This is Amendment #05 to Solicitation 36C78626B0005 for the Fort Custer National Cemetery Expansion and Site Improvements project (Project 909CM3030) issued by the Department of Veterans Affairs, National Cemetery Administration on September 25, 2026. The amendment provides answers to Requests for Information (RFIs) and updated project drawings.
The amendment revises multiple drawing sets across electrical and irrigation disciplines. Electrical revisions include updates to the Overall Electrical Site Plan (C-ES100), Electrical Site Plan Maintenance Yard (S-ES101), Electrical Power One-Line Diagrams (S-E-501), Electrical Schedules (S-E-502), and Electrical Details (S-E-601). Irrigation revisions encompass the entire Volume 3 drawing set with updates to the Irrigation Cover Sheet (LI100), Irrigation Wells General Notes and Legend (LI600), Irrigation Well Locations and Distribution Mainline (LI601), and four well pump detail sheets (LI700-LI704). The amendment clarifies that all reissued drawings marked Amendment 5, dated 9.25.2026, govern for all changes since the IFB documents dated 1.30.2026. Specific RFI responses address amendment reference clarifications, duplicate drawing sheet resolution, missing detail references, revision tracking inconsistencies, and comprehensive irrigation well specification questions regarding pipe diameters, well casing sizes, pump specifications, and site walkthrough coordination. The amendment confirms that all previous addenda and amendments are posted on sam.gov and establishes this amendment as the controlling version for bid purposes.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0005 09-16-2026 Funds Assurance 909CM3030
909CM3030
36C786
Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
36C786
Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
To all Offerors/Bidders
36C78626B0005
X
X X
X 1
This amendment to solicitation number 36C78626B0005 for Project 909CM3030 Cemetery Expansion and Site Improvements at Fort Custer National Cemetery
The purpose of this amendment is to:
A. Provide Answers to RFIs and provide updated drawings.
Shane Hilts Contracting Officer
Amendment #05
Date of Issue: 09.25.2026
Project: Fort Custer National Cemetery Gravesite Expansion Project Location: Augusta, Michigan VA
Project #: 909CM3030
The following changes have been made to the project documents as part of this revision. See attached revised drawings for additional information:
Revised Drawings:
C-ES100 Overall Electrical Site Plan S-ES101 Electrical Site Plan Maintenance Yard S-E-501 Electrical Power One-Line Diagrams S-E-502 Electrical Schedules S-E-601 Electrical Details
LI100 Irrigation Cover Sheet LI600 Irrigation Wells General Notes and Legend LI601 Irrigation Well Locations and Distribution Mainline LI700 Irrigation Well Pump CW01 Details LI701 Irrigation Well Pump CW02 Details LI702 Irrigation Well Pump #3 Details LI703 Irrigation Well Section 15 Irrigation Pump Station LI704 New Irrigation Well Pump Station
Additional RFIs and Responses
38 General Amendment References Page 3 of the amendment appears to indicate that the incorporated changes are associated with "Addendum No. 03."
-Were Addendum Nos. 01 and 02 issued previously?
-If so, are those addenda applicable to this project?
-If they are applicable, should they be included as part of the bidding documents?
All are posted on sam.gov.
39 Electrical Duplicate Drawing Sheet Number S-E-501 The amendment contains two drawing sheets identified as S-E-501, both bearing the title "Electrical Power One-Line Diagrams."
-The sheets contain distinctly different design information.
-Which version is intended to govern?
-If both are required, please clarify their intended sequence and application.
See reissued Drawing S-E-501 issued and noted as Amendment 5, dated
9.25.2026 governs for all changes since IFB documents dated 1.30.2026.
40 Electrical Missing Referenced Detail An enlarged callout for 1/S-E-601 has been added to Sheet S-ES101.
-However, the referenced detail does not appear to be included on Sheet S-E-601.
-Please clarify whether a revised or additional drawing sheet is missing from the amendment package.
This callout should be referencing detail C6 (generator pad and dimensions) on S- E-601. See reissued S-ES101 (Amendment 5, dated 9.25.2026)
41 Electrical Revision Tracking on Sheet S-E-501 The revision block on Sheet S-E-501 references both "Generator Addendum 7-24-2026" and "Amendment 01."
-Keyed Note #15 appears to have been added under Amendment No. 2 and is specifically clouded.
-Keyed Notes #7 through #14 also appear to be new additions but are not clouded or otherwise identified as revisions.
-As currently presented, it could reasonably be interpreted that only the addition of Note #15 constitutes a change.
See reissued Drawing S-E-501 issued and noted as Amendment 5, dated
9.25.2026 governs for all changes since IFB documents dated 1.30.2026.
42 Electrical Inconsistent Revision Blocks Throughout the drawing package, revision blocks reference various combinations of "Amendment 01" and "Generator Addendum," while some drawings contain no revision references at all.
-Please clarify the relationship between the amendments and addenda.
-Additionally, please confirm how revisions are intended to be identified and tracked throughout the drawing set.
Reissued drawings marked Amendment 5, dated 9.25.2026 governs for all changes since IFB documents dated 1.30.2026.
43 Irrigation Volume 03 Drawing Revisions It appears that the original 15 sheets in Volume 03 were replaced in their entirety, and seven additional sheets were added.
-While the drawing index reflects the addition of new sheets, there is no indication of what revisions were made to the original 15 sheets.
-Additionally, several newly added sheet numbers do not appear to correspond with the updated drawing index provided.
-Sheet LI100 does not match the drawing index designation as the Volume 03 cover sheet.
-This discrepancy was only identified because the revised cover sheet was not listed among the changes noted on Page 3 of the amendment.
Reissued Volume 3 of 3 drawings marked Amendment 5, dated 9.25.2026 governs for all changes since IFB documents dated 1.30.2026.
Revised and added sheets include sheet
no. 1 and 16 - 22 as clouded on the cover sheet LI100. See revised drawings:
• LI100 Irrigation Cover Sheet
• LI600 Irrigation Wells General Notes and Legend
• LI601 Irrigation Well Locations and
Distribution Mainline
• LI700 Irrigation Well Pump CW01
Details
• LI701 Irrigation Well Pump CW02
Details
• LI702 Irrigation Well Pump #3 Details
• LI703 Irrigation Well Section 15
Irrigation Pump Station
• LI704 New Irrigation Well Pump
Station
44 Irrigation I have many questions on amendment #3 Wells. The specs (diagrams) on each sheet appears to be the same drawing on every sheet even though each well produces very different GPM’s. The details show 3” intake and 3” discharge pipes with 2 of the wells claiming to produce 450 to 500 GPMs, need larger pipe diameters for that flow. Also, are all the existing well casings 8”? One spec is calling for a 75HP pump ,generally need a 12” to 14” well casing for the size pump, is the pump size correct? Are the new “Skid packages” to be enclosed? These are just a few questions that stand out.
Also the attached photos appear to be of the same 2 wells on all the pages.
Can a walk thru onsite be scheduled to view each well location and review the required demolition? Wells were not discussed at the earlier walk thru.
See RFI 43 response
C-ES101
S-ES101
T
M
W
W. DICKMAN RD
W
W
W
W
BATTLE CREEK BLVD
BATTLE CREEK BLVD
FORT CUSTER DR
CHIPPEWA WAY
CHIPPEWA WAY
FORT CUSTER DR
RIVER ROAD
JAMES B EADS RD
JAMES B EADS RD
FORT CUSTER DR
(E)(E)
(E) (E)
(E) (E)
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
HANDHOLE
S-E-601 C1
A
A
A
B
(TYP.)
NEW UTILITY POLE
75HP WELL PUMP; 480V, 3PH
200AS/175AF SERVICE DISCONNECT SWITCH
MOUNTED TO UTILITY POLE
UTILITY METER
NEW OVERHEAD ELECTRICAL SERVICE WIRING
BY UTILITY COMPANY
NEW POLE MOUNTED
TRANSFORMERS BY UTILITY
COMPANY
EXISTING UTILITY POLE
EXISTING OVERHEAD ELECTRICAL
C
EXISTING UTILITY POLE,
METERING CABINET, AND
PRIMARY SWITCH TO REMAIN
S-E-601 C1
EXISTING PAD MOUNTED TRANSFORMER
A
EXISTING COMMITTAL
SHELTER "A"
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION SERVICES,
NATIONAL CEMETERY ADMINISTRATION
0 200 400 600
Amendment 1 09-17-2026
ISSUED FOR BID 01-30-2026
N/A
EM HS30 JANUARY 2026
C-ES100
OVERALL ELECTRICAL SITE PLAN
GENERAL NOTES
KEYED NOTES
1" = 200'
ELECTRICAL OVERALL SITE PLAN
F1
A DISCONNECT EXISTING WELL PUMP FOR REMOVAL. RECONNECT
EXISTING POWER WIRING TO NEW WELL PUMP. REFER TO IRRIGATION
DRAWINGS FOR MORE INFORMATION.
B REFER TO C5-S-E601 FOR HANDHOLE DETAIL
C MINI POWER CENTER; 15KVA 3-PHASE, 480-120/208V WITH 18 CIRCUIT
SPACES IN NEMA 3R ENCLOSURE. PROVIDE WITH (18)-20A/1P CIRCUIT
BREAKERS. EATON #P48G28T1518 OR EQUAL. LOCATE WITHIN
EXISTING COMMIITTAL SHELTER A STORAGE SPACE.
1. REFER TO ELECTRICAL POWER ONELINE DIAGRAMS ON S-E-501
FOR MORE INFORMATION.
2. NEW UTILITY POLE, OVERHEAD SERVICE WIRING, AND POLE
MOUNTED TRANSFORMERS SERVING WELL PUMP TO BE
PROVIDED BY CONSUMERS ENERGY. COORDINATE WITH UTILITY
COMPANY FOR CONNECTION AND METERING REQUIREMENTS.
1. Amendment 5 9.25.2026
JAMES B EADS RD
(E)PUMP HOUSE
(X)SHED
UNDERGROUND CONDUITS AND
FEEDERS POWERING THE
CHEMICAL STORAGE AND SHED
SHALL BE DEMOLISHED BACK TO
SOURCE OF ORIGIN
(E)BUILDING TRANSFORMER XFMR-3
(E)MAINTENANCE BUILDING
(E)STORAGE
(E)SHED
(E)FUELING STATION
(E)3W01
(E)3001-MDP
(E)3001-PA
X
UNDERGROUND CONDUITS AND
FEEDERS POWERING THE PUMP
HOUSE SHALL BE DEMOLISHED BACK
TO SOURCE OF ORIGIN UNDERGROUND CONDUITS AND
FEEDERS POWERING THE
MAINTENACNE BUILDING SHALL
BE DEMOLISHED BACK TO
SOURCE OF ORIGIN
(XR)CHEMICAL
STORAGE
JAMES B EADS RD
(E)PUMP HOUSE
(E)BUILDING TRANSFORMER XFMR-3
TO PANELBOARD
P4S1
RELOCATED CHEMICAL
STORAGE LOCATION
(2) 2#12 & 1#12G - 1"C FOR
CHEMICAL STORAGE POWER
(E)MAINTENANCE BUILDING
(E)STORAGE
(E)SHED
(E)FUELING STATION
S-E-101
600AS/500AF, 3P NEMA 3R
FUSED DISCONNECT SWITCH
HANDHOLE
S-E-601 C1
S-E-601 C1
S-E-601 C7
ATS-A
(E)3W01
(E)3001-MDP
(E)3001-PA
GEN ANNUNCIATOR LOCATION
FROM PANELBOARD P4S1
S-E-601
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION SERVICES,
NATIONAL CEMETERY ADMINISTRATION
Amendment 1 09-17-2026
ISSUED FOR BID 01-30-2026
ANB
S-ES101
ELECTRICAL SITE PLAN
NOTES
20' 40'1" = 20' 10'0REF:F1 DEMOLITION ELECTRICAL SITE PLAN PROJECT
NORTH
30 JANUARY, 2026 EAH
20' 40'1" = 20' 10'0REF:F5 ELECTRICAL SITE PLAN
UNDERGROUND ELECTRICAL CONDUIT FROM STORAGE
BUILDING PANEL P4S1 SERVING EXISTING EQUIPMENT WITHIN
PUMP HOUSE. STUB CONDUIT UP OUTSIDE OF PUMP HOUSE
AND RUN CONDUIT OVERHEAD TO EXISTING PUMP HOUSE
DISCONNECT SWITCH. REFER TO 'STORAGE BUILDING
POWER ONELINE DIAGRAM' ON SHEET S-E-501 FOR WIRE AND
CONDUIT SIZING
C6
MAINTENANCE YARD
J
45kVA
250KW/312.5KVA
480/277V, 3PH, 4W
DIESEL
STANDBY
GENERATOR
OUTDOOR SOUND
ATTENUATED
ENCLOSURE
T F
PH
J
GRADE
120V POWER FOR
BATTERY CHARGER
208V POWER FOR
JACKET HEATER
EXTERIORMECH A-108MECH/STOR A-116
MDP
400A, 480/277V, 3-PHASE, 4-WIRE,
50KAIC
(E)
480/277V
45kVA T
F
LP-B
SWBD
400A, 480/277V, 3-PHASE, 4-WIRE, 50KAIC
(E)
480/277V
LP-A
208/120V
(E)(E) (E)
(E)(E)
(E)
MAINTAIN EXISTING UNDERGROUND CONDUIT
TO SWITCHBOARD MDP. REMOVE EXISTING
CONDUCTORS AND REPLACE WITH NEW AS
INDICATED. EXTEND WIRING TO SPLICE BOX
ON SIDE OF TRANSFORMER TO CONNECT TO
LOAD SIDE OF ATS-1
400AS
400AT
J
2#12 - 3/4"C CONTROL
WIRING FROM ATS-1
FOR GENERATOR
START CIRCUIT
EXISTING BUILDING
TRANSFORMER XFMR-1
(E)
PA
208/120V
(E) T
F
(E)
OPERATIONS A-107
PA1
208/120V
60A MCB
PA1-6,8
(20A/2P) PA1-10
J
1 5
(E) (E)
S B
GRADE
NEW COMMITTAL SHELTER
4#6 - 1"C SCHEDULE 409kVA
T F
120/208V
30A MCB
P2CS-3
480/277V
30A MCB
P4CS-3 T
F
(E)
EXISTING PAD MOUNTED
TRANSFORMER XFMR-2.
REFER TO SITE PLAN SHEET
C-ES101 FOR LOCATION
G
3/4"X10'-0" GROUND ROD
GROUND BAR. SEE DETAIL ON S-E-601
#8CU GROUND
STORAGE 105
15kVA T
F
P4S1 480/277V
P2S1 208/120V
150A MCB60A MCB
T
F
(E)
4#1/0 & 1#6G - 2"C
SCHEDULE 40
EXISTING MAINTENANCE
BUILDING
G
3/4"X10'-0" GROUND ROD
GROUND BAR. SEE DETAIL ON S-E-601
#6CU GROUND
EXISTING PAD MOUNTED
TRANSFORMER XFMR-3
T F
3W01
(E)
(E)
(E)
PUMP HOUSE
T F
3001-MDP3001-PA
(E)(E)
(E)
J
300KW/375KVA
480/277V, 3PH, 4W
DIESEL STANDBY
GENERATOR WITH
FUEL FOR 24HR OF
RUN TIME
OUTDOOR SOUND
ATTENUATED
ENCLOSURE
J
GRADE
120V-1P, 20A POWER
FOR BATTERY CHARGER
208V-2P, 20A POWER
FOR JACKET HEATER
J
2#12 - 1"C CONTROL
WIRING FROM ATS-A
FOR GENERATOR
START CIRCUIT
-P A-
,33
-P A-
J
600AF
500AT
(2) SETS OF: 4#250KCMIL & 1#2G - 3"C
SCHEDULE 40
4#500KCMIL & 1#3G - 4"C
SCHEDULE 40
x x x x x x x x x
4#1/0 & 1#6G - 2"C
4#500KCMIL & 1#3G - 4"C
2#10 & 1#8G - 1"C xx x x x x x xxxxxxxxx x x x x
14 5
(2) SETS OF: 4#250KCMIL - 3"C
SCHEDULE 40
(2) SETS OF: 4#250KCMIL & 1#2G - 3"C
x
COMMITTAL SHELTER A
3#1AWG & 1#6G - 2"C
T
F
3/4"X10'-0"
GROUND ROD
GRADE
(E)
NEW UTILITY METER
200AS/175AF SERVICE
DISCONNECT SWITCH,
NEMA 3R
3/4"X10'-0" GROUND ROD3#2/0 & 1#6G - 2"C
NEW OVERHEAD
UTILITY SERVICE
RISER STRAPS
3" RIGID STEEL CONDUIT
WEATHERHEAD
EXISTING OVERHEAD
UTILITY LINE
EXISTING UTILITY POLE
NEW POLE MONTED UTILITY
TRANSFORMERS
75HP, 480V, 3-PHASE
WELL PUMP ENCLOSURE
VFD PROVIDED AS PART
OF PUMP CONTROL SKID NEW UTILITY POLE
THE OFFICE OF DESIGN AND CONSTRUCTION SERVICES,
NATIONAL CEMETERY ADMINISTRATION
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
1075 BIG SHANTY RD. SUITE 100
KENNESAW, GA 30144
Phone: 770-421-3400
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
F
E
D
C
B
A
97 8654321
6"
6"
6" 6"
F
E
D
C
B
A
97 8654321
KEYED NOTES
GENERAL NOTES
909CM3030
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
S-E-501
DLC30 JANUARY, 2026 DDD
ELECTRICAL POWER ONELINE DIAGRAMS
N.T.S.S-E-501
B3 ADMINISTRATION BUILDING POWER ONELINE DIAGRAM
N.T.S.S-E-501
C3 COMMITTAL SHELTER POWER ONELINE DIAGRAM
1. 600V, 400AF/400AT, 3P, SOLID NEUTRAL, NEMA 3R HEAVY DUTY
FUSED SWITCH. MOUNTED TO NEW UNISTRUT PLATFORM.
2. ATS-1: 400/3PH, 3-POLE, NEMA 3R OUTDOOR RATED AUTOMATIC
TRANSFER SWITCH WITH BYPASS ISOLATION
3. 1"C WITH CABLING PER THE MANUFACTURERS
RECOMMENDATION TO ATS REMOTE ANNUNCIATOR LOCATED
IN MECH A-108.
4. 1"C WITH CABLING PER THE MANUFACTURERS
RECOMMENDATION TO GENERATOR REMOTE ALARM PANEL IN
MECH A-108
5. SERVICE ENTRANCE RATED MAIN DISCONNECT SWITCH
6. DISCONNECT EXISTING GROUND-NEUTRAL BOND WITHIN
MDP.BOND WITHIN NEW SERVICE ENTRANCE DISCONNECT
SWITCH
7. 1"C WITH CABLING PER THE MANUFACTURERS
RECOMMENDATION TO GENERATOR REMOTE ALARM PANEL IN
FOREMAN OFFICE M103 OR AN APPROVED LOCATION SELECTED
BY OWNER.
8. 1"C WITH CABLING PER THE MANUFACTURERS
RECOMMENDATION TO ATS REMOTE ANNUNCIATOR LOCATED
IN FOREMAN OFFICE M103 OR AN APPROVED LOCATION
SELECTED BY OWNER.
9. ATS-A: 500/3PH, 3-POLE, NEMA 3R OUTDOOR RATED AUTOMATIC
TRANSFER SWITCH MOUNTED TO EXTERIOR EXISTING
MAINTENANCE BUILDING.
10. 600V, 400AS/400AF,3P, NEMA 3R HEAVY DUTY FUSED SWITCH
MOUNTED TO EXISTING MAINTAINCE BUILDING.
11. 600V, 200AS/150AT,3P, NEMA 3R HEAVY DUTY FUSED SWITCH
MOUNTED TO EXISTING MAINTAINCE BUILDING.
12. 600V, 600AS/500AF,3P, NEMA 3R HEAVY DUTY FUSED SWITCH
MOUNTED TO EXISTING MAINTAINCE BUILDING.
13. WEATHER PROOF WIREWAY TROUGH MOUNTED TO EXISTING
MAINTANCE BUILDING.
14. REMOVE EXISTING GROUND TO NEUTRAL BOND WITHIN
BUILDING DISCONNECT.
15. 15KVA 480-120-208V MINI-POWER CENTER WITH 40A/3P PRIMARY
DISCONNECT SWITCH. REFER TO DRAWING C-ES100
Revisions: Date:
ISSUED FOR BID 01-30-2026
Amendment 1 09-17-2026
N.T.S.S-E-501
1 MAINTENANCE YARD POWER ONELINE DIAGRAM
N.T.S.S-E-501
2 WELL PUMP ELECTRICAL SERVICE POWER ONELINE
NOTES:
1. BOND AND GROUND TRANSFORMER PER NEC ARTICLE 250.30.
2. CONNECT TRANSFORMER GROUNDING ELECTRODE CONDUCTOR TO NEAREST GROUNDING ELECTRODE (BUILDING
STEEL, GROUND ROD, OR METAL WATER PIPE).
3. ALL CONDUCTOR SIZES ARE FOR COPPER CONDUCTORS. NEC TABLE 310.16
4. SECONDARY OVERCURRENT PROTECTION SHALL BE LOCATED WITHIN TEN (10) FEET OF THE TRANSFORMER SECONDARY TERMINALS EITHER IN PANELBOARD (MAIN BREAKER) OR A INDIVIDUALLY MOUNTED CIRCUIT
BREAKER.
5. TRANSFORMERS BONDING JUMPER AND GROUNDING ELECTRODE CONDUCTOR.
6. 600 KCMIL CONDUCTORS AND LARGER SHALL BE PROVIDED WITH MAC ADAPTERS AS REQUIRED TO
COORDINATE WITH BREAKER LUG SIZES.
PRIMARY
O.C. O.C.
SECONDARY
TO THE NEAREST GROUNDED
STEEL COLUMN OR CODE
APPROVED ELECTRODE.
THREE PHASE TRANSFORMERS
480 VOLT FEEDER
T75
T45
T30
T15
3#1/0 & 1#6G. - 1 1/2"C.
3#3&1#8G. - 1 1/2"C.
3#6 & 1#10G. - 3/4"C.
3#10&1#10G. - 3/4"C.
XFMR
NUMBER
T9 3#12&1#12G. - 3/4"C.
208 VOLT FEEDER
150A-3P 250A-3P
100A-3P 50A-3P 30A-3P
80A-3P
150A-3P
60A-3P
30A-3P
20A-3P
OVERCURRENT
PROTECTION
T500
T300
T225 T150
3#350 KCMIL & 1#2/0G. - (3) 3"C.
3#350 KCMIL & 1#1G. - (2) 3"C.
3#500 KCMIL & 1#3G. - 4"C.
3#350 KCMIL & 1#4G. - 2 1/2"C.
T112.5 3#3/0 & 1#6G. - 2"C.
1000A-3P
1600A-3P
800A-3P 500A-3P 400A-3P
600A-3P
900A-3P
400A-3P 300A-3P 200A-3P
OVERCURRENT
PROTECTION
480V. PRIMARY 3 PHASE, 3W 120/208V. SECONDARY 3 PHASE, 4W GROUNDING SEE NOTE #5
4#250 KCMIL&1#2G. - 3"C.
4#1/0&1#6G. - 2"C.
4#1&1#6G. - 2"C.
4#6&1#8G. - 1"C.
4#10&1#8G. - 3/4"C.
4#600 KCMIL & 1#350 KCMIL G. - (4) 4"C.
4#400 KCMIL & 1#3/0G. - (3) 3"C.
4#600 KCMIL & 1#3/0G. - (2) 4"C.
4#250 KCMIL & 1#1/0G. - (2) 3"C.
4#600 KCMIL&1#1/0G. - 4"C.
1#2 - 3/4"C.
1#6 - 3/4"C.
1#6 - 3/4"C.
1#8 - 3/4"C.
1#8 - 3/4"C.
1#1/0 - 3/4"C.
1#1/0 - 3/4"C.
1#3/0 - 1"C.
1#3/0 - 1"C.
1#3/0 - 1"C.
COPPER CONDUCTORS ABOVE GROUND (SEE NOTES)
3#600KCMIL & 1#1/0G.
3#600KCMIL & 1#500KCMIL G.
3#600KCMIL & 1#500KCMIL G.
3#500KCMIL & 1#400KCMIL G.
3#600KCMIL & 1#350KCMIL G.
3#600KCMIL & 1#250KCMIL G.
3#600KCMIL & 1#4/0G.
3#600KCMIL & 1#3/0G.
3#500KCMIL & 1#2/0G.
3#350KCMIL & 1#2/0G.
3#500KCMIL & 1#1/0G.
THREE PHASE CIRCUIT SCHEDULE
3#4 & 1#8G.
NOTES:
1. UNLESS OTHERWISE INDICATED, CONDUCTOR SIZING SHALL MATCH THE SIZE INDICATED ABOVE FOR THE APPLICABLE
OVERCURRENT DEVICE. PROVIDE LARGER CIRCUIT WHERE INDICATED.
2. PROVIDE MINIMUM SIZE CONDUIT INDICATED IN THE SPECIFICATIONS OR ON THE DRAWINGS.
3. PROVIDE 4 WIRE CIRCUIT UNLESS DEVICE SERVED DOES NOT HAVE PROVISIONS FOR A NEUTRAL CONNECTION. MINIMUM SIZE CONDUIT UNDERGROUND IS ONE STANDARD ELECTRICAL SIZE LARGER THAN INDICATED IN THE SCHEDULE. PROVIDE LARGER
CONDUIT WHERE SPECIFICALLY INDICATED OTHERWISE.
4. PROVIDE TYPE OF RACEWAY OR CABLE AS INDICATED IN SPECIFICATIONS OR ON THE DRAWINGS.
5. THIS SCHEDULE DOES NOT INCLUDE CONDUCTOR INCREASE IN SIZE DUE TO VOLTAGE DROPS, CONTRACTOR IS RESPONSIBLE TO MEASURE OR ESTIMATE THE ROUTINGS PRIOR TO ANY INSTALLATION AND MEET THE MAXIMUM VOLTAGE DROP PERCENTAGE ALLOWED BY THE CODE. THE EQUIPMENT GROUNDING CONDUCTORS SHALL BE INCREASED PROPORTIONALLY TO THE UNGROUNDED CONDUCTORS IN SIZE TO SATISFY THE NEC REQUIREMENTS.
3#500KCMIL & 1#3G.
3#350KCMIL & 1#1G.
3#250KCMIL & 1#2G.
3#4/0 & 1#2G.
3#500KCMIL & 1#3G.
3#350KCMIL & 1#4G.
3#250KCMIL & 1#4G.
3#4/0 & 1#4G.
3#1 & 1#6G.
3#3/0 & 1#6G.
3#2/0 & 1#6G.
3#1/0 & 1#6G.
3#1 & 1#6G.
3#3 & 1#8G.
3#1 & 1#6G.
3#3 & 1#8G.
3#6 & 1#10G.
3#6 & 1#10G.
3#6 & 1#10G.
3#8 & 1#10G.
3#8 & 1#10G.
3#10 & 1#10G.
3#10 & 1#10G.
3#12 & 1#12G.
CIRCUIT
SYMBOL
3#12 & 1#12G.
4#4 & 1#8G.1" 70A.1 1/4"
(2)4"4#500KCMIL & 1#1/0G.(2)3 1/2" 700A.
4#600KCMIL & 1#1/0G.
4#600KCMIL & 1#500KCMIL G.
4#600KCMIL & 1#500KCMIL G.
4#500KCMIL & 1#400KCMIL G.
4#600KCMIL & 1#3/0G.
4#500KCMIL & 1#2/0G.
4#350KCMIL & 1#2/0G.
(10)4" (8)4"
(3)4"
(8)3" (6)4" (5)4" (4)4"
(2)3 1/2"
(3)3 1/2" (3)3"
(10)4" (8)4" 3200A.
4000A.
(3)4"
(8)4" (6)4" (5)4" (4)4"
(3)3" (3)3 1/2"
(2)4"
2500A.
3000A.
2000A.
1600A.
900A.
1000A.
1200A.
800A.
4#250KCMIL & 1#4G.
4#350KCMIL & 1#4G.
4#500KCMIL & 1#3G.
4#500KCMIL & 1#3G.
4#250KCMIL & 1#2G.
4#350KCMIL & 1#1G.
(2)3" (2)3"
4" (2)3"
2 1/2" 2 1/2"
4" 3"
4#4/0 & 1#2G.
4#4/0 & 1#4G.
1 1/2"
1 1/2" 2"
1 1/2" 1 1/2"
1 1/4" 1 1/2"
1 1/4"
4#1 & 1#6G.
4#1/0 & 1#6G.
4#2/0 & 1#6G.
4#3/0 & 1#6G.
4#1 & 1#6G.
4#3 & 1#8G.
4#1 & 1#6G.
4#3 & 1#8G.
(2)3" (2)3"
4" (2)3"
4" 3" 3"
2 1/2"
500A.
600A.
450A.
400A.
350A.
300A.
250A.
225A.
1 1/2"
2" 2" 2"
1 1/2"
1 1/4" 1 1/2"
1 1/4"
200A.
175A.
150A.
125A.
90A.
110A.
100A.
80A.
3/4" 3/4"
3/4" 3/4"
3/4" 3/4"
3/4" 3/4"
4#8 & 1#10G.
4#6 & 1#10G.
4#6 & 1#10G.
4#6 & 1#10G.
4#12 & 1#12G.
4#10 & 1#10G.
4#10 & 1#10G.
4#8 & 1#10G.
3/4"
SIZE
CONDUIT
4#12 & 1#12G.
1" 1"
1" 3/4"
3/4" 3/4"
3/4" 3/4"
50A.
60A.
45A.
40A.
35A.
30A.
25A.
20A.
3/4"
CIRCUIT OR
OVERCURRENT
RATING 3POLE
15A.
CONDUCTORS IN EACH CONDUIT
3 PHASE, 3 WIRE & GROUND
4#600KCMIL & 1#4/0G.
4#600KCMIL & 1#250KCMIL G.
4#600KCMIL & 1#350KCMIL G.
CONDUCTORS IN EACH CONDUIT
3 PHASE, 4 WIRE & GROUND
SIZE
CONDUIT
2/5
3/5
4/5
3#600KCMIL & 1#500KCMIL G. 4#600KCMIL & 1#500KCMIL G.(12)4" (12)4" 5000A.500
2#4 & 1#8G., 2#3 & 1#8G., 2#6 & 1#10G., 2#6 & 1#10G., 2#8 & 1#10G., 2#10 & 1#10G., 2#12 & 1#12G., 2#12 & 1#12G., 1#12, 1#12N., & 1#12G., 70A.,2P.
80A.,1P.
80A.,2P 80A.,2P.
70A.,2P
15A.,2P
60A.,2P 70A.,1P.
60A.,2P.
60A.,1P.
50A.,2P 50A.,2P.
40A.,2P 50A.,1P.
30A.,1P.
40A.,2P.
40A.,1P.
30A.,2P 30A.,2P.
20A.,2P.
20A.,2P.
20A.,1P
15A.,1P.
15A.,2P.
2#12, 1#12N., & 1#12G., 1#12, 1#12N., & 1#12G., 2#12, 1#12N., & 1#12G., 1#10, 1#10N., & 1#10G., 2#10, 1#10N., & 1#10G., 1#8, 1#8N., & 1#10G., 2#8, 1#8N., & 1#10G., 1#6, 1#6N., & 1#10G., 2#6, 1#6N., & 1#10G., 1#6, 1#6N., & 1#10G., 2#6, 1#6N., & 1#10G., 1#4, 1#4N., & 1#8G., 2#4, 1#4N., & 1#8G., 1#3, 1#3N., & 1#8G., 2#3, 1#3N., & 1#8G., COPPER CONDUCTORS ABOVE GROUND (SEE NOTES)
SINGLE PHASE CIRCUIT SCHEDULE
CIRCUIT
SYMBOL
3/4"
3/4"
SIZE
CONDUIT
CIRCUIT OR
OVERCURRENT
RATING 3POLE
CONDUCTORS
1P
2P
3P
4P
5P
6P
7P
8P
9P
10T
12T
15T
17T
20T
1T
2T
3T
4T
5T
6T
7T
8T
9T
10N
12N
15N
17N
20N
1N
2N
3N
4N
5N
6N
7N
8N
9N
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 1" 1" 1"
1 1/4" 1 1/4" 1 1/4"
90A.,1P.
90A.,2P 90A.,2P.
100A.,2P 100A.,2P.
125A.,2P 125A.,2P.
150A.,2P 150A.,2P.
175A.,2P 175A.,2P.
200A.,2P 200A.,2P.
1 1/4" 1 1/4" 1 1/4" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2"
2" 2"
1#3, 1#3N., & 1#8G., 2#3, 1#3N., & 1#8G., 2#3 & 1#8G., 2#1, 1#1N., & 1#8G., 2#1 & 1#8G., 2#1, 1#1N., & 1#6G., 2#1 & 1#6G., 2#1/0, 1#1/0N., & 1#6G., 2#1/0 & 1#6G., 2#2/0, 1#2/0N., & 1#6G., 2#2/0 & 1#6G., 2#3/0, 1#3/0N., & 1#6G., 2#3/0 & 1#6G., BRANCH CIRCUIT BREAKERS
PANELBOARD SUMMARY SCHEDULE
PANEL MOUNTING REMARKS(RMS)
A.I.C.
POLES
TOTALMAINS
(CB)(MLO)VOLTAGE, PH/W
P2S1 60A
MCB SURFACE 18 10K -120/208V, 3PH, 4W (10)-20A/1P
P4S1 150A
MCB SURFACE 42 10K -480/277VV, 3PH, 4W (1)-30A/3P, (17)-20A/1P, (1)-30A/2P
P2CS-3 30A
MCB SURFACE 18 10K -120/208V, 3PH, 4W (10)-20A/1P
P4CS-3 30A
MCB SURFACE 18 10K -480/277VV, 3PH, 4W (1)-20A/3P, (5)-20A/1P
PA1 60A
MCB SURFACE 30 10K -120/208V, 3PH, 4W (10)-20A/1P, (1)-20A/2P
DJ VFD
MECHANICAL NOTES:
1. PROVIDE FLEXIBLE CONNECTION TO EQUIPMENT, REFER TO SPECIFICATIONS
NAME
TAG
SCHEDULE OF MECHANICAL EQUIPMENT
CHARACTERISTICS/LOADDESCRIPTION VOLT PANELPH
TS
FEEDER
CONNECTIONS
REMARKSCIRCUIT BREAKER
CIRCUIT
IH
1 4 KWINFRARED HEATER
ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT EQUIPMENT POWER REQUIREMENTS WITH EQUIPMENT MANUFACTURERS PRIOR TO CONNECTIONS.2.
277 1 20A/1P
LIGHTING FIXTURE SCHEDULE
FIXTURE
TYPE
FIXTURE
DESCRIPTION MANUFACTURER AND CATALOG NO. LAMP
TYPE
LAMP
WATTS VOLTS REMARKS
A 4'-0" SURFACE MOUNTED WET
LOCATION INDUSTIAL STRIP FIXTURE
COLUMBIA LIGHTING
#LXEP-4-40-HL-DCA-E-U
LED
4000K 52 UNV
SEE PLANS
B2 2'X2' RECESSED MOUNTED
TROFFER
FINELITE
#HPR-LED-A-2X2-S-835-DCO-96LG-UNV-FC-10%-*
PROVIE WITH OS1360WLK ON/OFF
OCCUPANCY SENSOR OPTION
3#12 & 1#12G - 3/4"C
B4 2'X2' SURFACE MOUNTED TROFFER
C1 6" RECESSED CAN FIXTURE
D1 4 FOOT, 8" SURFACE MOUNTED
LINEAR FIXTURE
F1 WALL MOUNTED SCONCE
G1 2' WALL MOUNTED MIRROR LIGHT
H1 RESTROOM COVE LIGHT
WP1 WALL PACK WITH INTEGRAL
PHOTOCELL
HOLOPHANE
#W4PLED-20C1000-40K-T3M-MVOLT-PCB-BKSDP
UNV
LED
3500K 28.5 UNV
LED
3500K 32 UNV
SET ADJUSTABLE LUMEN OUTPUT TO
1600 LUMEN OPTION.
LED
3500K 13.4 UNV
LENGTHS AS SHOWN ON PLANSLED
3500K 33.9 UNV
-LED
3500K 14 UNV
LED
3500K 21 UNV
LED
3500K 4.9/FT UNV
H.E. WILLIAMS
#12-2-L43-8-35-F-AF12125-DIM-UNV
H.E. WILLIAMS
#6FDR-LS-80CS-WH-DIM-UNV
H.E. WILLIAMS
#ASM-4-L46-8-35-S-A-DIM-UNV
ASL LIGHTING
#HDTS-3500K-BRUSHED NICKEL
H.E. WILLIAMS
#SLF-2-L26-8-35-HIA-DIM-UNV
H.E. WILLIAMS
#CX-C-*-L6-8-35-0-D-DIM-UNV
EB
ACRYLIC RED EDGE-LIT EXIT SIGN
WITH INTEGRAL BATTERY OPTION
EMERGENCY BATTERY UNIT
EMERGI-LITE
#PRESTIGE X40 SERIES
EMERGI-LITE
#EL-2LED
LED
4000K 52
LED 1.4
LED 3.6
UNV
UNV
PROVIDE WITH ELCW COLD WEATHER
EMERGENCY BATTERY OPTION
QUANTITY OF FACES AND
CHEVRONS AS SHOWN ON PLANS
LENGTHS AS SHOWN ON PLANS
DIE-CAST WEATERPROOF EXIT SIGN
WITH POLYCARBONATE SHIELD
EMERGI-LITE
#CDW-EM-R-1 LED 1.4 UNV QUANTITY OF FACES AND
CHEVRONS AS SHOWN ON PLANS
E E
PROVIDE WITH LGD18W BATTERY OPTION
WHERE INDICATED TO BE EMERGENCY
J1 LED SLIM UNDERCOUNTER STRIP
LIGHT LED 5.2/FT UNVH.E. WILLAIMS
#1SF-4-L24-8-35-DMA-DIM-UNV
LENGTHS AS SHOWN ON PLANS
C2 6" RECESSED CAN FIXTURE -
EXTERIOR RATED -LED
3500K 36.5 UNVH.E. WILLIAMS
#6DR-TL-L40-8-35-DIM-UNV-L-W-OF-CS-WET/CC
PTAC
1 2.16 RLAELECTRIC UNIT HEATER 208 1 20A/2PSEE PLANS 2#12 & 1#12G - 3/4"C PROVIDE WITH NEMA
6-15R RECEPTACLE
THE OFFICE OF DESIGN AND CONSTRUCTION SERVICES,
NATIONAL CEMETERY ADMINISTRATION
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
1075 BIG SHANTY RD. SUITE 100
KENNESAW, GA 30144
Phone: 770-421-3400
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
F
E
D
C
B
A
97 8654321
6"
6"
6" 6"
F
E
D
C
B
A
97 8654321
909CM3030
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
S-E-502
DLC30 JANUARY, 2026 DDD
ELECTRICAL SCHEDULES
Revisions: Date:
ISSUED FOR BID 01-30-2026
Amendment 1 09-17-20261. Amendment 5 9.25.2026
A
10" 5"
4" 2"
1"
A
REINFORCING
CONCRETE SLAB
GROUND ROD TYPICAL OF 4
GROUND GRID
GRAVEL
CONCRETE SLAB
SANDCONDUIT
36"R.
GRADE
NOTES:
1. ELECTRIAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE GENERATOR, CONDUIT, WIRING & GROUNDING
ASSOCIATED WITH THE GENERATOR. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL EXCAVATION, FORMING, REBAR & CONCRETE ASSOCIATED WITH GENERATOR PAD. ALL WORK SHALL BE COORDINATED BETWEEN THE
GENERAL CONTRACTOR AND THE ELECTRICAL SUB-CONTRACTOR.
2. CONDUIT- INSTALL AS SHOWN BEFORE SLAB IS POURED. USE 36" RADIUS BENDS, WITH COUPLINGS, NIPPLES AND BUSHINGS AS
REQUIRED.
3. GROUND GRID - INSTALL #4/0 7-STRAND BARE COPPER WIRE LOOP 1'-0" BELOW GRADE. BOND TO ALL EXPOSED METALLIC CONDUIT AND LEAVE 3'-0" OF WIRE ABOVE PAD FOR GROUNDING GENERATOR AT TWO OPPOSITE POINTS IN THE ENLCOSURE CONDUIT OPENINGS. INSTALL 3/4" x 10'-0" GALVANIZED STEEL GROUND RODS WHERE SHOWN.
4. COORDINATE CONCRETE PAD DIMENSIONS WITH GENERATOR ENCLOSURE DIMENSIONS. CONCRETE PAD SHALL EXTEND 6" PAST
GENERATOR ENCLOSURE ON ALL SIDES.
5. CONCRETE PAD TO BE FROST PROTECTED PER ASCE 32 OR HAVE THICKENED SLAV EDGES 3'-6" BELOW GRADE
6. MINIMUM REINFORCEMENT FOR 10" THICK CONCRETE PAD = #5@12"OC EACH WAY
7. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR REVIEW PRIOR TO CONSTRUCTION
8. DO NOT LOCATE GENERATOR SUPPORT PAD LESS THAN 8'-0" FROM EXISTING FOUNDATIONS
9. EQUIPMENT ANCHORAGE INTO SLAB SHALL BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE STATE OF MICHIGAN
FIG. #1 - PLAN VIEW
FIG. #2 - SECTION A-A
EXTRA 3'-0" (TYP)
TYPICAL GENERATOR PAD DETAIL
C6
N.T.S.
7'-10"
'-6
3'-6"
TYPICAL GROUND BAR DETAIL
C4
N.T.S.
WALL
SECTION A-A
STAND OFF
ISOLATION
BUSHING
MIN. 4" WIDE x 1/4" THICK COPPER
GROUND BAR PRE-DRILLED. REFER
TO DIVISION 26 SPECIFICATIONS
FOR LENGTH REQUIREMENTS.
DOUBLE LUG,
DOUBLE CRIMP
BURNDY
HYDENT LUG
#4/0 SERVICE GROUNDING
ELECTRODE CONDUCTOR
CONNECTED TO BUILDING
GROUNDING SYSTEM
A
AA
TYPICAL NAMEPLATE DETAIL
C3
N.T.S.
LP2
480/277 V
FED FROM LP1
LOCATED IN ELEC RM 123
1/4" LETTERS
SCREW
5" 4-1/2"
1- 1/2
" 3/4
NOTES:
1. NAMEPLATE TO BE CONSTRUCTED OF 1/16" THICK WHITE SURFACE WITH LETTER ENGRAVED
INTO BLACK LAMINATIONS.
2. ALL NAMEPLATES SHALL BE SECURED BY MACHINE SCREWS.
3. NO NAMEPLATES SHALL BE PASTED ON.
4. PROVIDE P-TOUCH LABEL WITH CIRCUIT NUMBER FEEDING DISCONNECT SWITCHES AND VFDs.
INDICATE PANEL NAME OR
NAME OF EQUIPMENT SERVED
INDICATE VOLTAGE RATING
INDICATE PANEL SERVING THIS
EQUIPMENT
INDICATE LOCATION OF PANEL
FROM LINE ABOVE
SWITCHBOARD/
DISTRIBUTION PANEL
TRANSFORMER PANEL DISCONNECT VFD
NAME PLATE LOCATION (TYPICAL)
PNL R251, CKT #16
ON
PNL R251, CKT #16
NOTES:
1. AT A MINIMUM, ELECTRICAL CONTRACTOR SHALL PROVIDE TYPED LABELS WITH PTOUCH MACHINE TO INDICATE PANEL NAME AND CIRCUIT NUMBER. PROVIDE 'EMERGENCY' TYPED LABEL FOR CIRCUITS CONNECTED TO EMERGENCY PANELS. COORDINATE EXACT NAMING WITH FACILITY PERSONNEL. IF FACILITY STANDARD IS ENGRAVED COVERPLATES, THE ELECTRICAL CONTRACTOR SHALL PROVIDE ENGRAVED COVERPLATES TO MATCH FACILITY REQUIREMENTS.
SEE NOTE 1
COVER PLATE,
JUNCTION BOX, ETC.
LINE VOLTAGE LIGHT
SWITCH
(LOCATE LABEL ON
INSIDE OF FACEPLATE)
PNL R251, CKT #16
COORDINATE WITH
ARCHITECT AND DIVISION 26
SPECIFICATIONS FOR
DEVICE AND FACEPLATE
COLORS AND MATERIALS.
E4 N.T.S.
RECEPTACLES
TYPICAL RECEPTACLE, COVERPLATE, AND SWITCH LABEL DETAIL
2" MIN.
CONDUIT AS REQUIRED SLEEVE - SIZE AS REQUIRED
FLOOR SLAB OR
MASONARY WALL
SUPPORT SLEEVE FROM
SLAB AS REQUIRED
U.L. LISTED FIRE
PROOFING - 2 HOUR
RATED AS REQUIRED
PER DIVISION 7
CONDUIT CORE DETAILE8
N.T.S.
DIRECT BURIED CONDUIT DETAIL
SAND 3" MINIMUM ALL
AROUND CONDUIT OR CABLE
UNDISTURBED EARTH OR 95
PERCENT COMPACTED FILL
3"
COMPACTED NATIVE BACKFILL
VOID OF OBJECTS OVER 2
INCH DIAMETER AND VOID OF
DECOMPOSABLE MATERIAL.
12"
3"
WARNING TAPE
FINISHED GRADE
CONDUIT
24" MIN.
NOTE:
1. WARNING TAPE ALSO REQUIRED UNDER BUILDING CONCRETE SLAB.
C1 N.T.S.
EXISTING FIRE
ALARM TERMINAL
CABINET POWER
BOOSTER
/SIGNAL
MODULES
F
F
EXISTING ACTUATING CIRCUIT
EXISTING ALARM CIRCUIT
PROVIDE 120V
BRANCH CIRCUIT
TO FLOOR ABOVE
TO FLOOR BELOW
H H H
H H
1. REFER TO FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES OF DEVICES.
2. FIELD VERIFY EXACT LOCATION OF FIRE ALARM TERMINAL CABINET.
3. PROVIDE POWER BOOSTER, AND SIGNAL MODULES AS REQUIRED FOR AUDIBLE
SIGNALS AND VISUAL STROBES.
4. PROVIDE MANUFACTURER SHOP DRAWINGS FOR WIRING DIAGRAMS, DEVICES AND
CONNECTIONS TO EXISTING SYSTEM.
5. PROVIDE UPDATED BATTERY CALCULATION.
6. OWNER'S FIRE ALARM MAINTENANCE CONTRACTOR SHALL MAKE FINAL CONNECTIONS
TO FIRE ALARM SYSTEM. ELECTRICAL CONTRACTOR SHALL CARRY ANY COST
ASSOCIATED WITH FINAL CONNECTIONS BY OWNER'S CONTRACTOR.
7. REPROGRAM SYSTEM TO ACCEPT NEW DEVICES.
8. AUDIBLE AND VISUAL STROBES SHALL BE SYNCHRONIZED WITH EXISTING FIRE ALARM
DEVICES.
E3 N.T.S.
FIRE ALARM CONNECTION TO EXISTING SYSTEM
Arc Flash Hazard.
Appropriate PPE Required.
Failure To Comply Can Result in Death or Injury.
Refer to NFPA 70 E.
NOTES:
1. ALL ELECTRICAL EQUIPMENT (SWITCHBOARDS, PANELBOARDS, METER SOCKETS
ENCLOSURES, MOTOR CONTROL CENTERS AND SIMILAR EQUIPMENT) THAT REQUIRE
EXAMINATION, ADJUSTMENT, SERVICING OR MAINTENANCE WHILE ENERGIZED SHALL
BE CLEARLY FIELD MARKED WITH A COMMERCIALLY PRODUCED WATER PROOF
PERMANENT LABEL (SIMILAR TO THE ABOVE WARNING LABEL) TO WARN QUALIFIED
PERSONS OF POTENTIAL ELECTRIC ARC FLASH HAZARD IN ACCORDANCE WITH NEC
110.16 AND NFPA 70E.
2. WARNING LABELS SHALL BE COMPLETED BY EQUIPMENT MANUFACTURE OR BY
OWNER APPROVED ENGINEERING FIRM WITH A MINIMUM OF FIVE (5) YEARS
EXPERIENCE IN ARC FLASH HAZARD CALCULATIONS.
3. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL
EQUIPMENT LISTED ABOVE IS PROPERLY LABELED.
WARNING
E1 N.T.S.
ARC FLASH LABEL DETAIL TYPICAL HANDHOLE DETAILC5
N.T.S.
LOGO
STANDARD HANDHOLE AND COVER COLOR SHALL BE AS SPECIFIED BY ARCHITECT.
HEX HEAD BOLT WITH WASHER
EXTENSION
PROVIDE IMPRINTED LOGO TO MATCH.
COVER, RING AND BOX SHALL BE MADE OF SAME MATERIAL.
PROVIDE HANDHOLES BY QUAZITE OR APPROVED EQUAL.
PROVIDE 1" x 4" BELL PULL SLOT FOR EACH HANDHOLE.
BASE
NOTES:
COVER
5.
4.
3.
2.
1.
4" MOUSEHOLES (4)
12" DEEP (MIN.).
GRAVEL BASE
A B
1/2" X 4" PULL SLOT
3/8" STAINLESS STEEL
SKID RESISTANT
SURFACE
C
KNOCKOUTS (6)
DIMENSIONS OF 12"W X 24"L X 18"D OR AS INDICATED ON DRAWINGS.6.
C7
NO SCALE
FINISHED GRADE
SAND 3" MINIMUM ALL
AROUND CONDUIT
PLASTIC SADDLE SPACERS
5'-0" O.C. MINIMUM UNDISTURBED EARTH OR 95
PERCENT COMPACTED FILL
3"
3"
COMPACTED NATIVE BACKFILL
VOID OF OBJECTS OVER 2
INCH DIAMETER AND VOID OF
DECOMPOSTABLE MATERIAL.
3"
12"
MAGNETIC WARNING TAPE 7.5"
24" MIN.
7.5"
NOTE:
1. WARNING TAPE ALSO REQUIRED
UNDER BUILDING CONCRETE SLAB.
7.5"
TO
LC
LC
MAINTENANCE GENERATOR UNDERGROUDN CONDUIT SECTION DETAIL
EDS-SERVICE-04
(1"C) LV TO ATS-A
(1"C) GEN BLOCK HEATER &
BATTERY CHARGER
(3"C) SPARE (3"C)PWR ATS-A
(1"C) LV TO GEN ANNUNCIATOR
THE OFFICE OF DESIGN AND CONSTRUCTION SERVICES,
NATIONAL CEMETERY ADMINISTRATION
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
1075 BIG SHANTY RD. SUITE 100
KENNESAW, GA 30144
Phone: 770-421-3400
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
F
E
D
C
B
A
97 8654321
6"
6"
6" 6"
F
E
D
C
B
A
97 8654321
909CM3030
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
S-E-601
DLC30 JANUARY, 2026 DDD
ELECTRICAL DETAILS
Revisions: Date:
ISSUED FOR BID 01-30-2026
Amendment 1 09-17-2026
W DICKMAN RD
SK
YL
IN
E
DR
HILL BRADY RD
FT CUSTER DR
RIVER RD W
E AUGUSTA DR
MICHIGAN AVE
COLLIER AVE
N
ND
S
T
EAGLE LAKE
N ULDRIKS DR
48TH ST
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
909CM303
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION
SERVICES, NATIONAL CEMETERY ADMINISTRATION
ISSUED FOR BID 01-30-2026 JDL LKB
LI100
IRRIGATION COVER SHEET
APPLICABLE CODES AND STANDARDS
1. THE SYSTEM DESIGN ASSUMES A MINIMUM DYNAMIC PRESSURE OF 90 PSI MINIMUM AND FLOW RATE OF 20 GPM IN THE EXISTING 4-INCH MAINLINE PIPE POINT OF CONNECTION. THE CONTRACTOR SHALL VERIFY THE MINIMUM OPERATING PRESSURE PRIOR TO INSTALLATION AND NOTIFY THE COR/PM OF ANY DISCREPANCIES.
2. READ THOROUGHLY AND BECOME FAMILIAR WITH THE SPECIFICATIONS AND INSTALLATION DETAILS FOR THIS AND RELATED WORK PRIOR TO CONSTRUCTION. CONFIRM EXACT LIMITS OF IRRIGATED AREA AND ALL EXISTING AND
FUTURE HARDSCAPE AND BURIAL AREAS PRIOR TO CONSTRUCTION.
3. COORDINATE UTILITY LOCATES ("CALL BEFORE YOU DIG") OF UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
CONTRACTOR RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND CONDITIONS BEFORE EXCAVATING.
4. DO NOT PROCEED WITH THE INSTALLATION OF THE IRRIGATION SYSTEM WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS OR GRADE DIFFERENCES EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING, OR IF DISCREPANCIES IN CONSTRUCTION DETAILS, LEGEND, NOTES, OR SPECIFICATIONS ARE DISCOVERED. BRING ALL
SUCH OBSTRUCTIONS OR DISCREPANCIES TO THE ATTENTION OF THE RESIDENT ENGINEER.
5. THE DRAWINGS ARE DIAGRAMMATIC. THEREFORE, THE FOLLOWING SHOULD BE NOTED:
A. IRRIGATION COMPONENTS MAY BE SHOWN OUTSIDE PLANTING AREAS FOR CLARITY.
B. AVOID CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING MATERIALS, AND ARCHITECTURAL FEATURES.
C. INSTALL IRRIGATION PIPE AND WIRING IN LANDSCAPED AREAS WHENEVER POSSIBLE.
6. CAREFULLY ADJUST THE RADIUS OF THROW AND ARC OF EACH ROTARY SPRINKLER TO PROVIDE THE BEST
PERFORMANCE AND MINIMIZE OVERSPRAY.
7. WITH REGARD TO PIPE SIZING, THE FOLLOWING SHOULD BE NOTED:
IF A SECTION OF UNSIZED PIPE IS LOCATED BETWEEN TWO IDENTICALLY SIZED SECTIONS, THE UNSIZED PIPE IS THE SAME NOMINAL SIZE AS THE TWO SIZED SECTIONS. THE UNSIZED PIPE SHOULD NOT BE CONFUSED WITH THE
DEFAULT PIPE SIZE NOTED IN THE LEGEND.
8. PROVIDE THE FOLLOWING COMPONENTS TO THE OWNER PRIOR TO THE COMPLETION OF THE PROJECT:
A. TWO OPERATING KEYS FOR EACH TYPE OF MANUALLY OPERATED VALVE.
B. TWO OF EACH SERVICING WRENCH OR TOOL NEEDED FOR COMPLETE ACCESS, ADJUSTMENT, AND REPAIR OF
ALL ROTARY SPRINKLERS.
C. TWO VALVE IN HEAD SPRINKLERS TO INCLUDE NOZZLE.
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ADVANCE NOTICE TO THE PROJECT ENGINEER (ENGINEER OF RECORD)
THAT CONSTRUCTION HAS COMMENCED.
2. THE TOTAL LAND DISTURBANCE AREA FOR THIS PROJECT IS GREATER THAN 1 ACRE. THEREFORE, SUBMITTAL OF A NOTICE OF INTENT (NOI) TO DISCHARGE CONSTRUCTION RELATED STORMWATER
UNDER THE MICHIGAN ENVIRONMENTAL PROTECTION AGENCY NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) IS REQUIRED BEFORE CONSTRUCTION ACTIVITIES CAN BEGIN.
CONSTRUCTION AND CONSTRUCTION RELATED DISCHARGES WILL BE AUTHORIZED UNDER THE
CONSTRUCTION GENERAL PERMIT IMMEDIATELY UPON COMPLETION OF QUALIFIED CREDENTIALED
PROFESSIONAL (QCP) CERTIFIED CONSTRUCTION BEST MANAGEMENT PRACTICES PLAN.
3. THE CONTRACTOR WILL BE REQUIRED TO IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS)
DESCRIBED IN A QCP CERTIFIED CBMPP TO ADDRESS ANY SOIL EROSION CONDITIONS ASSOCIATED WITH LAND DISTURBANCE ACTIVITIES WITHIN THE PROJECT LIMITS. ALL SOIL EROSION CONTROL
WORK SHALL BE PERFORMED IN ACCORDANCE WITH NPDES GENERAL PERMIT.
4. CONTRACTOR TO MAINTAIN TWO (2) FULL-SIZE SETS OF RED-LINE "AS-BUILT" DRAWINGS DURING CONSTRUCTION AND PROVIDE AN "AS-BUILT" SET OF DRAWINGS TO THE ENGINEER OF RECORD AT
THE COMPLETION OF THE PROJECT.
PERMITTING NOTES
1. BURIAL CEREMONIES WILL BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT.
COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS. CONTRACTOR SHALL OBTAIN THE SCHEDULE FOR THE NEXT DAY SERVICES PRIOR TO THE CLOSE OF BUSINESS EACH DAY. CONTRACTOR IS REQUIRED TO STOP ALL WORK DURING ALL INTERMENT SERVICES. ALLOWABLE WORK TO BE DETERMINED BY RESIDENT
ENGINEER AND CEMETERY DIRECTOR.
2. BECAUSE OF THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH
WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE
STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE
REQUIRED AT THE END OF EACH DAY AND/OR MORE FREQUENTLY AS REQUIRED.
3. THE CONTRACTOR'S STAFF AND SUBCONTRACTOR'S STAFF SHALL NOT: DRESS IN SLEEVELESS SHIRTS OR SHORT PANTS, WEAR CLOTHING WITH INAPPROPRIATE LOGOS, PLAY MUSIC, TALK LOUD, PLACE PERSONAL ITEMS ON HEADSTONES, LEAN AGAINST OR SIT ON HEADSTONES
4. THE EFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE
CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH
PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS.
5. DO NOT WORK UPON NOR STORE ANY MATERIALS ON OCCUPIED GRAVE PLOTS. ALL EFFORT WILL BE
MADE TO MAINTAIN DISTANCE FROM OCCUPIED GRAVE PLOTS.
CODE OF CONDUCT
PROJECT
LOCATION
DEPARTMENT OF VETERANS AFFAIRS
FORT CUSTER NATIONAL CEMETERY
EXPANSION & IMPROVEMENTS VOLUME 3 OF 3
PROJECT NO. 909CM3030
15501 DICKMAN RD, AUGUSTA, MICHIGAN 49012
-PLUMBING CODE: 2024 INTERNATIONAL PLUMBING CODE (IPC)
-MECHANICAL: 2024 INTERNATIONAL MECHANICAL CODE (IMC)
-ELECTRICAL: 2023 (NEC) NATIONAL ELECTRIC CODE
-LIFE SAFETY CODE: 2024 NFPA 101
-ADMINISTRATIVE CODE: MICHIGAN ADMINISTRATIVE CODE - CURRENT VERSION
-EROSION CONTROL: MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET STATE FACILITIES ADMINISTRATION
DRAWING INDEX
Sheet No SHEET NO SHEET TITLE
Ce rti f ie d Irrigation Designer
46102
JO
HN D. LEONARD
I RR
I G A T I O N A S SOC I AT I O
N
AMENDMENT 1 2026-09-18
Revisions: Date:
ISSUED FOR BID 01-30-2026
AMENDMENT 5 09-25-2026
AMENDMENT 5
AMENDMENT 5
IRRIGATION WELL PUMP #3 DETAILS
IRRIGATION WELL SECTION 15 IRRIGATION PUMP
September 25, 2026 Dwg 1 of 22 https://www.aquaengineering.com/
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
909CM303
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION
SERVICES, NATIONAL CEMETERY ADMINISTRATION
ISSUED FOR BID 01-30-2026
LI600AMENDMENT 5 09-25-2026
IRRIGATION WELLS GENERAL NOTES AND LEGEND
LEGEND
SLEEVES PIPE: CL 200 PVC
IRRIGATION MAINLINE PIPE: HDPE DR-11
WELL WATER DISTRIBUTION PIPE HDPE DR11
POINT-OF-CONNECTION (P.O.C.)
ISOLATION GATE VALVE ASSEMBLY
QUICK COUPLING ASSEMBLY
WELL LOCATION
Q
W
LKBJDL
IRRIGATION WELL DESIGN CONCEPT IS TO UPDATE 4 EXISTING WELL AND ADD ONE NEW WELL TO SUPPORT THE EXPANSION AND THE PHASE 5 EXISTING BURIAL AREA IRRIGATION. A NEW MAINLINE WILL BE INSTALLED FROM THE NEW WELL TO THE NEW IRRIGATION MAINLINE ON THE WEST SIDE OF THE CEMETERY. THIS WILL BALANCE THE FLOW AND PRESSURE. EXISTING WELLS #1 THROUGH #4 WILL REQUIRE AN UPDATED SKID MOUNTED CONTROL PACKAGE WHICH WILL INCLUDE THE VFD CONTROLS, SENSORS AND VALVES.
GENERAL DESCRIPTION IRRIGATION WELLS
September 25, 2026 Dwg 16 of 22 ê
à ó
A ø ø-
J J ó y
à ê óó
Æ
31323130
1"
1"
1"
D I C K M A N R O A D
B A T T L E C R E E K B L V D .
C H I P P E W A W A Y
C H I P P E W A W A Y
F O R T C U S T E R D R I V E
J A
M E
S B
. E A
D S
R O
A D
F O R T C U S T E R D R I V E
COMMITTAL
SHELTER B
F O
R T
C U
S T
E R
D R
I V E
CO
M
M
IT
TA
L
LO
O
P
HONOR GUARD
BUILDING
WELL PUMP #1
WELL #2
WELL #4
SECTION G
EE
E
MA
F
FF
SECTION 1
SECTION 2
MM
SECTION M
SECTION 4A
SECTION 4B
SECTION 5A
SECTION 4C
SECTION 5B
SECTION P3
SECTION P2
SECTION P1
SECTION N
SECTION 7
SECTION 6
SECTION Q
SECTION A
SECTION C
SECTION D
SECTION B
SECTION MA2
SECTION O
SECTION H
SECTION T
SECTION K
SECTION L
SECTION J
WELL PUMP #4
SECTION 8
SECTION 9
SECTION 11
SECTION 11
SECTION 10
SECTION T
SECTION N SECTION 3
EXISTING 4-INCH PVC STUB OUT
APPROXIMATE LOCATION OF SIX (6) EXISTING VALVES
EXISTING IRRIGATION TO REMAIN
APPROXIMATE LOCATION OF TWENTY-SEVEN (27) EXISTING
VALVES, C1 THROUGH C27
PROPOSED NEW WELL LOCATION
FLOW: 500 GPM
PRESSURE: 100 PSI
EXISTING SECTION 15 WELL PUMP
FLOW: 100 GPM
PRESSURE: 100 PSI
EXISTING WELL CW02
FLOW: 225 GPM
PRESSURE: 80 PSI
EXISTING WELL CWO1
FLOW: 100 GPM
PRESSURE: 80 PSI
EXISTING WELL #3
FLOW: 100 GPM
PRESSURE: 95 PSI
6"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
6" 6"
6"
6"
6"
3"
3"
6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6"
6"
6"
6"
6" 6"
6"
6"
6"
6" 6"
6"
6"
6"
6"
6" 6"
6"
6"
6"
6"6"
6"
6" 6"
6"
6"
6"
6"
6" 6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6" 6"6"
6" 6"
6"
6"
6"
6"
6"
6" 6"
6"6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6"6"
6"
6"
6" 6"6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6"
6"
6" 6"
6"
6"
6"6"
6"
6"
6" 6"
6"
6"
6" 6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6" 6" 6" 6"
6" 6"
6"
6"
6"
6"
6"
6"
6"
6"
6"6" 6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6"
6"
6"
6"
6" 6"
6" 6"
6"6" 6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6" 6"
6"
4"
4"
6"
6"
4"
6"
4"
4"
4"
4"
6"
6"
6"
6"
4"
6" 6"
6"
6"
6"
3"
3"
3"
3"
8"
8"
8"
6"
W
W
Q
Q
E
A
B
C
D
F
Q
P
P
P
P
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
P
P
P
P
P
P
P
Q
Q
Q
Q
Q
Q
Q
Q
Q
P
P
P
P
P
Q
Q
Q
Q
4 4
W
W
W
Q
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
909CM303
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION
SERVICES, NATIONAL CEMETERY ADMINISTRATION
ISSUED FOR BID 01-30-2026
LI601AMENDMENT 5 09-25-2026
0' 150'75' 300' 450'
1" = 150'
IRRIGATION WELL LOCATIONS AND DISTRIBUTION
MAINLINE
LKBJDLSeptember 25, 2026 Dwg 17 of 22
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
909CM303
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION
SERVICES, NATIONAL CEMETERY ADMINISTRATION
ISSUED FOR BID 01-30-2026
LI700AMENDMENT 5 09-25-2026
IRRIGATION WELL PUMP CW01DETAILS
LKBJDL
3 WELL #1
DEMOLITION N.T.S.
24'
EXISTING PUMP IS NOT OPERATIONAL. ALL IRRIGATION EQUIPMENT IN THE PUMP HOUSE TO BE DEMOLISHED AND REMOVED FROM THE INCOMING 4” FLANGED CONNECTION TO THE OUTGOING 3” FLANGED CONNECTION TO THE IRRIGATION SYSTEM AND THE 2” FLANGED CONNECTION TO THE POND. THIS INCLUDES THE PIPING, SURGE TANK, SURGE TANK COMPRESSOR, ELECTRICAL PANEL AND NON-OPERATING FLOAT SWITCH & WIRING. COMPONENTS WILL NEED TO BE CUT UP TO GET OUT THE DOOR TO THE BUILDING. THE POTABLE CONNECTION AND PIPING AND MAIN DISCONNECT AND 120 VAC POWER PANEL NEED TO BE PROTECTED. A 50 GALLON SURGE TANK
WILL BE INSTALLED. WELL PUMP HAS A PITLESS ADAPTER.
PUMP REPLACEMENT IS TO BE IN KIND. 140 GPM, 15 HP. NEED TO CONFIRM SETTING FROM WELL PERMIT WHICH WAS SENT BY WSP GEOTECH.
RENOVATION IN PUMP HOUSE INCLUDES REPLACEMENT OF EXISTING PUMP CONNECTION TO INCOMING 4” FLANGE, PIPE RUN FOR MAG METER AND PRESSURE TRANSDUCER AND CONNECTION TO OUTGOING 3” FLANGED TO IRRIGATION AND 2” CONNECTION TO POND. CONNECTION TO POND NEEDS TO INCLUDE A 2” SOLENOID
VALVE SO THEY CAN FILL THE POND. USE A 4-STATION RESIDENTIAL CONTROLLER.
THE PIPE ROUTING CAN BE ALONG THE WALL WHERE THE SUPPLY COMES IN, THEN TURN 90 DEGREES TO GO DIRECTLY TO THE 3” CONNECTION TO THE IRRIGATION SYSTEM. BEFORE THE CONNECTION CAN BE A TEE WITH 90 DEGREE EL TO A PARALLEL 2” PVC PIPE WITH THE SOLENOID TO THE 2” CONNECTION. USE SCH 40 STEEL WITH FLANGED FITTINGS. NEW CONTROL PANEL W/ VFD CAN BE MOUNTED ON THIS WALL AS THERE WILL NOT BE ROOM ON THE EXISTING WALL. POWER IS 3 PHASE 460 VAC.
INSTALL A 18 HP DISCHARGE FAN ON WALL OPPOSITE OF EXISTING LOUVERS END. LOUVER OPENING IS 22”X15”.
GENERAL DESCRIPTION IRRIGATION WELL CW01
INTERIOR CONTROL PANEL AND PUMP STATION CW01
29'
16'
8'
6'
PLAN VIEW
EXISTING DISCHARGE PIPES
September 25, 2026 Dwg 18 of 22
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
909CM303
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION
SERVICES, NATIONAL CEMETERY ADMINISTRATION
ISSUED FOR BID 01-30-2026
LI701AMENDMENT 5 09-25-2026
IRRIGATION WELL WELL PUMP CWO2 DETAILS
LKBJDL
24'
REPLACE EXISTING SUBMERSIBLE PUMP WITH 7.5 HP SUBMERSIBLE PUMP.
ALL IRRIGATION EQUIPMENT IN THE PUMP HOUSE TO BE DEMOLISHED AND REMOVED FROM THE INCOMING 4” FLANGED CONNECTION TO THE OUTGOING 3” FLANGED CONNECTION TO THE IRRIGATION SYSTEM AND THE 2” FLANGED CONNECTION TO THE POND. THIS INCLUDES THE PIPING, SURGE TANK, SURGE TANK COMPRESSOR, ELECTRICAL PANEL AND NON-OPERATING FLOAT SWITCH & WIRING. COMPONENTS WILL NEED TO BE CUT UP TO GET OUT THE DOOR TO THE BUILDING. ADDITIONALLY, THE POTABLE CONNECTION TO THE IRRIGATION SYSTEM NEEDS TO BE REMOVED. THE CONNECTION IS A VICTAULIC COUPLING WHICH CAN BE REMOVED AND A VICTAULIC CONNECTION W/ CAP CAN BE INSTALLED. THE POTABLE CONNECTION AND PIPING AND MAIN DISCONNECT AND 120 VAC POWER PANEL NEED TO BE PROTECTED.
INSTALL 50 GALLON EXPANSION TANK.
RENOVATION IN PUMP HOUSE INCLUDES REPLACEMENT OF EXISTING PUMP CONNECTION TO INCOMING 4” FLANGE, PIPE RUN FOR MAG METER AND PRESSURE TRANSDUCER AND CONNECTION TO OUTGOING 3” FLANGED TO IRRIGATION AND 2” CONNECTION TO POND. CONNECTION TO POND NEEDS TO INCLUDE A 2” SOLENOID VALVE SO THEY CAN FILL THE POND. POND IS FILLED USING A 4-STATION RESIDENTIAL CONTROLLER CONNECTED TO THE SOLENOID VALVE. THE PIPE ROUTING CAN BE ALONG THE WALL WHERE THE SUPPLY COMES IN, THEN TURN 90 DEGREE TO GO DIRECTLY TO THE 3” CONNECTION TO THE IRRIGATION SYSTEM. BEFORE THE CONNECTION, FAR ENOUGH BACK CAN BE A TEE WITH 90 DEGREE ELL TO A PARALLEL 2” PIPE WITH THE SOLENOID TO THE 2” CONNECTION. PIPE TYPE TBD.
NEW CONTROL PANEL W/ VFD CAN BE MOUNTED ON THIS WALL AS THERE WILL NOT BE ROOM ON THE EXISTING WALL. POWER IS 3 PHASE 460 VAC
PROVIDE AND INSTALL 18 HP FAN ON WALL OPPOSITE EXISTING LOUVERS.
GENERAL DESCRIPTION IRRIGATION WELLS CW02
SUPPLY CONNECTION
INTERIOR PIPE LAYOUT
DISCHARGE PIPES
29'
16'
8'
6'
PLAN VIEW
September 25, 2026 Dwg 19 of 22
Project Title
Date
Location
Checked
Drawing Number
Drawn
Revisions:
NATIONAL CEMETERY
ADMINISTRATION
OFFICE OF DESIGN
AND CONSTRUCTION
PRIME Project Number
Building Number
CONSULTANTS
Date:
909CM303
PROJECT
IMPROVEMENTS-DESIGN
FORT CUSTER CEMETERY
15501 DICKMAN ROAD, AUGUSTA, MI 49012
THE OFFICE OF DESIGN AND CONSTRUCTION
SERVICES, NATIONAL CEMETERY ADMINISTRATION
ISSUED FOR BID 01-30-2026
LI702AMENDMENT 5 09-25-2026
IRRIGATION WELL PUMP #3 DETAILS
LKBJDL
24'
EXISTING PUMP WAS REPLACED 3 YEARS AGO AND IS OPERATIONAL. NO NEED TO REPLACE.
CONTROLS IN EXISTING PUMP SKID ARE NOT WORKING. SKID IS RUSTED BECAUSE BACKFLOW CONTINUALLY VENTS. REMOVE EXISTING SKID AND REPLACE IT WITH NEW.
INCOMING AND OUTGOING ARE 3” VICTAULIC CONNECTIONS. EXISTING CONCRETE SLAB IS 6'X10'. NEW CONTROL SKID NEEDS TO FIT ON THIS AND ALIGN WITH EXISTING
INLET AND OUTLET PIPING.
INSTALL…