36E77618R0094-004.pdf
PDF 1 MB Posted
- Attached to
- Prepare Digital Radiography Rooms Site Prep - South Dakota Sites (Sioux Falls, Fort Meade and Hot Springs)
- Solicitation number
- 36E77618R0094
About this file
36E77618R0094 ATTACHMENT 3 - SOW Appendix 1 - Hot Springs - Samsung Equip Dwgs - 6-14-17.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0014-000.docx | DOCX document | |
| 36E77618R0094-0002002.docx | DOCX document | |
| 36E77618R0094-0002000.docx | DOCX document | |
| 36E77618R0094-0002001.docx | DOCX document | |
| 36E77618R0094-0001001.docx | DOCX document | |
| 36E77618R0094-0001000.docx | DOCX document | |
| 36E77618R0094-008.zip | ZIP file | |
| 36E77618R0094-005.pdf | ||
| 36E77618R0094-010.zip | ZIP file | |
| 36E77618R0094-009.zip | ZIP file | |
| 36E77618R0094-011.docx | DOCX document | |
| 36E77618R0094-007.pdf | ||
| 36E77618R0094-001.docx | DOCX document | |
| 36E77618R0094-002.docx | DOCX document | |
| 36E77618R0094-003.docx | DOCX document | |
| 36E77618R0094-012.docx | DOCX document | |
| 36E77618R0094-013.docx | DOCX document | |
| 36E77618R0094-006.pdf | ||
| 36E77618R0094-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S1
SHEET INDEX
SHEET NUMBER SHEET DESCRIPTION
N1 GENERAL NOTES
N2 SITE READINESS NOTES
A1 EQUIPMENT LAYOUT
A2 TABLE AND STAND MOUNT
CS1 & CS2 CEILING STRUCTURE
E1 ELECTRICAL REQUIRED
SHEET INDEX
DATE:
REVISION:
SHEET NUMBER:
OF SHEET
HOT SPRINGS, SD
6/14/17
E2 ELECTRICAL REQUIRED
E3 ELECTRICAL REQUIRED
1. THESE DRAWINGS ARE FOR INFORMATION PURPOSES ONLY. DRAWINGS SUGGESTS LOCATION OF
X-RAY EQUIPMENT AND ASSOCIATED DEVICES, ELECTRICAL DETAILS AND ROOM LAYOUT. THE
PREPAIRER OF THESE PLANS CANNOT ACCEPT RESPONSIBILITY FOR ANY CHANGES TO THE EQUIPMENT OR THE ROOM OR ANY DAMAGES RESULTING FROM. ACTUAL CONSTRUCTION DRAWINGS SHOULD BE PROVIDED BY CUSTOMERS ARCHITECT OR GENERAL CONTRACTOR. EVERY EFFORT IS MADE TO GIVE
ACCURATE DETAIL OF ACTUAL EQUIPMENT TO BE INSTALLED.
2. IMAGING SOLUTIONS IS ONLY RESPONSIBLE FOR INSTALLATION OF IMAGING EQUIPMENT PURCHASES
FROM OR CONTRACTED FOR IMAGING SOLUTIONS. ROOM PREPARATION INCLUDING NECESSARY
CONSTRUCTION, NETWORKING AND SHIELDING TO BE SUPPLIED BY OTHERS.
3. CUSTOMER AND GENERAL CONTRACTOR ARE RESPONSIBLE FOR PREPARING THE ROOM AND COSTS
INVOLVED.
4. CUSTOMER AND GENERAL CONTRACTOR ARE RESPONSIBLE FOR ALL, BUT NOT LIMITED TO, BUILDING, ELECTRICAL, CONTRACTING, PROFESSIONAL FEES AND PERMITS.
5. CUSTOMER IS RESPONSIBLE FOR OBTAINING LEAD SHIELDING REQUIREMENTS FROM A LICENSED
PHYSICIST PER STATE AND/OR LOCAL REGULATION
6. CUSTOMER IS RESPONSIBLE FOR LIGHTING (NOT ON THIS PLAN). DIMMING LIGHTS MUST BE PROVIDED
IN X-RAY AND CONTROL ROOMS BY ARCHITECT PLAN OR ELECTRICAL CONTRACTOR.
7. CEILING HEIGHT MUST BE MAINTAINED AS INDICATED ON THIS PLAN. IF UNOBTAINABLE CUSTOMER OR
CONTRACTOR MUST NOTIFY IMAGING SOLUTIONS
8. ALL DIMENSIONS ARE FROM FINISHED SURFACES UNLESS NOTED.
9. WALL BAKING FOR EQUIPMENT SUPPORT TO BE MINIMUM OF 1/2" WOOD SECURED TO MINIMUM OF 3
WALL STUDS WITH BACKING FLUSH WITH FACE OF STUDS.
10. CONSTRUCTION MUST COMPLY WITH BUILDING CODES.
11. CUSTOMER IS RESPONSIBLE FOR FURNISHING AND INSTALLATION AT CUSTOMERS EXPENSE OF ELECTRICAL JUNCTION BOXES, TROUGH, CONDUIT, BUSHINGS, WIRE DUCT, COVER PLATES, MAIN SWITCHES , PANEL BOARDS, WIRES, UNISTRUT (WALL FLOOR OR CEILING), OR ANY SATISFACTORY
INSTALLATION OF X-RAYEQUIPMENT.
12. IMAGING SOLUTIONS MUST PROVIDE A SIGNED PURCHASE ORDER PRIOR TO ANY WORK OR MATERIALS PROVIDED AT IMAGING SOLUTIONS EXPENSE. IMAGING SOLUTIONS ASSUMES NO RESPONSIBILITY FOR
ANY CONSTRUCTION COSTS RELATED OR NOT RELATED TO THE INSTALLATION OF ANY X-RAY
EQUIPMENT.
GENERAL NOTES
GENERAL NOTES
N1
DATE:
REVISION:
6/14/17
1. TO ENSURE THE BEST ENSURE THE BEST ENVIRONMENT FOR INSTALLATION AND
PROTECTION OF MECHANICAL EQUIPMENT, COMPUTERS, MONITORS, ELECTRICAL
DEVICES, X-RAY TUBES, IMAGE INTENSIFIERS, AND CAMERAS THE FOLLOWING
GENERAL CONDITIONS ARE REQUIRED PRIOR TO DELIVERY. RESCHEDULING BY
IMAGING SOLUTIONS MANAGEMENT COULD BE REQUIRED IF CONDITIONS ARE NOT
MET.
2. THE CUSTOMER IS REQUIRED TO OBTAIN ALL PERMITTING, SHIELDING AND APPROVALS
REQUIRED BY LOCAL OR STATE GOVERNING AGENCIES.
3. CONSTRUCTION COMPLETE WITH LEAD BARRIORS INSTALLED, DOORS HUNG, FLOOR
COVERING INSTALLED , CEILING COMPLETED, WALLS COMPLETE AND PAINTED.
4. A DUST FREE ENVIRONMENT MUST BE KEPT IN THE X-RAY, CONTROL AND
SURROUNDING ROOMS.
5. HVAC COMPLETED, TESTED AND FUNCTIONING PRIOR TO DELIVERY.
6. POWER AT DESIGNATED PANEL AND EQUIPMENT PRIOR TO DELIVERY.
7. ALL CONDUIT, TROUGH, JUNCTION BOXES, WIRE RACEWAYS INSTALLED
ACCORDINGLY
8. LIGHTING TO BE INSTALLED AND FUNCTIONING.
9. BASE PLATES, REINFORCEMENT PLATES, OVERHEAD GRID INSTALLED AS DESIGNATED.
IT IS THE RESPONSIBILITY OF THE CUSTOMERS DESIGN ENGINEER TO RECOMMEND
METHODS OF ANCHORING AND ATTACHING IMAGING SOLUTIONS EQUIPMENT.
10. NETWORK, NETWORK DROPS, PACS, ROUTERS, COMPUTERS, PROCESSORS, PRINTERS,
LAST IMAGERS, AND/OR CAMERAS ARE INSTALLED AND TESTED FUNCTIONAL PRIOR
TO INSTALL. CUSTOMER IS RESPONSIBLE FOR OBTAINING AND MAINTAINING ANY AND
ALL BACK-UP POWER, ANTI-VIRUS SOFTWARE, FIREWALLS, OR OTHER SOFTWARE AND
HARDWARE. IMAGING SOLUTIONS WILL CONNECT TO CUSTOMERS NETWORK BUT
ASSUMES NO RESPONSIBILITY FOR THE NETWORK RELATED PROBLEMS. IMAGING
SOLUTIONS IS NOT RESPONSIBLE FOR COMPUTER ISSUES DUE TO CUSTOMER OR
PATIENTS UNAUTHORIZED US OR INSTALLATION OF COMPUTER PROGRAMS FOR THE
PERSONAL USE.
11. IMAGING SOLUTIONS SUPPLIED SERVERS ARE NOT TO HAVE UPDATES INSTALLED
WITHOUT IMAGING SOLUTIONS PRIOR CONSENT. VPN AND PHONE SERVICE MUST BE
INSTALLED PRIOR TO INSTALL.
12. A CLEAR, UNOBSTRUCTED, PATH INCLUDING ROOM ENTRY MUST BE PROVIDED BY THE
CUSTOMER FOR DELIVERY.
13. REMOVAL OF OLD EQUIPMENT IS A SEPARATE SERVICE. PLEASE CONTACT IMAGING
SOLUTIONS FOR ALL YOUR X-RAY NEEDS.
SITE READINESS NOTES
SITE READINESS NOTES
N2
DATE:
REVISION:
EXAM ROOM
SAMSUNG GC-85
18'-4"
'-6
/2
'-3
DATE:
REVISION:
6/14/17
1 SAMSUNG GENERATOR CABINET
SAMSUNG XGEO WORKSTATION2
SAMSUNG TILTING WALL STAND
3 SAMSUNG TABLE
SAMSUNG 4M CEILING RAILS5
29.5"L 19.3"W 43"H
21"L 15"W
25"L 32"W 87"H
96"L 32"W VARIABLE H
157"L
4 SAMSUNG 3M METER BRIDGE
118"L 24"W VARIABLE H
EQUIPMENT LAYOUT
A1
220 LBS
85 LBS
330 LBS
484 LBS
X
11,798 BTU
1200 BTU
120 BTU
N/A BTU
120 BTU
800LBS 873
RECOMMENDED
CEILING HEIGHT 9'-6"
EQ
UI
PM
EN
T
LE
G
EN
D
8"
8' -1
0"
10'-0"
4' -4
FOCAL SPOT
TRAVEL
USE APPROPRIATE ANCHORS AND
WASHERS TO MOUNT TO THE FLOOR. USE
OF ANY SMALLER SIZE MAY CAUSE THE
BASE TO BREAK FREE FROM THE FLOOR
UNDER EXTREME LOAD AND LEVERAGE
CONDITIONS.
IT IS UP TO THE INSTALLER AND THE CUSTOMER TO
DETERMINE THE BEST METHOD FOR MOUNTING THE
BASE TO THE FLOOR. BEFORE MOUNTING THE BASE,
CONSULT WITH THE BUILDING'S MAINTENANCE
SUPERVISOR ABOUT DRILLING HOLES IN THE FLOOR.
MAKE SURE THAT THERE ARE NO HAZARDS UNDER
THE FLOOR SUCH AS PIPES, CONDUITS, OR
STRUCTURAL CABLES WHICH CAN BE DAMAGED BY
DRILLING HOLES IN FLOOR.
TABLE & STAND MOUNT
A2
DATE:
REVISION:
6/14/17
RECOMMENDED
CEILING HEIGHT 9'-6"
CEILING STRUCTURE
CS1
STRUCTURAL SUPPORT TO BE DESIGNED, SUPPLIED
AND INSTALLED BY GENERAL CONTRACTOR WITH
ALL HARDWARE FOR CEILING MOUNTED X-RAY
EQUIPMENT. STRUCTURAL SUPPORT MUST BE
RIGID AND UNABLE TO SWAY/BUCKLE/BEND AT
ANY POINT. SUPPORT ALSO MUST BE LEVEL,
SQUARE, PARALLEL AND COPLANER TO ITSELF.
DATE:
REVISION:
6/14/17
RECOMMENDED
CEILING HEIGHT 9'-6"
EXISTING CEILING STRUCTURE TO
BE UTILIZED, VERIFY POSITIONING
AND STRUCTURAL CAPACITY
EQUIPMENT VENDOR OR VENDORS DESIGNER IS IN NO WAY
RESPONSIBLE FOR THE DESIGN OR INSTALLATION OF
STRUCTURAL SUPPORTS FOR ANY CEILING MOUNTED X-RAY
EQUIPMENT. THESE DRAWINGS ARE FOR ILLUSTRATION
PURPOSES ONLY. PURCHASE R OR GENERAL CONTRACTOR
SHOULD CONSULT A STRUCTURAL ENGINEER AND/OR
UNISTRUT REP TO COORDINATE SUPPORT STRUCTURE, ANY
STRUCTURAL DETAILS SHOWN ARE FOR EXAMPLE ONLY AND
NOT TO BE USED FOR ACTUAL CONSTRUCTION. ENTIRE
CEILING STRUCTURE MUST BE ABLE TO WITHSTAND 1.2 TONS.
CEILING STRUCTURE
CS2
DATE:
REVISION:
6/14/17
ENTIRE CEILING STRUCTURE MUST BE
ABLE TO WITHSTAND 1.2 TONS
2' -5
/2
D D
3' -5
7'-0"
CONTROL ROOM
ELECTRICAL REQUIRED
E1
NOTE: #6 GROUND WIRE REQUIRED
VOLTAGE FLUCTUATION ± 10 FULL
LOAD. ALL WIRES TO BE THHN OR TFFN
STRANDED COPPER THERMOPLASTIC
600 VOLT OR EQUIVALENT, UNLESS
OTHERWISE NOTED. MAXIMUM
LENGTH FROM DISTRIBUTION
TRANSFORMER TO ROOM MAIN
BREAKER NOT TO EXCEED 200 FEET.
THREE
PHASE
MAIN
FACILITY
DIST XFMR
INCOMING
WIRE SIZE
X-RAY
ROOM
BREAKER
480 VAC 105 KVA #2 #00 250MCM 100 AMP
50' 100' 200'
DATE:
REVISION:
* SEE SHEET E2 FOR ELECTRICAL CALLOUT INFORMATION
INCOMING LINE POWER AND SHUNT TRIP BREAKER.
SEE MSP-E2 SPECIFICATION BLOCK
E.P.O. SWITCH IS CONTRACTOR SUPPLIED AND INSTALLED
PROVIDES SHUNT TRIP FOR INCOMING
8"X8"X8" JUNCTION BOX 1" ABOVE FINISHED CEILING WITH
CONDUIT OR FLEX TO TROUGH WITH (1) 3" GROMMETED
HOLE IN COVER FACING DOWN *CONTRACTOR SUPPLIED*
12" WALL TROUGH WITH (1) 3" GROMMETED HOLE
OR ACCESS SPACE IN COVER 18" FROM FLOOR
4" x 4" JBOX LOCATED FLUSH W/ FINISHED FLOOR WITH
(1) 2" GROMMETED HOLE IN COVER
4" X 4" J-BOX CENTERED 18" A.F.F. WITH
(1) 2" GROMMETED HOLE IN COVER
WARNING LIGHT ABOVE DOOR. WIRES TO BE ROUTED
TO WALL TROUGH 2 WITH 12 FOOT WHIP AT FLOOR
TO MAKE CONNECTIONS
DOOR SWITCH(ES) ARE CONTRACTOR SUPPLIED AND
INSTALLED WITH (2) #14 WIRES TO WALL TROUGH 2
WITH 12 ' WHIP FOR MAKING FINAL CONNECTIONS
(1) DEDICATED QUAD OUTLET 115VAC 20 AMP (1)
NETWORKING DATA DROPS LOCATED 12” A.F.F10
(1) DEDICATED
QUAD OUTLET 115VAC 20 AMP LOCATED 12” A.F.F11
LINE POWER @ ITEM
NOTE: #6 GROUND WIRE REQUIRED
VOLTAGE FLUCTUATION ± 10 FULL
LOAD. ALL WIRES TO BE THHN OR TFFN
STRANDED COPPER THERMOPLASTIC
600 VOLT OR EQUIVALENT, UNLESS
OTHERWISE NOTED. MAXIMUM
LENGTH FROM DISTRIBUTION
TRANSFORMER TO ROOM MAIN
BREAKER NOT TO EXCEED 200 FEET.
THREE
PHASE
MAIN
FACILITY
DIST XFMR
INCOMING
WIRE SIZE
X-RAY
ROOM
BREAKER
480 VAC 105 KVA #2 #00 250MCM 100 AMP
50' 100' 200'
8"x8"x8" J-Box
FINISHED CEILING
FLEX
HOLE
DATE:
REVISION:
6/14/17
NOTE: #6 GROUND WIRE REQUIRED
MINIMUM RECOMMENDED
DISTRIBUTION
TRANSFORMER RATING
OPERATIONAL CLIMATETHREE PHASE
INCOMING VOLTAGE
INCOMING
WIRE SIZE
X-RAY ROOM
MAIN
BREAKER
480 VAC 105 KVA #2 #00 250MCM 100 AMP
50' 100' 200'
CONTRACTOR TO SUPPLY POWER WIRES
NECESSARY FROM ROOM BREAKER TO
GENERATOR
VOLTAGE FLUCTUATION ±10% FULL LOAD.
ALL WIRES TO BE THHN OR TFFN STRANDED
COPPER THERMOPLASTIC 600 VOLT OR
EQUIVALENT, UNLESS OTHERWISE NOTED.
MAXIMUM LENGTH FROM DISTRIBUTION
TRANSFORMER TO ROOM MAIN BREAKER
NOT TO EXCEED 200'.
TEMPERATURE
HUMIDITY
PRESSURE
10 - 40 DEGREES C OR
50 - 104 DEGREES F
30% - 75%
70 kPa - 106 kPa
ELECTRICAL CALLOUT INFO
ELECTRICAL REQUIRED
E2
2” HOLE CORE DRILLED THROUGH FLOOR AS
CLOSE TO WALL AS POSSIBLE
D D
2" CONDUIT FROM
WALL STAND TO WALL
TROUGH. MUST BE AS
DIRECT AS POSSIBLE.
2" CONDUIT FROM MAINS
BOX 1 TO WALL TROUGH
AS NEEDED
CONDUIT FOR EPO
TO BREAKER
AS NEEDED CONDUIT
FOR WARNING AND
DOOR SWITCH WIRE TO
GENERATOR
2" CONDUIT FROM
CONTROL J-BOX 6
TO WALL TROUGH.
EXISTING CONDUIT
TO BE UTILIZED
3" CONDUIT OR
FLEX CONDUIT
FROM J-BOX 5
TO EXISTING WALL
TROUGH TOP
TROUGH
EXISTING CONDUIT
TO BE UTILIZED
CONTROL ROOM
DATE:
REVISION:
6/14/17
* SEE SHEET E2 FOR WIRE INFORMATION
ELECTRICAL REQUIRED
E3
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
File details come from the government source that posted it.