About this file

This document provides details on a federal construction contract opportunity for renovation, improvements, and repairs projects at the Long Island National Cemetery. The solicitation number is 36C78624B0005 and is seeking bids for Project No. 815CM3041 to address renovations, improvements, and repairs at the cemetery. The pre-solicitation opportunity is being conducted by the Department of Veterans Affairs National Cemetery Administration. Bids are due based on the details provided in the 16MB LINC Bid Set Bk-10.pdf file related to the required scope of work, specifications, terms, and conditions for the construction services sought under this contract award.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2'-0"

90.44'

93.90'

91.67'

1'-9 1/2"

2' -1

0"

EQ.

EQ.

1'-0"

6'-9"± VIF

3"

3' -6

3'-3" 3'-3" 3'-3" 3'-3"

13'-0" 4"

3/

4"

4" MAX., TYP.

1'-9 1/2"

3' -6

8"

1 1/2" DIA. PIPE

TOP RAIL

1 1/2" DIA. PIPE

BOTTOM RAIL

4"

SET POST AND

SLEEVE IN EXTERIOR

GRADE ANCHORING

CEMENT

1" DIA. PIPE

PICKET RAIL

1 1/2"

MIN.

3" DIA. COVER

FLANGE

EXISTING

CONCRETE

WALL

1 1/2" DIA.

PIPE

METAL

BRACKET

SUPPORT

91.03'

93.90'

1'-3"

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

PUBLIC INFORMATION CENTER:

PROPOSED ELEVATION

AE-231

1 WEST ELEVATION

1/4" = 1'-0"

0 1' 2' 4' 6'

NEW STOREFRONT DOOR AND WINDOWS

NEW DOUBLE HUNG ALUMINUM CLAD WOOD WINDOW

4 NORTH ELEVATION

1/4"=1'-0"

3 SOUTH ELEVATION

1/4" = 1'-0"

2 EAST ELEVATION

1/4" = 1'-0"

NEW RAMP, STAIR, COMPOSITE WOOD DECK, AND RAILING,

TYP. SEE DRAWING AE-232 FOR DETAILS AND BASIS OF

DESIGN.

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

KEY

NEW CONCRETE STEPS, RAILING AND LANDING. SEE AE-232

FOR RAILING BASIS OF DESIGN.04

PAINT HATCH DOOR. COLOR: P-11, SEE FINISH SCHEDULE.05

NEW 1 1/2" DIA. SCHEDULE 40 ALUMINUM PIPE HANDRAIL,

POWDER COATED BLACK, P-1006

NEW ALUMINUM ENTRANCE CANOPY AND POSTS. SEE SPEC

SECTION 05 51 20 AND DRAWING AE-232 FOR BASIS OF

DESIGN.

PREP AND PAINT ALL EXPOSED STEEL LINTELS P-11, SEE

FINISH SCHEDULE AE-805.08

9 AREAWAY HANDRAIL ELEVATION

1/2"=1'-0"

AE-231

AREAWAY

FW, MS FW, MS

7 GUARDRAIL ELEVATION

1/2" = 1'-0"

5 NORTH ELEVATION THROUGH AREAWAY

1/4"=1'-0"

TYPICAL CONSTRUCTION NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZARDOUS

MATERIALS NOTES FOR THIS PROJECT, TYPICAL.

2. UNLESS OTHERWISE NOTED, PAINT ALL EXTERIOR DOORS,

DOOR / WINDOW FRAMES AND WOOD TRIMS. COLOR: P-11,

SEE FINISH SCHEDULE AE-805.

PAINT ALL BASEMENT / CRAWL SPACE METAL VENT GRILLES

AND COVER PLATES, VIF. COLOR: P-11, SEE FINISH SCHEDULE.0909

09 09

NEW HM DOOR AND FRAME.10

NEW ALUMINUM CLAD WOOD WINDOW11

STAIR D

STAIR B

STAIR C

STAIR A

STAIR A

STAIR C

PAINT EXISTING METAL RAILING, COLOR: P-10, SEE FINISH

SCHEDULE.12

NEW METAL GUARDRAIL AND HANDRAIL. USE ALL

SCHEDULE 40 HOT DIPPED GALVANIZED STEEL, POWDER

COATED BLACK, P-10, SEE FINISH SCHEDULE. WELD ALL

CONNECTIONS.

8 GUARDRAIL DETAIL

1 1/2" = 1'-0" 6 HANDRAIL DETAIL

3" = 1'-0"

AE-231

NEW CONCRETE LANDING. SEE STRUCTURAL DRAWINGS

FOR DETAILS.14

HANDRAIL

BRACKET, TYP.,

SEE 6/AE-231

NEW COPPER CHIMNEY CAP. SUBMIT SHOP DRAWINGS FOR

APPROVAL.15

15 PAINT ALL EXTERIOR WOOD TRIMS TO REMAIN, P-11, SEE

FINISH SCHEDULE AE-805.16

NEW COPPER FLASHING AT CHIMNEY AND CRICKET.17

08 08

NEW ROOF MOUNTED EXHAUST FAN. PROVIDE CURB AND

FLASHING. SEE MECHANICAL DRAWINGS AND AE-800 FOR

DETAILS.

4 1/2" RADIUS

1" DIA. PICKET RAIL

1 1/2" DIA.

PICKET RAIL

SEE 8/AE-231 EMBEDMENT DETAIL, SIMILAR.19

AE-231

1 1/2" DIA. TOP RAIL

KEYNOTES

1 1/2" DIA. BOTTOM RAIL

1 1/2" DIA.

MID RAIL

NEW 12" X 12" LOUVER, SEE MECHANICAL DRAWINGS.20

NEW WALL SCONCE. INSTALL AT LOCATION SHOWN. SEE

ELECTRICAL DRAWINGS FOR SPECIFICATIONS21

TYP.

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

DN DN

DN

'-9

" R

AM

P

:1 S

LO

PE

'-9

" R

AM

P

:1 S

LO

PE

EQ

EQ

4" 4"

4"

8' -0

11'-2"

3'-6 1/4"3'-6 1/4"3'-6 1/4"3"

1' -0

4"

1' -0

5'-0"

2' -8

2' -8

3 1/2" 3 1/2"

3' -1

1"

6'-10"

3' -1

1"

2'-2 3/4"

2'-2 3/4"

5' -6

4'-10 1/2"4'-10 1/2"

3 1/2"3 1/2"

4"

3 1/2"

5' -0

/2

5'

-0

5' -0

4' -1

4'

-1

4"

90.44'

93.90'

91.67'

90.44'

5' -0

5'

-0

5' -0

/2

1/

2"

93.90'

(1) 2X10

(1) 2X10

G

F

E

D

C

B

A

3 4

7 8

'-0

" C O

N

CR

ET

E

RA

M

P 3'

-6

/2

8'-9"

1'-6 1/2" 1'-6 1/2"

3'-7 1/2" 3'-7 1/2"

1' -6

/2

3'

-6

/2

'-0

'-0

2' -1

1/

2"

6' -3

9'-5"

(2) 2X10

(2) 2X10

(2) 2X10

(2) 2X10

(2) 2X10

(2 ) 2

X1

(2 ) 2

X1

(2) 2 X10(2) 2X10

(2 ) 2

X1

(2 ) 2

X1

(2 ) 2

X1

(2 ) 2

X1

(2 ) 2

X1

(2 ) 2

X1

/2

1'-2 3/4"

/2

6 3/4"

4'-10 1/2"

4'-10 1/2"

4' -7

10 1/2"10 1/2"

3"3"

1' -3

8' -0

2' -1

1/

2"

EDGE OF EXISTING

MASONRY OPENING TO

EDGE OF CONCRETE PORCH

90.44'

93.90'

91.67'

91.67'

93.90'

6"

LINE OF EXISTING BUILDING

OVERLAP FASCIA

BOARD 6" BEYOND

BUILDING LINE

FASCIA BOARD

BEYOND

1'-0"

1'-0"

3' -0

3' -0

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

PUBLIC INFORMATION CENTER:

EXTERIOR RAMP & CANOPY

ENLARGED PLANS & DETAILS

AE-232

1 RAMP AND STEPS ENLARGED PLAN

3/8" = 1'-0"

05 HELICAL PILE FOUNDATION AT RAMP, TYPICAL. ALL LAYOUT

DIMENSIONS AND DEPTH SHALL BE COORDINATED TO

MANUFACTURER'S FINAL APPROVED SHOP DRAWINGS. REFER

TO AE-233 FOR PILE AND WOOD CONNECTOR SPECIFICATIONS.

IK, FW FW

2 FRAMING PLAN

3/8" = 1'-0"

06 DOWNSPOUT LOCATION FOR CANOPY, SLOPE CANOPY W-PAN

ROOF DECKING AND GUTTER AS REQUIRED FOR DRAINAGE.

OVERFLOW SCUPPER MAY BE LOCATED 4 FEET AWAY.

3 RAMP AND STAIR ELEVATION

3/8" = 1'-0"

NEW CONCRETE STAIR AND LANDING. SEE DRAWING

4/AE-233 FOR DETAILS

42" MIN. HIGH GUARDRAIL, TYP.

NEW COMPOSITE WOOD RAMP AND DECK, SUPPORTED BY

WOOD STRUCTURAL BEAMS AND HELICAL PILES, TYP.

02 02

GUARDRAIL POST, TYP., ANCHOR INTO WOOD BLOCKING OR

CONCRETE PER MANUFACTURER'S SPECIFICATIONS.

12 01

1-3/8" DIAMETER ALUMINUM HANDRAIL, POWDER COATED

WHITE. INSTALL AT 36" A.F.F. TYP.

CONCRETE RAMP, REFER TO CIVIL DRAWINGS FOR DETAILS.10

NOTE:

1. SEE AE-233 FOR HELICAL PILE SPECIFICATION AND WOOD

CONNECTOR PLATE CAP.

AE-232

1. SEE GENERAL AND HAZMAT NOTES ON SHEET A-001.

2. FOR ALUMINUM ENTRANCE CANOPY, DECK, RAMP, STAIR

BOARDS, ALUMINUM POSTS, RAILINGS AND ADA HANDRAIL,

SEE PRODUCT SCHEDULE ON THIS SHEET.

3. ALL DECK AND RAMP WOOD FRAMING MEMBERS SHALL BE

PRESSURE TREATED #1 HEM FIR.

4. REFER TO DRAWING S-203 FOR DECK JOIST BUTT

CONNECTIONS TO BEAMS, BEAM CONNECTIONS TO OTHER

BEAMS, AND LEDGER CONNECTION DETAILS.

NOTES

11 2X10 WOOD JOISTS AT 16" O.C.

1/2" X 11 3/4" COMPOSITE WOOD FASCIA BOARDS AT ALL

EXPOSED RAMP, STAIR AND DECK VERTICAL SURFACES, TYP.

PROVIDE BLOCKING PER MANUFACTURER SPECIFICATIONS

14 2X FRAMING FOR RAMP COMPOSITE WOOD FASCIA BOARDS,

16" O.C. TYP.

AE-232

4 RAMP SECTION

3/8" = 1'-0"

STAIR D

AE-233

07 07

3 7/8"Spacing 5/8" Baluster

SEE PLAN

2 11/16"End Space

Flat Cap 1¾" x 1-3/8" Top Rail

1¾" x 1¼" Bottom Rail

2"

5 TYPICAL GUARDRAIL SECTION

NTS

4" Base Cap

2" Heavy Duty Post

37-3/8"

42" 43"

DN DN

HIGH POINT AT CONCRETE RAMP. REFER TO CIVIL DRAWINGS

FOR DETAILS.

COMPOSITE FASCIA OVER CONCRETE RAMP, TYP.

NEW ALUMINUM ENTRANCE CANOPY WITH ALUMINUM

POSTS.

05 05

AE-233

15 ALUMINUM POST FOR CANOPY, TYPICAL.

15 15

TYP.

PRODUCT SCHEDULE

MANUFACTURER MODEL NO. SIZE FINISH COLOR REMARKSITEM / LOCATION

ENTRANCE CANOPY /

PUBLIC INFORMATION CENTER

UPSIDE

INNOVATIONS

POWDER COATED WHITESEE PLANS AND

ELEVATIONS

SEE SPEC SEC.

05 51 20

DECK, RAMP AND STAIR BOARDS /

PUBLIC INFORMATION CENTER AND

DIRECTOR'S LODGE

TIMBERTECH

AZEK

WEATHERED TEAK1X6 BOARDSVINTAGE

COLLECTION --

ALUMINUM POSTS, RAILING AND ADA

HANDRAIL /

PUBLIC INFORMATION CENTER AND

DIRECTOR'S LODGE

WESTBURY

ALUMINUM

RAILING

SEE PLANS AND

ELEVATIONS

LIBERTY SERIES

S10

DIGGER

SPECIALTIES

POWDER COATED WHITE

AE-233

AE-117

AE-117

SIM

AE-117

AE-117

AE-117

AE-117

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

DN

6' -6

5'-0"

CONCRETE

LANDING1'-0"

3'-8"

CONCRETE

STAIR

5R @ 6.88" 4T @ 12"

93.90'

90.44'

7' -4

/2

A B 6'-3"

6"

8 1/2"8 1/2"

3' -0

3' -0

" 1'-0"

ALUMINUM CANOPY

ALUMINUM POST

ADA HANDRAIL

GUARDRAIL

91.03'

93.90'

3' -0

1'-0"

1'-0"

3' -0

ADA HANDRAIL

GUARDRAIL

GUARDRAIL

3"

BUILDING LINE

7/

8"

1"

7/

8"

NEW CONCRETE

STEPS

SEE STRUCTURAL DRAWINGS

FOR FOOTING AND

REINFORCEMENT DETAILS

2' -1

1/

2" V

IF

EXISTING

BRICK

MASONRY

BUILDING

1'-0"

SEE STRUCTURAL

DRAWINGS FOR FOOTING

AND REINFORCEMENT

DETAILS

4"4"

EXISTING

GRADE

EXISTING

GRADE

GUARDRAIL

POST, TYP.

GUARDRAIL

POST, TYP.

DN DN

8' -0

N

EW

C

O N

CR

ET

E

LA

N

DI

N G

11'-2"

6R

.9

2"

T

2"

91.05'

A

4' -7

N

EW

C

O N

CR

ET

E

ST

AI

R

93.90'

1' -3

4'-10 1/2"

B

7 8

1' -0

DOWNSPOUT LOCATION

FOR CANOPY

1'-0"

1"

SEE STRUCTURAL DRAWINGS

FOR FOOTING AND

REINFORCEMENT DETAILS

NEW CONCRETE

STEPS AND

LANDING

CONCRETE

SIDEWALK, SEE

CIVIL DRAWINGS

3' -5

/2

" V

IF

A

10 1/2"

B

7/

8"

10 1/2"

SEE STRUCTURAL

DRAWINGS FOR FOOTING

AND REINFORCEMENT

DETAILS

EXISTING GRADE

6"

10 1/2"10 1/2"

4" SQUARE

ALUMINUM CANOPY

POST, STAINLESS STEEL

ANCHORS AND BASE

PLATES SUPPLIED BY

MANUFACTURER

EXISTING BRICK

MASONRY

BUILDING

GWB

EXISTING

MASONRY WALL

10 1/2"

4 1/2"

ALUMINUM

STOREFRONT WITH 1"

LOW-E INSULATED GLASS

VIF

3"

ALUMINUM

CANOPY

CANOPY POST,

SEE 3/AE-233

2"

BUILT IN GUTTER.

PROVIDE DRAINAGE

AT CANOPY POST

A8 ONLY

DN 1/8" PER FT

1'-0"

1/2" EXPANSION JOINT,

PROVIDE BACKER ROD &

SEALANT. REFER TO SPEC

SECTION 07 92 00

NEW CONCRETE

LANDING, SEE

STRUCTURAL

DRAWINGS

13/32"

3/8" X 1 3/16"

13/32"

1/4"

M

IN

. 6

M

IN

. 8 4" un til be ar in g ca pa ci ty is re ac he d

Factory-welded helix with a thickness of 0.5" Steel: CSA G40.21 Galvanization ASTM A123

HELICAL PILE HELIX DIAMETER SHALL BE

PROPORTIONED BY THE MANUFACTURER TO

RESIST 3,500 POUND COLUMN VERTICAL

REACTION, AND SHALL BE MEASURED/ VERIFIED

DURING CONSTRUCTION BY A CERTIFIED

INSTALLER. INCREASE IN HELIX DIAMETER OR

DEPTH AS REQUIRED TO ACHIEVE LOAD CAPACITY,

AT NO ADDITIONAL COST TO THE GOVERNMENT

Pile cap ( see Detail 10 ) UAS-P3

Circular section HSS round outside diameter:

3.5" x 0.3" Steel: ASTM A500 grade C Galvanization ASTM A123

Polyethylene green sleeve

Finish Grade

Basis of Design: Techno Metal Post Helical Piles Model P3-HD.

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

PUBLIC INFORMATION CENTER:

EXTERIOR RAMP & CANOPY

ENLARGED PLANS & DETAILS

AE-233

2001 IK, FW FW

1 ENLARGED STAIR 'A' PLAN

3/8" = 1'-0"

8 STAIR 'A' ELEVATION

3/8" = 1'-0" 7 STAIR 'D' & CANOPY ELEVATION

3/8" = 1'-0"11 STAIR 'A' SECTION

1" = 1'-0"

2 STAIR 'A' SECTION

1" = 1'-0"

AE-233

AE-233

AE-233

9 STAIR 'D' SECTION

1" = 1'-0"

4 ENLARGED STAIR 'D' PLAN

3/8" = 1'-0"

5 STAIR 'D' LANDING SECTION

1" = 1'-0"

4" X 4" X 0.125" CANOPY POST

8"X 8" X 1/2" CANOPY

POST FOOTPLATE

FOOTPLATES SHALL BE

ANCHORED TO CONCRETE

WITH (4) 5/8" X 5" STAINLESS

STEEL CONCRETE ANCHORS

(4) 1/4" GUSSETS

3 CANOPY BASE

NTS

AE-233

AE-233

6 CANOPY AND ENTRANCE DETAIL

1 1/2" = 1'-0"

LVT

EXISTING WOOD

SUBFLOOR, 1/2" MIN., VIF

SCHLUTER VINPRO-S EDGE

TRANSITION STRIP. RUN FULL

LENGTH OF STOREFRONT

OPENING.

BACKER ROD AND

SEALANT, MATCH

LVT COLOR

WALL

BEYOND

2"

EXISTING

MASONRY WALL

ADA COMPLIANT ALUMINUM

RAMP BY NATIONAL GUARD.

COVER LVT EDGE MIN. 2", VERIFY

WIDTH IN FIELD, SUBMIT SHOP

DRAWINGS FOR APPROVAL

10 HELICAL PILE WOOD CONNECTOR

NTS

CANOPY

POSTS

3" DEEP NON-SLIP EXTRUDED

ALUMINUM NOSING STRIP, BLACK.

PROVIDE 'SUPERGRIT' SAFETY

TREADS TYPE 231BF BY WOOSTER

PRODUCTS, OR EQUAL.

WWW.WOOSTER-PRODUCTS.COM

1/2" EXPANSION JOINT

FILL WITH BITUMINOUS

JOINT FILLER

NOTES:

1. BROOM FINISH ON EXPOSED CONCRETE SURFACES

NOTES:

1. BROOM FINISH ON EXPOSED CONCRETE SURFACES

NOTES:

1. BROOM FINISH ON EXPOSED CONCRETE SURFACES

NOTES:

1. BROOM FINISH ON EXPOSED CONCRETE SURFACES

OPENING FOR

WATER DRAINAGE

NOTES:

1. PROVIDE OPENING FOR WATER DRAINAGE AT CANOPY POST A8 ONLY.

DRAIN IN DIRECTION OF CONCRETE LANDING SLOPE.

2. ALL HARDWARE FOR CANOPY AND POSTS TO BE STAINLESS STEEL

INCLUDING ALL SHIMS, WASHERS, ANCHORS, AND ACORN NUTS.

SLOPE DN 1/8"

PER FT

NOTES:

1. BROOM FINISH ON EXPOSED CONCRETE SURFACES

3" DEEP NON-SLIP EXTRUDED

ALUMINUM NOSING STRIP, BLACK.

PROVIDE 'SUPERGRIT' SAFETY

TREADS TYPE 231BF BY WOOSTER

PRODUCTS, OR EQUAL.

WWW.WOOSTER-PRODUCTS.COM

HELICAL PILE WOOD CONNECTOR SHALL BE BY TECHNO METAL POST MODEL

UAS-P3 ADJUSTABLE, OR EQUAL. SIZE: 4" L X 4" W

FIELD-WELD U PLATE ADAPTER TO TOP OF POST. ATTACH TO WOOD BEAM WITH

TWO (2) 2.5"x 3/8"Ø GALVANIZED LAG SCREWS ON EACH SIDE.

HELICAL PILE MODEL IS P3-HD. INSTALL PER MANUFACTURER'S SPECIFICATIONS.

12 HELICAL PILE

NTS

CANOPY

POSTS

AE-233

NOTE: CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR HELICAL PILES,

SEALED BY AN ENGINEER LICENSED IN THE STATE OF NEW YORK.

1/2" EXPANSION

JOINT FILL WITH

BITUMINOUS

JOINT FILLER

1/2" EXPANSION

JOINT FILL WITH

BITUMINOUS

JOINT FILLER

SLOPE DN 1/8"

PER FT

AE-233

SIM.

AE-233

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

PRIME CONSULTANT

107A

107B

107C

B1

C

C

C2

B

4'-11"

B B

B

B B

4'-11"

5'-0"

2'-6" 2'-6"

AE-321W E

S

AE-321W

N

E

S

A3

3' -1

13 4"2' -8

3 4" 2'

-8 3 4"

2' -8

3 4" 2'

-8 3 4"

5' -0

2' -1

6' -0

A1

A3A1

A2 A2 03 03

03 03

03 03

05 05

A8 A8

A8 A8

A8

A8

A8

A8

B3 B1

E

F

E E E

E1

01 01

A14

A15

A15

05 B

A7

A6

A6

A6

A7

A7

A11

A4 A4

A4

A4

A4 A4

A4

A4

A14A14

N

KIOSK CL

JANITOR

WOMEN

LOBBY

MEN

MECH

MECH.

PORTICO

A13

3' -0

3'

-0

A11

A7

A10

A15

A15

3' -0

A6 A6 A6

AE-331

AE-331

AE

-3

AE

-3

N

S

AE-321

10'-111 2"

A10

A10

A10 A10

A10

06 06

6' -1

1"

4'-0"

5'-01 4"

1' -6

"71 2"

5'-2"

FD

F

E

C1

C4

B1

E

B

1'-9" 2'-11"

1' -9

2'

-3

1'-9" 5'-1"

2' -6

2'

-1 1"

4' -1

3'-0"

A10A10

4' -1

3'-0"

C2

A9

A9

A9

A9

A9

10'-4"

5' -2

E

4'-111 2"

'-5

1 2"

'-1

0"

4'-111 2"

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

PUBLIC RESTROOMS:

FLOOR PLAN

AE-311

1 FLOOR PLAN

1/2" = 1'-0"

0 1' 2' 4' 8'

03 NEW TOILET: WALL-MOUNTED, SEE PLUMBING DRAWINGS.

04 NEW UTILITY/SERVICE SINK: SEE PLUMBING DRAWINGS.

INSTALL 6" X 6" CERAMIC TILE IN JANITOR CLOSET 105 TO 24"

ABOVE FINISHED FLOOR WITH BULLNOSE TILE AT TOP

COURSE. COLOR: DALTILE COLORWHEEL CLASSIC

ARCHITECTURAL GRAY 0109.

05 NEW SINK: UNDER-MOUNT, SEE PLUMBING DOCUMENTS.

WINDOW TAG: SEE WINDOW SCHEDULE

XXX DOOR TAG: SEE DOOR SCHEDULE AE-802

X

CX

AX

XX EQUIPMENT TAG: SEE EQUIPMENT SCHEDULE

RESTROOM ACCESSORY TAG: SEE RESTROOM ACCESSORY

PARTITION TAG: SEE PARTITION TYPE SCHEDULE AE-804

LEGEND / KEYNOTES

NEW URINAL: WALL-MOUNTED, SEE PLUMBING DRAWINGS.

NEW ELECTRIC WATER COOLER: ADA-COMPLIANT "HI-LO"

TYPE, WALL-MOUNTED, WITH BOTTLE FILL, SEE PLUMBING

DRAWINGS.

06 REPLACE 4x4 COLUMNS AND BASE TRIM ON EACH OF TWO

(2) COLUMNS, SEE DETAIL ELEVATION ON SHEET AE-801. SEE

ALSO NOTE 09 BELOW FOR SIDEWALK COORDINATION.

07 ALIGN FINISH EDGE OF NEW PARTITION FLUSH WITH EDGE

OF ADJACENT EXISTING CONSTRUCTION.

08 SEE NEW GRAVESITE LOCATOR KIOSK DETAIL 3 ON SHEET

AE-312. REFER TO MANUFACTURER SPECS, ELECTRICAL AND

TELECOM DOCUMENTS FOR FURTHER INFORMATION.

KEYPLAN

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

NOT TO SCALE

09 INSTALL NEW AT-GRADE CONCRETE SLAB AT FRONT ENTRY.

SEE DETAILS 10 & 11 ON S-203. SEE LANDSCAPE DRAWINGS

FOR ADJOINING SIDEWALK WORK.

FW, IK MS

10 INSTALL NEW CONCRETE EQUIPMENT PADS AT INTERIOR

AND EXTERIOR AS SHOWN. SEE MECHANICAL AND

STRUCTURAL DRAWINGS FOR MORE INFORMATION.

INSTALL 2 CONCRETE SPLASH BLOCKS AT NEW CONDENSATE

DRAINS, SEE MECHANICAL DRAWINGS.

11 MODIFY EXISTING CONCRETE EQUIPMENT PAD, SEE

MECHANICAL DRAWINGS FOR REQUIRED SIZE. GRIND AND

PATCH EXISTING CONCRETE FLOOR SMOOTH AND SEAL.

NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZARDOUS

MATERIALS NOTES FOR THIS PROJECT, TYPICAL.

2. ABANDON EXISTING RADIATOR PIPES AND CAP.

ABANDONED PIPE SHALL NOT BE VISIBLE, PATCH FLOOR,

WALL, CEILING AND TRIM HOLES AS REQUIRED. SEE

MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

3. SEE WINDOW SCHEDULE, DOOR SCHEDULE, PARTITION

TYPES, FINISH SCHEDULE, RESTROOM ACCESSORIES

SCHEDULE AND EQUIPMENT SCHEDULE ON SHEETS AE-802,

AE-803, AE-804 AND AE-805.

4. SEE WINDOW DETAIL ON AE-803 FOR WINDOW DETAILS AT

ALL TILE WALLS, TYP. SEE WINDOW DETAIL ON AE-804 FOR

WINDOW DETAILS AT GWB WALLS.

12 INSTALL 2x4 WD. STUD INFILL FRAMING, BATT INSULATION

AND GWB ON INTERIOR, PATCH AND PAINT PREVIOUS

EQUIPMENT OPENING. INSTALL EXTERIOR SHEATHING AND

WATERPROOFING AND INFILL BRICK TO MATCH EXISTING.

13 NEW 4X4 STRUCTURAL COLUMN FOR NEW STEEL CHANNEL

TO SUPPORT CEILING HUNG TOILET PARTITIONS. REFER TO

STRUCTURAL DRAWINGS. SEE DETAIL 6/AE-312.

13 13

14 TILE RETURNS AT INTERIOR HEAD, JAMB AND SILL. SEE

DRAWINGS 3, 4 & 5 ON AE-803 FOR DETAILS.

SIGNAGE SCHEDULE - PUBLIC RESTROOM BUILDING

TAG DESCRIPTION NCA SIGN GUIDE

REFERENCE SIZE BACKGROUND COLOR TEXT COLOR ROOM ID

01 ADA/ABA COMPLIANT MEN'S

RESTROOM SIGN NC-15.01 6" W X 8" H SHIPYARD GRAY WHITE

02 ADA/ABA COMPLIANT WOMEN'S

RESTROOM SIGN NC-15.02 6" W X 8" H SHIPYARD GRAY WHITE

03 ADA/ABA COMPLIANT PRIMARY

ROOM IDENTIFICATION NC-14.01 6" W X 8" H SHIPYARD GRAY WHITE JANITOR'S CLOSET

04 ADA/ABA COMPLIANT PRIMARY

ROOM IDENTIFICATION NC-14.01 6" W X 8" H SHIPYARD GRAY WHITE MECHANICAL ROOM

05 ADA/ABA COMPLIANT PRIMARY

ROOM IDENTIFICATION NC-14.01 6" W X 8" H SHIPYARD GRAY WHITE MECHANICAL ROOM

06 ADA/ABA COMPLIANT PRIMARY

ROOM IDENTIFICATION NC-14.01 6" W X 8" H SHIPYARD GRAY WHITE EQUIPMENT ROOM

NOTE: REFER TO US VETERANS AFFAIRS NATIONAL CEMETERY SIGNS GUIDELINES PUBLISHED 12/2012

06 03

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

B B B B

D

D

B

B A

A A

A

A

C

CC

D

D

E E

E

D

B

B

B

B

BB

B

B B B

CH = 8'-0"

CH = 8'-0"

CH = 8'-0"

CH = 8'-0"

CH = 8'-0"

CH = +/- 8'-1"

CH = +/- 8'-1"

JANITOR

WOMEN

MEN

MECH.

MECH.

PORTICO

CH = 7'-6"

LOBBY103

KIOSK CL

EQ

EQ

5'-8"EQ. EQ.

3' -0

3'

-0

EQ

EQ

4'-1 1/4"

2' -8

5' -8

5'

-8

2' -6

/4

5'

-1

/4

5' -1

/4

3'-4 3/4" 2'-0"

5'-0"

2'-6"

3' -3

7'-9 1/2"

6' -6

EQ. EQ.

EQ

EQ

8'-1 1/4"

2' -8

/4

"8' -8

2'-0"

DSDS

DSDS

6"

2" GWB

NEW CEILING JOIST FRAMING

AND R-38 BATT INSULATION

THROUGHOUT

2" GWB

UNDERSIDE OF STRUCTURE

INSTALL NEW 2X6

BRIDGING @ 24" O.C.

3 -1/2" STEEL

FRAMING @ 24" O.C.

8"

8" CERAMIC TILE

AS SCHEDULED

NEW CEILING JOISTS

W/ NEW R-38 BATT

INSULATION IN

ENTIRE ATTIC

3 -1/2"

STEEL FRAMING

2" GWB

CEILING

PARABOLIC LOUVER-

PARACUBE, IV

W/ SUPPORT ANGLES

AT PERIMETER

GWB CONTINUOUS TO

CORNER; THEN FRAME COVE

INSTALL 2X6 BLOCKING BETWEEN

CEILING JOISTS @ 24" O.C.

13 4"±

CEILING HUNG TOILET

PARTITION ASSEMBLY

HUNG FROM STEEL BEAM;

SEE STRUCTURAL DWGS

AND MFR'S DETAILS

COLUMN BEYOND

2X BLOCKING

& BRACING @

24" O.C.

PARTITION

AS SCHEDULED

D

B

C

A

E

6" DIA. LED RECESSED

DOWNLIGHT

LED STRIP LIGHT

4" DIA. LED RECESSED

DOWNLIGHT

WALL MOUNTED

LED SCONCE

2X2 SURFACE MOUNTED

LED FIXTURE

CH = #'-#" CEILING HEIGHT

JANITOR

WOMEN

MEN

MECH.

MECH.

PORTICO

12 X 12 CT 12 X 12 VCT

12 X 12 CT 12 X 12 VCT

12 X 12 VCT

TILE START

POINT

LOBBY103

KIOSK CL

12 X 12 CT

CERAMIC TILE FLOOR

CONTINUES UNDER COUNTER

TOP TO WALL, TYPICAL

CERAMIC TILE FLOOR

CONTINUES UNDER

COUNTER TOP TO

WALL, TYP.

CERAMIC TILE FLOOR

CONTINUES UNDER ALL

CHANGING STATIONS,

URINALS & TOILETS TO

WALLS, TYPICAL

TILE START POINT TILE START POINT

EXISTING FLOOR

DRAIN TO REMAIN

8' -8

2'-0"

ROUGH

OPENING

45- 12" H 27- 12" W

MOUNTING- (6) #12

WOOD SCREWS (SIDES

& BOTTOM)

WALL AS SCHEDULED; FRAME

ALL 4 SIDES. ADD EXTRA

SUPPORT FRAMING IF REQ'D

(1) 110V GFCI AND RJ-45 JACK

(CAT 6e) WITHIN 4' OF ROUGH

OPENING

BOTTOM OF ROUGH

OPENING 25-1/2"

ABOVE FLOOR LEVEL

3" BORDER AROUND ROUGH

OPENING MUST BE FLAT TO

ALLOW FOR KIOSK SURROUND

BEZEL

2'-1" ±

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

PUBLIC RESTROOMS:

CEILING, ROOF &

FINISH PLANS

AE-312

0 2' 4' 8' 16'

1 REFLECTED CEILING PLAN

1/4" = 1'-0"4 ROOF PLAN

1/4" = 1'-0"

LEGEND / KEYNOTES

NEW 1/2" GWB CEILING ATTACHED TO UNDERSIDE OF NEW

CEILING JOISTS. PAINT PER FINISH SCHEDULE, SHEET AE-805.

INSULATE ENTIRE ATTIC WITH NEW R-38 BATT INSULATION.

04 FOR GRAVESITE LOCATOR KIOSK, OBTAIN CURRENT SPECS

AND INSTALLATION MANUAL FROM NCA, COORDINATE

WITH COR. SEE ELECTRICAL DOCUMENTS FOR MORE

INFORMATION. LOCATE IN KIOSK CLOSET 103, SEE SHEET

AE-311.

SLOPE

DN

SLOPE

DN

SLOPE

DN

SLOPE

DN

SLOPE

DN

SLOPE

DN

01 01

01 01

NEW GWB SOFFIT, SEE DETAIL 5, THIS SHEET, PAINT PER

FINISH SCHEDULE, SHEET AE-805.

5 SOFFIT DETAIL

1" = 1'-0"

6 COVE LIGHT & CEILING BEAM DETAIL

1" = 1'-0" 2 FINISH PLAN

1/4" = 1'-0"

SLOPE

DN

3 GRAVESITE LOCATOR DETAIL

1" = 1'-0"

03 FRAME AND INSTALL NEW ATTIC ACCESS PANEL, MINIMUM

CLEAR OPENING SIZE SHALL BE 30" x 30". COORDINATE

WITH MECHANICAL DRAWINGS FOR LOCATION. FRAME

OPENING WITH HEADERS AND APPROVED JOIST HANGERS.

SEE DETAIL 3/AE-212.

05 LIGHTNING PROTECTION SYSTEM: NEW, SEE ELECTRICAL

DOCUMENTS FOR DETAILS.

06 PROVIDE CERAMIC TILE TRANSITION THRESHOLD AT DOOR

AND CHANGE OF FLOOR MATERIAL, TYPICAL. DO NOT

EXCEED 1/4" VERTICAL.

KEYPLAN

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

NOT TO SCALE

FW MS, JP

AE-312

AE-312

07 INSTALL ALL NEW GUTTERS AND DOWNSPOUTS, SEE

ELEVATIONS ON SHEET AE-331.

08 INSTALL NEW ROOF CURB AND EXHAUST FAN, SEE ROOF

CURB DETAIL ON SHEET AE-800. SEE MECHANICAL

DRAWINGS AND SPECIFICATIONS.

09 INSTALL ALL NEW ASPHALT SHINGLE ROOFING AND

UNDERLAYMENT PER SPECIFICATIONS AND DETAILS ON

SHEET AE-801. SEE ELEVATIONS ON SHEET AE-331, INSTALL

NEW CAMERA BRACKET AND MAST-POLE. COORDINATE

RELOCATION AND RE-INSTALLATION OF TWO (2) EXISTING

CAMERAS WITH COR.

AE-312

BASIS OF DESIGN IS 'BEST ACCESS DOORS' SKU: BA-PFI FIRE

RATED INSULATED ACCESS DOOR, OR APPROVED EQUAL.

10 REPAIR AND INFILL ROOF WHERE CHIMNEY WAS REMOVED.

SEE DETAIL 9 ON SHEET AE-801.

DS DOWNSPOUT

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

2' -8

3'

-0

7"-9"

1' -5

1'

-2

4' -7

01 01 01 01 01

A5

A4 A9

A1

A3 A10

A8

3' -4

3'

-1 0"

2' -3

A10 A10 A10 A10

3 X 6 SUBWAY TILES3 X 6 SUBWAY TILES3 X 6 SUBWAY TILES

A15

39"-41"

2' -1

0"

A7.1 A7.1

A11

AE-801

05 05

A6.1

A6.1A6.1A6.1

03 03

TILE START POINT

TILE START POINT

TILE START POINT

ACCENT TILES, SEE FINISH SCHEDULE

ACCENT TILES, SEE FINISH SCHEDULE

WINDOW

PRIVACY

FILM AS

SCHEDULED, F-1

1"

WINDOW PRIVACY

FILM AS SCHEDULED, F-1

A4

A15

1' -7

A6.1

A5

03 03 03

2' -0

2' -3

A11 A14

A14 A14 A14

A4

A1

A3

A15

3' -0

1"

3 X 6 SUBWAY TILES 3 X 6 SUBWAY TILES 3 X 6 SUBWAY TILES

1' -5

7"-9"

A7

A8 A8

NOT ALL RESTROOM

ACCESSORIES ARE SHOWN

HERE, SEE FLOOR PLANS

FOR MORE INFORMATION, TYPICAL

A7.1

AE-801

2' -0

A6.1

A6.1A6.1

TILE START POINT TILE START POINT TILE START POINT

02 02

3"

6' -0

6"

TY

PI

CA

L

AC

CE

N T

TI

LE

D

IM

S

ACCENT TILES, SEE

FINISH SCHEDULE

39" - 41"

WINDOW PRIVACY

FILM AS

SCHEDULED, F-1

01 01 01

2' -1

0"

A11

1' -5

A4

A9

A15

12 X 24 WALL TILES 3 X 6 SUBWAY TILES12 X 24 WALL TILES

A10 A10 A10

FOR SCHLUTER TILE

END CONDITION DETAILS

AT TYPICAL WINDOW HEAD, JAMB

AND SILL SEE SHEETS AE-803 & 804

A8

TOILET NOT SHOWN HERE FOR

CLARITY - SHOWING MOUNTING

OF RESTROOM ACCESSORIES

3' -3

AE-312

TILE START POINT TILE START POINT TILE START POINT

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

PUBLIC RESTROOMS:

INTERIOR ELEVATIONS

AE-321

1 WOMEN'S RESTROOM- INTERIOR ELEVATIONS

1/2" = 1'-0"

LEGEND / KEYNOTES

EAST SOUTH WEST

2 MEN'S RESTROOM- INTERIOR ELEVATIONS

1/2" = 1'-0"

NORTH EAST SOUTH

3 MEN'S RESTROOM- INTERIOR ELEVATION

1/2" = 1'-0"

NEW TOILET:

WALL-MOUNTED, SEE PLUMBING DOCUMENTS.

AX

XX EQUIPMENT TAG: SEE EQUIPMENT SCHEDULE - SHEET AE-805

RESTROOM ACCESSORY TAG: SEE RESTROOM ACCESSORIES

SCHEDULE ON SHEET AE-805

NEW URINAL:

WALL-MOUNTED, SEE PLUMBING DOCUMENTS.

NEW SINK : UNDER MOUNTED, SEE PLUMBING DOCUMENTS.

04 INSTALL NEW ELECTRIC WATER COOLER : ADA-COMPLIANT

"HI-LO" TYPE WITH BUBBLER AND BOTTLE FILLER, WALL

MOUNTED, SEE PLUMBING DOCUMENTS. COORDINATE

MOUNTING OF REMOTE CHILLER WITH OTHER TRADES.

WESTNORTH

4 WOMEN'S RESTROOM- INT. ELEV.

1/2" = 1'-0"6 LOBBY- INTERIOR ELEVATION

1/2" = 1'-0"

NORTHSOUTH

5 LOBBY- INTERIOR ELEVATION

1/2" = 1'-0"

FW MS, JP

05 INSTALL NEW CEILING-HUNG TOILET PARTITIONS AND

WALL-MOUNTED URINAL SCREENS AS SCHEDULED ON SHEET

AE-805. SEE DETAIL 6 / AE-312, STRUCTURAL DRAWINGS

AND MANUFACTURER'S SHOP DRAWINGS FOR STEEL BEAM

AND WOOD COLUMN SUPPORT DETAILS. INSTALL PER

MANUFACTURER'S STANDARD ELEVATIONS, DETAILS AND

INSTRUCTIONS. INSTALL ALL REQUIRED BLOCKING IN

PARTITIONS, BRACKETS, BOLTS, CROSS-BRACES, PULLS,

STRIKES, HINGES, BUMPERS AND RELATED HARDWARE. SEE

SPECIFICATION SECTION 10 21 13 - TOILET COMPARTMENTS.

SUBMIT MATERIAL SAMPLES TO COR FOR COLOR SELECTION

AND APPROVAL.

06 INSTALL SOLID SURFACE COUNTERTOPS AND PLASTIC

LAMINATE KNEE PANELS AS SHOWN. SEE DETAIL 7 / AE-801

AND FINISH SCHEDULE ON SHEET AE-805.

07 INSTALL SOAP DISPENSER SYSTEM WITH COUNTERTOP

MOUNTED SOAP PUMP SPOUTS AS SHOWN. INSTALL PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS, SEE

RESTROOM ACCESSORY SCHEDULE ON SHEET AE-805.

SYSTEM SHALL MOUNT UNDER COUNTERTOP AND BE

SUPPORTED BY 3/16" STEEL STOCK ANGLE BRACKETS

ANCHORED INTO SOLID WOOD BLOCKING AT PARTITION OR

P.LAM END PANEL CONDITION WITH NO EXPOSED FASTENERS.

NOTES

1. SEE AE-906 AND AE-805 FOR INTERIOR FINISHES INFORMATION

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

- 8

'-1

- 3

'-9 1 4"

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

PUBLIC RESTROOMS:

EXTERIOR ELEVATIONS

AE-331

1 SOUTH ELEVATION

1/4" = 1'-0"

PREP AND PAINT ALL STEEL LINTELS, INSTALL NEW

WINDOWS, BLOCKING, FLASHING AND TRIM. SEE SCHEDULE

AND DETAILS ON SHEETS AE-804 AND AE-803.

INSTALL NEW DOORS, FRAMES & HARDWARE, SEE SHEETS

AE-802 AND AE-803 FOR SCHEDULE AND DETAILS.

INSTALL NEW ROOFING PER SPECIFICATIONS AND DETAILS

ON SHEET AE-801. REMOVE AND REPLACE UP TO 288 S.F.

OF PLYWOOD ROOF SHEATHING WHERE EXISTING PANELS

ARE SOFT OR DAMAGED.

INSTALL NEW 5" K-STYLE ALUMINUM GUTTERS AND 3X4

DOWNSPOUTS. POWDER COATED FINISH, COLOR: SHERWIN

WILLIAMS ANODIZED MEDIUM BRONZE EVDF

ARCHITECTURAL METAL COATINGS, OR EQUAL. PROVIDE

CONCEALED STAINLESS STEEL FASTENERS THROUGHOUT.

4 EAST ELEVATION

1/4"=1'-0"

3 NORTH ELEVATION

1/4" = 1'-0"

2 WEST ELEVATION

1/4" = 1'-0"

KEYNOTES

04 05 04

INSTALL NEW 4x4 P.T. WOOD COLUMNS, 1x TRIM AND 1x6

BASE TRIM. MATCH EXISTING DIMENSIONS, PAINT COLOR:

P-11, SEE AE-805 FINISH SCHEDULE. SEE DETAIL 8, SHEET

AE-801.

SCRAPE, CLEAN AND PAINT EXISTING VENTS, RAKE BOARDS,

FASCIA BOARDS AND TRIM. COLOR: P-11, SEE FINISH

SCHEDULE AE-805.

07 AT PREVIOUS CHIMNEY OPENING: INSTALL NEW ROOF

FRAMING, PLYWOOD SHEATHING AND ROOFING.

FW MS, JP

INSTALL NEW CONCRETE MECHANICAL EQUIPMENT PADS

PER MECHANICAL DRAWINGS AND SPECIFICATIONS.

REPLACE ANY BRICK DAMAGED DURING CUTTING FOR

MECHANICAL EQUIPMENT DRAINS AND PIPES. CAULK

SOFFIT AND BRICK WHERE DRAINS AND PIPES PENETRATE

FACADE. INSTALL 2 SPLASH BLOCKS AS SHOWN.

0 2' 4' 8' 16'

SEE MECHANICAL DRAWINGS FOR EXHAUST FLUE TYPE AND

INSTALLATION. INSTALL THRU-WALL METAL SLEEVE PER

SPECIFICATIONS, SEAL BOTH SIDES OF WALL. INSTALL

BACKER ROD AND SEALANT AT BRICK. REPAIR, PREP AND

PAINT EXISTING TRIM.

INSTALL EXHAUST FAN PER MECHANICAL DRAWINGS AND

SPECIFICATIONS. SEE ROOF CURB AND FLASHING DETAIL ON

SHEET A-800.

DISCONNECT EXISTING CAMERA MAST-POLE AND SUPPORT

STRAPS AND RELOCATE AS DIRECTED BY COR DURING ROOF

REPAIR WORK. CAMERAS TO REMAIN IN OPERATION AT ALL

TIMES DURING CONSTRUCTION. INSTALL CAMERAS ON NEW

ROOF BRACKET AND MAST POLE, BASIS OF DESIGN IS BAIRD

MOUNTING SYSTEMS MODEL # SSRM-190X5 OR

EQUIVALENT. COORDINATE WITH COR. MAINTAIN 5 FEET

MINIMUM DISTANCE FROM MAST POLE TO EXHAUST FAN.

MAXIMUM OFFSET FROM EXISTING MAST POLE LOCATION IS

10 FEET. EXTEND CAMERA CABLES AS REQUIRED.

INSTALL PER MANUFACTURER'S INSTALLATION

INSTRUCTIONS AND DETAILS.

INSTALL OUTSIDE AIR LOUVER PER MECHANICAL DRAWINGS

AND SPECIFICATIONS. REMOVE PORTION OF EXISTING

WALL, BRICK, FASCIA AND TRIM BOARDS, PATCH AND PAINT

TO MATCH EXISTING. INSULATE CAVITY AND INSTALL

BACKER ROD AND SEALANT, PATCH AND PAINT EXISTING

INTERIOR WALL.

13 INSTALL NEW AT-GRADE CONCRETE SLAB AT FRONT PORCH.

SEE DETAILS 10 & 11 ON SHEET S-203.

AT PREVIOUS EQUIPMENT OPENING: INFILL WALL CAVITY

WITH WOOD STUD FRAMING, BATT INSULATION, GWB,

EXTERIOR SHEATHING, WATERPROOFING BARRIER AND

BRICK INFILL TO MATCH EXISTING CONSTRUCTION.

TYPICAL CONSTRUCTION NOTES

1. SEE SHEET A-001 FOR ALL GENERAL NOTES FOR THIS PROJECT,

TYPICAL.

2. PAINT ALL EXTERIOR DOORS, DOOR / WINDOW FRAMES,

WOOD TRIMS, WOOD POSTS AND EXPOSED STEEL LINTELS.

COLOR: P-11, SEE FINISH SCHEDULE AE-805.

PAINT PORTICO CEILING P-11.15

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

101A

BAY 2

STORAGE

PARTS

HALLWAY

FERTILIZER

OFFICE

BAY 3

BAY 4

BAY 1

108A

BAY 5

101A

101B

103B 103A

105 107A

107C

108A 108B107B

EXISTING. N.I.C.

01C

A1

A1

09 11

091010

09 10

1212 12

10 10 10

C

CCCC

F

1'-6" 4' -0

1'-0"

4' -0

1' -0

4'-0"

AE-431W

N

E

S

AE-431

N

E

S

AE-431

N

W

E04

E05

E06

E04E03E02

E01 E01 E01

07 07

A1

D

4'-1"

2' -2

3' -1

3'-8"

E07

E03

E03

E07 E07 E07

E03

E06

E06

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

MAINTENANCE BUILDING:

FLOOR PLAN

AE-411

1 FLOOR PLAN

1/4" = 1'-0"

0 2' 4' 8' 16'

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZMAT

NOTES FOR THIS PROJECT, TYPICAL.

2. SEE FINISH SCHEDULE ON SHEET AE-805 FOR ALL WALL,

CEILING AND FLOOR FINISHES.

3. SEE EQUIPMENT SCHEDULE ON SHEET AE-805.

4. SEE SHEETS AE-802 THRU AE-804 FOR WINDOW AND DOOR

SCHEDULES AND PARTITION TYPES. SEE WINDOW DETAIL

ON AE-804 FOR WINDOW DETAILS AT NEW WINDOWS.

INSTALL NEW CONCRETE SLAB INFILL: CUT ANCHOR BOLTS

FROM REMOVED LIFT BELOW TOP OF SLAB; FILL HOLES,

REPAIR AND LEVEL FLOOR.

WINDOW TAG: SEE WINDOW SCHEDULE - SHEET AE-804

XXX DOOR TAG: SEE DOOR SCHEDULE - SHEET AE-802

X

CX

XX EQUIPMENT TAG: SEE EQUIPMENT SCHEDULE - SHEET AE-805

PARTITION TAG: SEE PARTITION SCHEDULE - SHEET AE-804

02 BLOCKING: INSTALL 2x4 FRT WOOD CENTERED @ 48" A.F.F., 72" A.F.F. & 96" A.F.F. IN NON-MASONRY WALLS. REMOVE, REPLACE, PATCH & PAINT EXISTING GYP. BD. AS REQUIRED.

03 BLOCKING: INSTALL 2x4 FRT WOOD CENTERED @ 48" A.F.F., 72" A.F.F. & 96" A.F.F. BOLTED TO MASONRY WALLS.

04 REINSTALLED GOVERNMENT FF&E: ALL EXISTING FF&E SHALL

BE TEMPORARILY STORED IN PROTECTED LOCKED

INTERMODAL CONTAINER(S) ON-SITE AND RE-INSTALLED

AFTER CONSTRUCTION IS COMPLETE. THIS INCLUDES ALL 'E#'

EQUIPMENT, PRESSES, TOOL BOXES, RACKS, WORK BENCHES

AND OTHER SHOP FF&E. PROTECT EXISTING VEHICLE SERVICE

LIFT AND HOSE REELS IN-PLACE WITH POLYSHEETING.

05 INFILL WALL LOCATION OF REMOVED AIR CONDITIONING

UNIT WITH CMU BLOCK MASONRY AND BRICK TOOTHED-IN

TO MATCH EXISTING CONDITIONS. PAINT NEW CMU BLOCK

WITH MASONRY SEALING DRYLOK WATERPROOFER BEFORE

APPLYING FINAL PAINT FINISH.

06 EXISTING EMERGENCY EYEWASH STATION TO REMAIN.

PROTECT FROM DAMAGE DURING WORK.

07 NEW MECHANICAL EQUIPMENT, SEE MECHANICAL

DOCUMENTS. INSTALL CONCRETE EQUIPMENT PAD.

08 INSTALL NEW FRAMING AND GWB TO RECEIVE NEW DOOR

AND FRAME AT NEW LOCATION. SEE DOOR SCHEDULE ON

SHEET AE-802.

FW MS

AREA OF WORK

/ KEYNOTES

09 INSTALL NEW BACKER RODS AND SEALANT IN THREE (3)

VERTICAL CONTROL JOINTS IN EXISTING MASONRY WALL.

TOTAL: 36 LINEAR FEET. ROUT, REPAIR AND REPOINT 3

LINEAR FEET OF MORTAR JOINTS AT CMU BLOCK.

NOTES

10 INSTALL NEW BACKER ROD AND SEALANT IN ONE (1)

VERTICAL CONTROL JOINT IN EXTERIOR BRICK WALL.

AE-423

AE-423

AE-423

AE-423

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

101A

BAY 2

STORAGE

PARTS

HALLWAY

FERTILIZER

OFFICE

BAY 3

BAY 4

BAY 1

108A

BAY 5

EXISTING. N.I.C.

02 02 02

03 TYPICAL

THIS ROOM03 TYPICAL

THIS ROOM

03 TYPICAL

THIS ROOM

03 TYPICAL

THIS ROOM

03 TYPICAL

THIS ROOM

05 05 05

08 08

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

MAINTENANCE BUILDING:

REFLECTED CEILING PLAN

AE-421

1 REFLECTED CEILING PLAN

1/4" = 1'-0"

0 2' 4' 8' 16'

NEW LIGHT FIXTURE OR RE-LAMPING OF EXISTING FIXTURE:

SEE ELECTRICAL DOCUMENTS.03

NEW OVERHEAD COILING GARAGE DOOR AND HOUSING.

COLOR: WHITE.

01 EXISTING ATTIC ACCESS OPENING TO REMAIN. INSTALL NEW

ACCESS DOOR AND TRIM. PAINT TO MATCH CEILING.

04 EXISTING AND NEW MECHANICAL EQUIPMENT, PROTECT

FROM DAMAGE. SEE MECHANICAL DOCUMENTS.

05 NEW MECHANICAL EQUIPMENT, SEE MECHANICAL

DOCUMENTS.

06 REMOVED EXISTING OVERHEAD SHELVING: SEE

DEMOLITION FLOOR PLAN. PATCH AND PAINT TO MATCH

WHERE ADJACENT WALLS WERE DAMAGED.

07 EXISTING VEHICLE LIFT TO REMAIN, PROTECT FROM

DAMAGE.

08 EMERGENCY LIGHTING EQUIPMENT AND EXIT SIGNAGE: SEE

ELECTRICAL DOCUMENTS. (NOT ALL DEVICES SHOWN HERE)

1501 FW MS

09 INSTALL NEW 5/8" FRT PLYWOOD CEILING PANELS IN ENTIRE

ROOM. REPLACE ALL INSULATION. PATCH AND PAINT

CEILINGS IN ALL OTHER ROOMS. FOR PAINT COLOR SEE

FINISH SCHEDULE ON SHEET AE-805.

/ KEYNOTES

AREA OF WORK

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

02 02

05 05 05 05

EXISTING. N.I.C.

(TYPICAL)(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL)

(TYPICAL) (TYPICAL)

(TYPICAL)

LEGEND

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Final Construction Documents - Issued for Construction

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

KEYKEYKEYKEYKEYKEY

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

NOT TO SCALE

KEY

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2H2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

3B

2X

2Z2Y

2W 3D

2S

2R

2Q

2D

3F

3C

2U

2T

2M

2K

H

J

C

D

N

O

M L

K A

B

G

F

2L

2P2N

2J

2E2G

2E2G

R

Q

P

Y Z

2A

X

V

T

US

2C

2B

2VW

3A

DSSE 3E

MAINTENANCE BUILDING:

ROOF PLAN

AE-422

1 ROOF PLAN

1/4" = 1'-0"

0 2' 4' 8' 12'

INSTALL NEW GUTTERS, DOWNSPOUTS AND SPLASH BLOCKS.

IF EXISTING RECEPTOR DRAIN OCCURS AT GRADE: TIE

DOWNSPOUT INTO RECEPTOR. INSTALL PVC ADAPTER,

ANCHOR TO WALL AT BASE, OR FLEX ADAPTER WITH BAND

CLAMPS. CONNECTION SHALL BE WATER-TIGHT. SNAKE

AND FLUSH STORM PIPE RECEPTOR DRAINS.

INSTALL NEW ASPHALT SHINGLES AND ROOFING

UNDERLAYMENT PER SPECIFICATIONS. REPLACE RAKE

BOARDS, TRIM, SOFFITS AND ROOF STEP FLASHING AS

SHOWN AND NOTED ON ELEVATIONS, SHEET AE-423 AND

DETAILS ON SHEET AE-801.

EXISTING EXHAUST FAN TO REMAIN.03

INSTALL NEW ROOF CURBS AND EXHAUST FANS PER DETAIL 1

ON SHEET AE-800. COORDINATE WITH MECHANICAL

DOCUMENTS.

05 LIGHTNING PROTECTION SYSTEM: EXISTING, SEE

ELECTRICAL DOCUMENT E-003 FOR DETAILS AND SYSTEM

REQUIREMENTS.

/ KEYNOTES

3001 FW MS

AE-801

AE-801

(TYPICAL)

AE-801

AE-801

AE-800

1. SEE SHEET A-001 FOR ALL GENERAL NOTES AND HAZMAT

NOTES FOR THIS PROJECT, TYPICAL.

NOTES

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

Revisions Date

Drawing Title Project Title

Drawn

Location

Date

4 5 6 7 8 9

1 4 7 9

A B

C D

F

B D

E F

NATIONAL

CEMETERY

ADMINISTRATION

Approved:

Approved:

Building Number Checked

Project No.

DRAWING NO.

Dwg. Of

1 2

2 3 5 6 8

E

A C

© COPYRIGHT 2023, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

May 22, 2023

Fi…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .