36E77619R0036-0003002.pdf
PDF 3 MB Posted
- Solicitation number
- 36E77619R0036
About this file
36E77619R0036 0003 Amendment to Utilities Routing.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0059-000.docx | DOCX document | |
| 36E77619R0036-0005001.pdf | ||
| 36E77619R0036-0005000.docx | DOCX document | |
| 36E77619R0036-0004001.pdf | ||
| 36E77619R0036-0004000.docx | DOCX document | |
| 36E77619R0036-0003001.pdf | ||
| 36E77619R0036-0003003.pdf | ||
| 36E77619R0036-0003004.pdf | ||
| 36E77619R0036-0003005.pdf | ||
| 36E77619R0036-0003006.pdf | ||
| 36E77619R0036-0003000.docx | DOCX document | |
| 36E77619R0036-0003007.pdf | ||
| 36E77619R0036-0002000.docx | DOCX document | |
| 36E77619R0036-0001000.docx | DOCX document | |
| 36E77619R0036-0001001.pdf | ||
| 36E77619R0036-004.pdf | ||
| 36E77619R0036-007.pdf | ||
| 36E77619R0036-008.pdf | ||
| 36E77619R0036-005.pdf | ||
| 36E77619R0036-002.pdf | ||
| 36E77619R0036-009.docx | DOCX document | |
| 36E77619R0036-006.pdf | ||
| 36E77619R0036-010.pdf | ||
| 36E77619R0036-003.pdf | ||
| 36E77619R0036-001.docx | DOCX document | |
| 36E77619R0036-000.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CCiivviill
1. Sheet CU101 (Reissued July 3, 2019)
a. Revise routing of steam trench as shown in clouded areas of the Plan AArrcchhiitteeccttuurraall
1. Sheet AD101 (Reissued July 3, 2019)
a. Revised extent of demolition and reconstruction of wall and ceiling elements in
Building 1 to accommodate revised steam pipe route.
MMeecchhaanniiccaall
11.. SShheeeett MMPP110000 ((RReeiissssuueedd JJuullyy 33,, 22001199))
a. RReevviissee rroouuttiinngg ooff sstteeaamm aanndd wwaatteerr ppiippiinngg aass sshhoowwnn iinn cclloouuddeedd aarreeaa ooff ppllaann..
2. Sheet MP100A (sheet added July 3, 2019)
a. Added large scale plans and details.
EElleeccttrriiccaall
1. Sheet ES01 (Reissued July 3, 2019)
a. Revised routing of telecom conduits through Building 1 and on site as shown on clouded area of plan.as shown in clouded area of plan 1/ES001
b. RReevviisseedd KKeeyynnoottee LLeeggeenndd aass iinnddiiccaatteedd..
2. Sheet ET131(Reissued July 3, 2019)
a. CChhaannggeedd 33”” tteelleeccoomm ccoonndduuiittss ttoo 22”” ccoonndduuiittss
3. Sheet EE401(Reissued July 3, 2019)
a. Changed 3” telecom conduits to 2” conduits at enlarged plan 2/EE401
040025
025A
EMS
EMS
ENG
001A
ENG
EMS
001B
ENG
001C
ENG
052A
ELEV. C
052B
ELEV. B
ELEVATOR
LOBBY
UNASSIGNED
ROOM
CORRIDOR
042A
CORRIDOR
REMOVE THIS SECTION OF CEILING
REMOVE SECTION OF CEILING
025A
EMS
EMS
ENG
001A
ENG
EMS
001B
ENG
001C
ENG
052A
ELEV. C
052B
ELEV. B
ELEVATOR
LOBBY
UNASSIGNED
ROOM
CORRIDOR 042A
CORRIDOR
NEW 2'-0"X2'-0" AT-1 CEILING
CORE DRILL
THROUGH WALL,
COORDINATE
SIZE OF HOLE
W/ MECH
AND FIRE SEAL
NEW HVAC PIPING-
SEE MECH
CORE DRILL THROUGH
WALL, COORDINATE
SIZE OF HOLE W/ MECH
AND SEAL PENETRATION
WATER TIGHT
ALIGN CEILING GRID
TO MATCH EXIST
MODIFY SPRINKLER
HEADS FOR NEW
CEILING HEIGHT
AD101
AD101
AD101
AD101
CONSTRUCT SHAFT OF 3 5/8"
METAL STUD WITH 5/8" GYP
BOARD TO ENCLOSE PIPES
RUNNING VERTICALLY ON WALL
AD101
AD101
DEMOLITION REFELECTED CEILING PLAN
REFELECTED CEILING PLAN
052A
ELEV. C
052B
ELEV. B
ELEVATOR
LOBBY
UNASSIGNED
ROOM
CORRIDOR
042A
CORRIDOR
MECH
032B032
032C
032A
041C
FITNESS
041B
041A
029B
029A
027A 034
FITNESS
MECH
STAIR E
STAIR D
034A
034B
026A
040025
025A
EMS
EMS
ENG
001A
ENG
EMS
001B
ENG
IT
021020001
ENG
STAIR C
001C
ENG
IT
BREAK
ROOM
IT
STAIR B
STORAGE
STORAGE
008 008A
OFFICE
STAIR A
NEW CEILING TILE
MATCH TO EXISTING
METAL TRIM
SEE RCP
E X
IS
T
IN
G
V E
R
IF
Y W
IT
H
M E
C H
A N
IC
A
L
EXISTING
CEILING TILE
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/8
/2
:0 :3
A
M C
U s e rs
\p c h o i\ D o c u m e n ts
\1 O
M H
B R
V T
Y e u n y o u n g .r v t
DEMOLITION PLAN S - BUILDING 1
PDD PYC 22
AD101
1/8" = 1'-0"
ENLARGED BASEMENT DEMOLITION REFLECTED CEILING PLAN - BLDG 1
1/8" = 1'-0"
ENLARGED BASEMENT REFLECTED CEILING PLAN - BLDG 1
PLAN
NORTH
TRUENORTH
0 8' 16' 24'2' 4'
SCALE: 1/8" = 1'-0"
1/16" = 1'-0"
BUILDING 1 - OVERALL FLOOR PLAN
0 4' 8' 16' 32' 48'
SCALE: 1/16" = 1'-0"
1 1/2" = 1'-0"
SOFFIT DETAIL
0 1' 2'
SCALE: 1 1/2" = 1'-0"
Revisions Date
Reissued with Amendment #1 July, 3, 2019
STRUCTURE
SCHEDULE
NAME
STMH 14
STMH 2
STMH 4
STMH 1
STMH 8
STMH 11
STMH 13
CB 12
CB 7
CBMH 6
CBMH 5
CB10
CBMH 9
CBMH 3
CASTING
R-1642
R-1642
R-1642
R-1642
R-1642
R-1642
R-1642
R-3067
R-3067
R-3067
R-3067
R-4342
R-4342
R-4342
RIM
1498.08
1492.50
1494.17
1495.29
1494.92
1495.55
1499.14
1493.24
1493.19
1493.19
1493.55
1494.72
1494.50
1494.79
INV
1488.30
1485.70
1486.00
1484.60
1487.80
1489.90
1488.10
1490.00
1489.90
1489.80
1489.70
1490.70
1490.20
1486.10
SIZE
48"
48"
48"
48"
48"
48"
48"
2'x3'
2'x3'
48"
48"
48"
48"
60"
UTILITY PLAN
SCALE:
BUILDING 1 - ROOF DRAIN CONNECTION
1"=10'
LEGEND:
1. UTILITY INFORMATION SUPPLIED BY VA. CONTRACTOR TO VERIFY ALL UNDERGROUND UTILITIES AS NECESSARY
TO COMPLETE WORK. THIS MAY REQUIRE A PRIVATE LOCATOR. UTILITIES ON PLANS MAY VARY FROM EXISTING
CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO UTILITIES WHETHER SHOWN, NOT
SHOWN, OR SHOWN INCORRECTLY. NOTIFY COR IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND.
2. COORDINATE ALL UTILITY RELOCATIONS WITH ALL DISCIPLINES TO MINIMIZE DISRUPTIONS. COORDINATE WITH
COR ON ALL DISRUPTIONS.
3. WATERMAIN TO BE LOCATED 10' MINIMUM HORIZONTAL SEPARATION FROM SANITARY SEWER.
4. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF THE LOCAL GOVERNING AUTHORITIES FOR CONNECTION
TO PUBLIC WATER, SANITARY SEWER, AND STORM SEWER UTILITIES AND WORK WITHIN THE PUBLIC RIGHT OF
WAY.
5. ALL WATER SERVICE THRUST FORCE POINTS (INCLUDES VALVES, TEES, WYES, HYDRANTS, DEAD ENDS, AND
BENDS ARE TO HAVE MECHANICAL JOINT CONNECTIONS. THRUST BLOCKS ARE TO BE USED AS DETAILED.
6. THE CONTRACTOR SHALL CLEAN ALL SURFACE FLOW CHANNELS, PIPES, AND STRUCTURES AFTER FINAL
SURFACES ARE ESTABLISHED AND PRIOR TO PROJECT CLOSEOUT.
7. VERIFY ALL UTILITY CONNECTIONS AND CONTINUATION NEAR BUILDING PERIMETER WITH MECHANICAL PLANS
PRIOR TO INSTALLATION.
8. CONTRACTOR SHALL PERFORM A RECORD SURVEY FOR ALL CONSTRUCTED ITEMS TO VERITY CONSTRUCTION
CONFORMS TO CONSTRUCTION DOCUMENTS. ITEMS INCLUDED, BUT NOT LIMITED TO; CONNECTIONS TO EXISTING
UTILITIES (LOCATION AND ELEVATION), NEW UTILITY LINE ROUTING, NEW STRUCTURE LOCATIONS, INVERT
ELEVATIONS, PAVEMENT/CURB AND GUTTER/SIDWALK/RETAINING WALL/ ETC. LOCATIONS AND ELEVATIONS.
9. SEE ELECTRICAL FOR NEW TELEPHONE/COMMUNICATION LINE INSTALLATION AND ROUTING.
GENERAL NOTES:
INSTALL NEW HYDRANT, GATE VALVE, AND 6" HYDRANT LEAD.
COORDINATE UTILITY CONNECTION WITH BUILDING MECHANICAL, ELECTRICAL, FIRE PROTECTION, AND PLUMBING
PLANS.
CONNECT TO EXISTING WATER LINE. CONTRACTOR TO VERIFY DEPTH, SIZE, MATERIAL, AND LOCATION OF EXISTING
UTILITY PRIOR TO CONSTRUCTION. COORDINATE WITH VA ON SERVICE DISRUPTIONS.
INSTALL TWO 45° BENDS (TYP.)
INSTALL 8" 45° BEND
INSTALL 8"x6" TEE AND 6" GATE VALVE
INSTALL 8" GATE VALVE
INSTALL NEW TRANSFORMER PER ELECTRICAL PLANS.
INSTALL NEW UNDERGROUND ELECTRIC SERVICE FROM TRANSFORMER TO BUILIDNG (SEE ELECTRICAL PLANS).
INSTALL NEW TELEPHONE SERVICE. SEE ELECTRICAL PLANS FOR LOCATION.
SEE MECHANICAL FOR STEAM TRENCH CONNECTION TO BUILDING.
INSTALL SANITARY CLEANOUT.
CONNECT TO EXISTING SANITARY SEWER MANHOLE. INV. 1485.2±
LOWER WATER LINE TO MAINTAIN 7.5' MIN BURY DEPTH. INSULATE AS NECESSARY IF DEPTH IS LESS THAN 7.5'. ADD
45° ELBOW TO DROP PIPE DOWN (TO MAINTAIN PROPER BURY DEPTH) ADD SECOND 45° ELBOW TO LEVEL PIPE. SEE
DETAIL 1/CJ104
75 LF OF NEW 8" DIP WATERMAIN
6" DIP HARD WATER FIRE SERVICE LINE.
2" TYPE K COPPER SOFT WATER LINE W/ CURB STOP.
CONCRETE STEAM TRENCH. CONNECT AT BUILDING 1. SEE MECH. PLANS FOR DETAILS.
DROP MANHOLE FOR STEAM AND SOFT WATER. SEE MECH. PLANS FOR DETAILS.
(DEDUCT ALT.) NEW GAS LINE CONNECTED TO CITY HIGH PRESSURE STEEL LINE. COORDINATE WITH LOCAL UTILITY.
ELECTRICAL CONCRETE TRENCH. SEE ELEC. PLANS FOR DETAILS. RESTORE IN-KIND ALL DISTURBED.
NEW ELECTRICAL MANHOLE. SEE ELEC. PLANS FOR DETAILS.
SEE SHEET CJ106 FOR OUTLET CONTROL AND INLET STRUCTURE DETAILS.
(DEDUCT ALT.) 2" TYPE K COPPER HARD WATER SERVICE.
2" TYPE K COPPER HARD WATER IRRIGATION SERVICE. LINE TO ENTER BUILDING, PASS THROUGH WATER METER, AND EXIT BUILDING. EXTEND IRRIGATION SERVICE LINE 20' FROM BUILDING AND INSTALL CORP STOP, PLUG, AND
PROVIDE SURFACE MARKER.
PIV - SEE FIRE PROTECTION PLANS FOR DETAILS.
WATER SERVICE CONNECTION WITH CURB STOP. SEE DETAIL 5/CJ101
REROUTE EXISTING ROOF DRAIN. ELEVATION OF THE EXISTING DRAIN IS
UNKNOWN. NOTIFY COR IF EXISTING DRAIN ELEVATIONS WILL NOT DRAIN
WITH PROPOSED ELEVATIONS.
INSPECTION PORTS FOR NEW STORMWATER CHAMBERS (TYP).
SEE SHEETS CJ106 - CJ109.
LOW VOLTAGE SYSTEM (TWO 3" CONDUITS) INSTALLED ADJACENT
TO STEAM TRENCH. SEE ES001
KEYNOTES:
NEW STORM SEWER
NEW STORM SEWER STRUCTURES
NEW SANITARY SEWER
NEW WATERMAIN
NEW STEAM TRENCH
NEW GAS SERVICE
NEW GATE VALVE
NEW SANITARY SEWER MANHOLE
CONSTRUCTION LIMITS
N
0 20' 40'
UNDERGROUND STORMWATER CHAMBER
A
M
Revisions Date
EMS
Checked Drawn
IJW
CONSULTANT Drawing Title
Approved: Project Director
Project Title
Location
Issue Date
Drawing Number
Dwg. of
Project Number
Building Number
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
Y v a s i o u x f a l l s m e n t a l h e a l t h b u i l d i n g D w g
C d
C i v i l S h e e t s
C
U
T I L d w g
A
B
C
D
E
F
PhaseARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
U.S. Department of Veterans Affairs
CU101
H
A
R
D
W
A
T
E
R
L
I
N
E
NEW CONCRETE ELECTRICAL TRENCH
CONNECT TO EXISTING @ 1484.2±
12 LF - 6" PVC @ 2.0%
50 LF - 6" PVC @ 2.0%
SAN CO
RIM 1494.27
I. 1486.2 (6" OUT)
I. 1486.3 (6" IN)
STRM CO
RIM 1494.22
I. 1490.4 (6" OUT)
SCALE:
WATER SERVICE CONNECTIONS
1"=10'
L
F
P
V
C
CONNECT TO
EXISTING STORM
DRAIN LINE
NEW WATER HYDRANT
NEW LIGHT POLE. SEE ELECTRICAL FOR DETAILS.
NEW CLEANOUT
NEW VALVE
SEE 1/CU101 FOR ROOF
DRAIN CONNECTION RIM
AND INVERTS (TYP.)
SEE 2/CU101 WATER
SERVICE CONNECTIONS
DETAILS (TYP.)
PROTECT GAS LINE.
RELOCATE AS NECESSARY
NOT FOR CONSTRUCTION
45°
COORDINATE CONNECTION OF
EACH TRENCH UTILITY (STREAM
LINE, WATER LINE & ELEC. LINE)
WITH MECHANICAL BOTH
HORIZONTALLY & VERTICALLY. USE
CARE ADJACENT TO EXISTING
BUILDING SO AS NOT TO IMPACT
ITS STRUCTURAL INTEGRITY
RELOCATE EXISTING AIR
CONDITIONING UNIT AS NEEDED
FOR TRENCH INSTALLATION
Reissued with Amendment #1 July 3, 2019
AA
CC
DD
BB
EE
GG
HH
KK
LL
MM
JJ
FF
PIPING IN CONCRETE TRENCH. 3"
HPS, 2" HCR & 2" SCW.
REFER TO CIVIL DRAWINGS FOR
EXACT SIZE AND LOCATION
2" HPS AND 1-1/4" HPC STUBBED OUT
AND CAP TO SERVES BUILDING 16
AND 17 ON FUTURE PROJECT.
PROVIDE END OF MAIN DRIP AS
NEEDED.
REFER TO CIVIL DRAWINGS FOR MAN
HOLE LOCATION.
3" HPS
2" HCR
ROUTE 2-1/2" HPS AND 1-1/2" HPC UP
IN AN ENCLOSURE. OFFSET PIPING
AS NEEDED TO STAY IN AN
ENCLOSURE. PROVIDE END OF MAIN
DRIP AS NEEDED.
3" HPS
2" HCR 3" SCW
SEE ENLARGED PLAN
ON SHEET MP100A
3" HPS
2" HCR
3" SCW
3" SCW
PIPING IN CONCRETE TRENCH. 3"
HPS, 2" HCR & 2" SCW.
REFER TO CIVIL DRAWINGS FOR
TRENCH AND PIPE INVERT
ELEVATIONS
PIPE ANCHORS
SEE ENLARGED PLAN
ON SHEET MP100A
PIPE ANCHORS
SEE ENLARGED PLAN
ON SHEET MP100A
A. ALL NEW WORK SHALL BE COORDINATED WITH THE OWNER. THIS
FACILITY SHALL REMAIN IN OPERATION DURING OCCUPIED PERIODS.
B. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES
TO THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF
CONSTRUCTION ACTIVITIES.
C. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF NATIONAL
AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.
D. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY
SYSTEMS THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF
WORK. CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT
THESE AREAS ARE NOT DEPRIVED OF HEATING, COOLING,
VENTILATION, ETC. UPON COMPLETION THESE SYSTEMS SHOULD
BE RETURNED TO PREVIOUS WORKING ORDER.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY
DEMOLITION OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND
REPAIR AND RESTORATION TO BREAK IN PLAN OR TO FIRST
MATERIAL JOINT BEYOND DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION
DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION
DAMAGED BY ALTERATIONS TO MECHANICAL AND ELECTRICAL
SYSTEMS, WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS
SHOWING.
G. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY
OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF
THE WORK WITH THE OWNER.
H. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO THE START OF CONSTRUCTION. REPORT ANY
DISCREPANCIES TO THE PROJECT ENGINEER PRIOR TO START OF
DEMOLITION OF CONSTRUCTION ACTIVITIES.
I. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF
WEATHER CONDITIONS AT THE END OF EACH DAY. MAINTAIN
WEATHER TIGHT CONDITIONS 24 HOURS A DAY FOR THE DURATION
OF THE PROJECT.
J. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF
EXISTING STRUCTURES SURROUNDING THE CONTRACT AREA.
DAMAGE TO EXISTING STRUCTURES OR EQUIPMENT SHALL BE
REPAIRED AT NO ADDITIONAL COST TO THE OWNER.
K. CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITH VENTING
DIRECTLY TO OUTSIDE DURING DEMOLITION AND NEW
CONSTRUCTION ACTIVITIES IN ORDER TO MINIMIZE THE CHANCE
FOR AIR POLLUTION TO ENTER HOSPITAL VENTILATION SYSTEMS.
ALL EXISTING RETURN AND SUPPLY AIR DUCTWORK TO THESE
AREAS SHALL BE SECURELY CAPPED WITH SHEET METAL DURING
THE CONSTRUCTION PERIOD. THIS REQUIREMENT APPLIES TO ALL
WORK AREAS COORDINATE W/ OWNER.
L. ALL HVAC PIPING IS SHOWN IN SCHEMATIC FORM. NOT ALL PIPING
RISES AND DROPS ARE SHOWN. PROVIDE OFFSETS AS REQUIRED
TO MEET SPACE REQUIREMENTS AND TO AVOID INTERFERENCE
WITH OTHER TRADES.
M. COORDINATE FINAL LOCATIONS OF NEW HVAC PIPING AND
EQUIPMENT WITH EXISTING SYSTEMS, STRUCTURE, LIGHTING,
ARCHITECTURAL ELEMENTS, PIPING AND SPRINKLERS.
N. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE
RATED ASSEMBLIES AND SEAL WITH FLANGES AND INTUMESCENT
MATERIAL, AS REQUIRED.
O. PROVIDE ADEQUATE CLEARANCE FOR INSULATION IN HANGERS,
FROM STRUCTURE AND FROM EQUIPMENT.
P. PROVIDE END OF MAIN DROP AND TRAP AS NEEDED FOR THE
STEAM SYSTEM.
GENERAL HVAC PIPING NOTES
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/3
/2
:3 :1
A
M C
U s e rs
\g jh a ik
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -M
E P g jh a ik
.r v t
HVAC PIPING BASEMENT LEVEL
PLAN AND SITE PLAN
LLK SB 92
MP100
SCALE: NTSMP100
1 HVAC PIPING SITE PLAN
PLAN
NORTH
TRUENORTH
0 4' 8' 12'2'1'
SCALE: 1/4" = 1'-0"
BUILDING 1
042A
052A
052B
CORRIDOR
UNASSIGNED
ROOM
CORRIDOR
ELEV. B
ELEV. C
ELEVATOR
LOBBY
025A
001A
001B
001C
EMS
EMS
ENG
ENG
ENG
ENG
PIPE GUIDE-
TYPICAL
PIPE ANCHOR-
TYPICAL
FOR FUTURE
CONNECTION TO
BUILDINGS 16 AND 17
3" H
P S
2" P
C R
3" H
P S
2" P
C R
PROVIDE METRA FLEX MODEL DOUBLE
METRAGATOR (BASIS OF DESIGN)EXPANSION
COMPENSATOR RATED FOR 150 PSIG @ 850
DEGREE F., CS BODY, 304 SS BELOW,
COMPRESSION / CONTRACTION +/- 4 INCHES.
(TYPICAL)
EXISTING BUILDING #1
NEW MENTAL HEALTH CLINIC
30'-0"
3" H
P S
2" P
C R
PROVIDE END OF
MAIN DRIP AND TRAP
AS NEEDED.
2" S
C W
2" S
C W
2" S
C W
CONNECT NEW 3" HPS AND 2" HPC TO
EXISTING 6" STEAM AND 2-1/2"
CONDENSATE MAINS IN TUNNEL. OFFSET
PIPING AS REQUIRED TO
ACCOMMONDATE NEW CONNECTIONS.
PROVIDE END OF MAIN DRIPS AS
REQUIRED. INSTALL SHUTOFF GATE
VALVE NEAR MAINS.
COORDINATE WITH GENERAL
CONTRACTOR FOR EXISTING CEILING
TILE REMOVAL, REINSTALLED AND
SOFFIT ENCLOSURE.
PIPING IN CONCRETE TRENCH.
REFER TO CIVIL DRAWINGS FOR
EXACT SIZE AND LOCATION.
3" H
P S
2" H
C R
OFFSET PIPING AS NEEDED TO GET
UNDERNEATH EXISTING
DUCTWORK AND PIPING.
DROP PIPES DOWN IN EXISTING
SLAB RECESS ALONG EXTERIOR
WALL. CORE DRILL THROUGH
FOUNDATION TO TRENCH.
DROP PIPES DOWN
IN SHAFT
COORDINATE WITH GENERAL
CONTRACTOR FOR EXISTING CEILING
TILE REMOVAL, REINSTALLED AND
SOFFIT ENCLOSURE.
3" S
C W
3" S
C W2"
H C
R 3"
H P
S
3" SCW
2" HCR
3" HPS
3" HPS
2" HCR
3" SCW
PROVIDE CONDENSATE DRIP TRAPS
ON ALL STEAM PIPE RISE AND DROPS
PIPE CONDENSATE TO RECEIVER IN TUNNEL
A. ALL BRANCH PIPING ARE 3/4" UNLESS OTHERWISE NOTED.
B. ALL PIPING IS SHOWN IN SCHEMATIC FORM. NOT ALL PIPING RISES
AND DROPS ARE SHOWN. PROVIDE OFFSETS AS REQUIRED TO MEET
SPACE REQUIREMENTS AND TO AVOID INTERFERENCE WITH OTHER
TRADES.
C. COORDINATE FINAL LOCATIONS OF NEW PIPING AND HVAC EQUIPMENT
WITH STRUCTURE, LIGHTING, ARCHITECTURAL ELEMENTS,
DUCTWORK, PIPING AND SPRINKLERS.
D. REFER TO PIPING DETAILS FOR PIPING ACCESSORIES AND FINAL
CONNECTIONS TO HVAC EQUIPMENT AND TERMINAL UNITS.
TRANSITION PIPING AS REQUIRED FOR FINAL EQUIPMENT
CONNECTIONS, MINIMUM ¾” IPS PIPE SIZE.
E. PROVIDE MANUAL AIR VENTS WITH CAPPED HOSE END CONNECTIONS
AT THE TOP OF EACH RISER AND AT ALL HIGH POINTS IN EACH
PRESSURE PIPING SYSTEM.
F. PROVIDE DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT
THE BOTTOM OF EACH RISER AND AT ALL LOW POINTS IN EACH
PRESSURE PIPING SYSTEM.
G. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE RATED
ASSEMBLIES AND SEAL WITH INTUMESCENT MATERIAL.
H. PROVIDE ADEQUATE CLEARANCE FOR INSULATION IN HANGERS, FROM
STRUCTURE AND FROM EQUIPMENT.
I. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION AND
TO MINIMIZE STRESSING OF EQUIPMENT CONNECTIONS.
J. WHERE ANY CONTROL VALVE, MANUAL VALVE, DRAIN OR AIR VENT
CANNOT BE ACCESSED OR VIEWED THROUGH LAY-IN CEILINGS OR
OTHER CONVENIENT MEANS, PROVIDE A MINIMUM 24 INCH X 24 INCH
ARCHITECTURALLY ACCEPTABLE RATED ACCESS PANEL AT EACH
INACCESSIBLE LOCATION.
K. CONNECT PIPE AND EQUIPMENT HANGERS TO TOP CHORD OF ROOF
JOISTS, BEAM FLANGES OR CONCRETE FLOOR DECK, BY APPROVED
MEANS.
L. PROVIDE END OF MAIN DRIP AND TRAP AS NEEDED FOR THE STEAM
SYSTEM.
M. THE PERIMETER SLAB RECESS IN THE BASEMENT OF BUILDING ONE
MAY HAVE ASBESTOS WITHIN THE RECESS. VERIFY WITH THE VA.
GENERAL HVAC PIPING NOTES
PIPE PIPE
1/4
TYP.
TYPE
STEEL ASTM SIZE
SHOES FOR CARBON STEEL PIPE
MATERIAL
S-1
S-2
CARBON
CARBON A-36
A-36 ST 6 X 15.9 X 16" LONG
1 PLATE
8" X 16" X 1/4" THK. (HORIZ.)
2 PLATES
6" X 16" X 1/4" THK. (VERT.)
SEE NOTE 3
NOTES:
1. WELD THICKNESS SHALL BE SAME AS PIPE SHOE OR PIPE WALL THICKNESS, WHICHEVER IS THINNEST.
2. WHERE INSULATION IS GREATER THAN SHOE HEIGHT, CUT AWAY INSULATION PARTIALLY WHERE IT
INTERFERES WITH PIPE SHOES AND SUPPORTS.
3. SEE TABLE ___ FOR CHANNEL SUPPORT SCHEDULE.
HEAT INSULATED PIPING (100° F - 750° F)
PIPE 2" THRU 10" PIPE 12" THRU 24"
*SEE NOTE 1
S-1 S-2
INSULATIO
N SEE
NOTE 2
INSULATION SEE NOTE 2
1 1/2"
8"
1 1/2"
PIPE
HEAT INSULATED PIPING
TYPE
STEEL ASTM SIZE
MATERIAL
G-4
G-5
CARBON
CARBON A-36
A-36
G-4
3/16 1 1/2"-3
TYP.
3/16 1 1/2"-3
G-5
GUIDES FOR PIPE SHOE
1" X 1" X 3/16"
ANGLE 16" LONG
1" X 1" X 3/16"
ANGLE 16" LONG
PIPE 2" THRU 10"
PIPE 12" THRU 24"
GUIDE ANGLE (TYP.)
1/4" CLEAR (TYP)
S-2 SEE NOTE 1
INSULATION
S-1 SEE NOTE 1
INSULATION
PIPE
TYP.
SUPPORT
CHANNEL IN
TRENCH (TYP)
(SEE NOTE 2)
GUIDE ANGLE (TYP)
NOTE:
1. SEE TABLE ___ FOR CHANNEL SUPPORT SCHEDULE.
1/4" CLEAR (TYP)
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
KEY PLAN
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/3
/2
:3 :1
A
M C
U s e rs
\g jh a ik
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -M
E P g jh a ik
.r v t
ENLARGED PLANS OF STEAM
PIPE ROUTING
Checker GJH 93
MP100A
Revisions Date
Reissued with Amendment #1 July 3, 2019
SCALE: NONEMP100A
1 STEAM PIPE IN TRENCH ROUTING DETAIL
SCALE: 1/8" = 1'-0"MP100A
2 HVAC PIPING ENLARED PLAN OF BUILDING 1
SCALE: 1 : 1MP100A
3 HVC41-FREE PIPE SUPPORT DETAIL
SCALE: 1 : 1MP100A
4 HVC42-GUIDED PIPE SUPPORT DETAIL
1. COORDINATE UNDERGROUND ELECTRICAL WORK WITH CIVIL
ENGINEERING DRAWINGS AND ALL NEW AND EXISTING
UNDERGROUND INFRASTRUCTURE.
2. CONNECT ALL SITE LIGHTING CIRCUITS TO PANEL LL. CIRCUIT
NUMBER IS INDICATED BY LUMINAIRE TAG.
3. FOR TYPE S1 LUMINAIRES SHOWN, PROVIDE 14' ROUND STEEL
POLE TO MATCH EXISTING VA CAMPUS STANDARD.
4. FOR TYPE S2 LUMINAIRES SHOWN, PROVIDE 25' SQUARE STEEL
POLE TO MATCH EXISTING VA CAMPUS STANDARD.
5. ROUTE HOMERUNS FOR SITE LIGHTING SHOWN AND FOR TYPE M1
FIXTURES ON SHEET EL111 THROUGH LIGHTING RELAY PANEL
RP-1 IN MAIN ELECTRICAL ROOM. PROVIDE PHOTOCELL ON ROOF,
COORDINATE LOCATION WITH OTHER TRADES. INTERCONNECT
PHOTOCELL AND RELAY PANEL PER MANUFACTURER'S
INSTRUCTIONS. PROVIDE DUSK TO DAWN CONTROL OF FIXTURE
TYPE S1, S2, S3, AND M1.
6. PROVIDE TWO SETS OF MEDIUM VOLTAGE CABLES BETWEEN
"POWER J-BOX #4" AND NEW MEDIUM VOLTAGE SECTIONALIZING
CABINET "POWER J-BOX #6." PROVIDE THREE (3) 1/C SHIELDED #
2/0 COPPER 15KV 133% EPR INSULATION AND ONE (1) #1 XHHW-2
600 VOLT GROUND PER SET.
7. PROVIDE TWO SETS OF MEDIUM VOLTAGE CABLES BETWEEN
"POWER J-BOX #6" AND NEW SERVICE TRANSFORMER. PROVIDE
THREE (3) 1/C SHIELDED #2 COPPER 15KV 133% EPR INSULATION
AND ONE (1) #1 XHHW-2 600 VOLT GROUND PER SET.
GENERAL SITE NOTES
1. TERMINATE NEW MEDIUM VOLTAGE CABLES ON EXISTING SET OF
SPARE LUGS WITHIN EXISTING MEDIUM VOLTAGE SECTIONALIZING
CABINET, "POWER J-BOX #4."
2. ROUTE NEW MEDIUM VOLTAGE CABLES THROUGH SPARE
CONDUITS IN EXISTING DUCTBANK. ROUTE 'A' AND 'B' CABLES
THROUGH SEPARATE CONDUITS.
3. REOUTE NEW MEDIUM VOLTAGE CABLES THROUGH EXISTING
MANHOLE.
4. INTERCEPT AND CONNECT NEW DUCTBANK TO NORTH SIDE OF
EXISTING MANHOLE.
5. PROVIDE NEW MEDIUM VOLTAGE DUCTBANK. ROUTE NEW MEDIUM
VOLTAGE CABLES THROUGH NEW DUCTBANK. SEE DETAIL D1.
6. PROVIDE NEW MEDIUM VOLTAGE MANHOLE. ROUTE NEW MEDIUM
VOLTAGE CABLES THROUGH NEW MANHOLE. SEE DETAIL B1 & D1.
7. PROVIDE NEW MEDIUM VOLTAGE SECTIONALIZING CABINET,
"POWER J-BOX #6." NEW SECTIONALIZING CABINET SHALL BE
INSTALLED ADJACENT TO NEW MANHOLE, SIMILAR TO EXISTING
MEDIUM VOLTAGE SECTIONALIZING CABINETS ON THE VA CAMPUS.
8. PROVIDE NEW PAD MOUNTED MEDIUM VOLTAGE SERVICE
TRANSFORMER. SEE ELECTRICAL ONE-LINE DIAGRAM E7/EE401.
9. PROVIDE NEW LOW VOLTAGE FEEDER FROM SERVICE
TRANSFORMER TO NEW MAIN DISTRIBUTION PANELBOARD, MDP.
10. PROVIDE TWO (2) 2" CONDUITS BETWEEN NEW TELECOM ROOM
202 AND BUILDING 1 FOR COPPER CABLING. CONDUITS SHALL
FOLLOW THE PATH OF THE PROPOSED STEAM TRENCH. AFTER
CONDUITS ENTER BUILDING 1, CONTRACTOR SHALL FIELD-ROUTE
CONDUIT THROUGH BUILDING 1, THROUGH ACCESS TUNNEL, AND
TO ROOM E23-5 IN BUILDING 5. COORDINATE PATHWAY WITH
OWNER PRIOR TO ROUGH-IN, AND ROUTE IN SUCH A WAY THAT
THE QUANTITY OF PULL BOXES IS MINIMIZED. IN ONE OF THE TWO
CONDUIT PATHWAYS, PROVIDE ONE (1) 25-PAIR OSP COPPER
CABLE BETWEEN NEW TELECOM ROOM 202 AND TELECOM
EQUIPMENT IN ROOM E23-5-5 IN BUILDING 5.
11. PROVIDE TWO (2) 2" CONDUITS BETWEEN NEW TELECOM ROOM
202 AND BUILDING 1 FOR FIBER CABLING. CONDUITS SHALL
FOLLOW THE PATH OF THE PROPOSED STEAM TRENCH. AFTER
CONDUITS ENTER BUILDING 1, CONTRACTOR SHALL FIELD-ROUTE
CONDUIT THROUGH BUILDING 1, THROUGH ACCESS TUNNEL, AND
TO ROOM 178-5 IN BUILDING 5. COORDINATE PATHWAY WITH
OWNER PRIOR TO ROUGH-IN, AND ROUTE IN SUCH A WAY THAT
THE QUANTITY OF PULL BOXES IS MINIMIZED. PROVIDE TWO (2)
PACKS OF 2" 3-CELL MAXCELL INNERDUCT IN EACH CONDUIT. IN
ONE OF THE TWO CONDUIT PATHWAYS, PROVIDE ONE (1) 24-
STRAND MULTIMODE FIBER CABLE BETWEEN NEW TELECOM
ROOM 202 AND TELECOM EQUIPMENT IN ROOM 178-5 IN BUILDING
5.
12. NEW ACCESS CONTROL DEVICES WILL BE ADDED TO THE 1ST
LEVEL ENTRY DOORS INTO STAIR E AND STAIR F OF BUILDING 1 TO
FACILITATE STAFF WITH THE ABILITY TO MOVE BETWEEN
BUILDINGS. HOWEVER, DOOR ACCESS HARDWARE DEVICES AND
ASSOCIATED WIRING AND TERMINATIONS WILL BE PROVIDED BY
OTHERS OUTSIDE OF THIS PROJECT SCOPE.
13. COORDINATE WITH OWNER PATHWAY OF NEW CONDUITS
THROUGH BUILDINGS 1 AND 5.
14. ROUTE NEW CONDUITS ABOVE CEILINGS IN FINISHED AREAS.
COORDINATE WITH MECHANICAL HIGH PRESSURE STEAM LINE
INSTALLATION AND WITH CEILING HEIGHT MODIFICATIONS BY
ARCHITECT. RELOCATE EXISTING CEILING-MOUNTED DEVICES,
LIGHTING, SPEAKERS, AND EQUIPMENT IN LOWERED CEILINGS,
PROVIDING WIRING/CONDUIT EXTENSIONS AS NECESSARY.
15. ROUTE NEW CONDUITS ALONG THE EAST SIDE OF THE EXISTING
TUNNEL.
16. PROVIDE 1" CONDUIT PATHWAY AND PULL STRING, LABELED AT
BOTH ENDS WITH THE LOCATION OF THE OPPOSITE END,
BETWEEN MAIN ELECTRICAL ROOM AND HANDHOLE AT FUTURE
ILLUMINATED MONUMENT SIGN LOCATION.
17. SEE CIVIL DEMOLITION SHEET CD101 FOR ELECTRICAL
DEMOLITION INFORMATION. EXISTING WIRING MADE OBSOLETE
DURING DEMOLITION PHASE TO BE REMOVED TO THE POINT OF
ORIGINATION AND DISCONNECTED.
18. PROVIDE 24"X36"X36" POLYMER CONCRETE HANDHOLE ASSEMBLY
WITH SOLID BOTTOW (WITH DRAIN HOLES, REGRESSED STAINLESS
STEEL BOLTS AND WEC 3.6, ANSI/SCTE 77-"T15/20K" MINIMUM
LOAD RATING. PROVIDE CUSTOM NAMEPLATE - COORDINATE
NAMEPLATE WITH CONTRACTING OFFICER. USE QUAZITE,
OLDCASTLE, OR SIMILAR. SUBMIT PRODUCT DATA FOR REVIEW BY
ENGINEER AND OWNER.
19. PROVIDE WATERPROOF PENETRATIONS THROUGH EXTERIOR
WALL, WITH PULLBOX(ES), AS NECESSARY.
KEYNOTE LEGEND
8'
F O
R T
Y P
E S
F
IX
T
U R
E P
O
LE
B A
S E
6'
F
O R
T Y
P E
S
F
IX
T U
R E
P O
LE
B
A S
E
PIPING IN CONCRETE TRENCH BY
MECH. REFER TO MECH. AND
CIVIL DRAWINGS.
S1
S2
S2
S2
S112
S1
S1
S2
S2
S2
S2
W 22ND STREET
S1
S2
S1
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/3
/2
:5 :1
A
M C
U s e rs
\m s b ilb e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -M
E P m s b ilb e n .r v t
ELECTRICAL SITE PLAN
WSN MPG 95
ES001
SCALE: NTSES001
D1 MEDIUM VOLTAGE DUCTBANK DETAIL
SCALE: NTSES001
D3 POWER MANHOLE DETAILS
SCALE: NTSES001
B1 MANHOLE GROUNDING DETAIL
SCALE: NTSES001
F3 POLE BASE DETAIL
PLAN
NORTH
TRUENORTH
0 4' 8' 12'2'1'
SCALE: 1/4" = 1'-0"
Revisions Date
Reissued with Amendment #1 July 3, 2019
SCALE: 1" = 30'-0"ES001
1 ELECTRICAL SITE PLAN
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PSYCHIATRY
PROVIDER
PATHWAY /
PRACTICUM
DIRECTOR
VESTIBULE
HALLWAY
VESTIBULE
CALMING RM
STORAGE
HALLWAY
LOBBY
ENTRY
VESTIBULE
PUBLIC T.
PUBLIC T.
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
PSYCHOL.
PROVIDER
VESTIBULE
ELEC
LOUNGE/STAFF
HALLWAY
STAFF T.
H.K.
HALLWAY
STAFF T.
LACTATION
MECH PENTHOSE
STAIR
RISER ROOM
HALLWAY
THERAPIST
THERAPIST
PSYCHOL.
INTERN SHARED
OUTPATIENT
SUPERVISOR
CONF/
CLASSROOM
GROUP THERAPY
GROUP THERAPY
MED ROOM
PUBLIC T.
PUBLIC T.
ALCOVE
STAFF T.
EXAM T.
HALLWAY
HALLWAY
PEER SUPPORT
SERVICE LINE
DIRECTOR
TEST
TEST / OBSERV
TEST
LOC RECOVERY
VOC SHARED
SUIC PREV
SHARED
RESIDENT
167 OFFICE
SUIC PREV
SHARED
THERAPIST
OFFICE
THERAPIST
PRINT / COPY /
STORAGE
RESIDENT
RESIDENT
TREATMENT
HALLWAY
ADMIN OFFICER
NURSE
NURSE
SECRETARY
WORK AREA
PROG. ASS.
COMM. CENTER
OFFICE
NURSE
NURSE
NURSE
RECEPTION
AA
CC
DD
BB
EE
GG
HH
KK
LL
MM
JJ
FF
W
W
WW
44"
44"
W
44"
PSYCHIATRY
PROVIDER
CR
ES
REX
DC
ES
REX
DC
CR
CR
CR
ES
REX
DC
ES REX
DC
CR
ES
REX
DC
CR
ES
REX
DC
ES
REX
DC
CR
ES
REX
DC
CR
ES
REX DC
CR
ES
REX
DC
CR
ES
DC
REX
CR
ES
DC
REX
CR
DC
DC
12" x 2"
CABLE TRAY
12" X 2"
CABLE TRAY
12" X 2"
CABLE TRAY
12" X 2"
CABLE TRAY
12" x 2"
CABLE TRAY
12" X 2"
CABLE TRAY 12" X 2" CABLE TRAY
20" X 2"
CABLE TRAY
12" X 2"
CABLE TRAY
DA DA DA DA DA DA DA DA DA DA
DADA
DADA
DA
DA
DA
DA
DA
DA
DA DA DA DA DA DA
DA
DA
DADADADADA
DA DA DA DA DA DA DA
DA
DADADADADADA
RAISE TRAY OVER
DUCTWORK
12" x 2" CABLE TRAY
NL
NE
NL
NE
NL
NE
NL NE
NL NE
COPIER
COPIER
PRINTER
PRINTER 4" CONDUITS TO
TELECOM ROOM 2" CONDUITS TO
TELECOM ROOM
(4) 2" CONDUITS TO BUILDING 1
AND BUILDING 5 REFER TO SITE
PLAN ES001.
DA
DC
DA
CR
CR
CR
CR
CR
CR
CR
DA DA DA
72"
72"72"
DA
SMART BOARD SMART BOARD
SMART BOARD
44"
44"
44"
44"
44"
ES
DC
ES
DC
DA
DA
DA
DA
10'-6" 10'-6"
ES
REX
DC
PROVIDE HANDHOLE FOR LOW-
VOLTAGE SYSTEM CONDUITS
SEE ES001 FOR CONTINUATION
TO BUILDING 1 AND BUILDING 5
1. ALL EQUIPMENT AND DEVICES SHOWN ON THIS PLAN ARE NEW,
UNLESS NOTED OTHERWISE.
2. PROVIDE A COMPLETE AND FULLY FUNCTIONAL DATA NETWORK
SYSTEM INCLUDING, BUT NOT LIMITED TO, OUTSIDE PLANT
CABLING, BACKBONE CABLING, HORIZONTAL CABLING,
EQUIPMENT ROOM FITTINGS, PASSIVE NETWORK EQUIPMENT,
DATA OUTLETS, AND TERMINATIONS. COORDINATE WITH OWNER
TO INTERCEPT AND CONNECT TO EXISTING SYSTEM. REFER TO
DIVISION 27 SPECIFICATIONS.
3. PROVIDE A COMPLETE AND FULLY FUNCTIONAL PUBLIC ADDRESS
AND MASS NOTIFICATION SYSTEM IN ALL AREAS WHERE
SPEAKERS ON SHOWN ON THIS DRAWING. COORDINATE WITH
OWNER TO INTERCEPT AND CONNECT TO EXISTING SYSTEM,
RCOMM PT 2020. VA POINT OF CONTACT IS IRA WIESENFELD, (214)
707-7711. REFER TO SPECIFICATION SECTION 27 51 16.
4. PROVIDE A COMPLETE AND FULLY FUNCTIONAL SOUND MASKING
SYSTEM. SYSTEM SHALL PROVIDE SOUND MASKING IN ALL
CIRCULATION, LOBBY, AND RECEPTION AREAS. REFER TO
SPECIFICATION SECTION 27 51 19.
5. PROVIDE A COMPLETE AND FULLY FUNCTIONAL PHYSICAL
ACCESS CONTROL SYSTEM. COORDINATE WITH OWNER TO
INTERCEPT AND CONNECT TO EXISTING SYSTEM. REFER TO
SPECIFICATION SECTION 28 13 00.
6. PROVIDE A COMPLETE AND FULLY FUNCTIONAL ELECTRONIC
PERSONAL PROTECTION (DURESS ALARM) SYSTEM. COORDINATE
WITH OWNER TO INTERCEPT AND CONNECT TO EXISTING SYSTEM.
DURESS ALARM MUST INTERFACE THE PAGING SYSTEM.
COORDINATE WIRELESS STATIONARY DEVICE LOCATIONS WITH
OWNER PRIOR TO INSTALLATION. POINT OF CONTACT FOR
INFORMATION REGARDING INTERFACE OF DURESS SYSTEM AND
PAGING SYSTEM IS TOM MANTHEI, (214) 728-7248. REFER TO
SPECIFICATION SECTION 28 26 00.
7. NURSE CALL DEVICES INDICATED ARE NOT PART OF A SYSTEM,
THEY ARE STANDALONE PULL CORD STATIONS / DOME LIGHTS
INTENDED TO NOTIFY STAFF OF OCCUPANTS IN NEED OF
ASSISTANCE IN THE PUBLIC RESTROOMS.
8. PROVIDE ONE (1) Z-BAND 24-PORT CATV DISTRIBUTION UNIT, HZ
6001-1, IN NEW TELECOM ROOM. COORDINATE WITH OWNER TO
INTERCEPT AND CONNECT TO EXISTING CATV SYSTEM.
9. PROVIDE ALLOWANCE FOR CABLING TO FORTY (40) WIRELESS
ACCESS POINTS THROUGHOUT THE FACILITY. COORDINATE
DEVICE LOCATIONS WITH VA TECHNOLOGY MANAGER.
GENERAL SYSTEMS NOTES
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
KEY PLAN
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/3
/2
:5 :2
A
M C
U s e rs
\m s b ilb e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -M
E P m s b ilb e n .r v t
SYSTEMS PLAN - FIRST FLOOR
WSN MPG 99
ET131
SCALE: 1/8" = 1'-0"ET131
E1 ELECTRICAL SYSTEMS PLAN
PLAN
NORTH
TRUENORTH
0 4' 8' 12'2'1'
SCALE: 1/4" = 1'-0"
C
C
C
J
NEW SERVICE ENTRANCE PANELBOARD, MPB, 480 V, 3 Ø, 4 W
150 A
400 A
MAIN BREAKER
T-LR 75
kVA
T-LM
30 kVA
LM
208 V
3 Ø, 4 W 100 A
MCB
LRA
208 V
3 Ø, 4 W 100 A
MLO
LR
208 V
3 Ø, 4 W 250 A
MCB
LRD
208 V
3 Ø, 4 W 100 A
MCB
LRC
208 V
3 Ø, 4 W 100 A
MCB
LRB
208 V
3 Ø, 4 W 100 A
MLO
400 A BUS
150 A
HM
480 V
3 Ø, 4 W 150 A
MCB
(RECEPT)
ELEC.
(RECEPT)
ELEC.
(RECEPT)
ELEC.
CLOSET
(MECH)
MECH.
(MECH)
MECH.
(RECEPT)
ELEC.
ELEC.
ELEC.
MECH.
110 A
300 kVA 3-PHASE
13.8 kV - 480/277 V
TO NEW MEDIUM VOLTAGE SECTIONALIZING
CABIENT "POWER J-BOX #6"
25 A
LL
208 V
3 Ø, 4 W 60 A
MCB
(LIGHTING)
ELEC.
CU-1
M
PRIVATE ENERGY METER
COMPATIBLE WITH VA AUMS,
REFER TO 25 10 10
3" CONDUIT WITH:
(3) #500 Ø
(1) #500 N
G
N
TO MGB
1-1/4" CONDUIT WITH:
(3) #4 Ø
(1) #4 N
(1) #10 G
1-1/2" CONDUIT WITH:
(3) #1 Ø
(1) #1 N
(1) #8 G
1-1/2" CONDUIT WITH:
(3) #1/0 Ø
(1) #1/0 N
(1) #6 G
2-1/2" CONDUIT WITH:
(3) #250 Ø
(1) #250 N
(1) #4 G
1-1/2" CONDUIT WITH:
(3) #1/0 Ø
(1) #6 G
1-1/4" CONDUIT WITH:
(3) #2 Ø
(1) #2 N
(1) #6 G
1" CONDUIT WITH:
(3) #6 Ø
(1) #10 G
1-1/2" CONDUIT WITH:
(3) #1 Ø
(1) #1 N
(1) #8 G
(RECEPT)
ELEC.
CLOSET
SPD
T-LL
15 kVA
ELEC.
3/4" CONDUIT WITH:
(3) #10 Ø
(1) #10 G
EL
120 V
1 Ø, 3 W
2800 VA
LTG.
INVRTR
(LIGHTING)
ELEC.
3/4" CONDUIT WITH:
(1) #10 Ø
(1) #10 N
(1) #10 G
ISOLITE E3MAC-2800-1P-IA-OA-C(n)-FS-EW OR EQUAL
100 A 60 A 30 A 20 A
SPARE SPARE SPARE SPARE
REFERENCE
ELECTRICAL
GROUNDING DIAGRAM
E6/EE501.
AA
BB
LL
LRB
LRA
LR
T-LR
MPB
MGB
EL
(EMERGENCY
LIGHTING
INVERTER
CABINET)
EL
(EMERGENCY
LIGHTING
INVERTER
CABINET)
LRA
T-LL
W
CC
DD
TMGB
PROVIDE FIRE-TREATED PLYWOOD
BACKBOARD ON FULL LENGTH OF WALL.
LM
LM
LM
LM
(4) 4" CONDUITS TO
CABLE TRAY BELOW
(4) 2" CONDUITS TO
BUILDING 1
PROVIDE FIRE-TREATED PLYWOOD
BACKBOARD ON FULL LENGTH OF WALL.
PROVIDE FIRE-TREATED
PLYWOOD BACKBOARD
ON FULL LENGTH OF
WALL.
(4) 4" CONDUITS TO
CABLE TRAY BELOW
PROVIDE ENLARGED FLOOR PLANS OF TELECOMMUNICATION
SPACES INDICATING LAYOUT OF ACTUAL EQUIPMENT AND
DEVICES TO BE PROVIDED. REFER TO SPECIFICATION
SECTION 27 05 11 PARAGRAPH 1.7.I.1.
FRONT SIDE OF
EQUIPMENT RACKS
PROVIDE FIRE STOPPING IN
ALL CONDUITS PENETRATING
FLOOR SLAB AFTER CABLE
INSTALLATION IS COMPLETE
(TYPICAL).
PROVIDE VERTICAL CABLE
LADDER FROM FLOOR
PENETRATIONS TO
OVERHEAD LADDER RACK.
MOUNT RECEPTACLE TO
OVERHEAD LADDER RACK.
COORDINATE WITH
EQUIPMENT INSTALLER.
48"
48"
PROVIDE FIRE-TREATED
PLYWOOD BACKBOARD ON
FULL LENGTH OF WALL.
LM
LM
LM
LM
LM
LM
LM
LM
LM
22 48"
48"
LM
24 LM
PROVIDE POWER CONNECTION
TO B.A.S. CONTROL PANEL.
OMAHA | LINCOLN | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
FE#:172074
CONSULTANT
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Phase
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
AE PROJECT NO.: 14541
Stamp
730 Second Avenue South, Suite 1100 Minneapolis, MN, 55402-2455 Tel 612-338-8741 Fax 612-338-4840
1 2 3
EST. 1915
100% BID DOCUMENTS
10/01/2018
Outpatient Mental Health Building
VA #438-450
2501 W 22nd St, Sioux Falls, SD, 57105
KEY PLAN
U.S. Department of Veterans Affairs
NOT FOR CONSTRUCTION
/3
/2
:5 :1
A
M C
U s e rs
\m s b ilb e n \D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
-S F
-M H
F -M
E P m s b ilb e n .r v t
ENLARGED ELECTRICAL FLOOR
PLANS & GENERAL INFORMATION
WSN MPG 100
EE401
SCALE: NTSEE401
E7 ELECTRICAL ONE-LINE DIAGRAM
SCALE: 1/2" = 1'-0"EE401
1 ENLARGED MAIN ELECTRICAL ROOM 192 PLAN
SCALE: 1/2" = 1'-0"EE401
2 ENLARGED TELECOMMUNICATIONS ROOM (TR) 202 PLAN
PLAN
NORTH
TRUENORTH
0 4' 8' 12'2'1'
SCALE: 1/4" = 1'-0"
ELECTRICAL EQUIPMENT CONNECTION SCHEDULE
TAG Text Label SOURCE PANEL CIRCUIT FEEDER LOAD DISCONNECT NOTES
ACCU-1 AIR COOLED CONDENSING UNIT MPB 7,9,11 (3) #2 Ø, (1) #6 EGC, 1-1/4" C 480 V/3-70834 VA BY DIV 23
AHU-1-RF AIR HANDING UNIT RETURN FAN HM 7,9,11 (3) #12 Ø, (1) #12 EGC, 3/4" C 480 V/3-10975 VA BY DIV 23
AHU-1-SF AIR HANDING UNIT SUPPLY FAN HM 1,3,5 (3) #8 Ø, (1) #10 EGC, 3/4" C 480 V/3-29432 VA BY DIV 23
B-1 CONDENSING BOILER LM 13 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-300 VA BY DIV 22 PROVIDE FOR DEDUCT ALTERNATE #6
B-2 CONDENSING BOILER LM 15 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-300 VA BY DIV 22 PROVIDE FOR DEDUCT ALTERNATE #6
CP-1 CONDENSATE PUMP LM 7 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-864 VA MOTOR RATED SWITCH
CRAC-1 COMPUTER ROOM AIR CONDITIONER LM 19,21 (2) #12 Ø, (1) #12 EGC, 3/4" C 208 V/2-2808 VA MOTOR RATED SWITCH
CUH-1 CABINET UNIT HEATER LM 2 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
CUH-2 CABINET UNIT HEATER LM 4 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
CUH-3 CABINET UNIT HEATER LM 6 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
CUH-4 CABINET UNIT HEATER LM 8 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
CUH-5 CABINET UNIT HEATER LM 10 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
EF-1 EXHAUST FAN LM 25 (1) #10 Ø, (1) #10 N, (1) #10 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23
EF-2 EXHAUST FAN LM 27 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23
EVAP-1 EVAPORATIVE COOLER LM 19,21 (2) #12 Ø, (1) #12 EGC, 3/4" C 208 V/2-583 VA MOTOR RATED SWITCH
GWH-1 GAS WATER HEATER LM 23 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-300 VA BY DIV 22 PROVIDE FOR DEDUCT ALTERNATE #6
HUH-1 HORIZONTAL UNIT HEATER LM 12 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
PHWP-1 PRIMARY HEATING WATER PUMP LM 29 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23
PHWP-2 PRIMARY HEATING WATER PUMP LM 31 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-1656 VA BY DIV 23 REDUNDANT
RCP-1 CIRCULATING PUMP LM 11 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-60 VA BY DIV 22
SHWP-1 SECONDARY HEATING WATER PUMP LM 9 (1) #10 Ø, (1) #10 N, (1) #10 EGC, 3/4" C 120 V/1-2880 VA BY DIV 23
SHWP-2 SECONDARY HEATING WATER PUMP LM 17 (1) #10 Ø, (1) #10 N, (1) #10 EGC, 3/4" C 120 V/1-2880 VA BY DIV 23 REDUNDANT
SMP-1 SNOWMELT PUMP LM 35 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-864 VA BY DIV 23 OMIT FOR DEDUCT ALTERNATE #3
VUH-1 VERTICAL UNIT HEATER LM 14 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
VUH-2 VERTICAL UNIT HEATER LM 16 (1) #12 Ø, (1) #12 N, (1) #12 EGC, 3/4" C 120 V/1-696 VA MOTOR RATED SWITCH
WS-1 WATER SOFTENER LM 11 N/A 120 V/1-300 VA CORD AND PLUG
WS-2 LRD 11 120 V/1-600 VA
WS-3 LRA 3 120 V/1-180 VA
WS-3 LM 20 120 V/1-360 VA
WS-4 LM 18 120 V/1-360 VA
WS-5 LM 24 120 V/1-100 VA
WS-6 LRA 18 120 V/1-400 VA
WS-7 120 V/1-0 VA
WS-8 GFI LM 26 120 V/1-180 VA
| Amendment No 1 20190703 |
| Amendment to Utilities Routing drawings |
| Sheets |
| AD101 - DEMOLITION PLAN S - BUILDING 1 |
File details come from the government source that posted it.