36C78625Q0097 0001.docx
DOCX document 18 KB Posted
- Solicitation number
- 36C78625Q0097
About this file
This document is a Combined Synopsis/Solicitation for the Department of Veterans Affairs National Cemetery Administration (VA NCA) to procure W1 Granite Headstones. The solicitation (36C78625Q0097) seeks a contractor to supply and inscribe upright granite headstones, with a performance period requiring delivery within 26 calendar days. The contract is classified as a supply contract under NAICS code 327991 (Cut Stone and Stone Product Manufacturing), with a Product Service Code of 9930 for Memorials and Cemeterial Supplies.
Key details include a response deadline of 28 July 2025 at 2:00 p.m. CST, with a pricing structure that includes a pre-filled $2,000 for assessorial charges. The solicitation has been amended to clarify delivery requirements, remove Service Contract Act references, and address vendor questions about delivery timelines and chargeable fees. Vendors must provide individual pricing for four specific assessorial items and acknowledge all amendments, with failure to do so potentially resulting in being deemed non-responsive and ineligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitaton - W1 - Revised - 17 July 2025.docx | DOCX document | |
| 36C78625Q0097 0003.docx | DOCX document | |
| 36C78625Q0097 0002.docx | DOCX document | |
| Combined Synopsis Solicitaton - W1 - Revised - 15 July 2025.docx | DOCX document | |
| Attachment B - Statement of Work - W1 - Revised - 15 July 2025.pdf | ||
| Combined Synopsis Solicitaton - W1 - Revised.docx | DOCX document | |
| Attachment B - Statement of Work - W1 - Revised.pdf | ||
| Attachment A - Price-Cost Schedule - W1 - Revised.xlsx | XLSX spreadsheet | |
| Attachment D - WD 2015-4281 Rev 32 - 23 Dec 2024.pdf | ||
| 36C78625Q0097.docx | DOCX document | |
| Attachment C - Drawings PDF Portfolio - W1.pdf | ||
| Attachment B - Statement of Work - W1.pdf | ||
| Attachment I - FAR 52.204-20.pdf | ||
| Attachment A - Price-Cost Schedule - W1.xlsx | XLSX spreadsheet | |
| Attachment H - Past Performance Questionnaire.docx | DOCX document | |
| Attachment E - Sample Weekly Status Report.pdf | ||
| Attachment G - Sample Review Form.pdf | ||
| Attachment F - CDR.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
Amendment to a Previous Combined Solicitation
| SUBJECT* |
| Supply & Inscribe W1 Granite Headstones for MPS |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 22172 |
| SOLICITATION NUMBER* |
| 36C78625Q0097 |
| RESPONSE DATE/TIME/ZONE |
| 07-28-2025 14:00 CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SBA |
| PRODUCT SERVICE CODE* |
| 9930 |
| NAICS CODE* |
| 327991 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
POINT OF CONTACT*
Weston Worsham and Patara Mcdonald Weston.Worsham@va.gov Patara.Mcdonald@va.gov
PLACE OF PERFORMANCE
| ADDRESS |
| Contractor's Facility |
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
Supply & Inscribe W1 Granite Headstones for MPS The purpose of this amendment is to address submitted questions and to provide a revised Combined Synopsis/Solicitation, Price/Cost Schedule and Statement of Work documents.
The response due date and time is NOT extended and remains on 28 July 2025 at 2:00 p.m. CST.
The Combined Synopsis/Solicitation, Price/Cost Schedule and Statement of Work have been revised and are attached separately to this amendment.
The Combined Synopsis/Solicitation has been revised to include but not limited to, add clarifying information regarding sample and remove references to Service Contract Act Wage Determinations, including Attachment D.
The Price/Cost Schedule was revised to correct the title of the sheet within the document to W1.
The Statement of Work has been revised, to include but not limited to, to solidify the requirement delivery of 26 calendar days for normal orders and to add clarifying information regarding assessorial items.
Note: There will not be a SF30 to sign for this amendment. Quoters shall provide a statement of acknowledgement and receipt of any and all amendments. Failure to acknowledge all amendments will result in the Interested Quoter being considered non-responsive and ineligible for award.
Questions and Answers:
1. Q: In the Statement of Work, 10.0 FOB Destination Procedure and Responsibilities: it lists the basic costs that contractors are normally responsible for on FOB Destination contracts, but on the last line of page 9 it states "Accessorial charges that the contractor could include:" and on the next page lists 4 items that are outside the contractors control. Does this mean that we can include these charges on our invoice? I see on the Price / Cost Schedule there is a pre-filled $2,000 for these items for each year.
A: Assessorial Charges are additional fees imposed by freight companies for services beyond standard shipping. For the delivery of the headstones, VA has designated assessorial charges for which vendors can invoice for after receiving written authorization from MPS transportation manager or clerk. Per the note on Attachment A – Price/Cost Schedule regarding Assessorial Charges: Quoters shall provide individual pricing for the four (4) listed items under the Description portion of that CLIN. Do not change the unit price. Individual pricing for these items will be evaluated for reasonableness. The unit of measure (1 Lot) and Unit Price ($2000) has been given to promote an even playing field.
1. Why do you have this contract as a Service Contract instead of a Supply Contract? It is clear by the statement of work that this is classic example of a Supply Contract. 3.0 General: "This contract shall include all labor and materials necessary to furnish upright granite headstones, to each consignee's address" providing a tangible finished product. Unit price: "the unit price is all-inclusive and covers the completed monuments delivered FOB destination." Again an all inclusive tangible finished product. This is much different than for instance an on-site engraving contract where the government is furnishing stones and the contractor is only doing the engraving. That is clearly a service contract. This contract is for an all-inclusive delivered finished product and the core purpose of the contract is for the government and its veterans to receive finished goods. I'm pretty sure this was litigated a few years back and it was determined that these contracts are in fact Supply Contracts.
A: The NAICS used for this requirement is 327991, Cut Stone and Stone Product Manufacturing, and the PSC is 9930, Memorials; Cemeterial and Mortuary Equipment and Supplies. Reference to the Service Contract Act Wage Determinations and Attachment D are removed from the solicitation. The combined synopsis/solicitation document has been revised to reflect this.
1. Q: In the Statement of Work, 3.1 Performance Period it states, The contractor shall have 26 calendar days to deliver. But on 9.1 Normal Delivery it states, All headstones shall be manufactured and delivered to the consignee within 15 calendar days. Which is it supposed to be? FYI... the U1 and V1 contracts currently have a delivery period of 26 days.
A: Section 9.1 has been revised to 26 calendar days excluding accelerated delivery orders. See revised SOW.
See attached document: Combined Synopsis Solicitaton - W1 - Revised.
See attached document: Attachment A - Price-Cost Schedule - W1 - Revised.
See attached document: Attachment B - Statement of Work - W1 - Revised.
End of Document
| *= Required Field |
| Amendment to a Previous Combined Solicitation |
Page 1 of
Amendment to a Previous Combined Solicitation
File details come from the government source that posted it. Updated .