1915

100% BID DOCUMENTS

10/01/2018

Outpatient Mental Health Building

U.S. Department of Veterans Affairs

CU101

H

A

R

D

W

A

T

E

R

L

I

N

E

NEW CONCRETE ELECTRICAL TRENCH

CONNECT TO EXISTING @ 1484.2±

12 LF - 6" PVC @ 2.0%

50 LF - 6" PVC @ 2.0%

SAN CO

RIM 1494.27

I. 1486.2 (6" OUT)

I. 1486.3 (6" IN)

STRM CO

RIM 1494.22

I. 1490.4 (6" OUT)

SCALE:

WATER SERVICE CONNECTIONS

1"=10'

L

F

P

V

C

CONNECT TO

EXISTING STORM

DRAIN LINE

NEW WATER HYDRANT

NEW LIGHT POLE. SEE ELECTRICAL FOR DETAILS.

NEW CLEANOUT

NEW VALVE

SEE 1/CU101 FOR ROOF

DRAIN CONNECTION RIM

AND INVERTS (TYP.)

SEE 2/CU101 WATER

SERVICE CONNECTIONS

DETAILS (TYP.)

PROTECT GAS LINE.

RELOCATE AS NECESSARY

NOT FOR CONSTRUCTION

45°

COORDINATE CONNECTION OF

EACH TRENCH UTILITY (STREAM

LINE, WATER LINE & ELEC. LINE)

WITH MECHANICAL BOTH

HORIZONTALLY & VERTICALLY. USE

CARE ADJACENT TO EXISTING

BUILDING SO AS NOT TO IMPACT

ITS STRUCTURAL INTEGRITY

RELOCATE EXISTING AIR

CONDITIONING UNIT AS NEEDED

FOR TRENCH INSTALLATION

Reissued with Amendment #1 July 3, 2019

AA

CC

DD

BB

EE

GG

HH

KK

LL

MM

JJ

FF

PIPING IN CONCRETE TRENCH. 3"

HPS, 2" HCR & 2" SCW.

REFER TO CIVIL DRAWINGS FOR

EXACT SIZE AND LOCATION

2" HPS AND 1-1/4" HPC STUBBED OUT

AND CAP TO SERVES BUILDING 16

AND 17 ON FUTURE PROJECT.

PROVIDE END OF MAIN DRIP AS

NEEDED.

REFER TO CIVIL DRAWINGS FOR MAN

HOLE LOCATION.

3" HPS

2" HCR

ROUTE 2-1/2" HPS AND 1-1/2" HPC UP

IN AN ENCLOSURE. OFFSET PIPING

AS NEEDED TO STAY IN AN

ENCLOSURE. PROVIDE END OF MAIN

DRIP AS NEEDED.

3" HPS

2" HCR 3" SCW

SEE ENLARGED PLAN

ON SHEET MP100A

3" HPS

2" HCR

3" SCW

3" SCW

PIPING IN CONCRETE TRENCH. 3"

HPS, 2" HCR & 2" SCW.

REFER TO CIVIL DRAWINGS FOR

TRENCH AND PIPE INVERT

ELEVATIONS

PIPE ANCHORS

SEE ENLARGED PLAN

ON SHEET MP100A

PIPE ANCHORS

SEE ENLARGED PLAN

ON SHEET MP100A

A. ALL NEW WORK SHALL BE COORDINATED WITH THE OWNER. THIS

FACILITY SHALL REMAIN IN OPERATION DURING OCCUPIED PERIODS.

B. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR

TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES

TO THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF

CONSTRUCTION ACTIVITIES.

C. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF NATIONAL

AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.

D. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY

SYSTEMS THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF

WORK. CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT

THESE AREAS ARE NOT DEPRIVED OF HEATING, COOLING,

VENTILATION, ETC. UPON COMPLETION THESE SYSTEMS SHOULD

BE RETURNED TO PREVIOUS WORKING ORDER.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY

DEMOLITION OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND

REPAIR AND RESTORATION TO BREAK IN PLAN OR TO FIRST

MATERIAL JOINT BEYOND DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION

DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION

DAMAGED BY ALTERATIONS TO MECHANICAL AND ELECTRICAL

SYSTEMS, WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS

SHOWING.

G. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY

OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF

THE WORK WITH THE OWNER.

H. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO THE START OF CONSTRUCTION. REPORT ANY

DISCREPANCIES TO THE PROJECT ENGINEER PRIOR TO START OF

DEMOLITION OF CONSTRUCTION ACTIVITIES.

I. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF

WEATHER CONDITIONS AT THE END OF EACH DAY. MAINTAIN

WEATHER TIGHT CONDITIONS 24 HOURS A DAY FOR THE DURATION

OF THE PROJECT.

J. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF

EXISTING STRUCTURES SURROUNDING THE CONTRACT AREA.

DAMAGE TO EXISTING STRUCTURES OR EQUIPMENT SHALL BE

REPAIRED AT NO ADDITIONAL COST TO THE OWNER.

K. CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITH VENTING

DIRECTLY TO OUTSIDE DURING DEMOLITION AND NEW

CONSTRUCTION ACTIVITIES IN ORDER TO MINIMIZE THE CHANCE

FOR AIR POLLUTION TO ENTER HOSPITAL VENTILATION SYSTEMS.

ALL EXISTING RETURN AND SUPPLY AIR DUCTWORK TO THESE

AREAS SHALL BE SECURELY CAPPED WITH SHEET METAL DURING

THE CONSTRUCTION PERIOD. THIS REQUIREMENT APPLIES TO ALL

WORK AREAS COORDINATE W/ OWNER.

L. ALL HVAC PIPING IS SHOWN IN SCHEMATIC FORM. NOT ALL PIPING

RISES AND DROPS ARE SHOWN. PROVIDE OFFSETS AS REQUIRED

TO MEET SPACE REQUIREMENTS AND TO AVOID INTERFERENCE

WITH OTHER TRADES.

M. COORDINATE FINAL LOCATIONS OF NEW HVAC PIPING AND

EQUIPMENT WITH EXISTING SYSTEMS, STRUCTURE, LIGHTING,

ARCHITECTURAL ELEMENTS, PIPING AND SPRINKLERS.

N. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE

RATED ASSEMBLIES AND SEAL WITH FLANGES AND INTUMESCENT

MATERIAL, AS REQUIRED.

O. PROVIDE ADEQUATE CLEARANCE FOR INSULATION IN HANGERS,

FROM STRUCTURE AND FROM EQUIPMENT.

P. PROVIDE END OF MAIN DROP AND TRAP AS NEEDED FOR THE

STEAM SYSTEM.

GENERAL HVAC PIPING NOTES

OMAHA | LINCOLN | COLORADO SPRINGS

FARRIS ENGINEERING

farris-usa.com

FE#:172074

CONSULTANT

Drawing Title

Approved: Project Director

Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Phase

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

AE PROJECT NO.: 14541

Stamp

730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840

EST. 1915

100% BID DOCUMENTS

10/01/2018

Outpatient Mental Health Building

VA #438-450

2501 W 22nd St, Sioux Falls, SD, 57105

U.S. Department of Veterans Affairs

NOT FOR CONSTRUCTION

/3

/2

:3 :1

A

M C

U s e rs

\g jh a ik

\D o c u m e n ts

\A u to d e s k \R e v it

P ro je c ts

\V A

-S F

-M H

F -M

E P g jh a ik

.r v t

HVAC PIPING BASEMENT LEVEL

PLAN AND SITE PLAN

LLK SB 92

MP100

SCALE: NTSMP100

1 HVAC PIPING SITE PLAN

PLAN

NORTH

TRUENORTH

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

BUILDING 1

042A

052A

052B

CORRIDOR

UNASSIGNED

ROOM

CORRIDOR

ELEV. B

ELEV. C

ELEVATOR

LOBBY

025A

001A

001B

001C

EMS

EMS

ENG

ENG

ENG

ENG

PIPE GUIDE-

TYPICAL

PIPE ANCHOR-

TYPICAL

FOR FUTURE

CONNECTION TO

BUILDINGS 16 AND 17

3" H

P S

2" P

C R

3" H

P S

2" P

C R

PROVIDE METRA FLEX MODEL DOUBLE

METRAGATOR (BASIS OF DESIGN)EXPANSION

COMPENSATOR RATED FOR 150 PSIG @ 850

DEGREE F., CS BODY, 304 SS BELOW,

COMPRESSION / CONTRACTION +/- 4 INCHES.

(TYPICAL)

EXISTING BUILDING #1

NEW MENTAL HEALTH CLINIC

30'-0"

3" H

P S

2" P

C R

PROVIDE END OF

MAIN DRIP AND TRAP

AS NEEDED.

2" S

C W

2" S

C W

2" S

C W

CONNECT NEW 3" HPS AND 2" HPC TO

EXISTING 6" STEAM AND 2-1/2"

CONDENSATE MAINS IN TUNNEL. OFFSET

PIPING AS REQUIRED TO

ACCOMMONDATE NEW CONNECTIONS.

PROVIDE END OF MAIN DRIPS AS

REQUIRED. INSTALL SHUTOFF GATE

VALVE NEAR MAINS.

COORDINATE WITH GENERAL

CONTRACTOR FOR EXISTING CEILING

TILE REMOVAL, REINSTALLED AND

SOFFIT ENCLOSURE.

PIPING IN CONCRETE TRENCH.

REFER TO CIVIL DRAWINGS FOR

EXACT SIZE AND LOCATION.

3" H

P S

2" H

C R

OFFSET PIPING AS NEEDED TO GET

UNDERNEATH EXISTING

DUCTWORK AND PIPING.

DROP PIPES DOWN IN EXISTING

SLAB RECESS ALONG EXTERIOR

WALL. CORE DRILL THROUGH

FOUNDATION TO TRENCH.

DROP PIPES DOWN

IN SHAFT

COORDINATE WITH GENERAL

CONTRACTOR FOR EXISTING CEILING

TILE REMOVAL, REINSTALLED AND

SOFFIT ENCLOSURE.

3" S

C W

3" S

C W2"

H C

R 3"

H P

S

3" SCW

2" HCR

3" HPS

3" HPS

2" HCR

3" SCW

PROVIDE CONDENSATE DRIP TRAPS

ON ALL STEAM PIPE RISE AND DROPS

PIPE CONDENSATE TO RECEIVER IN TUNNEL

A. ALL BRANCH PIPING ARE 3/4" UNLESS OTHERWISE NOTED.

B. ALL PIPING IS SHOWN IN SCHEMATIC FORM. NOT ALL PIPING RISES

AND DROPS ARE SHOWN. PROVIDE OFFSETS AS REQUIRED TO MEET

SPACE REQUIREMENTS AND TO AVOID INTERFERENCE WITH OTHER

TRADES.

C. COORDINATE FINAL LOCATIONS OF NEW PIPING AND HVAC EQUIPMENT

WITH STRUCTURE, LIGHTING, ARCHITECTURAL ELEMENTS,

DUCTWORK, PIPING AND SPRINKLERS.

D. REFER TO PIPING DETAILS FOR PIPING ACCESSORIES AND FINAL

CONNECTIONS TO HVAC EQUIPMENT AND TERMINAL UNITS.

TRANSITION PIPING AS REQUIRED FOR FINAL EQUIPMENT

CONNECTIONS, MINIMUM ¾” IPS PIPE SIZE.

E. PROVIDE MANUAL AIR VENTS WITH CAPPED HOSE END CONNECTIONS

AT THE TOP OF EACH RISER AND AT ALL HIGH POINTS IN EACH

PRESSURE PIPING SYSTEM.

F. PROVIDE DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT

THE BOTTOM OF EACH RISER AND AT ALL LOW POINTS IN EACH

PRESSURE PIPING SYSTEM.

G. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE RATED

ASSEMBLIES AND SEAL WITH INTUMESCENT MATERIAL.

H. PROVIDE ADEQUATE CLEARANCE FOR INSULATION IN HANGERS, FROM

STRUCTURE AND FROM EQUIPMENT.

I. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION AND

TO MINIMIZE STRESSING OF EQUIPMENT CONNECTIONS.

J. WHERE ANY CONTROL VALVE, MANUAL VALVE, DRAIN OR AIR VENT

CANNOT BE ACCESSED OR VIEWED THROUGH LAY-IN CEILINGS OR

OTHER CONVENIENT MEANS, PROVIDE A MINIMUM 24 INCH X 24 INCH

ARCHITECTURALLY ACCEPTABLE RATED ACCESS PANEL AT EACH

INACCESSIBLE LOCATION.

K. CONNECT PIPE AND EQUIPMENT HANGERS TO TOP CHORD OF ROOF

JOISTS, BEAM FLANGES OR CONCRETE FLOOR DECK, BY APPROVED

MEANS.

L. PROVIDE END OF MAIN DRIP AND TRAP AS NEEDED FOR THE STEAM

SYSTEM.

M. THE PERIMETER SLAB RECESS IN THE BASEMENT OF BUILDING ONE

MAY HAVE ASBESTOS WITHIN THE RECESS. VERIFY WITH THE VA.

GENERAL HVAC PIPING NOTES

PIPE PIPE

1/4

TYP.

TYPE

STEEL ASTM SIZE

SHOES FOR CARBON STEEL PIPE

MATERIAL

S-1

S-2

CARBON

CARBON A-36

A-36 ST 6 X 15.9 X 16" LONG

1 PLATE

8" X 16" X 1/4" THK. (HORIZ.)

2 PLATES

6" X 16" X 1/4" THK. (VERT.)

SEE NOTE 3

NOTES:

1. WELD THICKNESS SHALL BE SAME AS PIPE SHOE OR PIPE WALL THICKNESS, WHICHEVER IS THINNEST.

2. WHERE INSULATION IS GREATER THAN SHOE HEIGHT, CUT AWAY INSULATION PARTIALLY WHERE IT

INTERFERES WITH PIPE SHOES AND SUPPORTS.

3. SEE TABLE ___ FOR CHANNEL SUPPORT SCHEDULE.

HEAT INSULATED PIPING (100° F - 750° F)

PIPE 2" THRU 10" PIPE 12" THRU 24"

*SEE NOTE 1

S-1 S-2

INSULATIO

N SEE

NOTE 2

INSULATION SEE NOTE 2

1 1/2"

8"

1 1/2"

PIPE

HEAT INSULATED PIPING

TYPE

STEEL ASTM SIZE

MATERIAL

G-4

G-5

CARBON

CARBON A-36

A-36

G-4

3/16 1 1/2"-3

TYP.

3/16 1 1/2"-3

G-5

GUIDES FOR PIPE SHOE

1" X 1" X 3/16"

ANGLE 16" LONG

1" X 1" X 3/16"

ANGLE 16" LONG

PIPE 2" THRU 10"

PIPE 12" THRU 24"

GUIDE ANGLE (TYP.)

1/4" CLEAR (TYP)

S-2 SEE NOTE 1

INSULATION

S-1 SEE NOTE 1

INSULATION

PIPE

TYP.

SUPPORT

CHANNEL IN

TRENCH (TYP)

(SEE NOTE 2)

GUIDE ANGLE (TYP)

NOTE:

1. SEE TABLE ___ FOR CHANNEL SUPPORT SCHEDULE.

1/4" CLEAR (TYP)

OMAHA | LINCOLN | COLORADO SPRINGS

FARRIS ENGINEERING

farris-usa.com

FE#:172074

CONSULTANT

Drawing Title

Approved: Project Director

Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Phase

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

AE PROJECT NO.: 14541

Stamp

730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840

1 2 3

EST. 1915

100% BID DOCUMENTS

10/01/2018

Outpatient Mental Health Building

VA #438-450

2501 W 22nd St, Sioux Falls, SD, 57105

KEY PLAN

U.S. Department of Veterans Affairs

NOT FOR CONSTRUCTION

/3

/2

:3 :1

A

M C

U s e rs

\g jh a ik

\D o c u m e n ts

\A u to d e s k \R e v it

P ro je c ts

\V A

-S F

-M H

F -M

E P g jh a ik

.r v t

ENLARGED PLANS OF STEAM

PIPE ROUTING

Checker GJH 93

MP100A

Revisions Date

Reissued with Amendment #1 July 3, 2019

SCALE: NONEMP100A

1 STEAM PIPE IN TRENCH ROUTING DETAIL

SCALE: 1/8" = 1'-0"MP100A

2 HVAC PIPING ENLARED PLAN OF BUILDING 1

SCALE: 1 : 1MP100A

3 HVC41-FREE PIPE SUPPORT DETAIL

SCALE: 1 : 1MP100A

4 HVC42-GUIDED PIPE SUPPORT DETAIL

1. COORDINATE UNDERGROUND ELECTRICAL WORK WITH CIVIL

ENGINEERING DRAWINGS AND ALL NEW AND EXISTING

UNDERGROUND INFRASTRUCTURE.

2. CONNECT ALL SITE LIGHTING CIRCUITS TO PANEL LL. CIRCUIT

NUMBER IS INDICATED BY LUMINAIRE TAG.

3. FOR TYPE S1 LUMINAIRES SHOWN, PROVIDE 14' ROUND STEEL

POLE TO MATCH EXISTING VA CAMPUS STANDARD.

4. FOR TYPE S2 LUMINAIRES SHOWN, PROVIDE 25' SQUARE STEEL

POLE TO MATCH EXISTING VA CAMPUS STANDARD.

5. ROUTE HOMERUNS FOR SITE LIGHTING SHOWN AND FOR TYPE M1

FIXTURES ON SHEET EL111 THROUGH LIGHTING RELAY PANEL

RP-1 IN MAIN ELECTRICAL ROOM. PROVIDE PHOTOCELL ON ROOF,

COORDINATE LOCATION WITH OTHER TRADES. INTERCONNECT

PHOTOCELL AND RELAY PANEL PER MANUFACTURER'S

INSTRUCTIONS. PROVIDE DUSK TO DAWN CONTROL OF FIXTURE

TYPE S1, S2, S3, AND M1.

6. PROVIDE TWO SETS OF MEDIUM VOLTAGE CABLES BETWEEN

"POWER J-BOX #4" AND NEW MEDIUM VOLTAGE SECTIONALIZING

CABINET "POWER J-BOX #6." PROVIDE THREE (3) 1/C SHIELDED #

2/0 COPPER 15KV 133% EPR INSULATION AND ONE (1) #1 XHHW-2

600 VOLT GROUND PER SET.

7. PROVIDE TWO SETS OF MEDIUM VOLTAGE CABLES BETWEEN

"POWER J-BOX #6" AND NEW SERVICE TRANSFORMER. PROVIDE

THREE (3) 1/C SHIELDED #2 COPPER 15KV 133% EPR INSULATION

AND ONE (1) #1 XHHW-2 600 VOLT GROUND PER SET.

GENERAL SITE NOTES

1. TERMINATE NEW MEDIUM VOLTAGE CABLES ON EXISTING SET OF

SPARE LUGS WITHIN EXISTING MEDIUM VOLTAGE SECTIONALIZING

CABINET, "POWER J-BOX #4."

2. ROUTE NEW MEDIUM VOLTAGE CABLES THROUGH SPARE

CONDUITS IN EXISTING DUCTBANK. ROUTE 'A' AND 'B' CABLES

THROUGH SEPARATE CONDUITS.

3. REOUTE NEW MEDIUM VOLTAGE CABLES THROUGH EXISTING

MANHOLE.

4. INTERCEPT AND CONNECT NEW DUCTBANK TO NORTH SIDE OF

EXISTING MANHOLE.

5. PROVIDE NEW MEDIUM VOLTAGE DUCTBANK. ROUTE NEW MEDIUM

VOLTAGE CABLES THROUGH NEW DUCTBANK. SEE DETAIL D1.

6. PROVIDE NEW MEDIUM VOLTAGE MANHOLE. ROUTE NEW MEDIUM

VOLTAGE CABLES THROUGH NEW MANHOLE. SEE DETAIL B1 & D1.

7. PROVIDE NEW MEDIUM VOLTAGE SECTIONALIZING CABINET,

"POWER J-BOX #6." NEW SECTIONALIZING CABINET SHALL BE

INSTALLED ADJACENT TO NEW MANHOLE, SIMILAR TO EXISTING

MEDIUM VOLTAGE SECTIONALIZING CABINETS ON THE VA CAMPUS.

8. PROVIDE NEW PAD MOUNTED MEDIUM VOLTAGE SERVICE

TRANSFORMER. SEE ELECTRICAL ONE-LINE DIAGRAM E7/EE401.

9. PROVIDE NEW LOW VOLTAGE FEEDER FROM SERVICE

TRANSFORMER TO NEW MAIN DISTRIBUTION PANELBOARD, MDP.

10. PROVIDE TWO (2) 2" CONDUITS BETWEEN NEW TELECOM ROOM

202 AND BUILDING 1 FOR COPPER CABLING. CONDUITS SHALL

FOLLOW THE PATH OF THE PROPOSED STEAM TRENCH. AFTER

CONDUITS ENTER BUILDING 1, CONTRACTOR SHALL FIELD-ROUTE

CONDUIT THROUGH BUILDING 1, THROUGH ACCESS TUNNEL, AND

TO ROOM E23-5 IN BUILDING 5. COORDINATE PATHWAY WITH

OWNER PRIOR TO ROUGH-IN, AND ROUTE IN SUCH A WAY THAT

THE QUANTITY OF PULL BOXES IS MINIMIZED. IN ONE OF THE TWO

CONDUIT PATHWAYS, PROVIDE ONE (1) 25-PAIR OSP COPPER

CABLE BETWEEN NEW TELECOM ROOM 202 AND TELECOM

EQUIPMENT IN ROOM E23-5-5 IN BUILDING 5.

11. PROVIDE TWO (2) 2" CONDUITS BETWEEN NEW TELECOM ROOM

202 AND BUILDING 1 FOR FIBER CABLING. CONDUITS SHALL

FOLLOW THE PATH OF THE PROPOSED STEAM TRENCH. AFTER

CONDUITS ENTER BUILDING 1, CONTRACTOR SHALL FIELD-ROUTE

CONDUIT THROUGH BUILDING 1, THROUGH ACCESS TUNNEL, AND

TO ROOM 178-5 IN BUILDING 5. COORDINATE PATHWAY WITH

OWNER PRIOR TO ROUGH-IN, AND ROUTE IN SUCH A WAY THAT

THE QUANTITY OF PULL BOXES IS MINIMIZED. PROVIDE TWO (2)

PACKS OF 2" 3-CELL MAXCELL INNERDUCT IN EACH CONDUIT. IN

ONE OF THE TWO CONDUIT PATHWAYS, PROVIDE ONE (1) 24-

STRAND MULTIMODE FIBER CABLE BETWEEN NEW TELECOM

ROOM 202 AND TELECOM EQUIPMENT IN ROOM 178-5 IN BUILDING

5.

12. NEW ACCESS CONTROL DEVICES WILL BE ADDED TO THE 1ST

LEVEL ENTRY DOORS INTO STAIR E AND STAIR F OF BUILDING 1 TO

FACILITATE STAFF WITH THE ABILITY TO MOVE BETWEEN

BUILDINGS. HOWEVER, DOOR ACCESS HARDWARE DEVICES AND

ASSOCIATED WIRING AND TERMINATIONS WILL BE PROVIDED BY

OTHERS OUTSIDE OF THIS PROJECT SCOPE.

13. COORDINATE WITH OWNER PATHWAY OF NEW CONDUITS

THROUGH BUILDINGS 1 AND 5.

14. ROUTE NEW CONDUITS ABOVE CEILINGS IN FINISHED AREAS.

COORDINATE WITH MECHANICAL HIGH PRESSURE STEAM LINE

INSTALLATION AND WITH CEILING HEIGHT MODIFICATIONS BY

ARCHITECT. RELOCATE EXISTING CEILING-MOUNTED DEVICES,

LIGHTING, SPEAKERS, AND EQUIPMENT IN LOWERED CEILINGS,

PROVIDING WIRING/CONDUIT EXTENSIONS AS NECESSARY.

15. ROUTE NEW CONDUITS ALONG THE EAST SIDE OF THE EXISTING

TUNNEL.

16. PROVIDE 1" CONDUIT PATHWAY AND PULL STRING, LABELED AT

BOTH ENDS WITH THE LOCATION OF THE OPPOSITE END,

BETWEEN MAIN ELECTRICAL ROOM AND HANDHOLE AT FUTURE

ILLUMINATED MONUMENT SIGN LOCATION.

17. SEE CIVIL DEMOLITION SHEET CD101 FOR ELECTRICAL

DEMOLITION INFORMATION. EXISTING WIRING MADE OBSOLETE

DURING DEMOLITION PHASE TO BE REMOVED TO THE POINT OF

ORIGINATION AND DISCONNECTED.

18. PROVIDE 24"X36"X36" POLYMER CONCRETE HANDHOLE ASSEMBLY

WITH SOLID BOTTOW (WITH DRAIN HOLES, REGRESSED STAINLESS

STEEL BOLTS AND WEC 3.6, ANSI/SCTE 77-"T15/20K" MINIMUM

LOAD RATING. PROVIDE CUSTOM NAMEPLATE - COORDINATE

NAMEPLATE WITH CONTRACTING OFFICER. USE QUAZITE,

OLDCASTLE, OR SIMILAR. SUBMIT PRODUCT DATA FOR REVIEW BY

ENGINEER AND OWNER.

19. PROVIDE WATERPROOF PENETRATIONS THROUGH EXTERIOR

WALL, WITH PULLBOX(ES), AS NECESSARY.

KEYNOTE LEGEND

8'

F O

R T

Y P

E S

F

IX

T

U R

E P

O

LE

B A

S E

6'

F

O R

T Y

P E

S

F

IX

T U

R E

P O

LE

B

A S

E

PIPING IN CONCRETE TRENCH BY

MECH. REFER TO MECH. AND

CIVIL DRAWINGS.

S1

S2

S2

S2

S112

S1

S1

S2

S2

S2

S2

W 22ND STREET

S1

S2

S1

OMAHA | LINCOLN | COLORADO SPRINGS

FARRIS ENGINEERING

farris-usa.com

FE#:172074

CONSULTANT

Drawing Title

Approved: Project Director

Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Phase

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

AE PROJECT NO.: 14541

Stamp

730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840

EST. 1915

100% BID DOCUMENTS

10/01/2018

Outpatient Mental Health Building

VA #438-450

2501 W 22nd St, Sioux Falls, SD, 57105

U.S. Department of Veterans Affairs

NOT FOR CONSTRUCTION

/3

/2

:5 :1

A

M C

U s e rs

\m s b ilb e n \D o c u m e n ts

\A u to d e s k \R e v it

P ro je c ts

\V A

-S F

-M H

F -M

E P m s b ilb e n .r v t

ELECTRICAL SITE PLAN

WSN MPG 95

ES001

SCALE: NTSES001

D1 MEDIUM VOLTAGE DUCTBANK DETAIL

SCALE: NTSES001

D3 POWER MANHOLE DETAILS

SCALE: NTSES001

B1 MANHOLE GROUNDING DETAIL

SCALE: NTSES001

F3 POLE BASE DETAIL

PLAN

NORTH

TRUENORTH

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

Revisions Date

Reissued with Amendment #1 July 3, 2019

SCALE: 1" = 30'-0"ES001

1 ELECTRICAL SITE PLAN

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PSYCHIATRY

PROVIDER

PATHWAY /

PRACTICUM

DIRECTOR

VESTIBULE

HALLWAY

VESTIBULE

CALMING RM

STORAGE

HALLWAY

LOBBY

ENTRY

VESTIBULE

PUBLIC T.

PUBLIC T.

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

PSYCHOL.

PROVIDER

VESTIBULE

ELEC

LOUNGE/STAFF

HALLWAY

STAFF T.

H.K.

HALLWAY

STAFF T.

LACTATION

MECH PENTHOSE

STAIR

RISER ROOM

HALLWAY

THERAPIST

THERAPIST

PSYCHOL.

INTERN SHARED

OUTPATIENT

SUPERVISOR

CONF/

CLASSROOM

GROUP THERAPY

GROUP THERAPY

MED ROOM

PUBLIC T.

PUBLIC T.

ALCOVE

STAFF T.

EXAM T.

HALLWAY

HALLWAY

PEER SUPPORT

SERVICE LINE

DIRECTOR

TEST

TEST / OBSERV

TEST

LOC RECOVERY

VOC SHARED

SUIC PREV

SHARED

RESIDENT

167 OFFICE

SUIC PREV

SHARED

THERAPIST

OFFICE

THERAPIST

PRINT / COPY /

STORAGE

RESIDENT

RESIDENT

TREATMENT

HALLWAY

ADMIN OFFICER

NURSE

NURSE

SECRETARY

WORK AREA

PROG. ASS.

COMM. CENTER

OFFICE

NURSE

NURSE

NURSE

RECEPTION

AA

CC

DD

BB

EE

GG

HH

KK

LL

MM

JJ

FF

W

W

WW

44"

44"

W

44"

PSYCHIATRY

PROVIDER

CR

ES

REX

DC

ES

REX

DC

CR

CR

CR

ES

REX

DC

ES REX

DC

CR

ES

REX

DC

CR

ES

REX

DC

ES

REX

DC

CR

ES

REX

DC

CR

ES

REX DC

CR

ES

REX

DC

CR

ES

DC

REX

CR

ES

DC

REX

CR

DC

DC

12" x 2"

CABLE TRAY

12" X 2"

CABLE TRAY

12" X 2"

CABLE TRAY

12" X 2"

CABLE TRAY

12" x 2"

CABLE TRAY

12" X 2"

CABLE TRAY 12" X 2" CABLE TRAY

20" X 2"

CABLE TRAY

12" X 2"

CABLE TRAY

DA DA DA DA DA DA DA DA DA DA

DADA

DADA

DA

DA

DA

DA

DA

DA

DA DA DA DA DA DA

DA

DA

DADADADADA

DA DA DA DA DA DA DA

DA

DADADADADADA

RAISE TRAY OVER

DUCTWORK

12" x 2" CABLE TRAY

NL

NE

NL

NE

NL

NE

NL NE

NL NE

COPIER

COPIER

PRINTER

PRINTER 4" CONDUITS TO

TELECOM ROOM 2" CONDUITS TO

TELECOM ROOM

(4) 2" CONDUITS TO BUILDING 1

AND BUILDING 5 REFER TO SITE

PLAN ES001.

DA

DC

DA

CR

CR

CR

CR

CR

CR

CR

DA DA DA

72"

72"72"

DA

SMART BOARD SMART BOARD

SMART BOARD

44"

44"

44"

44"

44"

ES

DC

ES

DC

DA

DA

DA

DA

10'-6" 10'-6"

ES

REX

DC

PROVIDE HANDHOLE FOR LOW-

VOLTAGE SYSTEM CONDUITS

SEE ES001 FOR CONTINUATION

TO BUILDING 1 AND BUILDING 5

1. ALL EQUIPMENT AND DEVICES SHOWN ON THIS PLAN ARE NEW,

UNLESS NOTED OTHERWISE.

2. PROVIDE A COMPLETE AND FULLY FUNCTIONAL DATA NETWORK

SYSTEM INCLUDING, BUT NOT LIMITED TO, OUTSIDE PLANT

CABLING, BACKBONE CABLING, HORIZONTAL CABLING,

EQUIPMENT ROOM FITTINGS, PASSIVE NETWORK EQUIPMENT,

DATA OUTLETS, AND TERMINATIONS. COORDINATE WITH OWNER

TO INTERCEPT AND CONNECT TO EXISTING SYSTEM. REFER TO

DIVISION 27 SPECIFICATIONS.

3. PROVIDE A COMPLETE AND FULLY FUNCTIONAL PUBLIC ADDRESS

AND MASS NOTIFICATION SYSTEM IN ALL AREAS WHERE

SPEAKERS ON SHOWN ON THIS DRAWING. COORDINATE WITH

OWNER TO INTERCEPT AND CONNECT TO EXISTING SYSTEM,

RCOMM PT 2020. VA POINT OF CONTACT IS IRA WIESENFELD, (214)

707-7711. REFER TO SPECIFICATION SECTION 27 51 16.

4. PROVIDE A COMPLETE AND FULLY FUNCTIONAL SOUND MASKING

SYSTEM. SYSTEM SHALL PROVIDE SOUND MASKING IN ALL

CIRCULATION, LOBBY, AND RECEPTION AREAS. REFER TO

SPECIFICATION SECTION 27 51 19.

5. PROVIDE A COMPLETE AND FULLY FUNCTIONAL PHYSICAL

ACCESS CONTROL SYSTEM. COORDINATE WITH OWNER TO

INTERCEPT AND CONNECT TO EXISTING SYSTEM. REFER TO

SPECIFICATION SECTION 28 13 00.

6. PROVIDE A COMPLETE AND FULLY FUNCTIONAL ELECTRONIC

PERSONAL PROTECTION (DURESS ALARM) SYSTEM. COORDINATE

WITH OWNER TO INTERCEPT AND CONNECT TO EXISTING SYSTEM.

DURESS ALARM MUST INTERFACE THE PAGING SYSTEM.

COORDINATE WIRELESS STATIONARY DEVICE LOCATIONS WITH

OWNER PRIOR TO INSTALLATION. POINT OF CONTACT FOR

INFORMATION REGARDING INTERFACE OF DURESS SYSTEM AND

PAGING SYSTEM IS TOM MANTHEI, (214) 728-7248. REFER TO

SPECIFICATION SECTION 28 26 00.

7. NURSE CALL DEVICES INDICATED ARE NOT PART OF A SYSTEM,

THEY ARE STANDALONE PULL CORD STATIONS / DOME LIGHTS

INTENDED TO NOTIFY STAFF OF OCCUPANTS IN NEED OF

ASSISTANCE IN THE PUBLIC RESTROOMS.

8. PROVIDE ONE (1) Z-BAND 24-PORT CATV DISTRIBUTION UNIT, HZ

6001-1, IN NEW TELECOM ROOM. COORDINATE WITH OWNER TO

INTERCEPT AND CONNECT TO EXISTING CATV SYSTEM.

9. PROVIDE ALLOWANCE FOR CABLING TO FORTY (40) WIRELESS

ACCESS POINTS THROUGHOUT THE FACILITY. COORDINATE

DEVICE LOCATIONS WITH VA TECHNOLOGY MANAGER.

GENERAL SYSTEMS NOTES

OMAHA | LINCOLN | COLORADO SPRINGS

FARRIS ENGINEERING

farris-usa.com

FE#:172074

CONSULTANT

Drawing Title

Approved: Project Director

Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Phase

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

AE PROJECT NO.: 14541

Stamp

730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840

1 2 3

EST. 1915

100% BID DOCUMENTS

10/01/2018

Outpatient Mental Health Building

VA #438-450

2501 W 22nd St, Sioux Falls, SD, 57105

KEY PLAN

U.S. Department of Veterans Affairs

NOT FOR CONSTRUCTION

/3

/2

:5 :2

A

M C

U s e rs

\m s b ilb e n \D o c u m e n ts

\A u to d e s k \R e v it

P ro je c ts

\V A

-S F

-M H

F -M

E P m s b ilb e n .r v t

SYSTEMS PLAN - FIRST FLOOR

WSN MPG 99

ET131

SCALE: 1/8" = 1'-0"ET131

E1 ELECTRICAL SYSTEMS PLAN

PLAN

NORTH

TRUENORTH

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

C

C

C

J

NEW SERVICE ENTRANCE PANELBOARD, MPB, 480 V, 3 Ø, 4 W

150 A

400 A

MAIN BREAKER

T-LR 75

kVA

T-LM

30 kVA

LM

208 V

3 Ø, 4 W 100 A

MCB

LRA

208 V

3 Ø, 4 W 100 A

MLO

LR

208 V

3 Ø, 4 W 250 A

MCB

LRD

208 V

3 Ø, 4 W 100 A

MCB

LRC

208 V

3 Ø, 4 W 100 A

MCB

LRB

208 V

3 Ø, 4 W 100 A

MLO

400 A BUS

150 A

HM

480 V

3 Ø, 4 W 150 A

MCB

(RECEPT)

ELEC.

(RECEPT)

ELEC.

(RECEPT)

ELEC.

CLOSET

(MECH)

MECH.

(MECH)

MECH.

(RECEPT)

ELEC.

ELEC.

ELEC.

MECH.

110 A

300 kVA 3-PHASE

13.8 kV - 480/277 V

TO NEW MEDIUM VOLTAGE SECTIONALIZING

CABIENT "POWER J-BOX #6"

25 A

LL

208 V

3 Ø, 4 W 60 A

MCB

(LIGHTING)

ELEC.

CU-1

M

PRIVATE ENERGY METER

COMPATIBLE WITH VA AUMS,

REFER TO 25 10 10

3" CONDUIT WITH:

(3) #500 Ø

(1) #500 N

G

N

TO MGB

1-1/4" CONDUIT WITH:

(3) #4 Ø

(1) #4 N

(1) #10 G

1-1/2" CONDUIT WITH:

(3) #1 Ø

(1) #1 N

(1) #8 G

1-1/2" CONDUIT WITH:

(3) #1/0 Ø

(1) #1/0 N

(1) #6 G

2-1/2" CONDUIT WITH:

(3) #250 Ø

(1) #250 N

(1) #4 G

1-1/2" CONDUIT WITH:

(3) #1/0 Ø

(1) #6 G

1-1/4" CONDUIT WITH:

(3) #2 Ø

(1) #2 N

(1) #6 G

1" CONDUIT WITH:

(3) #6 Ø

(1) #10 G

1-1/2" CONDUIT WITH:

(3) #1 Ø

(1) #1 N

(1) #8 G

(RECEPT)

ELEC.

CLOSET

SPD

T-LL

15 kVA

ELEC.

3/4" CONDUIT WITH:

(3) #10 Ø

(1) #10 G

EL

120 V

1 Ø, 3 W

2800 VA

LTG.

INVRTR

(LIGHTING)

ELEC.

3/4" CONDUIT WITH:

(1) #10 Ø

(1) #10 N

(1) #10 G

ISOLITE E3MAC-2800-1P-IA-OA-C(n)-FS-EW OR EQUAL

100 A 60 A 30 A 20 A

SPARE SPARE SPARE SPARE

REFERENCE

ELECTRICAL

GROUNDING DIAGRAM

E6/EE501.

AA

BB

LL

LRB

LRA

LR

T-LR

MPB

MGB

EL

(EMERGENCY

LIGHTING

INVERTER

CABINET)

EL

(EMERGENCY

LIGHTING

INVERTER

CABINET)

LRA

T-LL

W

CC

DD

TMGB

PROVIDE FIRE-TREATED PLYWOOD

BACKBOARD ON FULL LENGTH OF WALL.

LM

LM

LM

LM

(4) 4" CONDUITS TO

CABLE TRAY BELOW

(4) 2" CONDUITS TO

BUILDING 1

PROVIDE FIRE-TREATED PLYWOOD

BACKBOARD ON FULL LENGTH OF WALL.

PROVIDE FIRE-TREATED

PLYWOOD BACKBOARD

ON FULL LENGTH OF

WALL.

(4) 4" CONDUITS TO

CABLE TRAY BELOW

PROVIDE ENLARGED FLOOR PLANS OF TELECOMMUNICATION

SPACES INDICATING LAYOUT OF ACTUAL EQUIPMENT AND

DEVICES TO BE PROVIDED. REFER TO SPECIFICATION

SECTION 27 05 11 PARAGRAPH 1.7.I.1.

FRONT SIDE OF

EQUIPMENT RACKS

PROVIDE FIRE STOPPING IN

ALL CONDUITS PENETRATING

FLOOR SLAB AFTER CABLE

INSTALLATION IS COMPLETE

(TYPICAL).

PROVIDE VERTICAL CABLE

LADDER FROM FLOOR

PENETRATIONS TO

OVERHEAD LADDER RACK.

MOUNT RECEPTACLE TO

OVERHEAD LADDER RACK.

COORDINATE WITH

EQUIPMENT INSTALLER.

48"

48"

PROVIDE FIRE-TREATED

PLYWOOD BACKBOARD ON

FULL LENGTH OF WALL.

LM

LM

LM

LM

LM

LM

LM

LM

LM

22 48"

48"

LM

24 LM

PROVIDE POWER CONNECTION

TO B.A.S. CONTROL PANEL.

OMAHA | LINCOLN | COLORADO SPRINGS

FARRIS ENGINEERING

farris-usa.com

FE#:172074

CONSULTANT

Drawing Title

Approved: Project Director

Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

Dwg. of

Office of Construction and Facilities Management

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Phase

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

AE PROJECT NO.: 14541

Stamp

730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840

1 2 3

EST. 1915

100% BID DOCUMENTS

10/01/2018

Outpatient Mental Health Building

VA #438-450

2501 W 22nd St, Sioux Falls, SD, 57105

KEY PLAN

U.S. Department of Veterans Affairs

NOT FOR CONSTRUCTION

/3

/2

:5 :1

A

M C

U s e rs

\m s b ilb e n \D o c u m e n ts

\A u to d e s k \R e v it

P ro je c ts

\V A

-S F

-M H

F -M

E P m s b ilb e n .r v t

ENLARGED ELECTRICAL FLOOR

PLANS & GENERAL INFORMATION

WSN MPG 100

EE401

SCALE: NTSEE401

E7 ELECTRICAL ONE-LINE DIAGRAM

SCALE: 1/2" = 1'-0"EE401

1 ENLARGED MAIN ELECTRICAL ROOM 192 PLAN

SCALE: 1/2" = 1'-0"EE401

2 ENLARGED TELECOMMUNICATIONS ROOM (TR) 202 PLAN

PLAN

NORTH

TRUENORTH

0 4' 8' 12'2'1'

SCALE: 1/4" = 1'-0"

ELECTRICAL EQUIPMENT CONNECTION SCHEDULE

TAG Text Label SOURCE PANEL CIRCUIT FEEDER LOAD DISCONNECT NOTES

ACCU-1 AIR COOLED CONDENSING UNIT MPB 7,9,11 (3) #2 Ø, (1) #6 EGC, 1-1/4" C 480 V/3-70834 VA BY DIV 23

AHU-1-RF AIR HANDING UNIT RETURN FAN HM 7,9,11 (3) #12 Ø, (1) #12 EGC, 3/4" C 480 V/3-10975 VA BY DIV 23

AHU-1-SF AIR HANDING UNIT SUPPLY FAN HM 1,3,5 (3) #8 Ø, (1) #10 EGC, 3/4" C 480 V/3-29432 VA BY DIV 23

B-1 CONDENSING BOILER LM 13 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-300 VA BY DIV 22 PROVIDE FOR DEDUCT ALTERNATE #6

B-2 CONDENSING BOILER LM 15 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-300 VA BY DIV 22 PROVIDE FOR DEDUCT ALTERNATE #6

CP-1 CONDENSATE PUMP LM 7 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-864 VA MOTOR RATED SWITCH

CRAC-1 COMPUTER ROOM AIR CONDITIONER LM 19,21 (2) #12 Ø, (1) #12 EGC, 3/4" C 208 V/2-2808 VA MOTOR RATED SWITCH

CUH-1 CABINET UNIT HEATER LM 2 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

CUH-2 CABINET UNIT HEATER LM 4 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

CUH-3 CABINET UNIT HEATER LM 6 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

CUH-4 CABINET UNIT HEATER LM 8 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

CUH-5 CABINET UNIT HEATER LM 10 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

EF-1 EXHAUST FAN LM 25 (1) #10 Ø, (1) #10 N, (1) #10 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23

EF-2 EXHAUST FAN LM 27 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23

EVAP-1 EVAPORATIVE COOLER LM 19,21 (2) #12 Ø, (1) #12 EGC, 3/4" C 208 V/2-583 VA MOTOR RATED SWITCH

GWH-1 GAS WATER HEATER LM 23 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-300 VA BY DIV 22 PROVIDE FOR DEDUCT ALTERNATE #6

HUH-1 HORIZONTAL UNIT HEATER LM 12 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

PHWP-1 PRIMARY HEATING WATER PUMP LM 29 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23

PHWP-2 PRIMARY HEATING WATER PUMP LM 31 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23 REDUNDANT

RCP-1 CIRCULATING PUMP LM 11 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-60 VA BY DIV 22

SHWP-1 SECONDARY HEATING WATER PUMP LM 9 (1) #10 Ø, (1) #10 N, (1) #10 EGC, 3/4" C 120 V/1-2880 VA BY DIV 23

SHWP-2 SECONDARY HEATING WATER PUMP LM 17 (1) #10 Ø, (1) #10 N, (1) #10 EGC, 3/4" C 120 V/1-2880 VA BY DIV 23 REDUNDANT

SMP-1 SNOWMELT PUMP LM 35 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-864 VA BY DIV 23 OMIT FOR DEDUCT ALTERNATE #3

VUH-1 VERTICAL UNIT HEATER LM 14 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

VUH-2 VERTICAL UNIT HEATER LM 16 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH

WS-1 WATER SOFTENER LM 11 N/A 120 V/1-300 VA CORD AND PLUG

WS-2 LRD 11 120 V/1-600 VA

WS-3 LRA 3 120 V/1-180 VA

WS-3 LM 20 120 V/1-360 VA

WS-4 LM 18 120 V/1-360 VA

WS-5 LM 24 120 V/1-100 VA

WS-6 LRA 18 120 V/1-400 VA

WS-7 120 V/1-0 VA

WS-8 GFI LM 26 120 V/1-180 VA

Amendment No 1 20190703
Amendment to Utilities Routing drawings
Sheets
AD101 - DEMOLITION PLAN S - BUILDING 1

File details come from the government source that posted it.