This document is Amendment 0006 to Solicitation 36C78626B0005 issued by the Department of Veterans Affairs National Cemetery Administration for Project 909CM3030, Cemetery Expansion and Site Improvements at Fort Custer National Cemetery, with an effective date of September 29, 2026.
The amendment provides answers to five Requests for Information (RFIs) numbered 45-49 regarding architectural specifications and materials. RFI 45 clarifies that the contractor must provide a basis of design product for heavy-duty traffic epoxy floor coating, specifying ArmorGarage Military Industrial Epoxy Floor System or an approved equal high-build industrial epoxy coating system with manufacturer-recommended primer and topcoats. RFI 46 requires the contractor to supply Foundation Armor SX5000 penetrating concrete sealer or an approved equal penetrating solvent-based silane siloxane concrete sealer for horizontal concrete surfaces and vehicular traffic, with slip resistance provided by concrete slab surface texture. RFI 47 clarifies design intent for CMU construction up to 8 feet above finished floor with metal building framing and metal wall panels above that height, noting that detail drawing titles C4 and C7 should be reversed. RFI 48 directs contractors to Specification Section 10 14 00 regarding bronze service seals, requiring provision of six military branch seals for new Committal Shelter C and removal and reinstallation of existing seals plus addition of a Space Force seal for existing Committal Shelters A and B. RFI 49 requires contractors to match existing trash receptacles and benches on site, providing two wood grain plastic benches to match existing installations and submit product data for approval prior to ordering.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0006 09-29-2026 Funds Assurance 909CM3030
909CM3030
36C786
Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
36C786
Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
To all Offerors/Bidders 36C78626B0005
X
X X
X 1
This amendment to solicitation number 36C78626B0005 for Project 909CM3030 Cemetery Expansion and Site Improvements at Fort Custer National Cemetery
The purpose of this amendment is to:
A. Provide Answers to RFIs.
Shane Hilts Contracting Officer
RFI-ID Building/Site location RFI/Discussion topic VA Response
45 Architecture Reference Drawing S-AE101, Key Notes: Note 08 – There is a heavy duty traffic epoxy floor coating stated as being required. There is no specification for such a floor treatment. What material is required?
Contractor to provide basis of design product
ArmorGarage Military Industrial Epoxy Floor System, or approved equal high-build industrial epoxy coating system consisting of manufacturer’s recommended primer and epoxy topcoats.
46 Architecture Reference Drawing S-AE101, Key Notes: Note 09 – There is a heavy duty concrete penetrating material required. There is no specification for such a material. What material is required.
Contractor to provide basis of design product
Foundation Armor SX5000 penetrating concrete sealer, or approved equal penetrating solvent-based silane siloxane concrete sealer suitable for horizontal concrete surfaces and vehicular traffic. Slip resistance shall be provided by the concrete slab surface texture and no additional slip-resistant coating is required.
47 Architecture Reference Drawing S-AE101 – Plan F-1: Details A4, A7, C7 and C4 are not correct with what is shown as elevations on Drawing S-AE201.
The design intent is for CMU up to 8’-0” AFF and metal building framing with metal wall panels above 8’-0”
AFF, as shown in details A4 and A7 and the elevations.
The drawing titles for details C4 and C7 should be reversed to align with that design intent and the respective content of the details.
48 Architecture Reference Drawing C-AE101 – Elevation F6: What are the seals that are required to be set in the wall? Who provides them, what are they, where are they specified.
Refer to Specification Section 10 14 00, paragraph 2.7
BRONZE PLAQUES - SERVICE EMBLEMS – SEALS.
a. For the new Committal Shelter C on C-AE101, the contractor is required to provide bronze service seals, one for each of the six branches of the military and size to match existing seals at Committal Shelters A and B.
b. For the existing Committal Shelters A and B and the flag stone wall, the scope is to remove the five existing seals and reinstall recentered with a new, contractor-provided sixth seal for the Space Force, size to match existing seals at the respective locations, in accordance with drawings W-AS001 and W-AS003
49 Architecture There is no specification for the bench and waste receptacle. These are expensive small items and should be in accordance with a specification. It states on Drawing C-
506 that the waste receptacle should be in accordance with the specification.
Contractor is to match existing trash receptacles and benches on site; provide two wood grain plastic benches to match existing at committal shelter B, secure to the concrete slab. Contractor to submit product data for review / approval prior to ordering.