36C78627Q50002 0001 Ammendment.pdf
PDF 278 KB Posted
- Solicitation number
- 36C78627Q50002
About this file
This is an Amendment to a Solicitation (Amendment No. 0001) issued by the Department of Veterans Affairs, National Cemetery Administration Contracting Services for solicitation 36C78627Q50002. The amendment addresses 16 substantive concerns raised during the pre-solicitation phase regarding the original Statement of Work, wage determinations, ordering periods, evaluation criteria, and contract terms for sod installation and related lawn maintenance services at Jefferson Barracks National Cemetery.
Key clarifications and revisions include: corrected turf-quality, sod thickness, and acceptance criteria language; confirmation that Jefferson Barracks has not held a prior sod installation contract with the referenced bidder; removal of references to the A-LIST standard; revised evaluation schemes and acceptability standards; correction of the wage determination document; alignment of the IDIQ ordering period with the base performance period beginning April 1, 2027; clarification that the Service Contract Act price-adjustment clause is not required as contract value is not expected to exceed the simplified acquisition threshold; and definition of the 30-day guarantee and replacement duty terms. The government asserts its discretionary authority to establish the $1,000 guaranteed minimum and maximum contract values based on estimated demand, budgetary constraints, and market research. The estimated annual quantity is 40,000 units per contract year. Offerors must acknowledge receipt of this amendment prior to the deadline specified in the original solicitation, either by completing items 8 and 15 and returning one copy, acknowledging receipt on each offer submitted, or via separate letter or electronic communication referencing the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78627Q50002 0002 Ammendment.pdf | ||
| D P07 2015 5075.pdf | ||
| S02 Combined Synopsis Solicitation JBNC Sod.pdf | ||
| S02 Combined Synopsis Solicitation JBNC Sod.pdf | ||
| A P09 JBNC Sod SOW FY27.pdf | ||
| D P07 2015-4853.pdf | ||
| F Pricing.xlsx | XLSX spreadsheet | |
| F Pricing.xlsx | XLSX spreadsheet | |
| P09 JBNC Sod SOW FY27.pdf | ||
| C P09 D Dignity Clause.pdf | ||
| E P09 Past Performance.pdf | ||
| S02 Combined Synopsis Solicitation JBNC Sod.pdf | ||
| F Pricing.xlsx | XLSX spreadsheet | |
| B P09 C Cemetery Operational Standards and Measures.pdf | ||
| D P07 2015-5031.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
36C786
Department of Veterans Affairs
National Cemetery Administration
Contracting Services
18434 Joplin Road
Triangle VA 22172
36C786
Department of Veterans Affairs
National Cemetery Administration
Contracting Services
18434 Joplin Road
Triangle VA 22172
To all Offerors/Bidders
36C78627Q50002
X 1
The purpose of this amendment is to:
(1) Provide amended Combined Solicitation, Statement of Work and Wage determination.
(2) While no questions were directly asked, concerns listed below are addressed.
April Graves
Contracting Officer
Q1: — The turf-quality provision (SOW ¶ A.1(b)) is internally contradictory.
A1: See revised SOW.
Q2: — The sod standard and the seed standard for this cemetery cannot be reconciled. This is a red-line issue for ****.
A2: **** has given a false statement. Jefferson Barracks has not held a contract for sod installation with
**** in the previous 10 years.
Q3: — The record shows no documented basis for dropping the established A-LIST standard.
A3: **** has given a false statement. The A-list standard has not been listed in the previous 3 contracts for Sod and installation.
Q4 — Acceptance turns on undisclosed, subjective criteria.
A4: See revised SOW.
Q5: — The SOW states two irreconcilable sod thicknesses.
A5: See revised SOW.
Q6: — Conflicting units of measure and undefined order limits.
A6. The clause referencing min/max orders references monetary amounts not sod measurements.
Q7: — The IDIQ ordering period ends before the base performance period begins.
A7: See Amended Solicitation
Q8: — The wrong wage determination is attached.
A8: See Amended Solicitation
Q9: — Conflicting question and quotation deadlines.
A9: See Amended Solicitation
Q10 — The evaluation scheme conflicts with itself and the acceptability standard is undefined.
A10: See Amended Solicitation
Q11 — Four one-year options are priced with no proper term-extension mechanism.
A11: See Amended Solicitation
Q12 — The availability-of-funds date precedes performance.
A12: The clause is correct as is for timeframes solicitation is issued. The Clause date may be changed prior to award, as funds become available.
Q13 — The required Service Contract Act labor price-adjustment clause is missing.
A13: FAR 52.222-41 is required for service contracts over $2,500. FAR 52.222-43 is required over the simplified acquisition threshold (SAT). Contract value is not expected to exceed SAT.
Q14 — The 30-day guarantee and one-to-two-day replacement duty are undefined.
A14: See Amended SOW
Q15 — The site-manager and staffing language is overbroad for an as-needed IDIQ.
A15: See Amended SOW
Q16: — The $1,000 guaranteed minimum is nominal and the IDIQ limits lack a stated basis.
The government retains broad discretion to set minimum and maximum contract values as it determines necessary to meet program and procurement objectives. This includes selecting minimums, and setting aggregate maximums based on factors such as estimated usage, budgetary constraints, or market research.
While FAR 16.504-1(b) specifies that the minimum quantity should not be merely nominal, and FAR
16.504-1(c) requires the maximum to have a rational basis, ultimately these thresholds are established at the government's discretion and can be adjusted to reflect anticipated demand, operational needs, and risk allocation considerations.
The Government retains the sole authority and discretion to define, clarify, amend, or revise its technical requirements and specifications in accordance with applicable federal laws and regulations, including the
Federal Acquisition Regulation. The requirements stated in the solicitation represent the Government’s needs and mission priorities.
The Government welcomes meaningful feedback from industry partners to enhance clarity and fair competition. All timely, substantive concerns will be considered, and, if appropriate, may result in amendment to the solicitation. However, the Government is under no obligation to adopt suggested changes and will adhere to the requirements as stated in the final solicitation and any subsequent amendments.
1. Pricing workbook
Use latest posted documents
2. Applicable wage determination
Use latest posted documents.
3. Ordering and performance dates
The solicitation identifies an anticipated base performance period beginning April 1, 2027.
However, the ordering-period language under FAR 52.216-18 appears to provide dates that precede the anticipated base period. Please confirm the correct ordering period for the base year.
4. Estimated annual quantity
Estimated 40,000 per contract year
5. Past-performance submissions
The Government will evaluate the Past Performance of the Prime
Vendor (i.e. the offeror) proposed to perform a major portion of the requirement. The
Government may, but is not required to, also consider relevant past performance information regarding predecessor companies, key personnel, or subcontractors that will perform major or critical aspects of the requirement when the Government determines such information to be pertinent to this acquisition. The past performance evaluation factor assesses the degree of confidence the Government has in the an offeror's ability to supply products and services that meet users' needs, based on a demonstrated record of performance. For evaluation of Past Performance, the
Government may use information from any sources available to it including, but not limited to, the Contract Performance Assessment Reporting System (CPARS) and the attached Past Performance Questionnaire.
6. Onsite Site Manager
The Government will evaluate the Past Performance of the Prime
Vendor (i.e. the offeror) proposed to perform a major portion of the requirement. The
Government may, but is not required to, also consider relevant past performance information regarding predecessor companies, key personnel, or subcontractors that will perform major or critical aspects of the requirement when the Government determines such information to be pertinent to this acquisition. The past performance evaluation factor assesses the degree of confidence the Government has in the an offeror's ability to supply products and services that meet users' needs, based on a demonstrated record of performance. For evaluation of Past Performance, the
Government may use information from any sources available to it including, but not limited to, the Contract Performance Assessment Reporting System (CPARS) and the attached Past Performance Questionnaire.
File details come from the government source that posted it. Updated .