This document is a detailed Statement of Work (SOW) for historic preservation and repair work at the Mound City National Cemetery in Illinois. The project scope involves comprehensive repairs to the historic lodge, including renovating the second-floor restroom with new tile, fixtures, and base; replacing 12 windows (8 awning and 4 fixed) with insulated versions; addressing road expansion joints by installing 400 linear feet of elastomeric sealant; and replacing the EPDM roof system covering approximately 2,153 gross square feet. Additional work includes repairing carpet, drywall, and wood flooring, with special emphasis on preserving the historical integrity of the site.

The contract requires strict adherence to National Cemetery Administration (NCA) standards, with contractors mandated to exercise extreme care and reverence during work, given the site's status on the National Register of Historic Places. The project has a 91-calendar day performance period from the Notice to Proceed, with requirements including daily progress reporting, photographic documentation, compliance with federal safety protocols, and submission of historical project experience. Contractors must coordinate closely with cemetery staff to minimize disruption to burial services and maintain the dignified nature of the national cemetery environment.

View the file

Other files

File Type Posted
36C78625B0004 0005.docx DOCX document
36C78625B0004 0004.docx DOCX document
36C78625B0004 0003.docx DOCX document
Amendment 0002 36C78625B0004.pdf PDF
Amendment 0001.pdf PDF
IFB Specifications 36C78625B0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.5 STATEMENT OF WORK

The Contractor shall provide all Management, Supervision, Labor, Equipment, Materials, Parts, Tools, etc., required, and necessary to provide complete construction services necessary to provide for the Historic Lodge FCA Deficiencies Repair work at the Mound City National Cemetery, as stated and described and in accordance with the Statement of Work, Specifications, Drawings (if applicable) and applicable Local, State and Federal laws and regulations.

I. PRE-BID SITE INSPECTION

Interested bidders are highly encouraged to Survey / Inspect the site (Mound City National Cemetery) prior to submitting a bid in order to be fully aware of the Scope of Services required and to adequately gather existing unit’s product information, model numbers and all necessary and matching standards and requirements. Failure to do so shall not relieve the successful bidder from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

No later that after the issuance of the Government’s Notication of Award, and before the start of the work or the ordering of any equipment, parts and or materials the awarded Contractor must perform a ‘Site Inspection’ of the site to verify all dimensions/measurements and site conditions. Failure of the Contractor to do so shall not relieve the Contractor from performing in accordance with the intent and meaning of the specifications without any imposition of additional cost to the Government.

II. POST AWARD SITE INVESTIGATION INSPECTION

Per FAR 52.236-3, Contractor is required to survey / inspect the site prior to be fully aware of the Services required and to adequately gather existing unit’s product information, model numbers and all necessary and matching standards and requirements.

Within ten (10) calendar days after issuance of the Notice to Proceed, the Contractor shall perform a ‘Site Investigation’ to verify the magnitude of all dimensions/measurements and site conditions before start of the work or the ordering of any equipment, parts and or materials. Failure to do so shall not relieve the successful offeror from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

Prior to beginning any work, the Contractor shall survey the site and review the Statement of Work to determine the extent of the work. The Contractor shall submit an ‘After Inspection Report’ of Contractor’s findings, listing any deficiencies found and provide written recommended repair/work solutions to the COR and Contracting Officer for review and approval No Later Than five (5) calendar days after completion of the Site Investigation Inspection.

Any electrical work shall be in accordance with the latest edition of the National Electrical Code (NEC) and local building codes. Failure to do so shall not relieve the Contractor from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

III. SCOPE

General Information: The Department of Veterans Affairs (VA), National Cemetery Administration (NCA) seeks to repair the FCAs (380516, 229839, 229840, 413912) at the Mound City National Cemetery. The 3 items addressing defective bathroom fixtures, bathroom flooring, roofing system and windows are to remediate the historic lodge. The 1 item addressing concrete joints affect safety of visitors.

A. Project Purpose: Here are four (4) items addressing the deficiencies and what can be done to correct the issues. The Roadway joint condition effects safety for guests and visitors. The Fixtures, Roof and Windows address and protect the integrity of the existing lodge.

The Mount City National Cemetery is on the National Register of Historic Places. All work related to historical relevance must receive approval from the NCA Historical, Historic Architect & Cultural Resources Manager via the District Engineer.

IV. SCOPE OF WORK

Contractor shall inspect the grounds where the work is to be completed and ascertain the work deemed necessary and required to complete the work outlined herein, failure of the Contractor to fully inspect the grounds and buildings prior to performing the work shall not relieve the Contractor from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

1. As noted herein, the Contractor shall:

a. Submit an ‘After Inspection Report’ of Contractor’s findings; listing any deficiencies found and provide written recommendations, to the Contracting Officer’s Representative (COR) and Contracting Officer for review and approval prior to commencing the work. The report will include all aspects of the services needed to provide the Location and Mapping services as specified herein.

b. Conduct appropriate records research, investigate site conditions and identify applicable project limits, with assistance from the National Cemetery Administration (NCA) as necessary.

c. Determine and provide all material, equipment, personnel, tools and supplies required to perform the work.

d. Take all necessary precautions to avoid damages to existing property. Any damaged caused shall be reported, repaired or replaced as approved by the COR. Repair and restore any Contractor caused damages to be as good as the original conditions or better due to construction activities. Upon completion of the work the Contractor’s On-site Superintendent, along with the COR, shall inspect the completed work for satisfactory acceptability prior to Contractor de-mobilizing from the site.

e. Locate, tag and identify any utilities and other related/associated components.

f. Obtain any and all necessary permits/licenses from appropriate City, County or

Municipal jurisdictions required for completion of the work.

2. Contractor shall coordinate with Cemetery staff for all work to avoid or minimize any interruption of Cemetery functions. Contractor shall perform daily clean-up and final clean-up and shall dispose of all waste materials properly off site. The Government will not provide receptacle(s) for disposal of debris related to this contract.

a. All unused materials from the project operations shall be removed from the cemetery property by the Contractor at Contractor’s expense.

b. Contractor shall haul away and dump all debris and waste products at an appropriate approved license disposal site.

c. Any areas disturbed in performance of this contract which may require restoration shall be restored by the Contractor and considered incidental to the contract.

d. Areas outside of the construction zone impacted by operations of the Contractor shall be returned to the state it was found prior to the construction.

3. Contractor shall provide the COR and Contracting Officer with daily/weekly progress summary reports along with photographs to show the progression of work.

4. All materials and layout of site will be pre-approved by the COR before materials are ordered or work commences.

5. The Contractor shall perform the following inclusive but not limited described work:

a. The entire restroom/bathroom will be renovated with new tile, tub/shower, vanity & base, and water closet.

a. Floor tile is to be demo’ed and replaced with matching tile. Contractor is to save a 6”x6” piece to match with like kind. To be approved by COR.

b. Wall tile: remove the bottom 2 rows of wall tile. Contractor is to salvage a minimum of 15 pieces and use as replacement for cracked or broken pieces in other wall locations. The goal is to replace all damaged wall pieces with salvaged tile.

c. New wall base tile is to match color of the floor tile as a cove tile.

Note: The fixtures on second floor are past their useful life, two (2) manual lavatories, one

(1) manual tank WC, one (1) shower.

b. Replace Lodge windows: (8) Awning Windows 60” wide x 32” tall and four (4) Fixed Windows 32” x 32” with insulated windows.

Note: Original single-glazed, fixed and awning type steel windows are rusted, inoperable, unlockable, and not energy efficient.

i. Rehab and refurbish of the eight (8) - (3’ x 5’) windows, heads, jambs and sills.

ii. Replace all eight (8) storm window screens.

iii. Verify and confirm with the COR that the Historic requirements are meet.

c. Removal/Installation

i. Removal of double hung and casement window sash, interior stops, parting bead and sash pulleys.

ii. Installation of a weather-tight/draft resistant temporary enclosures from OSB, plywood, plexi-glass or temporary window as needed in combination with existing storm window. Storm windows may be used alone if season and security allows; upon approval by the COR.

iii. Transport the window components to shop for restoration process.

iv. HEPA vacuum scrape loose paint from jambs and sill.

Minor repairs to casing/jambs/sill with either epoxy, glazing putty or wood splice/replacement as needed.

v. Prime and paint sill and jamb/blindstop (within storm window area).

vi. Re-installation of restored window sashes with appropriate draft reducing weather-strip as described under WEATHERSTRIPPING.

vii. Supply and install new sash cord or sash chain as applicable.

viii. All work to be done in accordance with EPA lead safe operations including protection and cleanup of work area. (provide such guidance)

d. Window Sash Restoration

i. Complete removal of all paint from both sides of sash and interior stop.

ii. Removal of all glass and glazing putty.

Glass breakage is expected which will require some glass replacement.

iii. Repairs to all damaged/deteriorated sash components using wood or epoxy repair methods.

iv. Replacement of missing or extensively deteriorated components using wood to match the original window profiles. Same species wood to be used.

v. Apply wood conditioner and preservation product to sash.

vi. Prep, prime and paint interior and exterior side of sash per your color choice.

vii. Re-install original glass.

Replace broken glass with float glass or salvaged/new period appropriate glass.

viii. Clean/polish/lubricate window hardware.

Replace damaged missing hardware with new hardware that matches old hardware as close as possible.

ix. Properly disposal of removed lead paint. (provide such guidance)

e. Weatherstripping

i. Installation of either brushed pile, silicone bulb, and/or metal weather-strip to window unit as appropriate to reduce air infiltration and ensure smooth operation of window.

f. Carpet Remove and replace carpet and padding in the main level lobby area (approximately 160 SF) and interior stairwell carpet and padding (approximately 208 SF) leading to the second level.

g. Drywall Remove and replace approximately 9 SF of drywall and associated insulation between levels where there is evidence of water damage; and paint using interior latex paint to match existing color, as approved by the COR.

Note: The drywall in the kitchen area is damaged from water.

h. Flooring Remove, replace and/or repair wood flooring (approximately 3 SF) as required to match existing; product/material to be pre-approved by the COR.

Note: The wood flooring on second floor, adjacent to HVAC unit, is water damaged due to leak.

i. Roads Expansion joints.

Backer rod and seal all joints as indicated.

i. Install 400 Linear Foot (LF) of elastomeric sealant.

Note: Concrete Road expansion joints missing sealant.

j. Roof

Replace the Ethylene Propylene Diene Monomer Rubber (EPDM) roof system;

approximately 2,153 Gross Square Feet (GSF) including insulation, flashings and trim, clean and seal stone coping joints.

Note: The EPDM roof was installed in 2006.

Periodic leaks have been reported.

Wrinkles, fishmouthing, deteriorated sealant at termination bars, deterioration of stone coping joints and residual roofing cement, and ponding is visible.

k. Past Experience Historical experience Contractor is to provide 2 examples of past projects with similar historical requirements.

Provide project location, estimated cost and project type.

All materials/products and layout of site will be pre-approved by Contracting Officer, COR and District Engineer before materials/products are ordered or prior to work commencing.

All work shall be performed in a professional workmanship like manner and in Accordance With (IAW) the National Cemetery Administration (NCA) Master Construction Specifications (MCS) as indicated in herein; as well as meet all local and state requirement including ASTM, ACI 381, and International Building Codes, and the work shall include full compliance with all related specifications requirements. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas. At the completion of the work and upon satisfactory acceptance by the Government, the Contractor shall provide to the COR and Contracting Officer any applicable Operation and Maintenance Manuals (if applicable), and a certificate of Warranty / Guarantee that all work done under the contract shall be free from defaults, faulty materials or workmanship for a minimum of one (1) year from the date of final acceptance.

Contractor hereby agrees to repair or replace identified deficiencies within the specified time frame by the direction of the COR or Contracting Officer at Contractor's own expense and such repaired and/or replaced deficit work shall be corrected to the satisfaction of the Government.

V. CEMETERY LOCATION MAP

VI. CURRENT CONDITIONS PHOTOS

#380516 2nd level restroom

#229839 – Roof

#229840 –Lower-Level Windows:

#229840 - 2nd Level Windows:

#413912 – Roads – Expansion Joints

VII. SPECIFICATIONS AND DRAWINGS DISCREPANCIES

In the case of any differences between the Statement of Work, Specification and/or Drawings, the specifications will prevail and govern over the Statement of Work and/or Drawings. Any Statement of Work, Specification and/or Drawings discrepancies should be brought to the immediate attention of the Contracting Officer and COR for clarification. Any errors or omissions in the Statement of Work, Specification and/or Drawings must be provided promptly to the Contracting Officer and COR, but in no case later than the start of related work.

VIII. CONSTRUCTION PROGRESS PHOTO DOCUMENTATION

During the construction through completion, Contractor shall provide photographic documentation of construction progress and at selected milestones per the Contracting Officer and/or the COR. The photos shall meet the following qualifications:

a. Digital image shall be taken with a professional grade camera with minimum size of 6 megapixels (MP) capable of producing 200x250mm (8 x 10 inch) prints with a minimum of 2272 x 1704 pixels and 400x500mm (16 x 20 inch) prints with a minimum 2592 x 1944 pixels.

b. Before construction services work, the area, building, adjacent streets, roadways, parkways, driveways, curbs, sidewalks, landscaping, adjacent utilities and adjacent structures surrounding the site shall be photo documented. Overlapping photographic techniques shall be used to ensure maximum coverage.

c. If site work or area preparation is extensive, this documentation may be required immediately before construction services work begins and at several pre-determined intervals during work commencement.

d. Photography of employees, visitors, volunteers, and others on NCA premises is strictly prohibited. Photographing of NCA premises (buildings, grounds, property, site) is allowed ONLY with written permission from the COR.

IX. PERIOD OF PERFORMANCE

The Contractor shall complete all work including submittals, reviews, quality control, repair/construction services, punch list corrections, clean up, invoicing and closeouts documentation submittal within ninety-one (91) calendar days from issuance of the Government’s Notice to Proceed.

The Contractor shall develop and provide the Contracting Officer with a Project Schedule and Cost Schedule within ten (10) calendar days of Government issuance of the Notice to Proceed.

X. WORK HOURS

Normal construction services work hours for this project shall be 7:30 a.m. to 4:00 p.m., CST Monday through Friday, excluding Saturday, Sunday, and Federal Holidays. Contractor work hours may be modified only by written approval of the Contracting Officer, at no additional cost to the Government. The Contractor shall coordinate with the COR to establish a work schedule and to ensure that no work is being performed at the immediate site of a scheduled interment or ceremony. The Contractor shall be responsible for ensuring that no contract work causes any funeral, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised.

The Contractor may request authorization in advance from the Contracting Officer to work outside of normal service hours at no additional cost to the Government. Written Authorization must be pre-approved in advance and prior to working and is at the sole discretion of the Contracting Officer.

Contractor, Contractor’s employees and sub-contractors must check-in with the COR, daily, upon arrival at the Mound City National Cemetery prior to beginning any work and prior to departing the facility/property after the day’s work is completed.

XI. HOLIDAYS

The following federal holidays are observed:

• New Year's Day - January 1

• Inauguration Day (DC Metropolitan Area Only) - January 20 every 4 years

• Martin Luther King's Birthday - 3rd Monday in January

• President's Day - 3rd Monday in February

• Memorial Day - Last Monday in May

• Juneteenth- June 19

• Independence Day - July 4

• Labor Day - 1st Monday in September

• Columbus Day - 2nd Monday in October

• Veterans Day - November 11

• Thanksgiving Day - 4th Thursday in November

• Christmas Day - December 25

And any other holiday proclaimed by the President as a Federal Holiday. When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday shall be observed as a holiday.

XII. CONTRACTOR QUALITY CONTROL

The Contractor’s Site Superintendent will:

a. be on site, at all times, whenever work is being performed by Contractor or subcontractors’ employees, to ensure adequately supervision and communication;

b. review and approve submittals;

c. inspect the quality of work performed; and

d. certify the completed work for payment and other purposes.

Note that there may be infrequent stoppages in work at the order of the Contracting Officers Representative (COR) due to burial services being conducted in the area.

Contractor will meet with COR at the start of each workday to ensure that no construction activities will interfere with burials on that specific day.

XIII. CONTRACTOR'S RESPONSIBILITIES

The Contractor will be responsible for ensuring that all work is done in a manner that safeguards NCA visitors, employees, and the public. Contractor will be responsible for and obtain all necessary licenses and/or permits required to perform the work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees' fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the State of Illinois.

XIV. NATIONAL CEMETERY ADMINISTRATION DIGNITY STANDARDS

1. Every action by contractor personnel at a National Cemetery must be performed with the special care, reverence, dignity, and respect that acknowledge the cemetery as the final resting place that commemorates the service and sacrifice those service members, Veterans, and their families made for our Nation. Critically important is the awareness, required of the contractor employees, of the remains buried in the grounds where the work is performed.

The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.

a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them. Contractor personnel should use tools approved by the Contracting Officer Representative (COR), such as shovels, pry bars or pinch bars to lift flat markers out of the ground; pickaxes are not an acceptable tool.

b. No tools, equipment or other items will be placed or leaned on headstones or markers. Once headstones/markers are removed from the socket, do not place on dirt piles or mud; they should be carefully placed on each associated gravesite and protected in such a way as to prevent any soiling and be out of the way of any other work.

c. Headstones shall be removed from their sockets using wooden and/or metal clamps.

If metal clamps are used, the area that contacts the headstone must be protected with a rigid fabric that will prevent damage to and marking of the headstone. Clamps may be attached to a skid steer loader (i.e., Bobcat®) or similar machine to extract the headstone from the socket. When headstones are removed from their sockets, they shall be carefully stored on each associated gravesite; do not lean headstones against each other. Use care not to scratch or damage headstones in any manner.

The headstones shall be laid with front inscription side up while the headstone is lying horizontally on the ground. The headstone shall be protected from direct ground contact while lying horizontally. The protection method shall be as approved by the COR and shall be free of deterioration in weather. An approved method is to support each headstone with two (2) wooded 4X4’s. Alternate methods can be approved. Cardboard shall not be used.

d. Wood or other suitable appropriate and attractive material shall be used to keep the headstones from contact with the soil while lying horizontally during the construction period. This also shows respect towards the families visiting the gravesites and the remains that are buried.

e. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.

f. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, the Contractor must contact the COR, Director/Assistant Director, and Contracting Officer for guidance.

2. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, and Contracting Officer for guidance or resolution.

3. The Contractor is required to discuss the guidance with their employees and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin.

XV. STANDARDS OF EMPLOYEE CONDUCT

The National Cemetery Administration (NCA) are national shrines that honors Veterans with a final resting place and lasting memorials that commemorate their service to our Nation. The standards of work, appearance, and procedures performed by Contractors at National Cemeteries shall reflect this nation’s concern for those interred there. Due to the sensitive mission of the cemetery, Contractor’s personnel must exercise and exhibit absolute decorum, composure, and stability at all times.

As the work being performed is at a National Cemetery all Contractor’s employee must always look professional and neat in appearance; and be fully clothed to include upper garment to cover the body from the waist to neck and long pants or slacks. The Contractor shall require its employees, including subcontractors, to wear distinctive visible identification at all times for easy identification while on NCA premises.

Contractor and Contractor’s personnel (including subcontractor and their employees) shall be required to adhere to the standards of dress and conduct while performing work on the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C. Section 218.

Contractor’s personnel shall:

a. be fully clothed at all times, to include long slacks or pants and shirt, buttoned up from neck to waist. Clothing will be clean each day. Any soiled clothing should be Cemetery work-related that day. Tank tops as outer garments are prohibited. Tee-shirts will have the company logo visibly displayed. Shoes/boots will have no holes or loose soles.

Steel-toed shoes shall be required in accordance with OSHA. Contractor employees shall maintain personal hygiene.

b. not engage in loud or boisterous behavior or use profane or abusive language. Shall show proper reverence during committal service.

c. not eat or drink beverages except water or non-alcoholic drinks while in work area or in sight of committal service area during a service. Use of intoxicating beverages and/or drugs is strictly prohibited.

d. not lean, sit or stand on or against headstones, markers, or monuments. No tools, equipment or other items will be placed or leaned on headstones or monuments at any time. Contractor personnel shall not drive over headstones, markers, or monuments.

e. Smoking is ONLY allowed in designed “Smoking” areas identified by the cemetery.

All other areas are designated as NO SMOKING. Smoking is not permitted inside any cemetery buildings. Smoking is not prohibited within twenty-five feet from Entrances, Exits, Operable Windows, and Ventilation intakes that serve an enclosed area(s).

Contractor must discuss the guidance in this paragraph with its employees and all subcontractors. Any doubts as to proper procedures shall be brought to the attention of the COR and Contracting Officer for guidance or resolution. Contractor and subcontractor employee shall sign a Statement of Compliance (if applicable); and shall deliver the signed statements to the COR before work may begin or before any new employee is allowed to work on Cemetery grounds.

Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises.

Contractor’s objections to any such action will be referred to the Contacting Officer for final resolution; however, the Contractor will first immediately comply with the COR’s direction pending the Contacting Officer final resolution at a later time or date. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR and is later found invalid and/or unreasonable by the Contracting Officer.

XVI. USE OF CEMETERY FACILITIES

a. The Government will not be responsible for any loss, damage, or theft of Contractor items, nor will free telephone service be provided. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of both National Cemetery Administration facilities and Contractor-installed facilities used by the Contractor's employees.

b. The Government will NOT furnish a storage building or area at the Cemetery site for use by the Contractor to store supplies and equipment. Contractor shall be responsible and required to provide and remove the material, equipment, tools and supplies to perform operations daily.

c. The Government will NOT furnish a rest room facility to include temporary port-o-pots and will not be allowed on the grounds.

d. Any hazardous substance that is used and which is a standard practice within the cemetery industry must be handled, stored, and transferred in accordance with all Occupational Safety and Health Administration (OSHA), Environment Protection Agency (EPA), and Department of Transportation (DOT) laws, regulations, and recommendations.

e. The Contractor will be responsible for safely storing any chemicals, pesticides, herbicides, cleaning solutions, etc. in accordance with manufacturers recommendations.

SDS (Safety Data Sheet) is required for any/all chemicals, pesticides, herbicides and cleaning solutions.

f. Electricity, water and phone services will NOT be furnished by the Government for the Contractor’s.

XVII. CONSTRUCTION DURING CEMETERY FUNCTIONS

a. The burial activities at a National Cemetery will take precedence over other contract activities. Contractor shall cooperate and coordinate with the COR or authorized designee, in arranging schedule to cause the least possible interference with cemetery activities in actual burial areas. The COR or a representative shall furnish the Contractor with a schedule of all interments and/or ceremonies no later than the close of business of the day prior to the scheduled event.

b. Work noise during the interment services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period. Contractor personnel shall not operate motorized equipment or conduct other commercial activities during interment services.

c. Execute work in such a manner as to interfere as little as possible with work being done by others. To minimize contract activity interference with flow of cemetery traffic, keep roads, walks and entrances to grounds, parking and occupied areas of buildings clear of materials, debris and standing equipment/vehicles at all times. At least one (1) lane must be open to traffic at all times.

d. Due to the sensitive mission of the Cemetery, the work could occasionally involve contact with and/or exposure to grieving individuals. Contractor personnel shall exercise and exhibit absolute decorum, composure and stability at all times and refer such individuals to Cemetery staff.

XVIII. HISTORIC PRESERVATION

When the Contractor or any of the Contractor's employees, prior to, or during the service work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.

XIX. AUTHORITIES OF GOVERNMENT PERSONNEL

Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The Government will provide, at the time of contract award, a list of Government personnel authorized to act as CORs.

XX. EXPOSURE OR ACCIDENTAL DISCOVERY OF REMAINS

Should any on-site activity, incident, emergency, or disaster result in exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, the Contractor shall IMMEDIATELY notify the Cemetery Director, the COR and/or the CO; take immediate steps to protect and render safe any exposed remains; and stop any further work that could affect those remains or grave site until the Cemetery Director provides the Contractor guidance regarding disposition of the remains and permission to proceed.

XXI. GENERAL

Contractor shall NOT mobilize on site until all Kick-Off meeting, Documentation and Submittals have been submitted, reviewed and accepted by the NCA. The Contracting Officer shall provide written notification approval to mobilize.

1. WORK ENVIRONMENT AND WEATHER CONDITIONS

a. All work under this service Contract will be performed outdoors and personnel performing these services will be exposed to wind, heat, sun, cold, dampness, frost, fog, and rain. These conditions, may, at times, be extreme.

The Contractor shall take all necessary precautions to protect his/her employees from the elements to the maximum practicable extent. Weather will not be considered an excusable delay in meeting specifications or project schedule.

b. The Contractor understands that it may be necessary to work throughout all weather conditions and to apply additional labor and equipment as necessary to meet deadlines, at no additional cost to the Government.

c. If weather conditions are such that the work performed may cause more damage to the Cemetery grounds than good, the COR has the authority to stop work until conditions improve and the COR directs continuation of performance.

d. If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the period of time, could not have been reasonably anticipated and had an adverse effect on the scheduled construction.

2. OPERATIONS

a. It is understood the Government will not be held responsible for any damage to or loss of the Contractor’s equipment, materials, supplies or the like which may result from vandalism, theft etc. while on site. The Contractor shall be responsible for maintaining fire extinguishers and other safety equipment.

b. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

c. All utilities to this area are the responsibility of the Contractor. Electrical power is to be supplied by either a Contractor-owned generator or by the local power company.

Secondary service runs and the cost of power are the Contractor’s responsibility.

d. The Contractor would then be responsible for delivering and removing all necessary equipment and supplies daily.

3. DISPOSAL AND RETENTION

a. The Contractor shall be responsible for cleaning cemetery structures, headstones/flat makers, monuments, and roadways that are soiled or stained as a result of Contractor’s performance. The Contractor shall wash-down with water all soiled or stained structures headstones/flat markers, and monuments at the end of each workday Any such washing/cleaning shall be brought to the immediate attention of the COR prior to washing/cleaning.

b. At the end of each workday the Contractor shall properly remove and dispose all debris from the Cemetery site resulting from the work.

The Contractor shall always ensure that rubbish and trash generated by the Contractor is kept clear of vehicular and pedestrian traffic throughout the site.

c. The Government will not provide receptacle(s) for disposal of debris related to this contract. The Contractor shall provide its own means of removing debris.

d. The Contractor shall dispose of all debris and other waste materials at a licensed off-site landfill unless otherwise directed by the COR.

e. The Contractor shall haul away and dispose of all waste in accordance with the Resource Conservation and Recovery Act (RCRA) and all other applicable Federal, State, and Local law and regulations. On-installation storage or disposal of hazardous waste is NOT allowed.

f. At the completion of the project the Contractors shall be responsible for properly removing and disposing of all debris from Government property.

All debris and packaging shall be properly removed and disposed of by the Contractor to an approved offsite disposal site or recycling center in compliance with State and Local ordinances.

4. PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

a. Restore any areas disturbed in performance of this contract which may require restoration (as deemed appropriate by the COR); and will be deemed incidental to the contract. Areas outside of the construction limits impacted by operations of the contract shall be returned to the state it was found prior to the construction services. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas.

b. Damage to Government property: The Contractor (including Contractor’s employees, subcontractors, consultants or the like) shall be responsible for repair or replacement of any Contractor damaged cemetery structure, to include: turf, curb, road pavement, headstones or markers, valve boxes, grid monument control markers, trees, plant beds, etc., which are chipped, marred, damaged and/or ruined at the fault of the Contractor.

The Contractor shall bear all costs associated with replacement and reinstallation. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas. Any such damage shall be brought to the immediate attention of the COR prior to repair, replacement, or installation.

c. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site that are not to be removed and which do not unreasonably interfere with the work required under this contract.

d. The Contractor shall only remove trees when specifically authorized to do so by the COR and shall avoid damaging vegetation that will remain in place.

If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and remove and properly dispose of from the site as defined herein.

e. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall immediately notify the COR of any such occurrence and repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

f. Protection of Existing Utilities: Contractor shall be responsible for damages to utilities, above and below ground.

5. RESTORATION

a. Upon completion of the contract work any existing cemetery features (lawns, paving, roads, and walks) disturbed or removed as a result of performing required work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. All restoration work shall be accomplished without undue delay.

b. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen/subcontractors to existing cemetery infrastructure.

6. USE OF ROADWAYS

The Contractor will be responsible for traffic control and shall obtain, erect, maintain and remove all signs, barricades, flagmen and other traffic control devices as may be necessary for the purpose of regulating, warning or guiding traffic. All traffic control protection will be considered incidental to the cost of the contract. The Contractor shall, under regulations prescribed by the Contracting Officer or COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the COR or Contracting Officer. The route of construction traffic to and from the project site shall be clear of debris at all times as well as the required safety signage and barricades for the safe passage of visitors. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, or similar construction the Contractor shall protect them from damage by well-constructed bridges.

The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

7. AVAILABILITY AND USE OF UTILITY SERVICES

a. Water: A water system is not available. The Contractor shall provide and utilize portable water when needed.

b. Electricity: In case the Contractor requires electricity while in performance of this

Contract, the Contractor shall provide and utilize portable generators as necessary to complete the work.

8. WORK PERFORMED ON SITE BY OTHERS

The Government may undertake or award other contracts for additional work at or near the site of work for this contract. The Contractor shall fully cooperate with any other contractors and with Government employees and shall carefully adapt scheduling and performance of work, and needing any direction, it shall be provided by the COR.

The Contractor’s Superintendent shall be responsible for reporting to the COR any problems or questions that may arise with any other personnel on site during the period of performance of this contract. The Contractor’s Superintendent shall not take it upon him or herself to resolve any problems or issues with other on-site Contractors or employees, but rather will leave it to the COR to resolve the issue.

9. REPORTING AND RECORD KEEPING

a. Contractor’s Superintendent shall report on a daily basis to the COR at the Cemetery and log in. This DAILY check-in is mandatory and shall be at a time agreed upon by the COR and the Contractor’s Superintendent within the requirements of paragraph “b” below.

b. A list of scheduled ceremonies will be provided to the Contractor’s Superintendent the week prior to the scheduled events, and a list of scheduled committal services will be provided daily. Contractor’s Superintendent shall be solely responsible for ensuring that no contract work causes any committal service, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised.

c. The Contractor shall be solely responsible for staying abreast of all such upcoming events and when in doubt, Contractor must ask the COR.

10. CONTRACTOR-FURNISHED ITEMS

a. Contractor shall be responsible for supplying all equipment, personnel, tools, supplies and materials necessary to perform the services required by this contract.

Contractor-furnished items necessary to perform work as required under this contract shall be furnished, maintained and operated by the contractor and shall be consistent and fully compliant with all applicable OSHA, Federal, State, County, City laws, ordinances and regulations.

b. Contractor shall be responsible for the supply, maintenance and repair of all Contractor-owned equipment. This includes minor maintenance/repair and minor operating parts for equipment such as lubrication, oil changes, spark plugs, gaskets, cotter pins/keys, electric extension cords, etc., to keep all equipment in good operational condition throughout the period of performance of this contract. No Contractor equipment maintenance repairs of any kind can be done on Cemetery property without the COR(s) approval.

c. Contractor shall be responsible for ensuring that all his/her motor vehicles and equipment meet State inspection, safety, licensing, registration, and insurance requirements.

d. Only Contractor equipment and supplies (property) required to perform work under this contract shall be used on cemetery property. No personal property, equipment, or vehicles shall be staged on the cemetery premises.

11. GOVERNMENT’S RESPONSIBILITIES

a. Prior to Contractor mobilizing or commencing work, the COR will inform the

Contractor of any known damages to the cemetery grounds, headstones/markers or any other areas that the Contractor is unaware of and not responsible for.

b. In addition, prior to Contractor mobilizing or commencing work, a walk-through of the cemetery grounds shall be scheduled by the Government and Contractor, and will be attended by the COR, Contractor’s Superintendent and/or Project Manager and any appropriate Contractor designated personnel. The NCA’s PM Officer and Contracting Officer are optional attendee.

c. The Government will not provide the Contractor with any equipment and materials storage, furnishings, fuel storage, equipment, materials, restrooms, or telephones.

Utilities will be provided as defined in “AVAILABILITY AND USE OF UTILITY

SERVICES”.

d. Notification of Non-Compliance: The COR will notify the Contractor of any detected non-compliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification.

If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order ceasing all or part of the work until satisfactory corrective action has been taken.

No part of the time lost due to such cessation direction shall be made the subject of claim for extension of time for excess costs or damages by the Contractor.

12. CLEANUP

Contractor shall thoroughly clean up the work area at the end of each day’s work and at the completion of the project. Contractor must remove and properly dispose of all debris, materials, equipment, and substances daily, at the end/completion of the work/job. Contractor shall leave the premises clean and free of waste, scrap, equipment or other material delivered to the site by the Contractor or contractor’s personnel.

a. Contractor shall request authorization from the COR prior to disposing of any Government owned materials, equipment or property.

b. Contractor shall properly remove and dispose all debris from government property. Disposal of debris, materials, equipment, and substances shall be in accordance with applicable Federal/State/local and environmental laws, rules and/or regulations.

c. Contractor shall provide, if requested, shipping manifest and documentation of proper disposal of any debris, materials, equipment, and substances prior to final payment. Contractor shall ensure and provide appropriate documentation to the COR that all applicable hazardous waste, haulers, and disposal facilities are properly certified or licensed.

d. The project site shall be protected and/or restored to a condition equal to that existing prior to the commencement of work.

13. PERSONAL PROTECTIVE EQUIPMENT

Contractor shall provide Personal Protective Equipment (PPE), proper safety signage; and must provide and have in place: fire extinguishers, cones, barricades etc., to protect the safety of visitors, patients, employees and tenants. The Contractor shall not be permitted to work if the proper safety equipment/items are missing; and shall be asked to leave the area/facility. Additionally, COVID-19 safety protocols for Federal facilities remain in effect for all employees.

14. MATERIAL STORAGE

There will be No on-site office or on-site storage/office container allowed. The Contractor shall provide ‘just in time delivery and pickup’. The Contractor shall coordinate with the COR for material storage/staging within the work area. The storage/staging of equipment, materials or supplies must have prior COR approval.

a. Tools/Staging: Contractor shall provide its own required tools, ladders and equipment to complete the work.

b. Operating vehicles/equipment: Contractors shall not leave operating vehicles/equipment unattended at any time and all shall ensure that vehicle/equipment keys are removed when not in operation.

15. NOISE

The Contractor / Contractor personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at any time on Government property.

The playing of loud music radios and/or electronic games/devices is not permitted. Two-way communications radios shall be allowed where broadcast frequency is approved by the COR.

Contractor shall coordinate and schedule any noise making activities with the COR. For any noise making work activities, the Contractor must provide written notification to the COR and the COR will schedule and provide written authorization to proceed within three

(3) business days in advance of the proposed activity.

16. FUMES

Any fume producing activities shall be scheduled after regular business hours unless written permission has been granted by the COR. The Contractor shall be responsible for all ventilation necessary to evacuate and prevent fumes from entering the building(s).

17. HOT WORK PERMIT

Any work or operation involving open flame or producing heat and/or sparks, (burning, welding or similar operation) that is capable of initiating fires or explosions will require a “Hot Work Permit”. The Contractor shall request a “Hot Work Permit” from the COR, a minimum of one (1) business day prior to the work activity.

This work shall include, but shall not be limited to, processes such as arc welding, oxy-fuel gas welding, open- flame soldering, brazing, thermal spraying, oxygen cutting, arc cutting, chipping, grinding, heat treating, sand blasting, torch-applied roofing, chemical welding and light horizontal welding.

18. CONSTRUCTION SAFETY

Contractor shall ensure that all onsite construction workers (including subcontractors) have completed the OSHA 10-hour Construction Safety training or the 30-hour Construction Safety training (for supervisor and/or managers), and other relevant competency training. Contractor shall provide verification of such training to the

Contracting Officer and the COR prior to mobilizing and at any time requested during the course of the work, until the contract is completed.

19. SECURITY & SAFETY

Contractor, Contractor’s employees and sub-contractors shall follow all VA Policies, Standard Operating Procedures, applicable Laws and Regulations while on VA property.

Violations of VA Policies, Standard Operating Procedures, applicable Laws and Regulations may result in citation and disciplinary measures for persons violating the VA Policies, Standard Operating Procedures, applicable Laws and Regulations.

a Contractor, Contractor’s employees and sub-contractors shall…