This document is an Architect's Supplemental Information (ASI 1) for two related projects at the Salisbury National Cemetery: Project 876CM3024 for Public Restroom Renovations, Repairs, and Improvements, and Project 876CM3025 for the Salisbury National Cemetery Annex II. The ASI details modifications and clarifications to project manuals and drawings, including additions and replacements of various specification sections such as safety requirements, quality control, testing laboratory services, standing seam metal roofing, gypsum board, tiling, and architectural signage.
For Project 876CM3024, changes include adding new sections for safety requirements, quality control, and testing laboratory services, and replacing sections for standing seam metal roofing, gypsum board, tiling, and architectural signage. For Project 876CM3025, modifications involve adding sections for general requirements, safety requirements, and quality control, and replacing sections for standing seam metal roofing and metal building systems. Drawing modifications include adding stream buffers, revising storm sewer plans, adjusting fence gates, and modifying various site-specific details. The ASI also includes permit approval documentation for NPDES Stormwater Construction General Permit and NC DEQ Erosion Control Permit.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECT’S SUPPLEMENTAL INFORMATION NO. 1 (ASI 1)
Salisbury National Cemetery
VA Project Number 876CM3024 - Public Restroom Renovations, Repairs, and Improvements VA Project Number 876CM3025 – Salisbury National Cemetery Annex II
March 10, 2025
MODIFICATIONS OR CLARIFICATIONS TO PROJECT MANUAL - 876CM3024
Item No. 1 Section 000110 Table of Contents – revised to add new sections
Item No. 2 Section 01 35 26 Safety Requirements – add new section
Item No. 3 Section 01 45 00 Quality Control – add new section
Item No. 4 Section 01 45 29 Testing Laboratory Services – add new section
Item No. 5 Section 07 41 13 Standing Seam Metal Roofing – replace section
Item No. 6 Section 09 29 00 Gypsum Board – replace section
Item No. 7 Section 09 30 13 Tiling – replace section
Item No. 8 Section 10 14 05 Architectural Signage – replace section
Item No. 9 Section 11 30 13 Residential Appliances – add new section
MODIFICATIONS OR CLARIFICATIONS TO DRAWINGS - 876CM3024
Item No. 10 Replace missing sheet LD-108
Item No. 11 Replace missing sheet LS-107
MODIFICATIONS OR CLARIFICATIONS TO PROJECT MANUAL - 876CM3025
Item No. 12 Section 000110 Table of Contents – revised to add new sections
Item No. 13 Section 01 00 02 General Requirements – add new section
Item No. 14 Section 01 35 26 Safety Requirements – add new section
Item No. 15 Section 01 45 00 Quality Control – add new section
Item No. 16 Section 074113 Standing Seam Metal Roofing – replace section
Item No. 17 Section 13 14 19 Metal Building Systems – replace section
MODIFICATIONS OR CLARIFICATIONS TO DRAWINGS - 876CM3025
Item No. 18: Sheet V-101 – Added stream buffer
Item No. 19: Sheet V-102 – Added stream buffer
Item No. 20: Sheet V-104 – Added stream buffer
Item No. 21: Sheet B-101 – Added steam buffer and revised gates at pipeline crossing
Item No. 22: Sheet CG101 – Revised limits of disturbance and revised storm sewer
Item No. 23: Sheet CG102 – Revised limits of disturbance and revised storm sewer
Item No. 24: Sheet CG103 – Revised baffles in sediment basin
Item No. 25: Sheet CD101 – Added stream buffer
Item No. 26: Sheet CD102 – Revised storm sewer
Item No. 27: Sheet CP101 – Revised storm sewer and storm structure schedule
Item No. 28: Sheet CP102 - Revised storm sewer plan and profile
Item No. 29: Sheet CP103 - Revised storm sewer plan and profile, revised labels for gas pipelines in profile
Item No. 30: Sheet CU101 – Revised fence gates, storm sewer and sanitary sewer
Item No. 31: Sheet CU102 - Revised fence gates, storm sewer and sanitary sewer
Item No. 32: Sheet CU104 – Revised fence gates
Item No. 33: Sheet CU105 – Revised storm sewer profiles
Item No. 34: Sheet CU106 - Revised storm sewer profiles
Item No. 35: Sheet CU108 - Revised sanitary sewer profiles
Item No. 36: Sheet LD-101 - Revised limit of clearing
Item No. 37: Sheet LD-102 - Revised limit of clearing
Item No. 38: Sheet LS-101 – Deleted catch basin and revised gates at pipeline crossing
Item No. 39: Sheet LS-102 - Deleted catch basin and revised gate at pipeline crossing
Item No. 40: Sheet LS-104 - Revised gate at pipeline crossing
Item No. 41: Sheet LS-202 - Revised gate at pipeline crossing
Item No. 42: Sheet LS-204 - Revised gate at pipeline crossing
Item No. 43: Sheet LG-101 – Revised grading related to storm drain revision
Item No. 44: Sheet LG-102 – Revised grading related to storm drain revision
Item No. 45: Sheet LP-101 – Revised planting related to storm drain revision
Item No. 46: Sheet LP-102 - Revised planting related to storm drain revision
Item No. 47: Sheet LS-502 – Revised gate detail
Item No. 48: Sheet LS-504 – Revised gate detail
Item No. 49: Sheet LS-506 – Revised chain link double swing gate detail
Item No. 50: Sheet S-106 – Revised chain link double swing gate detail
MISCELLANEOUS - 876CM3025
Item No. 51: Permit approval documentation for NPDES Stormwater Construction General Permit and NC DEQ Erosion Control Permit for reference.
Salisbury National Cemetery Project 876CM3024
Public Restroom Renovation, Repairs, ASI 1 and Improvements March 10, 2025
00 01 10-1
TABLE OF CONTENTS
Section 00 01 10
DIVISION 01 - GENERAL REQUIREMENTS Author
01 00 02 General Requirements (Minor NCA Projects) PMTR
01 00 05 Historic Treatment Plan Template PMTR
01 32 17 Network Analysis Schedules (Microsoft Project
Gantt Chart)
PMTR
01 33 23 Shop Drawings, Product Data, and Samples PMTR
01 35 26 Safety Requirements – ASI 1 Architura
01 42 19 Reference Standards PMTR
01 45 00 Quality Control – ASI 1 Architura
01 45 29 Testing Laboratory Services KCI
01 57 19 Temporary Environmental Controls KCI
01 74 19 Construction Waste Management PMTR
01 81 13 Sustainable Construction Requirements PMTR
DIVISION 02 – EXISTING CONDITIONS
02 41 10 Demolition and Site Clearing PMTR
02 83 33.13 Lead-Based Paint Removal and Disposal Architura
02 83 33.15 Hazardous Materials Investigation Report KCI
02 85 00 Geotechnical Investigation Report KCI
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete Architura
DIVISION 04 – MASONRY
04 20 00 Unit Masonry Architura
04 72 00 Cast Stone Architura
DIVISION 05 – METALS
05 50 00 Metal Fabrications Architura
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry Architura
06 17 15 Engineered Structural Wood Architura
06 17 53 Shop Fabricated Wood Trusses Architura
06 20 00 Finish Carpentry Architura
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation Architura
07 41 13 Standing Seam Metal Roofing Architura
07 60 00 Flashing and Sheet Metal Architura
07 72 00 Roof Accessories Architura
07 92 00 Joint Sealants Architura
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames Architura
08 14 00 Wood Doors Architura
08 31 13 Access Doors and Frames Architura
08 41 13 Aluminum-Framed Entrances and Storefronts Architura
00 01 10-2
08 62 23 Tubular Daylighting Devices Architura
08 71 00 Door Hardware Architura
08 80 00 Glazing Architura
DIVISION 09 – FINISHES
09 29 00 Gypsum Board Architura
09 30 13 Tiling Architura
09 51 00 Acoustical Ceilings Architura
09 65 13 Resilient Base and Accessories Architura
09 65 19 Resilient Tile Flooring Architura
09 91 00 Painting Architura
DIVISION 10 – SPECIALTIES
10 14 00 Exterior Signage PMTR
10 14 05 Architectural Signage Architura
10 21 13 Toilet Compartments Architura
10 28 00 Toilet and Bath Accessories Architura
10 44 13 Fire Extinguishers Architura
10 51 13 Metal Lockers Architura
10 75 00 Flagpoles PMTR
DIVISION 11 - EQUIPMENT
11 30 13 Residential Appliances Architura
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework
12 36 16.16 Solid Surfacing Countertops Architura
DIVISION 13 – SPECIALTY CONSTRUCTION
131419 Metal Building Systems Architura
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing Arium
22 05 23 General-Duty Valves for Plumbing Piping Arium
22 08 00 Commissioning of Plumbing Systems Arium
22 11 00 Facility Water Distribution Arium
22 13 00 Facility Sanitary Sewerage Arium
22 33 00 Electric Domestic Water Heaters Arium
22 40 00 Plumbing Fixtures Arium
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC Arium
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
Arium
23 05 93 Testing, Adjusting, and Balancing for HVAC Arium
23 07 11 HVAC Insulation Arium
23 09 23 Direct-Digital Control System for HVAC Arium
23 23 00 Refrigerant Piping Arium
23 31 00 HVAC Ducts and Casings Arium
23 34 00 HVAC Fans Arium
23 37 00 Air Outlets and Inlets Arium
00 01 10-3
23 81 43 Air-Source Unitary Heat Pumps Arium
23 82 39 Unit Heaters Arium
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations Arium
26 05 19 Low-Voltage Electrical Power Conductors and Cables Arium
26 05 26 Grounding and Bonding for Electrical Systems Arium
26 05 33 Raceway and Boxes for Electrical Systems Arium
26 27 26 Wiring Devices Arium
26 51 00 Interior Lighting Arium
26 56 00 Exterior Lighting Arium
DIVISION 27 – COMMUNICATIONS
27 05 00 Common Work Results for Communications Arium
27 05 26 Grounding and Bonding for Communications Systems Arium
27 05 33 Conduits and Backboxes for Communications Systems Arium
27 10 00 Control, Communication, and Signal Wiring Arium
DIVISION 31 – EARTHWORK
31 20 11 Earth Moving (Short Form) KCI
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements PMTR
32 12 16 Asphalt Paving PMTR
32 17 23 Pavement Markings PMTR
32 31 00 Historic Ironwork Restoration PMTR
32 31 13 Chain Link Fences and Gates PMTR
32 21 39 Wood Rail PMTR
32 84 00 Planting Irrigation Aqua
32 90 00 Planting PMTR
DIVISION 33 – UTILITIES
33 40 00 Storm Sewer Utilities KCI and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 1
SECTION 01 35 26
SAFETY REQUIREMENTS
TABLE OF CONTENTS
1.1 APPLICABLE PUBLICATIONS: 3
1.2 DEFINITIONS: 4
1.3 SUBMITTAL REQUIRMENTS: 8
1.4 REGULATORY REQUIREMENTS: 9
1.5 ACCIDENT PREVENTION PLAN (APP): 9
1.6 ACTIVITY HAZARD ANALYSES (AHAs): 14
1.7 PRECONSTRUCTION SAFETY CONFERENCE: 15
1.8 SAFETY MEETINGS: 16
1.9 “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP): 16
1.10 TRAINING: 17
1.11 INSPECTIONS: 19
1.12 MISHAPS, OSHA 300 LOGS, AND MAN-HOURS: 19
1.13 PERSONAL PROTECTIVE EQUIPMENT (PPE): 21
1.14 PRE-CONSTRUCTION RISK ASSESSMENT 22
1.15 DUST CONTROL 23
1.16 TUBERCULOSIS SCREENING 23
1.17 FIRE SAFETY 24
1.18 ELECTRICAL 25
1.19 FALL PROTECTION 27
1.20 SCAFFOLDS AND OTHER WORK PLATFORMS 27
1.21 EXCAVATION AND TRENCHES 28
1.22 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) 30
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 2
1.23 CONFINED SPACE ENTRY 30
1.24 WELDING AND CUTTING 31
1.25 LADDERS 31
1.26 FLOOR & WALL OPENINGS 31
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 3
SECTION 01 35 26
SAFETY REQUIREMENTS
1.1 APPLICABLE PUBLICATIONS:
A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.
B. American Society of Safety Professionals (ASSP):
A10.1-2011...........Pre-Project & Pre-Task Safety and Health
Planning
A10.34-2012..........Protection of the Public on or Adjacent to
Construction Sites
A10.38-2013..........Basic Elements of an Employer’s Program to
Provide a Safe and Healthful Work Environment
American National Standard Construction and
Demolition Operations
Z359.0-2012..........Definitions and Nomenclature Used for Fall
Protection and Fall Arrest
Z359.1-2016..........The Fall Protection Code
C. American Society for Testing and Materials (ASTM):
E84-2013.............Surface Burning Characteristics of Building
Materials
D. The Facilities Guidelines Institute (FGI):
FGI Guidelines-2010Guidelines for Design and Construction of
Healthcare Facilities
E. National Fire Protection Association (NFPA):
10-2018..............Standard for Portable Fire Extinguishers
30-2018..............Flammable and Combustible Liquids Code
51B-2019.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70-2020..............National Electrical Code
70B-2019.............Recommended Practice for Electrical Equipment
Maintenance
70E-2018 ............Standard for Electrical Safety in the Workplace
241-2019.............Standard for Safeguarding Construction, Alteration, and Demolition Operations and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 4
703-2024.............Standard for Fire Retardant–Treated Wood and
Fire-Retardant Coatings for Building Materials
F. The Joint Commission (TJC)
TJC Manual ..........Comprehensive Accreditation and Certification
Manual
G. U.S. Nuclear Regulatory Commission
10 CFR 20 ...........Standards for Protection Against Radiation
H. U.S. Occupational Safety and Health Administration (OSHA):
29 CFR 1904 .........Reporting and Recording Injuries & Illnesses
29 CFR 1910 .........Safety and Health Regulations for General
Industry
29 CFR 1926 .........Safety and Health Regulations for Construction
Industry
CPL 2-0.124..........Multi-Employer Citation Policy
I. US Army Corps of Engineers Safety and Occupational Health (SOH)
Requirements Publication No. EM 385-1-1, 2024 edition
1.2 DEFINITIONS:
A. Critical Lift. A lift with the hoisted load exceeding 75% of the crane’s maximum capacity; lifts made out of the view of the operator
(blind picks); lifts involving two or more cranes; personnel being hoisted; and special hazards such as lifts over occupied facilities, loads lifted close to power-lines, and lifts in high winds or where other adverse environmental conditions exist; and any lift which the crane operator believes is critical.
B. OSHA “Competent Person” (CP). One who is capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29 CFR 1926.32(f)).
C. Competent Person, Confined Space
The CP, Confined Space, is a person meeting the competent person requirements as defined EM 385-1-1 Appendix Q, with thorough knowledge of OSHA’s Confined Space Standard, 29 CFR 1910.146, and designated in writing to be responsible for the immediate supervision, implementation and monitoring of the confined space and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 5
program, who through training, knowledge and experience in confined space entry is capable of identifying, evaluating and addressing existing and potential confined space hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
D. Competent Person, Cranes and Rigging.
The CP, Cranes and Rigging, as defined in EM 385-1-1 Appendix Q, is a person meeting the competent person, who has been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the Crane and Rigging Program, who through training, knowledge and experience in crane and rigging is capable of identifying, evaluating and addressing existing and potential hazards and, who has the authority to take prompt corrective measures regarding such hazards.
E. Competent Person, Excavation/Trenching.
The CP, Excavation/Trenching, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and 29 CFR
1926, who has been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the excavation/trenching program, who through training, knowledge and experience in excavation/trenching is capable of identifying, evaluating and addressing existing and potential hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
F. Competent Person, Fall Protection
The CP, Fall Protection, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and in accordance with ASSE/SAFE Z359.0, who has been designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards.
G. Competent Person, Scaffolding
The CP, Scaffolding is a person meeting the competent person requirements in EM 385-1-1 Appendix Q and designated in writing by and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 6
the employer to be responsible for immediate supervising, implementing and monitoring of the scaffolding program. The CP for
Scaffolding has enough training, knowledge and experience in scaffolding to correctly identify, evaluate and address existing and potential hazards and has the authority to take prompt corrective measures with regard to these hazards. CP qualifications must be documented and include experience on the specific scaffolding systems/types being used, assessment of the base material that the scaffold will be erected upon, load calculations for materials and personnel, and erection and dismantling. The CP for scaffolding must have a documented, minimum of 8-hours of scaffold training to include training on the specific type of scaffold being used (e.g.
mast-climbing, adjustable, tubular frame), in accordance with EM
385-1-1 Section 22.B.02.
H. Competent Person (CP) Trainer
Cmpetent person trainer as defined in EM 385-1-1 Appendix Q, who is qualified in the material presented, and who possesses a working knowledge of applicable technical regulations, standards, equipment and systems related to the subject matter on which they are training
Competent Persons. A competent person trainer must be familiar with the typical hazards and the equipment used in the industry they are instructing. The training provided by the competent person trainer must be appropriate to that specific industry. The competent person trainer must evaluate the knowledge and skills of the competent persons as part of the training process.
I. High Risk Activities
High Risk Activities are activities that involve work at heights, crane and rigging, excavations and trenching, scaffolding, electrical work, and confined space entry.
J. "Qualified Person" means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.
K. Qualified Person, Fall Protection (QP for FP)
QP for FP is a person meeting the requirements of EM 385-1-1
Appendix Q, and ASSE/SAFE Z359.0, with a recognized degree or and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 7
professional certificate and with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, and evaluating and specifying fall protection and rescue systems.
L. USACE Property and Equipment
Interpret "USACE" property and equipment specified in USACE EM 385-
1-1 as Government property and equipment.
M. High Visibility Accident. Any mishap which may generate publicity or high visibility.
N. Mishap: Mishap in this specification is defined according to the EM
385-1-1. A mishap is any unplanned, undesired event that occurs during the course of work being performed. This includes accidents, incidents, and near misses.
O. Mishap Criticality Categories
1. No impact/Near-Miss – near miss incidents that shall be investigated and reported to the VA within 24 hours.
2. Minor incident/impact – incidents that require first aid or result in minor equipment damage (less than $5000). These incidents must be investigated and reported to the VA within 24 hours.
3. Moderate incident/impact – Any work-related injury or illness that results in any of the following. These incidents must be investigated and are required to be reported to the VA within 2 hours.
a. Days away from work (any time lost after day of injury/illness onset);
b. Restricted work;
c. Transfer to another job;
d. Medical treatment beyond first aid;
e. Loss of consciousness;
f. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (5) above or,
g. any incident that leads to major equipment damage (greater than $5000).
4. Major incident/impact – Any mishap that leads to fatalities, hospitalizations, amputations, and losses of an eye as a result and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 8
of contractors’ activities. Or any incident which leads to major property damage (greater than $20,000) and/or may generate publicity or high visibility. These incidents must be investigated and are required to be reported to the VA as soon as practical, but not later than 2 hours after the incident.
P. Load Handling Equipment (LHE)
A. LHE is a term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used with rigging to raise, lower or horizontally move a load).
Q. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by physician or registered personnel.
1.3 SUBMITTAL REQUIRMENTS:
A. Government approval or concurrence is required for submittals with a
"G" designation; submittals not having a "G" designation are submitted for information only.
B. Preconstruction Submittals
1. Accident Prevention Plan (APP); G
C. Reports
1. Monthly Contractor Health Safety and Environmental (HS&E)
Performance Report; G
2. Notifications and Reports;
3. Mishap Reports;
4. Near-Miss Reports;
5. LHE Inspection Reports
6. Monthly Exposure Hour Reports;
D. Work Plans
1. Standard Lift Plan; G
2. Critical Lift Plan; G
3. Activity Hazard Analysis (AHA); G
4. Confined Space Entry Permit
5. Hot Work Permit
6. Radiography Operation Planning Work Sheet; G
7. Portable Gauge Operations Planning Worksheet; G and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 9
E. Certificates
1. Contractor Safety Self-Evaluation Checklist
2. Crane Operators/Riggers Certifications; G
3. Certificate of Compliance
4. Mobile Cranes Inspection Certificate
5. License Certificates
1. 6. Machinery & Mechanized Equipment Certification Form
1.4 REGULATORY REQUIREMENTS:
A. In addition to the detailed requirements included in the provisions of this contract, comply with the most recent edition of USACE EM 385-1-1, comply with 29 CFR 1926, comply with 29 CFR 1910 as incorporated by reference within 29 CFR 1926, comply with ASSP A10.34, and all applicable federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern except with specific approval and acceptance by the Resident Engineer//
Regional Safety Engineer or Contracting Officer Representative or
Government Designated Authority.
1.5 ACCIDENT PREVENTION PLAN (APP):
A. The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and ensure it is site-specific. The Government considers the Prime Contractor to be the
"controlling authority" for all worksite safety and health of each subcontractor(s). Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that Mishap prevention responsibilities are being carried out.
B. The APP shall be prepared as follows:
1. Written in English by a qualified person who is employed by the
Prime Contractor articulating the specific work and hazards and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 10
pertaining to the contract. Specifically articulating the safety requirements found within these VA contract safety specifications and the latest version of the United States Army Corps of Engineers
– Safety and Occupational Health (SOH) Requirements - EM 385-1-1
Manual. Model language and format can be found in Appendix A of the
EM 385-1-1 Manual
2. Address both the Prime Contractors and the subcontractors work operations.
3. State measures to be taken to control hazards associated with materials, services, or equipment provided by suppliers.
4. Address all the elements/sub-elements and in order as follows:
a. SIGNATURE SHEET. Title, signature, and phone number of the following:
1) Plan preparer (Qualified Person such as corporate safety staff person or contracted Certified Safety Professional with construction safety experience);
2) Plan approver (company/corporate officers authorized to obligate the company);
3) Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional). Provide concurrence of other applicable corporate and project personnel (Contractor).
b. BACKGROUND INFORMATION. List the following:
1) Contractor;
2) Contract number;
3) Project name;
4) Brief project description, description of work to be performed, and location; phases of work anticipated (these will require an AHA).
c. STATEMENT OF SAFETY AND HEALTH POLICY. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. The Contractor’s written safety program goals, objectives, and accident experience goals for this contract should be provided. The Statement of Safety and Health Policy must be signed by a company executive.
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 11
d. RESPONSIBILITIES AND LINES OF AUTHORITIES. Provide the following:
1) A statement of the employer’s ultimate responsibility for the implementation of his SOH program;
2) Identification and accountability of personnel responsible for safety at both corporate and project level. Contracts specifically requiring safety or industrial hygiene personnel shall include a copy of their resumes.
3) The names of Competent and/or Qualified Person(s) and proof of competency/qualification to meet specific OSHA or EM 385-1-1
Competent/Qualified Person(s) requirements must be attached.;
4) Requirements that no work shall be performed unless a designated competent person is present on the job site;
5) Requirements for pre-task Activity Hazard Analysis (AHAs);
6) Lines of authority;
7) Policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified;
e. SUBCONTRACTORS AND SUPPLIERS. If applicable, provide procedures for coordinating SOH activities with other employers on the job site:
1) Identification of subcontractors and suppliers (if known);
2) Safety responsibilities of subcontractors and suppliers.
f. TRAINING.
1) Site-specific SOH orientation training at the time of initial hire or assignment to the project for every employee before working on the project site is required.
2) Mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, crane operator, rigger, crane signal person, fall protection, electrical lockout/NFPA 70E, machine/equipment lockout, confined space, etc.…) and any requirements for periodic retraining/recertification are required.
3) Procedures for ongoing safety and health training for supervisors and employees shall be established to address changes in site hazards/conditions.
4) OSHA 10-hour Construction Outreach training within the past five years is required for all workers on site and the OSHA and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 12
30-hour Construction Outreach training within the past five years is required for Trade Competent Persons (CPs)
g. SAFETY AND HEALTH INSPECTIONS.
1) Specific assignment of responsibilities for a minimum daily job site safety and health inspection during periods of work activity: Who will conduct (e.g., “Site Safety and Health
CP”), proof of inspector’s training/qualifications, when inspections will be conducted, procedures for documentation, deficiency tracking system, and follow-up procedures.
2) Any external inspections/certifications that may be required
(e.g., contracted CSP or CSHT)
h. MISHAP INVESTIGATION & REPORTING.
1) The APP shall include identify person(s) responsible to provide the following to the Contracting Officer
Representative:
1. Monthly HS&E Performance Report (Exposure Hours Data);
2. Mishap investigation reports;
3. Project site injury and illness logs;
4. Near-Miss reports;
i. PLANS (PROGRAMS, PROCEDURES) REQUIRED. Based on a risk assessment of contracted activities and on mandatory OSHA and/or EM 385-1-1 compliance programs, the Contractor shall address all applicable occupational, patient, and public safety risks in site-specific compliance and accident prevention plans. These Plans shall include but are not limited to procedures for addressing the risks associated with the following:
1) Emergency response;
2) Contingency for severe weather;
3) Fire Prevention;
4) Medical Support;
5) Posting of emergency telephone numbers;
6) Prevention of alcohol and drug abuse;
7) Site sanitation (housekeeping, drinking water, toilets);
8) Night operations and lighting;
9) Hazard communication program;
10)Welding/Cutting “Hot” work;
11)Electrical Safe Work Practices (Electrical LOTO/NFPA 70E);
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 13
12)General Electrical Safety;
13)Hazardous energy control (LOTO);
14)Site-Specific Fall Protection & Prevention;
15)Excavation/trenching;
16)Asbestos abatement;
17)Lead abatement;
18)Crane Critical lift;
19)Respiratory protection;
20)Health hazard control program;
21)Radiation Safety Program;
22)Abrasive blasting;
23)Heat/Cold Stress Monitoring;
24)Crystalline Silica Monitoring (Assessment);
25)Demolition plan (to include engineering survey);
26)Formwork and shoring erection and removal;
27)Pre-Cast Concrete;
28)Public (Mandatory compliance with ANSI/ASSP A10.34-2012);
29)Sub-contractor or cross-trade coordination;
C. Submit the APP to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01 33
23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction safety conference for acceptance. Work cannot proceed without an accepted APP.
D. Once accepted by the Contracting Officer Representative, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer in accordance with FAR Clause 52.236-13, Accident Prevention, until the matter has been rectified.
E. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Resident Engineer, Contracting Officer
Representative or Government Designated Authority. Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Resident Engineering Office and
Contracting Officer within 2 hours of discovery. Eliminate/remove the hazard. In the interim, take all necessary action to restore and and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 14
maintain safe working conditions to safeguard onsite personnel, visitors, the public and the environment.
1.6 ACTIVITY HAZARD ANALYSES (AHAS):
A. AHAs are also known as Job Hazard Analyses, Job Safety Analyses, and
Activity Safety Analyses. Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or sub-contractor is to perform the work, the Contractor(s) performing that work activity shall prepare an AHA (Example electronic AHA forms can be found on the US
Army Corps of Engineers web site)
B. AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk.
C. Work shall not begin until the AHA for the work activity has been accepted by the Contracting Officer Representative and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings.
1. The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by OSHA, EM 385-1-1, or other
State and Local agencies) shall be identified and included in the AHA.
Certification of their competency/qualification shall be submitted to the Government Designated Authority (GDA) for acceptance prior to the start of that work activity.
2. The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s).
a. If more than one Competent/Qualified Person is used on the AHA activity, a list of names shall be submitted as an attachment to the AHA. Those listed must be Competent/Qualified for the type of work involved in the AHA and familiar with current site safety issues.
b. If a new Competent/Qualified Person (not on the original list) is added, the list shall be updated (an administrative action not requiring an updated AHA). The new person shall acknowledge in and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 15
writing that he or she has reviewed the AHA and is familiar with current site safety issues.
3. Submit AHAs to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01
33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES for review at least
15 calendar days prior to the start of each phase. Subsequent AHAs as shall be formatted as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.
4. The AHA list will be reviewed periodically (at least weekly) at the
Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.
2. 5. Develop the activity hazard analyses using the project schedule as the basis for the activities performed. All activities listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier, or subcontractor and provided to the prime contractor for review and approval and then submitted to the
Contracting Officer Representative or Government Designated
Authority for review for compliance.
1.7 PRECONSTRUCTION SAFETY CONFERENCE:
A. Contractor representatives who have a responsibility or significant role in implementation of the accident prevention program, as required by 29 CFR 1926.20(b)(1), on the project shall attend the pre-construction safety conference to gain a mutual understanding of its implementation. This includes the project superintendent, subcontractor superintendents, and any other assigned safety and health professionals.
B. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting
Officer's representative as to which phases will require an analysis.
In addition, establish a schedule for the preparation, submittal, review, and acceptance of AHAs to preclude project delays.
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 16
1.8 SAFETY MEETINGS:
A. Conduct safety meetings to review past activities, plan for new or changed operations, review pertinent aspects of appropriate AHA (by trade), establish safe working procedures for anticipated hazards, and provide pertinent Safety and Occupational Health (SOH) training and motivation. Conduct meetings at least once a month for all supervisors on the project location. The SSHO, supervisors, foremen, or CDSOs must conduct meetings at least once a week for the trade workers. Document meeting minutes to include the date, persons in attendance, subjects discussed, and names of individual(s) who conducted the meeting.
Maintain documentation on-site and furnish copies to the Contracting
Officer on request. Notify the Contracting Officer of all scheduled meetings 7 calendar days in advance.
1.9 “SITE SAFETY AND HEALTH OFFICER” (SSHO) AND “COMPETENT PERSON” (CP):
A. The Prime Contractor shall provide a Safety oversight team that includes a minimum of one (1) person at each project site, for each shift, to function as the Site Safety and Health Officer (SSHO). The
Prime Contractor shall provide a minimum of one “Full-Time” SSHO at each project site, for each shift (with no other duties) that holds as current, a professional safety certification with at least 3 years of dedicated construction safety related experience. The SSHO shall ensure that the requirements of the VA and of 29 CFR 1926.16 are met for the project. The SSHO must be at the work site at all times, during construction activities, to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. If the
SSHO is off-site for a period longer than 8 hours, or one shift, and not exceeding 40 hours, or 5 shifts, a pre-approved Alternate Safety
Officer shall be provided and shall fulfill the same roles and responsibilities as the primary SSHO. The Alternate Safety Officer shall have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs. When the SSHO is temporarily (not to exceed 8 hours) off-site, a Designated Representative (DR) from the Prime Contractors’ staff, as identified in the AHA may be used in lieu of an Alternate
Safety Officer and shall be on the project site, at all times, when work is being performed. Note that the DR is a collateral duty safety position, with safety duties in addition to their full-time occupation.
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 17
Each subcontractor shall designate a minimum of one CP in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs.
B. Further, all specialized Competent Persons for the work crews will be supplied by the respective contractor as required by 29 CFR 1926 (i.e.
Asbestos, Electrical, Cranes, & Derricks, Demolition, Fall Protection, Fire Safety/Life Safety, Ladder, Rigging, Scaffolds, and
Trenches/Excavations).
C. These Competent Persons can have collateral duties as the subcontractor’s superintendent and/or work crew lead persons as well as fill more than one specialized CP role (i.e. Asbestos, Electrical, Cranes, & Derricks, Demolition, Fall Protection, Fire Safety/Life
Safety, Ladder, Rigging, Scaffolds, and Trenches/Excavations).
However, the SSHO has be a separate qualified individual from the Prime
Contractor’s Superintendent and/or Quality Control Manager with duties only as the SSHO
D. The SSHO or an equally qualified Designated Representative/alternate will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor.
CPs will maintain presence during their construction activities in accordance with above mentioned clause. A listing of the designated
SSHO and all known CPs shall be submitted prior to the start of work as part of the APP with the training documentation and/or AHA as listed in
Section 1.8 below.
E. The repeated presence of uncontrolled hazards during a contractor’s work operations will result in the designated CP as being deemed incompetent and result in the required removal of the employee in accordance with FAR Clause 52.236-5: Material and Workmanship, Paragraph (c).
1.10 TRAINING:
A. The designated Prime Contractor SSHO must meet the requirements of all applicable OSHA standards and be capable (through training, experience, and qualifications) of ensuring that the requirements of 29 CFR 1926.16 and other appropriate Federal, State and local requirements are met for the project.
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 18
B. As a minimum the SSHO must have completed the OSHA 30-hour Construction
Safety Outreach class within the past five (5) years and:
1. Seven (7) years of construction industry safety related experience.
2. OR have a safety and health degree from an accredited university or college and five (5) years of construction industry safety related experience
3. OR hold as current, a Certified Safety Professional (CSP) or a
Construction Health and Safety Technician (CHST) certification and five (3) years of construction industry safety related experience.
C. The Alternate Safety Officer shall meet, at a minimum, the requirements of EM 385-1-1 Section 1 and have five (5) years of construction industry safety experience If the SSHO does not have a current certification, certification must be obtained within 90 days, maximum, of contract award.
D. All designated CPs shall have completed the OSHA 30-hour Construction
Safety course and/or EM 385-1-1 40-hour training within the past 5 years. In addition, all CPs with high hazard work operations (such as operations involving asbestos, electrical, cranes, demolition, work at heights/fall protection, fire safety/life safety, ladder, rigging, scaffolds, and trenches/excavations) shall have a specialized formal course in the hazard recognition and control associated with those high hazard work operations. Documented “repeat” deficiencies in the execution of safety requirements will require retaking the requisite formal course.
E. All other construction workers shall have the OSHA 10-hour Construction
Safety Outreach course within the past 5 years and any necessary safety training to be able to identify hazards within their work environment.
F. Submit training records associated with the above training requirements to Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction safety conference for acceptance.
G. Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the SSHO or his/her designated representative. As a minimum, this briefing shall include information on the site-specific hazards, construction limits, VAMC safety guidelines, means of egress, break areas, work hours, and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 19
locations of restrooms, use of VAMC equipment, emergency procedures, accident reporting etc... Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.
H. Ongoing safety training will be accomplished in the form of weekly documented safety meeting.
1.11 INSPECTIONS:
A. The SSHO shall conduct frequent and regular safety inspections (daily) of the site and each of the subcontractors CPs shall conduct frequent and regular safety inspections (daily) of their work operations as required by 29 CFR 1926.20(b)(2). Each week, the SSHO shall conduct a formal documented inspection with a written report of the entire construction areas with the subcontractors’ “Trade Safety and Health
CPs” present in their work areas. Coordinate with, and report findings and corrective actions weekly to or Contracting Officer Representative.
B. A Certified Safety Professional (CSP) with specialized knowledge in construction safety or a certified Construction Safety and Health
Technician (CSHT) shall randomly conduct a monthly site safety inspection. The CSP or CSHT shall be one that is not a part of the immediate site project team. The individual can be a corporate safety professional or independently contracted who is not an immediate member of the construction project site team. The CSP or CSHT will provide their certificate number on the required report for verification as necessary.
1. Results of the inspection will be documented with tracking of the identified hazards to abatement.
2. The Contracting Officer Representative will be notified immediately prior to start of the inspection and invited to accompany the inspection.
3. Identified hazard and controls will be discussed to come to a mutual understanding to ensure abatement and prevent future reoccurrence.
4. A report of the inspection findings with status of abatement will be provided to the Contracting Officer Representative within one week of the onsite inspection.
1.12 MISHAPS, OSHA 300 LOGS, AND EXPOSURE-HOURS:
A. The prime contractor shall establish and maintain a Near-Miss and
Mishap reporting, recordkeeping, and analysis system to track and and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 20
analyze all injuries and illnesses, high visibility incidents, and accidental property damage (both government and contractor) that occur on site. Notify and provide an initial report to the Contracting
Officer Representative as soon as practical, but no more than two hours after any Moderate or Major Mishap, High Visibility Incidents, or any weight handling and hoisting equipment mishap. No Impact/Near-Miss and
Minor Mishaps shall be reported within 24 hours or as soon as practical. Within the notification the sender shall include contractor name; contract title; type of contract; name of activity, installation or location where mishap occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of mishap (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the Mishap site until the Contracting Officer
Representative determines whether a government investigation will be conducted.
B. Conduct a mishap investigation for all Mishaps including mishaps resulting in at least $20,000 in damages without injury, to establish the root cause(s) of the mishap. The Mishap investigation shall include images, 5 whys, the injured person’s firsthand account, any witness accounts, methods of procedures, related AHA to the task, and corrective action plan signed by the president, vice president, or appropriate corporate-level leadership identified in the company’s org chart for the project. Additionally, complete the VA Form 2162 (or equivalent) and provide the report to the Contracting Officer
Representative within 7 calendar days of the accident. The Contracting
Officer Representative will provide copies of any required or special forms.
C. A summation of all exposure-hours worked by the contractor and associated sub-contractors for each month will be reported to
Contracting Officer Representative no later than the 10th day of the following month.
D. A summation of all Minor, Moderate, and Major incidents experienced on site by the contractor and associated sub-contractors for each month will be provided to the Contracting Officer Representative monthly.
The contractor and associated sub-contractors’ OSHA 300 logs will be made available to the Contracting Officer Representative upon request.
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 21
1.13 PERSONAL PROTECTIVE EQUIPMENT (PPE):
A. PPE is governed in all areas by the nature of the work the employee is performing. For example, specific PPE required for performing work on electrical equipment is identified in NFPA 70E, Standard for Electrical
Safety in the Workplace.
B. Any PPE above and beyond the Mandatory PPE identified below and determined by the Contracting Officer or their Representative to be necessary in the performance of the Governments duties relative to this contract, shall be provided to the Government upon written notification by the Contracting Officer and at no additional expense to the
Government. All PPE provided to the Government shall also be accompanied by any relevant or required training necessary to ensure its proper use.
C. Mandatory Minimum PPE includes:
1. Hard Hats – unless written authorization is given by the Contracting
Officer Representative in circumstances of work operations that have limited potential for falling object hazards such as during finishing work or minor remodeling. With authorization to relax the requirement of hard hats, if a worker becomes exposed to an overhead falling object hazard, then hard hats would be required in accordance with the OSHA and/or EM 385-1-1 regulations.
2. Safety glasses - unless written authorization is given by the
Contracting Officer Representative in circumstances of no eye hazards, appropriate safety glasses meeting the ANSI Z.87.1 standard must be worn by each person on site.
3. Appropriate Safety Shoes – based on the hazards present, safety shoes meeting the requirements of ASTM F2413-11 shall be worn by each person on site unless written authorization is given by
Contracting Officer Representative in circumstances of no foot hazards.
4. Hearing protection - Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks.
5. High-visibility Safety Apparel – appropriate brightly colored clothing that feature some type of reflective material on them, such as safety vests, shall be worn by personnel or visitors on construction sites.
and Improvements March 10, 2025
SAFETY REQUIREMENTS 01 35 26 - 22
1.14 PRE-CONSTRUCTION RISK ASSESSMENT
A. Control of all construction-associated hazards that affect VA medical facilities, their occupants, services and mission-essential functions and capabilities is critical in all medical center facilities. VHA
Pre-Construction Risk Assessments (PCRAs) for construction, renovation and maintenance projects are included with this contract solicitation with required mitigations of identified hazards. VHA-PCRAs will be re-validated and updated as needed based on but not limited to changes from original designs, affected individuals, areas/locations, scope, contractor means and methods, safety requirements, phasing, contractor competencies and capabilities.
B. Infection Prevention and Control is critical in all medical center facilities. Interior construction activities causing disturbance of existing dust, or creating new dust, must be conducted within ventilation-controlled areas that minimize the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .