PRICE SCHEDULE
CLIN 0001, GERNAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS, WALKS, GRADING, DRAINAGE, ABATEMENT, ROOFING, FURNISHINGS, FIRE PROTECTION, MECHANICAL, PLUMBING AND ELECTRICAL AND NECESSARY REMOVAL OF EXISTING STRUCTURES AND CONSTRUCTION AND CERTAIN OTHER ITEMS. THE PERIOD OF PERFORMANCE IS 620 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED.
CLIN 0001: $__________________________________
CLIN 0002, DEDUCT ALTERNATE NO. 1 (BASE BID MINUS THE FOLLOWING WORK): ELIMINATE ALL WORK SHOWN IN THE POLICE SUITE ON THE FIRST FLOOR. THE PERIOD OF PERFORMANCE WITH THE APPLICATION OF THIS DEDUCT ALTERNATE REMAINS AT 620 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED.
CLIN 0002: $__________________________________
CLIN 0003, DEDUCT ALTERNATE NO. 2 (BASE BID MINUS DEDUCT ALTERNATE NO. 1 AND THE FOLLOWING WORK): ELIMINATE ALL WORK SHOWN ON FLOORS SEVEN THRU TEN. THE PERIOD OF PERFORMANCE WITH THE APPLICATION OF THIS DEDUCT ALTERNATE IS REDUCED TO 470 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED.
CLIN 0003: $__________________________________
CLIN 0004, DEDUCT ALTERNATE NO. 3 (BASE BID MINUS DEDUCT ALTERNATES NO. 1, 2 AND THE FOLLOWING WORK): ELIMINATE ALL WORK SHOWN ON FLOOR SIX. THE PERIOD OF PERFORMANCE WITH THE APPLICATION OF THIS DEDUCT ALTERNATE IS REDUCED TO 449 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED.
CLIN 0004: $__________________________________
CLIN 0005, DEDUCT ALTERNATE NO. 4 (BASE BID MINUS DEDUCT ALTERNATES NO. 1, 2, 3 AND THE FOLLOWING WORK): ELIMINATE ALL WORK SHOWN ON FLOOR FIVE. THE PERIOD OF PERFORMANCE WITH THE APPLICATION OF THIS DEDUCT ALTERNATE IS REDUCED TO 407 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED.
CLIN 0005: $__________________________________
NOTICE
1. The Department of Veterans Affairs intends to award a single contract to the Offeror whose proposal is in conformance with this solicitation and is determined to be the best value in accordance with the evaluation criteria.
2. CLIN 0001, Item I (General Construction) contains all of the work for the project. Each Deduct Alternate removes a portion of the work.
3. Offerors must provide a price for each of the CLIN items.
4. The intent is to award CLIN 0001, Item I (General Construction). However, if the proposal price exceeds the funds available for CLIN 0001, CLIN 0002 Deduct Alternate NO. 1, will be applied. If the price still exceeds the available funding, then the next Deduct Alternate will be applied. This process will be repeated until the price is within the available funding, or all of the Deduct Alternates have been applied.
5. If all Deduct Alternates have been applied and no offerors are within the available funding limitation, the VA reserves the right to enter into discussions with those offerors who are determined to be within the competitive range, if a competitive range is determined in the interest of the VA, otherwise discussion will be with all offerors.
6. If following the initial Non-Price and Price evaluations and/or receipt of Final Proposal Revisions resulting from discussion, an offeror’s total evaluated price still exceeds the VA's funding limitation, the VA will no longer consider the offeror to be eligible for award.