36E77619B0008-007.pdf

PDF 2 MB Posted

Attached to
Upgrade USP 800 Pharmacy Compounding Requirements at the John L. McClellan Memorial Veterans Hospital
Solicitation number
36E77619B0008
Issued by

About this file

36E77619B0008 Attachment 2 - Specs Vol. 1 Div. 00-14.pdf

View the file

Other files

File Type Posted
36E77619B0008-0004001.pdf PDF
36E77619B0008-0004000.docx DOCX document
36E77619B0008-0003004.pdf PDF
36E77619B0008-0003003.docx DOCX document
36E77619B0008-0003002.pdf PDF
36E77619B0008-0003010.pdf PDF
36E77619B0008-0003009.pdf PDF
36E77619B0008-0003008.pdf PDF
36E77619B0008-0003005.pdf PDF
36E77619B0008-0003001.docx DOCX document
36E77619B0008-0003000.docx DOCX document
36E77619B0008-0003007.pdf PDF
36E77619B0008-0003006.pdf PDF
36E77619B0008-0002000.docx DOCX document
36E77619B0008-0002005.pdf PDF
36E77619B0008-0002001.pdf PDF
36E77619B0008-0002004.pdf PDF
36E77619B0008-0002006.pdf PDF
36E77619B0008-0002002.pdf PDF
36E77619B0008-0002007.pdf PDF
36E77619B0008-0002008.pdf PDF
36E77619B0008-0002009.pdf PDF
36E77619B0008-0002003.pdf PDF
36E77619B0008-0001000.docx DOCX document
36E77619B0008-0001001.pdf PDF
36E77619B0008-0001005.pdf PDF
36E77619B0008-0001003.pdf PDF
36E77619B0008-0001004.doc DOC document
36E77619B0008-0001002.pdf PDF
36E77619B0008-006.docx DOCX document
36E77619B0008-011.pdf PDF
36E77619B0008-009.pdf PDF
36E77619B0008-008.pdf PDF
36E77619B0008-005.docx DOCX document
36E77619B0008-014.docx DOCX document
36E77619B0008-015.docx DOCX document
36E77619B0008-012.pdf PDF
36E77619B0008-010.pdf PDF
36E77619B0008-013.pdf PDF
36E77619B0008-000.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

John L. McClellan Memorial Veterans Hospital

4300 West 7th Street | Little Rock, Arkansas 72205

Building 1

Upgrade for USP 800 Pharmacy

Compounding Requirements

VA Contract No. 36C25618D0004 Station Project No. 598-18-102 Bancroft-AE Project No. 17-119

100% CONSTRUCTION DOCUMENTS FOR BID

(VOLUME 1, DIV 00-14)

June 21, 2019

DIVISION 00

Special Sections

UPGRADE FOR USP 800 PHARMACY COMPOUNDING REQUIREMENTS

Little Rock, AR 72205 08-01-18

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 10 - 1 06/21/2019

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 02-15 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 01-18 01 45 29 Testing Laboratory Services 08-17 01 45 35 Special Inspections 04-18 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 95 00 Cleanroom Construction Procedures

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 04 – MASONRY (NOT USED)

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16 05 31 00 Steel Decking 02-16 05 40 00 Cold-Formed Metal Framing 05-16 05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 02-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Little Rock, AR 72205 08-01-18

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 10 - 2 06/21/2019

07 21 13 Thermal Insulation 10-17 07 22 00 Roof and Deck Insulation 02-16 07 24 00 Exterior Insulation and Finish Systems 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16 07 60 00 Flashing and Sheet Metal 07-14 07 71 00 Roof Specialties 10-15 07 72 00 Roof Accessories 10-15 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 34 53 Security Doors and Frames 05-15 08 34 59 Vault Doors and Day Gates 02-16 08 42 29.23 Sliding Automatic Doors 08 56 59 Service and Teller Window Units 02-16 08 71 00 Door Hardware 01-16 08 71 13.11 Low Energy Power Assist Door Operators 08-16 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 06-18 09 30 13 Ceramic/Porcelain Tiling 10-15 09 51 00 Acoustical Ceilings 12-16 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 07-14 09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15

10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 17 36 Package Transfer Units 02-13

DIVISION 12 – FURNISHINGS

Little Rock, AR 72205 08-01-18

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 10 - 3 06/21/2019

12 31 00 Manufactured Metal Casework 05-15 12 36 00 Countertops 12-15

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components

01-14

DIVISION 14 – CONVEYING EQUIPEMENT (NOT USED)

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 40 00 Plumbing Fixtures 09-15 22 67 19.16 Reverse-Osmosis Water Equipment 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 25 00 HVAC Water Treatment 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 64 00 Packaged Water Chillers 04-11 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 82 16 Air Coils 04-11

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

Little Rock, AR 72205 08-01-18

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 10 - 4 06/21/2019

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 09 23 Lighting Controls 01-18 26 23 00 Low-Voltage Switchgear 01-17 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 00 Voice Communications Switching and Routing Equipment 06-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 09-11

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 13 00 Physical Access Control System 10-11 28 13 53 Security Access Detection 09-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15

DIVISION 31 – EARTHWORK (NOT USED)

DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)

Little Rock, AR 72205 08-01-18

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 10 - 5 06/21/2019

DIVISION 33 – UTILITIES (NOT USED)

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 48 – ELECTRICAL POWER GENERATION (NOT USED)

Little Rock, AR 72205 07-01-15

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 15 - 1 06/21/2019

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G001 Cover Sheet

G002 Sheet Index

GI001 General – Contractor and Basis-of-Design Protocol Notes

GI002 General – Protection Protocol, Scope of Work and Misc.

Notes

GI003 General – Demolition Notes

GI004 General – Abbreviations, Symbols Legend, and Standard

Mounting Heights

GI101 General – Code and Building Information

GI201 General – Building Orientation Maps

GI202 General – Building Orientation Maps

GI203 General – Building Orientation Maps

GI301 General – Life Safety Plan

GI401 General – Infection Control Plan, 6th Floor Pod ‘D’

GI402 General – Infection Control Plan, 7th Floor Pod ‘D’

GI403 General – ICRA Drawing Class III

GI404 General – ICRA Drawing Class IV

GI405 General – Infection Control Plan for

Electrical Secondary Distribution

GC101 General – Construction Staging Plan

STRUCTURAL

S001 Structural – General Notes, Part 1

SF107 Structural – Floor Framing Plan, 7th Floor Pod ‘D’

SF108 Structural – Floor Framing Plan, 8th Floor Penthouse Pod ‘D

SF109 Structural – Framing Plans, Penthouse Pod ‘D’

S501 Structural – Framing Details and Sections

ARCHITECTURAL

AD106 Architectural – Demolition Plan, 6th Floor Pod ‘D’

AD107 Architectural – Demolition Plan, 7th Floor Pod ‘D’

Little Rock, AR 72205 07-01-15

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 15 - 2 06/21/2019

AD108 Architectural – Demolition Plan, 8TH Floor Penthouse Pod ‘D’

ACD101 Architectural – Demolition Ceiling Plans for

Electrical Secondary Distribution

ACD106 Architectural – Demolition Ceiling Plan, 6th Floor Pod ‘D’

ACD107 Architectural – Demolition Ceiling Plan, 7th Floor Pod ‘D’

A106 Architectural – Floor Plan, 6th Floor Pod ‘D’

A107 Architectural – Floor Plan, 7th Floor Pod ‘D’

A108 Architectural – Floor Plan, 8th Floor Penthouse Pod ‘D’

A109 Architectural – Roof Plan Penthouse and Platform Grating

Plan, Pod ‘D’

AC106 Architectural – Ceiling Plan, 6th Floor Pod ‘D’

AC107 Architectural – Ceiling Plan, 7th Floor Pod ‘D’

A201 Architectural – Exterior Building Elevations

A301 Architectural – Building Sections

A311 Architectural – Wall Sections

A312 Architectural – Wall Sections

A313 Architectural – Wall Sections

A314 Architectural – Wall Sections

A401 Architectural – Enlarged Floor Plans

A402 Architectural – Enlarged Floor Plans

A403 Architectural – Enlarged Vault Plan and Details

A411 Architectural – Interior Elevations

A412 Architectural – Interior Elevations

A413 Architectural – Interior Elevations

A414 Architectural – Interior Elevations

A415 Architectural – Interior Elevations

A416 Architectural – Interior Elevations

A417 Architectural – Interior Elevations

A418 Architectural – Interior Elevations

A419 Architectural – Interior Elevations

A501 Architectural – Details

A502 Architectural – Details

A503 Architectural – Details

A504 Architectural - Details

A511 Architectural – Casework Details

A521 Architectural – Ceiling Details

A601 Architectural – Door Schedules and Details

Little Rock, AR 72205 07-01-15

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 15 - 3 06/21/2019

A602 Architectural – Door Details

INTERIORS

IQ101 Interiors – Furniture/ Equipment Move Plan

IQ107 Interiors – Furniture/ Equipment Plan, 7th Floor Pod ‘D’

IF107 Interiors – Finish Floor Plan, 7th Floor Pod ‘D’

IG107 Interiors – Signage Plan, 7th Floor Pod ‘D’

I601 Interiors – Room Finish Schedule and Finish Legend

I602 Interiors – Room Finish Schedule

I611 Interiors – Furniture and Equipment Schedule

I612 Interiors – Furniture and Equipment Schedule

I613 Interiors – Furniture and Equipment Schedule

I614 Interiors – Furniture and Equipment Schedule

I615 Interiors – Furniture and Equipment Schedule

I621 Interiors – Signage Schedule

FIRE PROTECTION

FX001 Fire Protection – General Notes, Symbols and

Abbreviations

FX106 Fire Protection – Suppression Plan, 6th Floor Pod ‘D’

FX107 Fire Protection – Suppression Plan, 7th Floor Pod ‘D’

FX108 Fire Protection – Suppression Plan, 8th Floor Penthouse

Pod ‘D’

FX501 Fire Protection - Details

PLUMBING

P001 Plumbing – General Notes, Symbols and Abbreviations

PSD106 Plumbing – Sanitary Demolition Plan, 6th Floor Pod ‘D’

PWD107 Plumbing – Domestic Water Demolition Plan, 7th Floor Pod ‘D’

PS106 Plumbing – Sanitary/Vent/Storm Demolition Plan, 6th Floor

Pod ‘D’

PS107 Plumbing – Vent Plan, 7th Floor Pod ‘D’

PW107 Plumbing – Domestic Water Plan, 7th Floor Pod ‘D’

PW108 Plumbing – Domestic Water Plan, 8th Floor Penthouse Pod ‘D’

P501 Plumbing – Details

P601 Plumbing – Schedules

MGD107 Medical Gas – Demolition Plan, 7th Floor Pod ‘D’

Little Rock, AR 72205 07-01-15

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 15 - 4 06/21/2019

MECHANICAL

M001 Mechanical – General Notes, Symbols and Abbreviations

MHD107 Mechanical – Ventilation Demolition Plan, 7th Floor Pod ‘D’

MPD107 Mechanical – Piping Demolition Plan, 7th Floor Pod ‘D’

MH107 Mechanical – Ventilation Plan, 7th Floor Pod ‘D’

MH107A Mechanical – Air Flow Pressurization Plan, 7th Floor Pod ‘D’

MH108 Mechanical – Ventilation Plan, 8th Floor Penthouse Pod ‘D’

MP103 Mechanical – Piping Plan, 3rd Floor Pod ‘D’

MP107 Mechanical – Piping Plan, 7th Floor Pod ‘D’

M401 Mechanical – Enlarged Clean Suite Ventilation Plan, 7th Floor

Pod ‘D’

M402 Mechanical – Enlarged Penthouse Piping Plan, 8th Floor Pod ‘D’

M403 Mechanical – Aerosol Injection Manifold Drawings, 7th Floor

Pod ‘D’

M501 Mechanical – Details

M502 Mechanical – Details

M503 Mechanical – Details

M504 Mechanical – Details

M505 Mechanical – Details

M506 Mechanical - Details

M601 Mechanical – Schedules

M602 Mechanical – Schedules

M603 Mechanical - Schedules

M701 Mechanical – Temperature Controls

M702 Mechanical – Temperature Controls

M703 Mechanical – Temperature Controls

M704 Mechanical – Temperature Controls

M705 Mechanical – Temperature Controls

M706 Mechanical – Temperature Controls

ELECTRICAL

E001 Electrical – General Notes

E002 Electrical – Symbols and Abbreviations

EPD106 Electrical – Power Demolition Plan, 6th Floor Pod ‘D’

EPD107 Electrical – Power Demolition Plan, 7th Floor Pod ‘D’

ELD106 Electrical – Lighting Demolition Plan, 6th Floor Pod ‘D’

Little Rock, AR 72205 07-01-15

Contract No. VA36C25618D0004

VA Project No. 598-18-102 00 01 15 - 5 06/21/2019

ELD107 Electrical – Lighting Demolition Plan, 7th Floor Pod ‘D’

EJD106 Electrical – Systems Demolition Plan, 6th Floor Pod ‘D’

EJD107 Electrical – Systems Demolition Plan, 7th Floor Pod ‘D’

EP101 Electrical – Secondary Distribution Plans, All Floors

EP106 Electrical – Power Plan, 6th Floor Pod ‘D’

EP107 Electrical – Power Plan, 7th Floor Pod ‘D’

EP108 Electrical – Power Plan, 8th Floor Penthouse Pod ‘D’

EP108A Electrical – Lightning Protection Plan, 8th Floor Penthouse

Pod ‘D’

EL106 Electrical – Lighting Plan, 6th Floor Pod ‘D’

EL107 Electrical – Lighting Plan, 7th Floor Pod ‘D’

EL108 Electrical – Lighting Plan, 8th Floor Penthouse Pod ‘D’

EF107 Electrical – Fire Alarm Plan, 7th Floor Pod ‘D’

EF108 Electrical – Fire Alarm Plan, 8th Floor Penthouse Pod ‘D’

EJ106 Electrical – Systems Plan, 6th Floor Pod ‘D’

EJ107 Electrical – Systems Plan, 7th Floor Pod ‘D’

ET108 Electrical – Controls Plan, 8th Floor Penthouse, Pod ‘D’

ET401 Electrical – Enlarged Clean Rooms Electrical Controls Plan, 7th Floor Pod ‘D’

E501 Electrical – Details

E502 Electrical – Fire Protection Details

E503 Electrical – Details, Security

E601 Electrical – Panel Schedules

E602 Electrical – Purchase Schedule and Lighting Schedules

E701 Electrical – Single Line Diagram

E701A Electrical – Secondary Distribution Single Line Diagram

E702 Electrical – Single Line Diagram PNL SQH1

E703 Electrical – Secondary Distribution Single Line

Diagram (1E128R)

E703A Electrical – Distribution Substation III

E703B Electrical – Generator Plan and Schedule

E704 Electrical – Single Line Diagram, Emergency Generator

Fault Current

E705 Electrical – Single Line Diagram, ATS-Fault Current

- - - E N D - - -

DIVISION 01

General Requirements

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - i 06/21/2019

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 USE OF ROADWAYS

1.16 RESIDENT ENGINEER'S FIELD OFFICE

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.18 TEMPORARY USE OF EXISTING ELEVATORS

1.19 TEMPORARY USE OF NEW ELEVATORS

1.20 TEMPORARY TOILETS

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - ii 06/21/2019

1.22 NEW TELEPHONE EQUIPMENT

1.23 TESTS

1.24 INSTRUCTIONS

1.25 GOVERNMENT-FURNISHED PROPERTY

1.26 RELOCATED EQUIPMENT ITEMS

1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

1.28 CONSTRUCTION SIGN

1.29 SAFETY SIGN

1.30 PHOTOGRAPHIC DOCUMENTATION

1.31 FINAL ELEVATION Digital Images

1.32 HISTORIC PRESERVATION

1.33 VA TRIRIGA CPMS

USP FOR PHARMACY COMPOUNDING USP 800

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 1 06/21/2019

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the construction bid documents to renovate approximately 5,200 GSF on the 7th Floor, Pod ‘D’ for a new pharmacy, selective demolition on the 6th floor below the 7th floor work and approximately 1,050 GSF on 8th floor for new penthouse as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Medical Center Engineering Officer.

C. Offices of Bancroft Architects and Engineers located in Elk Grove

Village, Illinois, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 2 06/21/2019 police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, General Construction: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.

ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project.

ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required mechanical construction work on this project.

ITEM IV, Plumbing Work: Work includes all labor, material, equipment and supervision to perform the required plumbing construction work on this project.

ITEM V, Fire Protection Work: Work includes all labor, material, equipment and supervision to perform the required fire protection construction work on this project.

B. ALTERNATES: None

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 3 06/21/2019

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR)for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 4 06/21/2019

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 5 06/21/2019

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR .

E. Workmen are subject to rules of Medical Center applicable to their conduct.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 6 06/21/2019

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Provide unobstructed access to Medical Center areas required to remain in operation.

G. Phasing: No Phasing.

H. Building(s) No. 1 will be occupied during performance of work; but immediate areas of alterations will be vacated.

I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 7 06/21/2019 or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 8 06/21/2019

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 9 06/21/2019

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by the

Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 10 06/21/2019 conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 11 06/21/2019

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (NOT USED)

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 12 06/21/2019 or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 PHYSICAL DATA (NOT USED)

1.12 PROFESSIONAL SURVEYING SERVICES (NOT USED)

1.13 LAYOUT OF WORK (NOT USED)

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 13 06/21/2019

1.16 RESIDENT ENGINEER'S FIELD OFFICE (NOT USED)

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 14 06/21/2019

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.18 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevator for handling building materials and

Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators.

The COR will ascertain that elevators are in proper condition.

Contractor may use service elevators Nos. S-1 thru S-5_ in Building

No. 1 for daily use between the hours of 7:00 a.m. and 5:00 p.m. and for special nonrecurring time intervals when permission is granted.

Personnel for operating elevators will not be provided by the

Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a. Entrance jambs, heads soffits and threshold plates.

b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c. Finish flooring.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 15 06/21/2019

3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractors expense.

4. If brake lining of elevators are excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining at the contractors expense.

5. All parts of main controller, starter, relay panel, selector, etc., worn or damaged during temporary use shall be removed and replaced with new parts at the contractors expense, if recommended by elevator inspector after elevator is released by Contractor.

6. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer.

1.19 TEMPORARY USE OF NEW ELEVATORS (NOT USED)

1.20 TEMPORARY TOILETS

A. Contractor may have for use of Contractor's workmen, such toilet accommodations as may be assigned to Contractor by Medical Center.

Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workmen. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 16 06/21/2019

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

1. Obtain heat by connecting to Medical Center heating distribution system.

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

F. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 17 06/21/2019 connection as per code. Water is available at no cost to the

Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.

G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the

Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the

Contractor at Contractor's expense.

1.22 NEW TELEPHONE EQUIPMENT

The contractor shall coordinate with the work of installation of telephone equipment by others. This work shall be completed before the building is turned over to VA.

1.23 TESTS

A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.

Little Rock, AR 72205

10-01-17

Contract No. VA36C25618D0004

VA Project No. 598-18-102 01 00 00 - 18 06/21/2019

Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.24 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site.