SPECIFICATIONS (VOL.2)
100% BID DOCUMENTS
CORRECT LIFE SAFETY DEFICIENCIES
IOWA CITY VA HEALTH CARE SYSTEM
IOWA CITY, IOWA
PROJECT NO: 636A8-16-006
19 SEPTEMBER 2017
Correct Life Safety Deficiencies Project No. 636A8-16-006
100% Bid Documents
19 September 2017
Prepared By:
Neal Suntken
Kenneth Hahn Architects 1343 South 75th Street Omaha, NE 68124
AutoCAD SHX Text and that I am a duly licensed Architect
AutoCAD SHX Text under the laws of the State of Nebraska.
AutoCAD SHX Text Specification Divisions/Sections covered by this seal:
AutoCAD SHX Text I hereby certify that this specifcation was
AutoCAD SHX Text prepared by me or under my direct personal supervision
AutoCAD SHX Text
02 41 00, 4, 6, 7, 8, 9, 10, 12 AND 33 46 13
AutoCAD SHX Text and that I am a duly licensed Professional Engineer
AutoCAD SHX Text under the laws of the State of Nebraska.
AutoCAD SHX Text Specification Divisions/Sections covered by this seal:
AutoCAD SHX Text I hereby certify that this specification was
AutoCAD SHX Text prepared by me or under my direct personal supervision
AutoCAD SHX Text
3, 5 AND 31 63 26
AutoCAD SHX Text 9/19/17
AutoCAD SHX Text 9/19/17
Gerrit Stamp
KAM
Image
ICVA HEALTH CARE SYSTEM 05-01-17
VA PROJECT: 636A8-16-006
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-15 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 02-15 01 33 23 Shop Drawings, Product Data, and Samples 09-16 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 29 Testing Laboratory Services 06-16 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 09-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 02-15 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 12-15
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 02-16 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 02-16 04 72 00 Cast Stone Masonry 02-15
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16 05 31 00 Steel Decking 02-16 05 40 00 Cold-Formed Metal Framing 05-16 05 50 00 Metal Fabrications 07-14
00 01 10-2
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-15 06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 00 Sheet Waterproofing 04-13 07 13 52 Modified Bituminous Sheet Waterproofing 09-11 07 21 13 Thermal Insulation 02-16 07 22 00 Roof and Deck Insulation 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 40 00 Roofing and Siding Panels 10-15 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 10-15 07 60 00 Flashing and Sheet Metal 07-14 07 72 00 Roof Accessories 10-15 07 81 00 Applied Fireproofing 10-15 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-15
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 34 53 Security Doors and Frames 05-15 08 41 13 Aluminum-Framed Entrances and Storefronts 08-16 08 44 13 Glazed Aluminum Curtain Walls 03-17 08 56 59 Service and Teller Window Units 02-16 08 71 00 Door Hardware 01-16 08 71 13 Automatic Door Operators 02-16 08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 22 16 Non-Structural Metal Framing 05-16 09 29 00 Gypsum Board 11-14 09 30 13 Ceramic/Porcelain Tiling 10-15 09 51 00 Acoustical Ceilings 12-15 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 02-16 09 65 19 Resilient Tile Flooring 12-15 09 66 16 Terrazzo Floor Tile 10-15 09 68 00 Carpeting 10-15 09 72 16 Vinyl-Coated Fabric Wall Covering 10-15 09 91 00 Painting 01-16
00 01 10-3
DIVISION 10 – SPECIALTIES
10 14 00 Signage 10-15 10 21 23 Cubicle Curtain Tracks 05-15 10 22 13 Wire Mesh Partitions 10-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-14
DIVISION 11 – EQUIPMENT
Not used
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 09-15
DIVISION 13 - SPECIAL CONSTRUCTION
Not used
DIVISION 14– CONVEYING EQUIPEMENT
Not used
DIVISION 21- FIRE SUPPRESSION
21 12 00 Manual Dry Standpipe Systems 06-15 21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 09-15 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
00 01 10-4
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-15 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 11-10
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 09-12 23 22 13 Steam and Condensate Heating Piping 02-15 23 23 00 Refrigerant Piping 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 72 00 Air-to-Air Energy Recovery Equipment 05-11 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11 23 81 43 Air-Source Unitary Heat Pumps 04-11 23 82 00 Convection Heating and Cooling Units 04-11
DIVISION 25 – INTEGRATED AUTOMATION
Not used
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 05-14 26 09 23 Lighting Controls 05-14 26 24 16 Panelboards 05-14 26 27 26 Wiring Devices 01-16 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 08-14 26 56 00 Exterior Lighting 05-14
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 11 00 Telecommunications Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16
00 01 10-5
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 09-11 28 05 13 Conductors and Cables for Electronic Safety and
Security 09-11
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 13 00 Physical Access Control System 10-11 28 16 11 Code Green Notification System 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12 31 63 26 Drilled Caissons 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
DIVISION 33 – UTILITIES
33 40 00 Storm Sewer Utilities 10-11 33 46 13 Foundation Drainage 10-11
DIVISION 34 – TRANSPORTATION
Not used
DIVISION 48 – Electrical Power Generation
Not used
APPENDIX
Appendix A Limited Asbestos Survey Report 12-16 Appendix B Geotechnical Engineering Report 10-16 Appendix C Safety Requirements – Risk Assessments --
06-01-15
Correct Life Safety Deficiencies 21 12 00 - 1 636A8 -16-006
SECTION 21 12 00
MANUAL DRY STANDPIPE SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Design, materials, equipment and installation, i nspection and testing of a manual dry standpipe system as required by NFP A 14.
B. Modification of the existing manual dry standpip e system as indicated on the drawings and as further required by these sp ecifications.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, A ND SAMPLES.
B. Section 07 84 00, FIRESTOPPING.
C. Section 09 91 00, PAINTING.
D. Section 28 31 00, FIRE DETECTION AND ALARM.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide design, materi als, equipment, installation, and testing of the manual dry standpi pe system in accordance with NFPA 14.
1. For hydraulic calculations, calculated demand sh all not fall less than 10 percent below the water supply curve.
2. Water Supply: Base water supply buildings fire p ump system.
3. Size standpipes to provide 100 psi at the most r emote connections.
4. NOT USED
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detail ed working drawings that are signed by a NICET Level III or Level IV Sp rinkler Technician or stamped by a Registered Professional Engineer li censed in the field of Fire Protection Engineering. As the Government r eview is for technical adequacy only, the installer remains resp onsible for correcting any conflicts with other trades and buil ding construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved pri or to the purchase or delivery to the job site. Suitably bind submitta ls in notebooks or binders and provide index referencing the appropria te specification section. In addition to the hard copies, provide su bmittal items in
Paragraphs 1.3(C)1 through 1.3(C)5 electronically i n pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
Correct Life Safety Deficiencies 21 12 00 - 2 636A8 -16-006
1. Qualifications:
a. Provide a copy of the installing contractors fir e sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for th e NICET Level III or Level IV Sprinkler Technician who prepared and s igned the detailed working drawings unless the drawings are s tamped by a
Registered Professional Engineer licensed in the fi eld of Fire
Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installati on of commercial automatic sprinkler systems for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations c hapter of NFPA
14. Drawings shall include graphical scales that al low the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test lo cation.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Inclu de listing information and installation instructions in data s heets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Calculation Sheets:
a. Submit hydraulic calculation sheets in tabular f orm conforming to the requirements and recommendations of the Plans a nd
Calculations chapter of NFPA 14.
5. Valve Charts: Provide a valve chart that identif ies the location of each control valve. Coordinate nomenclature and id entification of control valves with COR. Where existing nomenclatu re does not exist, the chart shall include no less than the fol lowing: Tag ID
No., Valve Size, Service (control valve, main drain , aux. drain, inspectors test valve, etc.), and Location.
6. Final Document Submittals: Provide as-built draw ings, testing and maintenance instructions in accordance with the req uirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limi ted to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the syst em switches
Correct Life Safety Deficiencies 21 12 00 - 3 636A8 -16-006 and the fire alarm equipment. Provide a complete s et in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) p rinted copy.
2) One complete set in electronic pdf format.
3) One complete set in AutoCAD format or a format a s directed by the COR.
b. Material and Testing Certificate: Upon completio n of the standpipe system installation or any partial sectio n of the system, including testing and flushing, provide a c opy of a completed Material and Testing Certificate as indic ated in NFPA
14. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine ma intenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recom mended service organization, including address and telephone numbe r, for each item of equipment.
d. One paper copy of the Material and Testing Certi ficates and the
Operations and Maintenance Manuals above shall be p rovided in a binder. In addition, these materials shall be prov ided in pdf format on a compact disc or as directed by the COR.
e. Provide one additional copy of the Operations an d Maintenance
Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the ris er or as directed by the COR.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall posse ss a valid State of
Iowa fire sprinkler contractor’s license. The insta ller shall have been actively and successfully engaged in the installati on of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devic es shall be of a make and type listed by UL or approved by FM, or other n ationally recognized
Correct Life Safety Deficiencies 21 12 00 - 4 636A8 -16-006 testing laboratory for the specific purpose for whi ch it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicate d otherwise on the contract drawings.
1.6 APPLICABLE PUBLICATIONS:
A. The publications listed below form a part of thi s specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
NFPA 14-13..............Installation of Standpipe a nd Hose Systems
NFPA 101-15.............Life Safety Code
NFPA 170-15.............Fire Safety Symbols
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS:
A. Piping and fitting shall be in accordance with N FPA 14. Do not use plain end pipe and fittings with locking lugs or sh ear bolts.
2.2 VALVES
A. Valves shall be in accordance with NFPA 14.
B. Do not use quarter turn ball valves for 50 mm (2 inches) or larger drain valves.
C. Standpipe Hose Valves: 65 mm (2-1/2 inches) scre wed, brass hose angle valve, male hose threads same as local fire protect ion service, 65 mm
(2-1/2 inches) by 40 mm (1-1/2 inches) reducer, wit h permanently attached polished brass cap and chain.
D. Automatic Ball Drips: Cast brass 20 mm (3/4-inch ) in-line automatic ball drip with both ends threaded with iron pipe th reads.
2.3 FIRE DEPARTMENT SUPPLY CONNECTION: (NOT USED)
2.4 IDENTIFICATION SIGNS:
A. Rigid plastic, steel or aluminum signs with whit e lettering on a red background with holes for easy attachment. Standpip e system signage shall be attached to the valve or piping with chain .
Correct Life Safety Deficiencies 21 12 00 - 5 636A8 -16-006
2.5 STANDPIPE HOSE VALVE CABINETS: (NOT USED)
2.6 VALVE SUPERVISORY SWITCHES:
A. Contain in a die cast red baked enamel, oil resi stant, aluminum housing with tamper resistant screws, which shall provide a 13 mm (1/2 inch) conduit entrance and necessary facilities for attac hment to the valves.
Provide two SPDT switches rated at 2.5 amps at 24 V DC. Valve supervisory switches for ball and butterfly valves may be integral with the valve.
2.7 PIPE SUPPORTS:
A. Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 14.
2.8 WALL, FLOOR AND CEILING PLATES:
A. Provide chrome plated steel escutcheon plates.
2.9 VALVE TAGS
Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less tha n 8 mm (1/4 inch) for service designation on 19 gauge, 40 mm (1-1/2 i nches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.
PART 3 - EXECUTION
3.1 INSTALLATION:
A. Installation shall be accomplished by the licens ed contractor. Provide a qualified technician, experienced in the installa tion and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Installation of Piping: Accurately cut pipe to m easurements established by the installer and work into place without spring ing or forcing. In any situations where bending of the pipe is require d, use a standard pipe-bending template. Conceal piping in all spaces which have finished ceilings. In stairways, locate piping as near to th e ceiling as possible to prevent tampering by unauthorized perso nnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clea rances required by
NFPA 101. Pipe hangers, supports, and restraint of system piping, and shall be installed accordance with NFPA 13.
C. NOT USED
D. Drains: Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate si ze to readily carry the full flow from each drain under maximum pressur e. Do not provide a
Correct Life Safety Deficiencies 21 12 00 - 6 636A8 -16-006 direct drain connection to sewer system or discharg e into sinks.
Install drips and drains where necessary and as req uired by NFPA 14.
E. Valve Supervisory Switches: Provide supervisory switches that are connected to the fire alarm system. Do not provide valve supervisory switches on standpipe hose valves, test or drain va lves. See Section 28
31 00 for connections.
F. Provide escutcheon plates for exposed piping pas sing through walls, floors or ceilings.
G. Clearances: For systems requiring seismic protec tion, piping that passes through floors or walls shall have penetrati ons sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm
(1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches ) nominally larger for penetrating pipe sizes 100 mm (4 inches) and la rger.
H. Sleeves: Provide for pipes passing through mason ry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fir e stop material in accordance with Section 07 84 00, FIRESTOPPING. Whe re core drilling is used in lieu of sleeves, also seal space around pen etrations. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with Section 07 84 00, FIRESTOPPING.
I. Paint all piping Fire Safety Red in accordance w ith Section 09 91 00 or a color designated by the Contracting Officers Tech nical Representative
(COR).
J. NOT USED
K. Securely attach identification signs to control valves, drain valves, and test valves.
L. Interruption of Service: There shall be no inter ruption of the existing sprinkler protection, water, electric, or fire alar m services without prior permission of the Contracting Officers Techni cal Representative
(COR). Permission shall be requested in writing at least one (1) week prior to the planned interruption. Any interruption shall be limited to
4 hours for final connections or repairs.
M. Welding: All welding shall conform to the requir ements and recommendations of NFPA 14.
3.2 INSPECTION AND TEST:
A. Hydrostatic Testing: Hydrostatically test the sy stem including the fire department connections, as specified in NFPA 14, in the presence of the
Correct Life Safety Deficiencies 21 12 00 - 7 636A8 -16-006
Contracting Officers Technical Representative (COR) or his designated representative.
B. Final Inspection and Testing: Test the system in accordance with NFPA
14 when all necessary corrections have been accompl ished. Advise the
Contracting Officers Technical Representative (COR) who will then schedule the final inspection and test. Furnish all instruments, labor and materials required for the tests and provide th e services of the installation foreman or other competent representat ive of the installer to perform the tests. Correct any deficiencies foun d and retest the system. Include the operation of all features of th e systems under normal conditions in the test.
- - - E N D - - -
Correct Life Safety Deficiencies 21 13 13 - 1 636A8-16-006
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Design, installation and testing shall be in acc ordance with
NFPA 13.
B. NOT USED
C. Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifica tions.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, A ND SAMPLES.
B. Section 33 10 00, WATER UTILITIES.
C. Section 07 84 00, FIRESTOPPING.
D. Section 09 91 00, PAINTING.
E. NOT USED.
F. Section 28 31 00, FIRE DETECTION AND ALARM.
G. NOT USED.
H. NOT USED.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide design, materi als, equipment, installation, inspection, and testing of the automa tic sprinkler system in accordance with the requirements of NFPA 13.
1. Perform hydraulic calculations in accordance wit h NFPA 13 utilizing the Area/Density method. Do not restrict design ar ea reductions permitted for using quick response sprinklers throu ghout by the required use of standard response sprinklers in the areas identified in this section.
2. Sprinkler Protection: Sprinkler hazard classific ations shall be in accordance with NFPA 13. The hazard classification examples of uses and conditions identified in the Annex of NFPA 13 s hall be mandatory for areas not listed below. Request clarification f rom the
Government for any hazard classification not identi fied. To determining spacing and sizing, apply the following coverage classifications:
a. Light Hazard Occupancies: Patient care, treatmen t, and customary access areas.
b. NOT USED
Correct Life Safety Deficiencies 21 13 13 - 2 636A8-16-006
c. Ordinary Hazard Group 2 Occupancies: Storage roo ms, storage areas, building management storage.
3. Hydraulic Calculations: Calculated demand includ ing hose stream requirements shall fall no less than 10 percent bel ow the available water supply curve.
4. NOT USED
5. Zoning:
a. Maintain existing zones.
b. Sprinkler zones shall conform to the smoke barri er zones shown on the drawings.
6. NOT USED
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detail ed working drawings that are signed by a NICET Level III or Level IV Sp rinkler Technician or stamped by a Registered Professional Engineer li censed in the field of Fire Protection Engineering. As the Government r eview is for technical adequacy only, the installer remains resp onsible for correcting any conflicts with other trades and buil ding construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved pri or to the purchase or delivery to the job site. Suitably bind submitta ls in notebooks or binders and provide an index referencing the approp riate specification section. In addition to the hard copies, provide su bmittal items in
Paragraphs 1.4(A)1 through 1.4(A)5 electronically i n pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fir e sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for th e NICET Level III or Level IV Sprinkler Technician who prepared and s igned the detailed working drawings unless the drawings are s tamped by a
Registered Professional Engineer licensed in the fi eld of Fire
Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installati on of commercial automatic sprinkler systems for the past ten years.
Correct Life Safety Deficiencies 21 13 13 - 3 636A8-16-006
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations c hapter of NFPA
13. Drawings shall include graphical scales that al low the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test lo cation.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Inclu de listing information and installation instructions in data s heets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Calculation Sheets:
a. Submit hydraulic calculation sheets in tabular f orm conforming to the requirements and recommendations of the Plans a nd
Calculations chapter of NFPA 13.
b. NOT USED
5. NOT USED
6. Final Document Submittals: Provide as-built draw ings, testing and maintenance instructions in accordance with the req uirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limi ted to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the syst em switches and the fire alarm equipment. Provide a complete s et in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) p rinted copy.
2) One complete set in electronic pdf format.
3) One complete set in AutoCAD format or a format a s directed by the COR.
b. Material and Testing Certificate: Upon completio n of the sprinkler system installation or any partial sectio n of the system, including testing and flushing, provide a c opy of a completed Material and Testing Certificate as indic ated in NFPA
13. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and
Correct Life Safety Deficiencies 21 13 13 - 4 636A8-16-006 routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine ma intenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recom mended service organization, including address and telephone numbe r, for each item of equipment.
d. One paper copy of the Material and Testing Certi ficates and the
Operations and Maintenance Manuals above shall be p rovided in a binder. In addition, these materials shall be prov ided in pdf format on a compact disc or as directed by the COR.
e. Provide one additional copy of the Operations an d Maintenance
Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the ris er or as directed by the COR.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall posse ss a valid State of
Iowa fire sprinkler contractor's license. The insta ller shall have been actively and successfully engaged in the installati on of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devic es shall be of a make and type listed by UL or approved by FM, or other n ationally recognized testing laboratory for the specific purpose for whi ch it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicate d otherwise on the contract drawings.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of thi s specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-13...................Installation of Sprinkler S ystems
25-14...................Inspection, Testing, and Ma intenance of Water-
Based Fire Protection Systems
101-15..................Life Safety Code
170-15..................Fire Safety Symbols
Correct Life Safety Deficiencies 21 13 13 - 5 636A8-16-006
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS
A. Piping and fittings for private underground wate r mains shall be in accordance with NFPA 13.
1. Pipe and fittings from inside face of building 3 00 mm (12 in.) above finished floor to a distance of approximately 1500 mm (5 ft.)
outside building: Ductile Iron, flanged fittings an d 316 stainless steel bolting.
B. Piping and fittings for sprinkler systems shall be in accordance with
NFPA 13.
1. Plain-end pipe fittings with locking lugs or she ar bolts are not permitted.
2. Piping sizes 50 mm (2 inches) and smaller shall be black steel
Schedule 40 with threaded end connections.
3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel
Schedule 10 with grooved connections. Grooves in S chedule 10 piping shall be rolled grooved only.
4. Use nonferrous piping in MRI Scanning Rooms.
5. Plastic piping shall not be permitted except for drain piping.
6. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside di ameter or 1-inch and a maximum length of 6-feet.
2.2 VALVES
A. General:
1. Valves shall be in accordance with NFPA 13.
2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.
B. NOT USED
C. Check Valve: Shall be of the swing type with a f langed cast iron body and flanged inspection plate.
D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch ) in-line automatic ball drip with both ends threaded with iron pipe th reads.
E. NOT USED
Correct Life Safety Deficiencies 21 13 13 - 6 636A8-16-006
F. NOT USED
2.3 FIRE DEPARTMENT SIAMESE CONNECTION – NOT USED
2.4 SPRINKLERS
A. All sprinklers shall be FM approved quick respon se except
“institutional” type sprinklers shall be permitted to be UL Listed quick response. Provide FM approved quick response sprinklers in all areas.
B. Temperature Ratings: In accordance with NFPA 13 except that sprinklers in elevator shafts and elevator machine rooms shall be no less than intermediate temperature rated and sprinklers in ge nerator rooms shall be no less than high temperature rated.
C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL lis ted or FM approved for use with the corresponding sprinkler.
2.5 SPRINKLER CABINET: NOT USED
2.6 SPRINKLER SYSTEM SIGNAGE
Rigid plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Sprinkle r system signage shall be attached to the valve or piping with chain .
2.7 SWITCHES: NOT USED
2.8 GAUGES: NOT USED
2.9 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING
Pipe hangers, supports, and restraint of system pi ping shall be in accordance with NFPA 13.
2.10 WALL, FLOOR AND CEILING PLATES
Provide chrome plated steel escutcheon plates.
2.11 ANTIFREEZE SOLUTION: NOT USED
2.12 VALVE TAGS: NOT USED
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by the licens ed contractor. Provide a qualified technician, experienced in the installa tion and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Installation of Piping: Accurately cut pipe to m easurements established by the installer and work into place without spring ing or forcing. In
Correct Life Safety Deficiencies 21 13 13 - 7 636A8-16-006 any situation where bending of the pipe is required , use a standard pipe-bending template. Concealed piping in spaces t hat have finished ceilings. Where ceiling mounted equipment exists, s uch as in operating and radiology rooms, install sprinklers so as not t o obstruct the movement or operation of the equipment. Sidewall he ads may need to be utilized. In stairways, locate piping as near to th e ceiling as possible to prevent tampering by unauthorized perso nnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clea rances required by
NFPA 101. Pipe hangers, supports and restraint of s ystem piping shall be installed accordance with NFPA 13.
C. Welding: Conform to the requirements and recomme ndations of NFPA 13.
D. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from e ach drain under maximum pressure. Do not provide a direct drain con nection to sewer system or discharge into sinks. Install drips and d rains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.
E. NOT USED
F. NOT USED
G. NOT USED
H. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connec tions to the respective waterflow switch or pipe connection near to the pipe from where they were cut.
I. Provide escutcheon plates for exposed piping pas sing through walls, floors or ceilings.
J. NOT USED
K. Sleeves: Provide for pipes passing through mason ry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fir e stop material in accordance with Section 07 84 00, FIRESTOPPING. Whe re core drilling is used in lieu of sleeves, also seal space. Seal pene trations of walls, floors and ceilings of other types of construction, in accordance with
Section 07 84 00, FIRESTOPPING.
Correct Life Safety Deficiencies 21 13 13 - 8 636A8-16-006
L. NOT USED
M. NOT USED
N. NOT USED
O. Firestopping shall be provided for all penetrati ons of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.
P. NOT USED
Q. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of pa int to match adjacent surfaces, except paint valves and operatin g accessories with two coats of gloss red enamel. Exercise care to av oid painting sprinklers. Painting of sprinkler systems above su spended ceilings and in crawl spaces is not required. Painting shall co mply with Section 09
91 00, PAINTING. Any painted sprinkler shall be re placed with a new sprinkler.
R. Sprinkler System Signage: Provide rigid sprinkl er system signage in accordance with NFPA 13 and NFPA 25. Sprinkler sys tem signage shall include, but not limited to, the following:
1. Identification Signs:
a. Provide signage for each drain valve.
b. Provide valve tags for each operable valve. Coor dinate nomenclature and identification of operable valves with COR.
Where existing nomenclature does not exist, the Tag
Identification shall include no less than the follo wing: (FP-B-
F/SZ-#) Fire Protection, Building Number, Floor Num ber/Smoke Zone
(if applicable), and Valve Number. (E.g., FP-500-1 E-001) Fire
Protection, Building 500, First Floor East, Number 001.)
2. NOT USED
3. Hydraulic Placards:
a. Provide signage indicating hydraulic design info rmation. The placard shall include location of the design area, discharge densities, required flow and residual pressure at t he base of riser, occupancy classification, hose stream allowa nce, flow test information, and installing contractor. Locate hyd raulic placard information signs at each alarm check valve.
S. Repairs: Repair damage to the building or equipm ent resulting from the installation of the sprinkler system by the install er at no additional expense to the Government.
Correct Life Safety Deficiencies 21 13 13 - 9 636A8-16-006
T. Interruption of Service: There shall be no inter ruption of the existing sprinkler protection, water, electric, or fire alar m services without prior permission of the Contracting Officer. Contra ctor shall develop an interim fire protection program where interrupti ons involve occupied spaces. Request in writing at least one week prior to the planned interruption.
3.2 INSPECTION AND TEST
A. Preliminary Testing: Flush newly installed syste ms prior to performing hydrostatic tests in order to remove any debris whi ch may have been left as well as ensuring piping is unobstructed. Hy drostatically test system, including the fire department connections, as specified in NFPA
13, in the presence of the Contracting Officers Rep resentative (COR) or his designated representative. Test and flush under ground water line prior to performing these hydrostatic tests.
B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections ha ve been accomplished, advise COR to schedule a final inspec tion and test.
Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labo r and materials required for the tests and provide the services of the installation foreman or other competent representative of the in staller to perform the tests. Correct deficiencies and retest system a s necessary, prior to the final acceptance. Include the operation of a ll features of the systems under normal operations in test
3.3 INSTRUCTIONS
Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation an d maintenance of the system, on the dates requested by the COR.
- - - E N D - - -
07-01-16
Correct Life Safety Deficiencies 22 05 11 - 1 63 6A8-16-006
SECTION 22 05 11
COMMON WORK RESULTS FOR PLUMBING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section shall apply to all sections of
Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
C. Abbreviations/Acronyms:
1. ABS: Acrylonitrile Butadiene Styrene
2. AC: Alternating Current
3. ACR: Air Conditioning and Refrigeration
4. AI: Analog Input
5. AISI: American Iron and Steel Institute
6. AO: Analog Output
7. AWG: American Wire Gauge
8. BACnet: Building Automation and Control Network
9. BAg: Silver-Copper-Zinc Brazing Alloy
10. BAS: Building Automation System
11. BCuP: Silver-Copper-Phosphorus Brazing Alloy
12. BSG: Borosilicate Glass Pipe
13. CDA: Copper Development Association
14. C: Celsius
15. CLR: Color
16. CO: Carbon Monoxide
17. COR: Contracting Officer’s Representative
18. CPVC: Chlorinated Polyvinyl Chloride
19. CR: Chloroprene
20. CRS: Corrosion Resistant Steel
21. CWP: Cold Working Pressure
22. CxA: Commissioning Agent
23. db(A): Decibels (A weighted)
24. DDC: Direct Digital Control
25. DI: Digital Input
26. DISS: Diameter Index Safety System
27. DO: Digital Output
28. DVD: Digital Video Disc
29. DN: Diameter Nominal
Correct Life Safety Deficiencies 22 05 11 - 2 63 6A8-16-006
30. DWV: Drainage, Waste and Vent
31. ECC: Engineering Control Center
32. EPDM: Ethylene Propylene Diene Monomer
33. EPT: Ethylene Propylene Terpolymer
34. ETO: Ethylene Oxide
35. F: Fahrenheit
36. FAR: Federal Acquisition Regulations
37. FD: Floor Drain
38. FED: Federal
39. FG: Fiberglass
40. FNPT: Female National Pipe Thread
41. FPM: Fluoroelastomer Polymer
42. GPM: Gallons Per Minute
43. HDPE: High Density Polyethylene
44. Hg: Mercury
45. HOA: Hands-Off-Automatic
46. HP: Horsepower
47. HVE: High Volume Evacuation
48. ID: Inside Diameter
49. IPS: Iron Pipe Size
50. Kg: Kilogram
51. kPa: Kilopascal
52. lb: Pound
53. L/s: Liters Per Second
54. L/min: Liters Per Minute
55. MAWP: Maximum Allowable Working Pressure
56. MAX: Maximum
57. MED: Medical
58. m: Meter
59. MFG: Manufacturer
60. mg: Milligram
61. mg/L: Milligrams per Liter
62. ml: Milliliter
63. mm: Millimeter
64. MIN: Minimum
65. NF: Oil Free Dry (Nitrogen)
66. NPTF: National Pipe Thread Female
67. NPS: Nominal Pipe Size
Correct Life Safety Deficiencies 22 05 11 - 3 63 6A8-16-006
68. NPT: Nominal Pipe Thread
69. OD: Outside Diameter
70. OSD: Open Sight Drain
71. OS&Y: Outside Stem and Yoke
72. OXY: Oxygen
73. PBPU: Prefabricated Bedside Patient Units
74. PH: Power of Hydrogen
75. PLC: Programmable Logic Controllers
76. PP: Polypropylene
77. PPM: Parts per Million
78. PSIG: Pounds per Square Inch
79. PTFE: Polytetrafluoroethylene
80. PVC: Polyvinyl Chloride
81. PVDF: Polyvinylidene Fluoride
82. RAD: Radians
83. RO: Reverse Osmosis
84. RPM: Revolutions Per Minute
85. RTRP: Reinforced Thermosetting Resin Pipe
86. SCFM: Standard Cubic Feet Per Minute
87. SDI: Silt Density Index
88. SPEC: Specification
89. SPS: Sterile Processing Services
90. STD: Standard
91. SUS: Saybolt Universal Second
92. SWP: Steam Working Pressure
93. TEFC: Totally Enclosed Fan-Cooled
94. TFE: Tetrafluoroethylene
95. THHN: Thermoplastic High-Heat Resistant Nylon C oated Wire
96. THWN: Thermoplastic Heat & Water Resistant Nylo n Coated Wire
97. T/P: Temperature and Pressure
98. USDA: U.S. Department of Agriculture
99. V: Volt
100. VAC: Vacuum
101. VA: Veterans Administration
102. VAMC: Veterans Administration Medical Center
103. VAC: Voltage in Alternating Current
104. WAGD: Waste Anesthesia Gas Disposal
105. WOG: Water, Oil, Gas
Correct Life Safety Deficiencies 22 05 11 - 4 63 6A8-16-006
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, A ND SAMPLES.
C. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.
D. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUI REMENTS.
E. Section 01 91 00, GENERAL COMMISSIONING REQUIR EMENTS.
F. Section 02 82 11, TRADITIONAL ASBESTOS ABATEME NT.
G. Section 03 30 00, CAST-IN-PLACE CONCRETE: Conc rete and Grout.
H. Section 05 31 00, STEEL DECKING: Building Comp onents for Attachment of
Hangers.
I. Not Used.
J. Section 05 50 00, METAL FABRICATIONS.
K. Section 07 60 00, FLASHING AND SHEET METAL: Flas hing for Wall and Roof
Penetrations.
L. Section 07 84 00, FIRESTOPPING.
M. Section 07 92 00, JOINT SEALANTS.
N. Section 09 91 00, PAINTING.
O. Not Used.
P. Section 22 05 12, GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT.
Q. Section 22 07 11, PLUMBING INSULATION.
R. Section 22 08 00, COMMISSIONING OF PLUMBING SY STEMS.
S. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTE M FOR HVAC.
T. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL IN STALLATIONS.
U. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER C ONDUCTORS AND CABLES.
V. Section 26 29 11, MOTOR CONTROLLERS.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below shall form a part of this specification to the extent referenced. The publications are refe renced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
ASME Boiler and Pressure Vessel Code -
BPVC Section IX-2013....Welding, Brazing, and Fusin g Qualifications
B31.1-2012..............Power Piping
C. American Society for Testing and Materials (ASTM ):
A36/A36M-2012...........Standard Specification for Carbon Structural
Steel
Correct Life Safety Deficiencies 22 05 11 - 5 63 6A8-16-006
A575-96(R2013)e1........Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades
E84-2013a...............Standard Test Method for Su rface Burning
Characteristics of Building Materials
E119-2012a..............Standard Test Methods for F ire Tests of
Building Construction and Materials
D. International Code Council, (ICC):
IBC-2012................International Building Code
IPC-2012................International Plumbing Code
E. Manufacturers Standardization Society (MSS) of t he Valve and Fittings
Industry, Inc:
SP-58-2009..............Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and
Installation
SP-69-2003..............Pipe Hangers and Supports - Selection and
Application
F. Military Specifications (MIL):
P-21035B................Paint High Zinc Dust Conten t, Galvanizing
Repair (Metric)
G. National Electrical Manufacturers Association (N EMA):
MG 1-2011...............Motors and Generators
H. National Fire Protection Association (NFPA):
51B-2014................Standard for Fire Preventio n During Welding, Cutting and Other Hot Work
54-2012.................National Fuel Gas Code
70-2014.................National Electrical Code (N EC)
I. NSF International (NSF):
61-2012.................Drinking Water System Compo nents – Health
Effects
372-2011................Drinking Water System Compo nents – Lead Content
J. Department of Veterans Affairs (VA):
PG-18-10................Plumbing Design Manual
PG-18-13-2011...........Barrier Free Design Guide
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PR ODUCT DATA, and
SAMPLES.
Correct Life Safety Deficiencies 22 05 11 - 6 63 6A8-16-006
B. Information and material submitted under this se ction shall be marked
"SUBMITTED UNDER SECTION 22 05 11, COMMON WORK RESULTS FOR PLUMBING",
with applicable paragraph identification.
C. Contractor shall make all necessary field measur ements and investigations to assure that the equipment and ass emblies will meet contract requirements and will fit the space availa ble.
D. If equipment is submitted which differs in arran gement from that shown, provide drawings that show the rearrangement of all associated systems.
Approval will be given only if all features of the equipment and associated systems, including accessibility, are eq uivalent to that required by the contract.
E. Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.
F. Installing Contractor shall provide lists of pre vious installations for selected items of equipment. Contact persons who wi ll serve as references, with telephone numbers and e-mail addre sses shall be submitted with the references.
G. Manufacturer's Literature and Data: Manufacturer ’s literature shall be submitted under the pertinent section rather than u nder this section.
1. Electric motor data and variable speed drive dat a shall be submitted with the driven equipment.
2. Equipment and materials identification.
3. Firestopping materials.
4. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
5. Wall, floor, and ceiling plates.
H. Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnis hed together and complete in a group. Coordinate and properly integr ate materials and equipment in each group to provide a completely com patible and efficient installation. Final review and approvals will be made only by groups.
I. Coordination Drawings: Complete consolidated and coordinated layout drawings shall be submitted for all new systems, an d for existing systems that are in the same areas. The drawings sh all include plan
Correct Life Safety Deficiencies 22 05 11 - 7 63 6A8-16-006 views, elevations and sections of all systems and s hall be on a scale of not less than 1:32 (3/8 inch equal to one foot). Clearly identify and dimension the proposed locations of the princip al items of equipment. The drawings shall clearly show the prop osed location and adequate clearance for all equipment, controls, pip ing, pumps, valves and other items. All valves, trap primer valves, wa ter hammer arrestors, strainers, and equipment requiring servi ce shall be provided with an access door sized for the complete removal of plumbing device, component, or equipment. Equipment foundations shal l not be installed until equipment or piping layout drawings have been approved. Detailed layout drawings shall be provided for all piping sy stems. In addition, details of the following shall be provided.
1. Mechanical equipment rooms.
2. Interstitial space.
3. Hangers, inserts, supports, and bracing.
4. Pipe sleeves.
5. Equipment penetrations of floors, walls, ceiling s, or roofs.
J. Maintenance Data and Operating Instructions:
1. Maintenance and operating manuals in accordance with Section 01 00
00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, fo r systems and equipment. Include complete list indicating all com ponents of the systems with diagrams of the internal wiring for ea ch item of equipment.
2. Include listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equi pment shall be provided. The listing shall include belts for equip ment: Belt manufacturer, model number, size and style, and dis tinguished whether of multiple belt sets.
K. Completed System Readiness Checklist provided by the Commissioning
Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00 COMMISSIONING OF P LUMBING SYSTEMS.
L. Submit training plans, trainer qualifications an d instructor qualifications in accordance with the requirements of Section 22 08 00
COMMISSIONING OF…