36E77619B0008 0003 Attachment 2 - M503 - Revised detail 6.pdf

View the file

Other files

File Type Posted
36E77619B0008-0004001.pdf PDF
36E77619B0008-0004000.docx DOCX document
36E77619B0008-0003004.pdf PDF
36E77619B0008-0003003.docx DOCX document
36E77619B0008-0003010.pdf PDF
36E77619B0008-0003009.pdf PDF
36E77619B0008-0003008.pdf PDF
36E77619B0008-0003005.pdf PDF
36E77619B0008-0003001.docx DOCX document
36E77619B0008-0003000.docx DOCX document
36E77619B0008-0003007.pdf PDF
36E77619B0008-0003006.pdf PDF
36E77619B0008-0002000.docx DOCX document
36E77619B0008-0002005.pdf PDF
36E77619B0008-0002001.pdf PDF
36E77619B0008-0002004.pdf PDF
36E77619B0008-0002006.pdf PDF
36E77619B0008-0002002.pdf PDF
36E77619B0008-0002007.pdf PDF
36E77619B0008-0002008.pdf PDF
36E77619B0008-0002009.pdf PDF
36E77619B0008-0002003.pdf PDF
36E77619B0008-0001000.docx DOCX document
36E77619B0008-0001001.pdf PDF
36E77619B0008-0001005.pdf PDF
36E77619B0008-0001003.pdf PDF
36E77619B0008-0001004.doc DOC document
36E77619B0008-0001002.pdf PDF
36E77619B0008-006.docx DOCX document
36E77619B0008-011.pdf PDF
36E77619B0008-009.pdf PDF
36E77619B0008-008.pdf PDF
36E77619B0008-005.docx DOCX document
36E77619B0008-007.pdf PDF
36E77619B0008-014.docx DOCX document
36E77619B0008-015.docx DOCX document
36E77619B0008-012.pdf PDF
36E77619B0008-010.pdf PDF
36E77619B0008-013.pdf PDF
36E77619B0008-000.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

700 Nicholas Blvd. | Suite 300 | Elk Grove Village, Illinois 60007 California | Connecticut | Colorado | Florida | Louisiana | Pennsylvania | Virginia | Wisconsin

847.952.9362 | www.bancroft-ae.com

RESPONSE TO RFI

August 27, 2019

To: Eugene Mike Johnston Sr., CCR COR Veterans Affairs North Little Rock Arkansas Office: (501) 257-1161 Cell: (501) 351-0767 Ernest.johnston@va.gov

Contract No.: 36C25618D0004

Station Project No.: 598-18-102

Bancroft Project No.: 17-119

Project Name: Upgrade for USP 800 Pharmacy Compounding Requirements

RE: Mechanical (from VA)

1. Is PRV-56 actually two 1/3, 2/3 steam stations as shown on M503? If so, four 2” PRV’s seems oversized for the application.

2. Additional information:

a. M402, Detail 1 shows PRV-56 @ 528 lbs/hr, with 30 PSI pressure upstream

b. M503, Detail 6 shows Qty (4) PRV’s, two sets of 1/3, 2/3, with 15 PSI pressure upstream, 528 lbs/hr with 30 PSI15 PSI could be handled with Qty(1) ¾” valve and Qty (1) 1” valve, but the PRV schedule for PRV-56 shows a 2” valve handling 1060 lbs/hr.

3. Is a spring diaphragm pilot all that is required for PRV-56? Generally, a temperature pilot is also added.

Summary

RFI RESPONSE:

1. Contractor to provide a 1/3, 2/3, PRV to serve all mechanical equipment sized to handle the total capacity of 860 lbs/hr. The PRV valve to be equipped with a pressure pilot. Refer to added detail 10 on sheet M503 for Steam Pressuere

Reducing Station.

2. Contractor to provide a control valve at each heat exchanger sized at 181.4 lbs/hr at 15psi entering the valve. The control valve to be equipped with a temperutare pilot. Refer to revise detail 6 on M503 for Heat Exchanger detail.

Prepared By: Raed Hamid

Copies To: File, Pat Bailey

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

100% CONSTRUCTION

DOCUMENTS FOR BID

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP UPGRADE FOR USP 800 PHARMACY

COMPOUNDING REQUIREMENTS

4300 WEST 7TH STREET, LITTLE ROCK, AR 72205

598-18-102

06-21-201935% SCHEMATIC DESIGN SUBMITTAL 08-07-2018

65% DESIGN DEVELOPMENT SUBMITTAL 09-25-2018

65% DESIGN DEVELOPMENT RE-SUBMITTAL 11-03-2018

95% CONSTRUCTION DOCUMENT PROGRESS SUBMITTAL 01-18-2019

100% CONSTRUCTION DOCUMENTS- PROGRESS SET 02-28-2019

BID DOCUMENTS- NOT FOR CONSTRUCTION 05-24-2019

100% CONSTRUCTION DOCUMENTS FOR BID 06-21-2019

1 RFI NO. 3 08-27-2019